POST CONSTRUCTION STORMWATER BMP INSPECTION REPORT
Inspection Date:
Reporting Year:
MSD Project Number:
Project Name:
Address of RMP:
11/17/2023
2023
P-0030556-00
Millipore Sigma -Laclede Ave
9Qn9 I arlorlo Avonue, qt.I ni iic Mn 6.'21.01
Owner Change Since Last Inspection? No
Property Owner:
Property Owner's Address:
Inspector's Name:
Inspector's Email:
Sigma -Aldrich Corporation
3050 Spruce Street
St Louis, MO 63103
Jerry Brandt
Property Owner's Agent: J Brandt
OwnerlAgent Email: JBrandt@LoyetLandscape.com
Inspector's Phone: (636) 487-2799
JBrandt@LoyetLandscape.com Conditions During Inspection: Sunny
INSPECTOR'S OBSERVATION SUMMARY
According to MSD records, construction approval for the Millipore Sigma Laclede Campus stormwater treatment system
improvements was granted on November 8, 2017 and consists of three biodentention basins. one pretreatment forebay, a permeable
concrete paver patio along with associated private inlets, piping, underdrains, manholes and structures. The fourth 2023 inspection
was performed the morning of November 17, 2023. Stewardship was performed on May 22nd, July 14th, August 28th, September
29th and October 24th. After carefully reviewing each component of the DeKalb Campus stormwater treatment system this day, I'm
confident confirming: based on what was observed, this stormwater treatment sytem appears to be functioning in accordance with its
design intent.
STORMWATER BEST MANAGEMENT PRACTICE (BMP) - SITE COMPONENT SUMMARY
SURFACE COMPONENTS
BMP TYPE
Biodetention / Rain
Garden Permeable
Pavement Pre -Treatment
NUMBER ON SITE
3
0
0
!Total civic Curripunerri 011 Site
3
Loyet Landscape. LLC
1�
L 0 Y E T
L an dsc a pe
Maintenance
261 Hughes Lane
St. Charles, MO 63301
(636) 487-4799 Jerry Brandt
BIORETENTION /RAIN GARDEN (Laclede Campus South Biodetention Basin)
INSPECTION RATING SYSTEM
Conditon
0
1
2
Assessment and Actions
Performance
Good
Moderate
Degraded
Serious
Well maintained, no action required
Should monitor
Routine maintenance and repair needed
Immediate need for repair or replacement
Satisfactory
Satisfactory
Unsatisfactory
Unsatisfactory
Color
NOTE TO INSPECTORS: �:,�nnel ent�..:,y �, , ,'fined spaces must take appropriate safety
measures and follow applicable OSHA regulations.
OVERALL DRAINAGE AREA CONDITIONS
Laclede South Biodetention Basin Site Well Stabilized
INSPECTION ITEMS
RATING
COMMENTS
A. INLETS (if not piped, identify as overland flow)
Provide stable conveyance into facility?
0
overland Flow via grass and rock swale
connections to curb cuts on conventional
parking surfaces. No debris present
Excessive trash/debris/sediment accumulation?
0
Site generally well maintained
Evidence of erosion?
0
None noted
B. PRETREATMENT (if applicable)
Excessive trash/debris/sediment accumulation?
NA
Evidence of standing water (Ponding, Noticable Odors,
Water Stains, Algae?
NA
Evidence of clogging?
NA
Dead vegetation/exposed soil?
NA
Evidence of erosion?
NA
C. TREATMENT AREA AND VEGETATION
Excessive trash/debris/sediment accumulation? 0 Site generally well maintained
Signs of erosion or movement of mulch (or pea gravel)?
0
No evidence of erosion in this Basin
Evidence of oil/chemical accumulation? 0 None present
Evidence of standing water (Ponding, Noticable Odors,
Water Stains, Algae?
0
None noted
Underdrain system (if equipped) broken/clogged? 0 Clear / working
Adequate plant covering present? 0 Native plants are well established
Is vegetation overgrown? Invasive, overgrown weeds,
woody vegetation?
0
No overgrown invasive or woody
vegetation present.
Dead vegetation/exposed soil? 0 None present this day
Signs of mulch layer thinning (or pea gravel) 0 Mulch layer appears adequate
Condition of filter media
0
Multiple soil probes confirmed well
constructed filter media of proper
D. OVERFLOW/OUTLET STRUCTURE
Stable conveyance out of facility provided?
0
Via Area Inlet D.E-1
Excessive trash/debris/sediment accumulation?
0
Clear/working
Evidence of erosion at/around?
—
0
None present
E. HAZARDS
Complaints from local residents? (describe if any)
0
None of which I'm aware
Any public hazards observed? (describe if any)
0
None noted
F. CORRECTIVE ACTIONS*
* If any 2 - 3 ratings are given in Sections A -E of this checklist, list corrective actions recommented or completed during inspection.
NAME
DATE IDENTIFIED
CORRECTIVE ACTION
N/A
G. PHOTOGRAPHS
Please attach photographs, with descriptions, showing current condition of the system and any deficiencies noted in this inscpection.
BIORETENTION / RAIN GARDEN
Laclede Campus Center Biodetention Basin
INSPECTION RATING SYSTEM
Conditon
0
1
2
3
Assessment and Actions
Performance
Color
Good
Moderate
Degraded
Serious
Well maintained, no action required
Should monitor
Routine maintenance and repair needed
Immediate need for repair or replacement
Satisfactory
Satisfactory
Unsatisfactory
Unsatisfactory
NOTE TO INSPECTORS: All personnel entering any confined spaces must take appropriate safPfv
measures and follow applicable OSHA regulations.
