Loading...
HomeMy Public PortalAbout16272 Coldwater Creek OMCI Stormwater Design (2024) (Contract A) (12462)O R D I N A N C E NO.16272 AN ORDINANCE, making an appropriation of Three Hundred Twenty Thousand Dollars ($320,000.00) from the Operations, Maintenance, Construction, and Improvement Fund of Coldwater Creek to be used for design in Coldwater Creek OMCI Stormwater Design (2024) (Contract A) (12462) in the Cities of Calverton Park and Overland, Missouri; and authorizing the Executive Director and Secretary-Treasurer on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53058 with Tepa Engineering Services, LLC for design. WHEREAS, the Director of Finance has certified that there is an unencumbered balance in the above-named fund sufficient to pay the obligation authorized herein. NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT: Section One. The sum of Three Hundred Twenty Thousand Dollars ($320,000.00) is hereby appropriated from the Operations, Maintenance, Construction, and Improvement Fund of Coldwater Creek to be used for design in Coldwater Creek OMCI Stormwater Design (2024) (Contract A) (12462) in the Cities of Calverton Park and Overland, Missouri. Section Two. The Executive Director and Secretary-Treasurer are hereby authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Contract No. 53058 with Tepa Engineering Services, LLC for design in Coldwater Creek OMCI Stormwater Design (2024) (Contract A) (12462) in the Cities of Calverton Park and Overland, Missouri; and said contract shall be comprised of such other terms and conditions as are approved by the Office of the General Counsel of the District. The Foregoing Ordinance was adopted January 11, 2024