HomeMy Public PortalAbout16316 SCADA System Upgrade (13467)O R D I N A N C E NO.16316
AN ORDINANCE, making a supplemental appropriation of One Million Dollars
($1,000,000.00) from the Sanitary Replacement Fund to be used for planning, design, and
engineering during construction phase services in SCADA System Upgrade (13467) at various
locations within the District; and authorizing the Executive Director and Secretary-Treasurer on
behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 3 to Contract
No. 22010 with EMA, Inc. for planning, design, and engineering during construction phase
services.
WHEREAS, Ordinance No. 15610, adopted February 11, 2021, appropriated the
initial funding for and authorized Contract No. 22010; and
WHEREAS, the Director of Finance has certified that there is an unencumbered
balance in the above-named fund sufficient to pay the obligation authorized herein.
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF TRUSTEES OF
THE METROPOLITAN ST. LOUIS SEWER DISTRICT:
Section One. The sum of One Million Dollars ($1,000,000.00) is hereby
appropriated from the Sanitary Replacement Fund to be used for planning, design, and engineering
during construction phase services in SCADA System Upgrade (13467) at various locations within
the District.
Section Two. The Executive Director and Secretary-Treasurer are hereby
authorized on behalf of The Metropolitan St. Louis Sewer District to enter into Amendment No. 3
to Contract No. 22010 with EMA, Inc. for planning, design, and engineering during construction
phase services in SCADA System Upgrade (13467) at various locations within the District; and
said contract shall be comprised of such other terms and conditions as are approved by the Office
of the General Counsel of the District.
The foregoing Ordinance was adopted March 14, 2024