OVERALL DRAINAGE AREA CONDITIONS
Laclede South Biodetention Basin
INSPECTION ITEMS
Site Well Stabilized
RATING
COMMENTS
A. INLETS (if not piped, identify as overland flow)
Provide stable conveyance into facility?
0
overland Flow via rock swale to curb
cut. No debris present
Excessive trash/debris/sediment accumulation?
0
Site generally well maintained
Evidence of erosion?
0
None noted
B. PRETREATMENT (if applicable)
Excessive trash/debris/sediment accumulation?
NA
Evidence of standing water (Ponding, Noticable Odors,
NA
Evidence of clogging?
NA
Dead vegetation/exposed soil?
NA
Evidence of erosion?
NA
C. TREATMENT AREA AND VEGETATION
Excessive trash/debris/sediment accumulation?
0
Site generally well maintained
Signs of erosion or movement of mulch (or pea gravel)?
0
No evidence of erosion in this Basin
Evidence of oil/chemical accumulation?
0
None present
Evidence of standing water (Ponding, Noticable Odors. Water
0
None noted
Underdrain system (if equipped) broken/clogged?
0
Clear / working
Adequate plant covering present?
0
Native plants are well established
Is vegetation overgrown? Invasive, overgrown weeds, woody
0
No overgrown invasive or woody
Dead vegetation/exposed soil?
0
None present this day
Signs of mulch layer thinning (or pea gravel)
0
Mulch layer appears adequate
Condition of filter media
0
Multiple soil probes confirmed well
D. OVERFLOW/OUTLET STRUCTURE
Stable conveyance out of facility provided?
0
Via underdrain to grate L -C.1
Excessive trash/debris/sediment accumulation?
0
Clear/working
Evidence of erosion at/around?
0
None present
E. HAZARDS
Complaints from local residents? (describe if any)
None of which I'm aware
Any public hazards observed? (describe if any)
None noted
F. CORRECTIVE ACTIONS*
* If any 2 - 3 ratings are given in Sections A -E of this checklist, list corrective actions recommented or completed during inspection.
NAME DATE IDENTIFIED CORRECTIVE ACTION
N/A
G. PHOTOGRAPHS
Please attach photographs. with descriptions, showing current condition of the system and any deficiencies noted in this inscpection.
BIORETENTION / RAIN GARDEN (Laclede Campus North Biodetention Basin)
INSPECTION RATING SYSTEM
Conditon
0
1
2
Lib
Assessment and Actions
Performance
Color
3ood
Moderate
Degraded
Serious
Well maintained, no action required
Should monitor
Routine maintenance and repair needed
Immediate need for repair or replacement
Satisfactory
Satisfactory
Unsatisfactory
Unsatisfactory
NOTE TO INSPECTORS: Ail personnel entering any confined spaces must take appropriate sc
measures and follow applicable OSHA regulations.
OVERALL DRAINAGE AREA CONDITIONS
Laclede North Biodetention Basin
INSPECTION ITEMS
Site Well Stabilized
RATING
COMMENTS
A. INLETS (if not piped, identify as overland flow)
Provide stable conveyance into facility?
0
overland Flow via rock swale to curb
Excessive trash/debris/sediment accumulation?
0
Site generally well maintained
Evidence of erosion?
0
None noted
6. PRETREATMENT (if applicable)
Excessive trash/debris/sediment accumulation?
NA
Evidence of standing water (Ponding, Noticable Odors,
NA
Evidence of clogging?
NA
Dead vegetation/exposed soil?
NA
Evidence of erosion?
NA
C. TREATMENT AREA AND VEGETATION
Excessive trash/debris/sediment accumulation?
0
Site generally well maintained
Signs of erosion or movement of mulch (or pea gravel)?
0
No evidence of erosion in this Basin
Evidence of oil/chemical accumulation?
0
None present
Evidence of standing water (Ponding, Noticable Odors,
0
None noted
Underdrain system (if equipped) broken/clogged?
0
Clear / working
Adequate plant covering present?
0
Native plants are well established
Is vegetation overgrown? Invasive, overgrown weeds,
0
No overgrown invasive or woody
Dead vegetation/exposed soil?
0
None present this day
Signs of mulch layer thinning (or pea gravel)
0
Mulch layer appears adequate
Condition of filter media
0
Multiple soil probes confirmed well
D. OVERFLOW/OUTLET STRUCTURE
Stable conveyance out of facility provided?
0
Via Area Inlet L -N.1
Excessive trash/debris/sediment accumulation?
0
Clear/working
Evidence of erosion at/around?
0
None present
E. HAZARDS
Complaints from local residents? (describe if any)
None of which I'm aware
Any public hazards observed? (describe if any)
0
None noted
F. CORRECTIVE ACTIONS*
* If any 2 - 3 ratings are given in Sections A -E of this checklist, list corrective actions recommented or completed during inspection.
NAME
DATE IDENTIFIED
CORRECTIVE ACTION
N/A
G. PHOTOGRAPHS
Please attach photographs, with descriptions, showing current condition of the system and any deficiencies noted in this inscpection.
Millipore Sigma - Laclede
BM P Inspection Photos
11/17/23
comments: MulOple sotl probe sarfl)les confirm we constructed !1. e' media of the prope1 clepth within all of the Biocletenuon Basins. This soil probe •Has cotlectecl horn the South Biodetent1on Bas n .
..
Comments: Looking north acmss the cemer BIOdetenc,on Basin
Comments: view into Grate Inlet L-S.J
. "Comments: v,:e1·., rito G•ai � ,nlet L·C l
VVIIOIg1IW. rNICJ 4„V DC1.1N,1DIVLaICV •IV'.1'1 Vl 1 IC basin
Comments: View into Area Inlet LA 1 w run Noah Bicaatenuon Basin
Comments: _oolano across the North Btottetentton Bastn
Comments: Inlet east cr the North Btodetenttcn eastn
1�
L 0 Y E T
Landscape
Maintenance
Loyet Landscape. LLC
261 Hughes Lane
St. Charles, MO 63301
(636) 487-4799 Jerry Brandt
POST CONSTRUCTION STORMWATER BMP INSPECTION REPORT
Inspection Date:
Reporting Year:
MSD Project Number:
Project Name:
Address of RMP:
11/17/2023
2023
P-0030556-00
Millipore Sigma -Laclede Ave
9Qn9 I arlorlo Avonue, qt.I ni iic Mn 6.'21.01
Owner Change Since Last Inspection? No
Property Owner:
Property Owner's Address:
Inspector's Name:
Inspector's Email:
Sigma -Aldrich Corporation
3050 Spruce Street
St Louis, MO 63103
Jerry Brandt
Property Owner's Agent: J Brandt
OwnerlAgent Email: JBrandt@LoyetLandscape.com
Inspector's Phone: (636) 487-2799
JBrandt@LoyetLandscape.com Conditions During Inspection: Sunny
INSPECTOR'S OBSERVATION SUMMARY
According to MSD records, construction approval for the Millipore Sigma Laclede Campus stormwater treatment system
improvements was granted on November 8, 2017 and consists of three biodentention basins. one pretreatment forebay, a permeable
concrete paver patio along with associated private inlets, piping, underdrains, manholes and structures. The fourth 2023 inspection
was performed the morning of November 17, 2023. Stewardship was performed on May 22nd, July 14th, August 28th, September
29th and October 24th. After carefully reviewing each component of the DeKalb Campus stormwater treatment system this day, I'm
confident confirming: based on what was observed, this stormwater treatment sytem appears to be functioning in accordance with its
design intent.
STORMWATER BEST MANAGEMENT PRACTICE (BMP) - SITE COMPONENT SUMMARY
SURFACE COMPONENTS
BMP TYPE
Biodetention / Rain
Garden Permeable
Pavement Pre -Treatment
NUMBER ON SITE
3
0
0
!Total civic Curripunerri 011 Site
3
Loyet Landscape. LLC
1�
L 0 Y E T
L an dsc a pe
Maintenance
261 Hughes Lane
St. Charles, MO 63301
(636) 487-4799 Jerry Brandt
BIORETENTION /RAIN GARDEN (Laclede Campus South Biodetention Basin)
INSPECTION RATING SYSTEM
Conditon
0
1
2
Assessment and Actions
Performance
Good
Moderate
Degraded
Serious
Well maintained, no action required
Should monitor
Routine maintenance and repair needed
Immediate need for repair or replacement
Satisfactory
Satisfactory
Unsatisfactory
Unsatisfactory
Color
NOTE TO INSPECTORS: �:,�nnel ent�..:,y �, , ,'fined spaces must take appropriate safety
measures and follow applicable OSHA regulations.
OVERALL DRAINAGE AREA CONDITIONS
Laclede South Biodetention Basin Site Well Stabilized
INSPECTION ITEMS
RATING
COMMENTS
A. INLETS (if not piped, identify as overland flow)
Provide stable conveyance into facility?
0
overland Flow via grass and rock swale
connections to curb cuts on conventional
parking surfaces. No debris present
Excessive trash/debris/sediment accumulation?
0
Site generally well maintained
Evidence of erosion?
0
None noted
B. PRETREATMENT (if applicable)
Excessive trash/debris/sediment accumulation?
NA
Evidence of standing water (Ponding, Noticable Odors,
Water Stains, Algae?
NA
Evidence of clogging?
NA
Dead vegetation/exposed soil?
NA
Evidence of erosion?
NA
C. TREATMENT AREA AND VEGETATION
Excessive trash/debris/sediment accumulation? 0 Site generally well maintained
Signs of erosion or movement of mulch (or pea gravel)?
0
No evidence of erosion in this Basin
Evidence of oil/chemical accumulation? 0 None present
Evidence of standing water (Ponding, Noticable Odors,
Water Stains, Algae?
0
None noted
Underdrain system (if equipped) broken/clogged? 0 Clear / working
Adequate plant covering present? 0 Native plants are well established
Is vegetation overgrown? Invasive, overgrown weeds,
woody vegetation?
0
No overgrown invasive or woody
vegetation present.
Dead vegetation/exposed soil? 0 None present this day
Signs of mulch layer thinning (or pea gravel) 0 Mulch layer appears adequate
Condition of filter media
0
Multiple soil probes confirmed well
constructed filter media of proper
D. OVERFLOW/OUTLET STRUCTURE
Stable conveyance out of facility provided?
0
Via Area Inlet D.E-1
Excessive trash/debris/sediment accumulation?
0
Clear/working
Evidence of erosion at/around?
—
0
None present
E. HAZARDS
Complaints from local residents? (describe if any)
0
None of which I'm aware
Any public hazards observed? (describe if any)
0
None noted
F. CORRECTIVE ACTIONS*
* If any 2 - 3 ratings are given in Sections A -E of this checklist, list corrective actions recommented or completed during inspection.
NAME
DATE IDENTIFIED
CORRECTIVE ACTION
N/A
G. PHOTOGRAPHS
Please attach photographs, with descriptions, showing current condition of the system and any deficiencies noted in this inscpection.
BIORETENTION / RAIN GARDEN
Laclede Campus Center Biodetention Basin
INSPECTION RATING SYSTEM
Conditon
0
1
2
3
Assessment and Actions
Performance
Color
Good
Moderate
Degraded
Serious
Well maintained, no action required
Should monitor
Routine maintenance and repair needed
Immediate need for repair or replacement
Satisfactory
Satisfactory
Unsatisfactory
Unsatisfactory
NOTE TO INSPECTORS: All personnel entering any confined spaces must take appropriate safPfv
measures and follow applicable OSHA regulations.
OVERALL DRAINAGE AREA CONDITIONS
Laclede South Biodetention Basin
INSPECTION ITEMS
Site Well Stabilized
RATING
COMMENTS
A. INLETS (if not piped, identify as overland flow)
Provide stable conveyance into facility?
0
overland Flow via rock swale to curb
cut. No debris present
Excessive trash/debris/sediment accumulation?
0
Site generally well maintained
Evidence of erosion?
0
None noted
B. PRETREATMENT (if applicable)
Excessive trash/debris/sediment accumulation?
NA
Evidence of standing water (Ponding, Noticable Odors,
NA
Evidence of clogging?
NA
Dead vegetation/exposed soil?
NA
Evidence of erosion?
NA
C. TREATMENT AREA AND VEGETATION
Excessive trash/debris/sediment accumulation?
0
Site generally well maintained
Signs of erosion or movement of mulch (or pea gravel)?
0
No evidence of erosion in this Basin
Evidence of oil/chemical accumulation?
0
None present
Evidence of standing water (Ponding, Noticable Odors. Water
0
None noted
Underdrain system (if equipped) broken/clogged?
0
Clear / working
Adequate plant covering present?
0
Native plants are well established
Is vegetation overgrown? Invasive, overgrown weeds, woody
0
No overgrown invasive or woody
Dead vegetation/exposed soil?
0
None present this day
Signs of mulch layer thinning (or pea gravel)
0
Mulch layer appears adequate
Condition of filter media
0
Multiple soil probes confirmed well
D. OVERFLOW/OUTLET STRUCTURE
Stable conveyance out of facility provided?
0
Via underdrain to grate L -C.1
Excessive trash/debris/sediment accumulation?
0
Clear/working
Evidence of erosion at/around?
0
None present
E. HAZARDS
Complaints from local residents? (describe if any)
None of which I'm aware
Any public hazards observed? (describe if any)
None noted
F. CORRECTIVE ACTIONS*
* If any 2 - 3 ratings are given in Sections A -E of this checklist, list corrective actions recommented or completed during inspection.
NAME DATE IDENTIFIED CORRECTIVE ACTION
N/A
G. PHOTOGRAPHS
Please attach photographs. with descriptions, showing current condition of the system and any deficiencies noted in this inscpection.
BIORETENTION / RAIN GARDEN (Laclede Campus North Biodetention Basin)
INSPECTION RATING SYSTEM
Conditon
0
1
2
Lib
Assessment and Actions
Performance
Color
3ood
Moderate
Degraded
Serious
Well maintained, no action required
Should monitor
Routine maintenance and repair needed
Immediate need for repair or replacement
Satisfactory
Satisfactory
Unsatisfactory
Unsatisfactory
NOTE TO INSPECTORS: Ail personnel entering any confined spaces must take appropriate sc
measures and follow applicable OSHA regulations.
OVERALL DRAINAGE AREA CONDITIONS
Laclede North Biodetention Basin
INSPECTION ITEMS
Site Well Stabilized
RATING
COMMENTS
A. INLETS (if not piped, identify as overland flow)
Provide stable conveyance into facility?
0
overland Flow via rock swale to curb
Excessive trash/debris/sediment accumulation?
0
Site generally well maintained
Evidence of erosion?
0
None noted
6. PRETREATMENT (if applicable)
Excessive trash/debris/sediment accumulation?
NA
Evidence of standing water (Ponding, Noticable Odors,
NA
Evidence of clogging?
NA
Dead vegetation/exposed soil?
NA
Evidence of erosion?
NA
C. TREATMENT AREA AND VEGETATION
Excessive trash/debris/sediment accumulation?
0
Site generally well maintained
Signs of erosion or movement of mulch (or pea gravel)?
0
No evidence of erosion in this Basin
Evidence of oil/chemical accumulation?
0
None present
Evidence of standing water (Ponding, Noticable Odors,
0
None noted
Underdrain system (if equipped) broken/clogged?
0
Clear / working
Adequate plant covering present?
0
Native plants are well established
Is vegetation overgrown? Invasive, overgrown weeds,
0
No overgrown invasive or woody
Dead vegetation/exposed soil?
0
None present this day
Signs of mulch layer thinning (or pea gravel)
0
Mulch layer appears adequate
Condition of filter media
0
Multiple soil probes confirmed well
D. OVERFLOW/OUTLET STRUCTURE
Stable conveyance out of facility provided?
0
Via Area Inlet L -N.1
Excessive trash/debris/sediment accumulation?
0
Clear/working
Evidence of erosion at/around?
0
None present
E. HAZARDS
Complaints from local residents? (describe if any)
None of which I'm aware
Any public hazards observed? (describe if any)
0
None noted
F. CORRECTIVE ACTIONS*
* If any 2 - 3 ratings are given in Sections A -E of this checklist, list corrective actions recommented or completed during inspection.
NAME
DATE IDENTIFIED
CORRECTIVE ACTION
N/A
G. PHOTOGRAPHS
Please attach photographs, with descriptions, showing current condition of the system and any deficiencies noted in this inscpection.
Millipore Sigma - Laclede
BM P Inspection Photos
11/17/23
comments: MulOple sotl probe sarfl)les confirm we constructed !1. e' media of the prope1 clepth within all of the Biocletenuon Basins. This soil probe •Has cotlectecl horn the South Biodetent1on Bas n .
..
Comments: Looking north acmss the cemer BIOdetenc,on Basin
Comments: view into Grate Inlet L-S.J
. "Comments: v,:e1·., rito G•ai � ,nlet L·C l
VVIIOIg1IW. rNICJ 4„V DC1.1N,1DIVLaICV •IV'.1'1 Vl 1 IC basin
Comments: View into Area Inlet LA 1 w run Noah Bicaatenuon Basin
Comments: _oolano across the North Btottetentton Bastn
Comments: Inlet east cr the North Btodetenttcn eastn
1�
L 0 Y E T
Landscape
Maintenance
Loyet Landscape. LLC
261 Hughes Lane
St. Charles, MO 63301
(636) 487-4799 Jerry Brandt
POST CONSTRUCTION STORMWATER BMP INSPECTION REPORT
Inspection Date:
Reporting Year:
MSD Project Number:
Project Name:
Address of RMP:
11/17/2023
2023
P-0030556-00
Millipore Sigma -Laclede Ave
9Qn9 I arlorlo Avonue, qt.I ni iic Mn 6.'21.01
Owner Change Since Last Inspection? No
Property Owner:
Property Owner's Address:
Inspector's Name:
Inspector's Email:
Sigma -Aldrich Corporation
3050 Spruce Street
St Louis, MO 63103
Jerry Brandt
Property Owner's Agent: J Brandt
OwnerlAgent Email: JBrandt@LoyetLandscape.com
Inspector's Phone: (636) 487-2799
JBrandt@LoyetLandscape.com Conditions During Inspection: Sunny
INSPECTOR'S OBSERVATION SUMMARY
According to MSD records, construction approval for the Millipore Sigma Laclede Campus stormwater treatment system
improvements was granted on November 8, 2017 and consists of three biodentention basins. one pretreatment forebay, a permeable
concrete paver patio along with associated private inlets, piping, underdrains, manholes and structures. The fourth 2023 inspection
was performed the morning of November 17, 2023. Stewardship was performed on May 22nd, July 14th, August 28th, September
29th and October 24th. After carefully reviewing each component of the DeKalb Campus stormwater treatment system this day, I'm
confident confirming: based on what was observed, this stormwater treatment sytem appears to be functioning in accordance with its
design intent.
STORMWATER BEST MANAGEMENT PRACTICE (BMP) - SITE COMPONENT SUMMARY
SURFACE COMPONENTS
BMP TYPE
Biodetention / Rain
Garden Permeable
Pavement Pre -Treatment
NUMBER ON SITE
3
0
0
!Total civic Curripunerri 011 Site
3
Loyet Landscape. LLC
1�
L 0 Y E T
L an dsc a pe
Maintenance
261 Hughes Lane
St. Charles, MO 63301
(636) 487-4799 Jerry Brandt
BIORETENTION /RAIN GARDEN (Laclede Campus South Biodetention Basin)
INSPECTION RATING SYSTEM
Conditon
0
1
2
Assessment and Actions
Performance
Good
Moderate
Degraded
Serious
Well maintained, no action required
Should monitor
Routine maintenance and repair needed
Immediate need for repair or replacement
Satisfactory
Satisfactory
Unsatisfactory
Unsatisfactory
Color
NOTE TO INSPECTORS: �:,�nnel ent�..:,y �, , ,'fined spaces must take appropriate safety
measures and follow applicable OSHA regulations.
OVERALL DRAINAGE AREA CONDITIONS
Laclede South Biodetention Basin Site Well Stabilized
INSPECTION ITEMS
RATING
COMMENTS
A. INLETS (if not piped, identify as overland flow)
Provide stable conveyance into facility?
0
overland Flow via grass and rock swale
connections to curb cuts on conventional
parking surfaces. No debris present
Excessive trash/debris/sediment accumulation?
0
Site generally well maintained
Evidence of erosion?
0
None noted
B. PRETREATMENT (if applicable)
Excessive trash/debris/sediment accumulation?
NA
Evidence of standing water (Ponding, Noticable Odors,
Water Stains, Algae?
NA
Evidence of clogging?
NA
Dead vegetation/exposed soil?
NA
Evidence of erosion?
NA
C. TREATMENT AREA AND VEGETATION
Excessive trash/debris/sediment accumulation? 0 Site generally well maintained
Signs of erosion or movement of mulch (or pea gravel)?
0
No evidence of erosion in this Basin
Evidence of oil/chemical accumulation? 0 None present
Evidence of standing water (Ponding, Noticable Odors,
Water Stains, Algae?
0
None noted
Underdrain system (if equipped) broken/clogged? 0 Clear / working
Adequate plant covering present? 0 Native plants are well established
Is vegetation overgrown? Invasive, overgrown weeds,
woody vegetation?
0
No overgrown invasive or woody
vegetation present.
Dead vegetation/exposed soil? 0 None present this day
Signs of mulch layer thinning (or pea gravel) 0 Mulch layer appears adequate
Condition of filter media
0
Multiple soil probes confirmed well
constructed filter media of proper
D. OVERFLOW/OUTLET STRUCTURE
Stable conveyance out of facility provided?
0
Via Area Inlet D.E-1
Excessive trash/debris/sediment accumulation?
0
Clear/working
Evidence of erosion at/around?
—
0
None present
E. HAZARDS
Complaints from local residents? (describe if any)
0
None of which I'm aware
Any public hazards observed? (describe if any)
0
None noted
F. CORRECTIVE ACTIONS*
* If any 2 - 3 ratings are given in Sections A -E of this checklist, list corrective actions recommented or completed during inspection.
NAME
DATE IDENTIFIED
CORRECTIVE ACTION
N/A
G. PHOTOGRAPHS
Please attach photographs, with descriptions, showing current condition of the system and any deficiencies noted in this inscpection.
BIORETENTION / RAIN GARDEN
Laclede Campus Center Biodetention Basin
INSPECTION RATING SYSTEM
Conditon
0
1
2
3
Assessment and Actions
Performance
Color
Good
Moderate
Degraded
Serious
Well maintained, no action required
Should monitor
Routine maintenance and repair needed
Immediate need for repair or replacement
Satisfactory
Satisfactory
Unsatisfactory
Unsatisfactory
NOTE TO INSPECTORS: All personnel entering any confined spaces must take appropriate safPfv
measures and follow applicable OSHA regulations.
OVERALL DRAINAGE AREA CONDITIONS
Laclede South Biodetention Basin
INSPECTION ITEMS
Site Well Stabilized
RATING
COMMENTS
A. INLETS (if not piped, identify as overland flow)
Provide stable conveyance into facility?
0
overland Flow via rock swale to curb
cut. No debris present
Excessive trash/debris/sediment accumulation?
0
Site generally well maintained
Evidence of erosion?
0
None noted
B. PRETREATMENT (if applicable)
Excessive trash/debris/sediment accumulation?
NA
Evidence of standing water (Ponding, Noticable Odors,
NA
Evidence of clogging?
NA
Dead vegetation/exposed soil?
NA
Evidence of erosion?
NA
C. TREATMENT AREA AND VEGETATION
Excessive trash/debris/sediment accumulation?
0
Site generally well maintained
Signs of erosion or movement of mulch (or pea gravel)?
0
No evidence of erosion in this Basin
Evidence of oil/chemical accumulation?
0
None present
Evidence of standing water (Ponding, Noticable Odors. Water
0
None noted
Underdrain system (if equipped) broken/clogged?
0
Clear / working
Adequate plant covering present?
0
Native plants are well established
Is vegetation overgrown? Invasive, overgrown weeds, woody
0
No overgrown invasive or woody
Dead vegetation/exposed soil?
0
None present this day
Signs of mulch layer thinning (or pea gravel)
0
Mulch layer appears adequate
Condition of filter media
0
Multiple soil probes confirmed well
D. OVERFLOW/OUTLET STRUCTURE
Stable conveyance out of facility provided?
0
Via underdrain to grate L -C.1
Excessive trash/debris/sediment accumulation?
0
Clear/working
Evidence of erosion at/around?
0
None present
E. HAZARDS
Complaints from local residents? (describe if any)
None of which I'm aware
Any public hazards observed? (describe if any)
None noted
F. CORRECTIVE ACTIONS*
* If any 2 - 3 ratings are given in Sections A -E of this checklist, list corrective actions recommented or completed during inspection.
NAME DATE IDENTIFIED CORRECTIVE ACTION
N/A
G. PHOTOGRAPHS
Please attach photographs. with descriptions, showing current condition of the system and any deficiencies noted in this inscpection.
BIORETENTION / RAIN GARDEN (Laclede Campus North Biodetention Basin)
INSPECTION RATING SYSTEM
Conditon
0
1
2
Lib
Assessment and Actions
Performance
Color
3ood
Moderate
Degraded
Serious
Well maintained, no action required
Should monitor
Routine maintenance and repair needed
Immediate need for repair or replacement
Satisfactory
Satisfactory
Unsatisfactory
Unsatisfactory
NOTE TO INSPECTORS: Ail personnel entering any confined spaces must take appropriate sc
measures and follow applicable OSHA regulations.
OVERALL DRAINAGE AREA CONDITIONS
Laclede North Biodetention Basin
INSPECTION ITEMS
Site Well Stabilized
RATING
COMMENTS
A. INLETS (if not piped, identify as overland flow)
Provide stable conveyance into facility?
0
overland Flow via rock swale to curb
Excessive trash/debris/sediment accumulation?
0
Site generally well maintained
Evidence of erosion?
0
None noted
6. PRETREATMENT (if applicable)
Excessive trash/debris/sediment accumulation?
NA
Evidence of standing water (Ponding, Noticable Odors,
NA
Evidence of clogging?
NA
Dead vegetation/exposed soil?
NA
Evidence of erosion?
NA
C. TREATMENT AREA AND VEGETATION
Excessive trash/debris/sediment accumulation?
0
Site generally well maintained
Signs of erosion or movement of mulch (or pea gravel)?
0
No evidence of erosion in this Basin
Evidence of oil/chemical accumulation?
0
None present
Evidence of standing water (Ponding, Noticable Odors,
0
None noted
Underdrain system (if equipped) broken/clogged?
0
Clear / working
Adequate plant covering present?
0
Native plants are well established
Is vegetation overgrown? Invasive, overgrown weeds,
0
No overgrown invasive or woody
Dead vegetation/exposed soil?
0
None present this day
Signs of mulch layer thinning (or pea gravel)
0
Mulch layer appears adequate
Condition of filter media
0
Multiple soil probes confirmed well
D. OVERFLOW/OUTLET STRUCTURE
Stable conveyance out of facility provided?
0
Via Area Inlet L -N.1
Excessive trash/debris/sediment accumulation?
0
Clear/working
Evidence of erosion at/around?
0
None present
E. HAZARDS
Complaints from local residents? (describe if any)
None of which I'm aware
Any public hazards observed? (describe if any)
0
None noted
F. CORRECTIVE ACTIONS*
* If any 2 - 3 ratings are given in Sections A -E of this checklist, list corrective actions recommented or completed during inspection.
NAME
DATE IDENTIFIED
CORRECTIVE ACTION
N/A
G. PHOTOGRAPHS
Please attach photographs, with descriptions, showing current condition of the system and any deficiencies noted in this inscpection.
Millipore Sigma - Laclede
BM P Inspection Photos
11/17/23
comments: MulOple sotl probe sarfl)les confirm we constructed !1. e' media of the prope1 clepth within all of the Biocletenuon Basins. This soil probe •Has cotlectecl horn the South Biodetent1on Bas n .
..
Comments: Looking north acmss the cemer BIOdetenc,on Basin
Comments: view into Grate Inlet L-S.J
. "Comments: v,:e1·., rito G•ai � ,nlet L·C l
VVIIOIg1IW. rNICJ 4„V DC1.1N,1DIVLaICV •IV'.1'1 Vl 1 IC basin
Comments: View into Area Inlet LA 1 w run Noah Bicaatenuon Basin
Comments: _oolano across the North Btottetentton Bastn
Comments: Inlet east cr the North Btodetenttcn eastn
1�
L 0 Y E T
Landscape
Maintenance
Loyet Landscape. LLC
261 Hughes Lane
St. Charles, MO 63301
(636) 487-4799 Jerry Brandt
POST CONSTRUCTION STORMWATER BMP INSPECTION REPORT
Inspection Date:
Reporting Year:
MSD Project Number:
Project Name:
Address of RMP:
11/17/2023
2023
P-0030556-00
Millipore Sigma -Laclede Ave
9Qn9 I arlorlo Avonue, qt.I ni iic Mn 6.'21.01
Owner Change Since Last Inspection? No
Property Owner:
Property Owner's Address:
Inspector's Name:
Inspector's Email:
Sigma -Aldrich Corporation
3050 Spruce Street
St Louis, MO 63103
Jerry Brandt
Property Owner's Agent: J Brandt
OwnerlAgent Email: JBrandt@LoyetLandscape.com
Inspector's Phone: (636) 487-2799
JBrandt@LoyetLandscape.com Conditions During Inspection: Sunny
INSPECTOR'S OBSERVATION SUMMARY
According to MSD records, construction approval for the Millipore Sigma Laclede Campus stormwater treatment system
improvements was granted on November 8, 2017 and consists of three biodentention basins. one pretreatment forebay, a permeable
concrete paver patio along with associated private inlets, piping, underdrains, manholes and structures. The fourth 2023 inspection
was performed the morning of November 17, 2023. Stewardship was performed on May 22nd, July 14th, August 28th, September
29th and October 24th. After carefully reviewing each component of the DeKalb Campus stormwater treatment system this day, I'm
confident confirming: based on what was observed, this stormwater treatment sytem appears to be functioning in accordance with its
design intent.
STORMWATER BEST MANAGEMENT PRACTICE (BMP) - SITE COMPONENT SUMMARY
SURFACE COMPONENTS
BMP TYPE
Biodetention / Rain
Garden Permeable
Pavement Pre -Treatment
NUMBER ON SITE
3
0
0
!Total civic Curripunerri 011 Site
3
Loyet Landscape. LLC
1�
L 0 Y E T
L an dsc a pe
Maintenance
261 Hughes Lane
St. Charles, MO 63301
(636) 487-4799 Jerry Brandt
BIORETENTION /RAIN GARDEN (Laclede Campus South Biodetention Basin)
INSPECTION RATING SYSTEM
Conditon
0
1
2
Assessment and Actions
Performance
Good
Moderate
Degraded
Serious
Well maintained, no action required
Should monitor
Routine maintenance and repair needed
Immediate need for repair or replacement
Satisfactory
Satisfactory
Unsatisfactory
Unsatisfactory
Color
NOTE TO INSPECTORS: �:,�nnel ent�..:,y �, , ,'fined spaces must take appropriate safety
measures and follow applicable OSHA regulations.
OVERALL DRAINAGE AREA CONDITIONS
Laclede South Biodetention Basin Site Well Stabilized
INSPECTION ITEMS
RATING
COMMENTS
A. INLETS (if not piped, identify as overland flow)
Provide stable conveyance into facility?
0
overland Flow via grass and rock swale
connections to curb cuts on conventional
parking surfaces. No debris present
Excessive trash/debris/sediment accumulation?
0
Site generally well maintained
Evidence of erosion?
0
None noted
B. PRETREATMENT (if applicable)
Excessive trash/debris/sediment accumulation?
NA
Evidence of standing water (Ponding, Noticable Odors,
Water Stains, Algae?
NA
Evidence of clogging?
NA
Dead vegetation/exposed soil?
NA
Evidence of erosion?
NA
C. TREATMENT AREA AND VEGETATION
Excessive trash/debris/sediment accumulation? 0 Site generally well maintained
Signs of erosion or movement of mulch (or pea gravel)?
0
No evidence of erosion in this Basin
Evidence of oil/chemical accumulation? 0 None present
Evidence of standing water (Ponding, Noticable Odors,
Water Stains, Algae?
0
None noted
Underdrain system (if equipped) broken/clogged? 0 Clear / working
Adequate plant covering present? 0 Native plants are well established
Is vegetation overgrown? Invasive, overgrown weeds,
woody vegetation?
0
No overgrown invasive or woody
vegetation present.
Dead vegetation/exposed soil? 0 None present this day
Signs of mulch layer thinning (or pea gravel) 0 Mulch layer appears adequate
Condition of filter media
0
Multiple soil probes confirmed well
constructed filter media of proper
D. OVERFLOW/OUTLET STRUCTURE
Stable conveyance out of facility provided?
0
Via Area Inlet D.E-1
Excessive trash/debris/sediment accumulation?
0
Clear/working
Evidence of erosion at/around?
—
0
None present
E. HAZARDS
Complaints from local residents? (describe if any)
0
None of which I'm aware
Any public hazards observed? (describe if any)
0
None noted
F. CORRECTIVE ACTIONS*
* If any 2 - 3 ratings are given in Sections A -E of this checklist, list corrective actions recommented or completed during inspection.
NAME
DATE IDENTIFIED
CORRECTIVE ACTION
N/A
G. PHOTOGRAPHS
Please attach photographs, with descriptions, showing current condition of the system and any deficiencies noted in this inscpection.
BIORETENTION / RAIN GARDEN
Laclede Campus Center Biodetention Basin
INSPECTION RATING SYSTEM
Conditon
0
1
2
3
Assessment and Actions
Performance
Color
Good
Moderate
Degraded
Serious
Well maintained, no action required
Should monitor
Routine maintenance and repair needed
Immediate need for repair or replacement
Satisfactory
Satisfactory
Unsatisfactory
Unsatisfactory
NOTE TO INSPECTORS: All personnel entering any confined spaces must take appropriate safPfv
measures and follow applicable OSHA regulations.
OVERALL DRAINAGE AREA CONDITIONS
Laclede South Biodetention Basin
INSPECTION ITEMS
Site Well Stabilized
RATING
COMMENTS
A. INLETS (if not piped, identify as overland flow)
Provide stable conveyance into facility?
0
overland Flow via rock swale to curb
cut. No debris present
Excessive trash/debris/sediment accumulation?
0
Site generally well maintained
Evidence of erosion?
0
None noted
B. PRETREATMENT (if applicable)
Excessive trash/debris/sediment accumulation?
NA
Evidence of standing water (Ponding, Noticable Odors,
NA
Evidence of clogging?
NA
Dead vegetation/exposed soil?
NA
Evidence of erosion?
NA
C. TREATMENT AREA AND VEGETATION
Excessive trash/debris/sediment accumulation?
0
Site generally well maintained
Signs of erosion or movement of mulch (or pea gravel)?
0
No evidence of erosion in this Basin
Evidence of oil/chemical accumulation?
0
None present
Evidence of standing water (Ponding, Noticable Odors. Water
0
None noted
Underdrain system (if equipped) broken/clogged?
0
Clear / working
Adequate plant covering present?
0
Native plants are well established
Is vegetation overgrown? Invasive, overgrown weeds, woody
0
No overgrown invasive or woody
Dead vegetation/exposed soil?
0
None present this day
Signs of mulch layer thinning (or pea gravel)
0
Mulch layer appears adequate
Condition of filter media
0
Multiple soil probes confirmed well
D. OVERFLOW/OUTLET STRUCTURE
Stable conveyance out of facility provided?
0
Via underdrain to grate L -C.1
Excessive trash/debris/sediment accumulation?
0
Clear/working
Evidence of erosion at/around?
0
None present
E. HAZARDS
Complaints from local residents? (describe if any)
None of which I'm aware
Any public hazards observed? (describe if any)
None noted
F. CORRECTIVE ACTIONS*
* If any 2 - 3 ratings are given in Sections A -E of this checklist, list corrective actions recommented or completed during inspection.
NAME DATE IDENTIFIED CORRECTIVE ACTION
N/A
G. PHOTOGRAPHS
Please attach photographs. with descriptions, showing current condition of the system and any deficiencies noted in this inscpection.
BIORETENTION / RAIN GARDEN (Laclede Campus North Biodetention Basin)
INSPECTION RATING SYSTEM
Conditon
0
1
2
Lib
Assessment and Actions
Performance
Color
3ood
Moderate
Degraded
Serious
Well maintained, no action required
Should monitor
Routine maintenance and repair needed
Immediate need for repair or replacement
Satisfactory
Satisfactory
Unsatisfactory
Unsatisfactory
NOTE TO INSPECTORS: Ail personnel entering any confined spaces must take appropriate sc
measures and follow applicable OSHA regulations.
OVERALL DRAINAGE AREA CONDITIONS
Laclede North Biodetention Basin
INSPECTION ITEMS
Site Well Stabilized
RATING
COMMENTS
A. INLETS (if not piped, identify as overland flow)
Provide stable conveyance into facility?
0
overland Flow via rock swale to curb
Excessive trash/debris/sediment accumulation?
0
Site generally well maintained
Evidence of erosion?
0
None noted
6. PRETREATMENT (if applicable)
Excessive trash/debris/sediment accumulation?
NA
Evidence of standing water (Ponding, Noticable Odors,
NA
Evidence of clogging?
NA
Dead vegetation/exposed soil?
NA
Evidence of erosion?
NA
C. TREATMENT AREA AND VEGETATION
Excessive trash/debris/sediment accumulation?
0
Site generally well maintained
Signs of erosion or movement of mulch (or pea gravel)?
0
No evidence of erosion in this Basin
Evidence of oil/chemical accumulation?
0
None present
Evidence of standing water (Ponding, Noticable Odors,
0
None noted
Underdrain system (if equipped) broken/clogged?
0
Clear / working
Adequate plant covering present?
0
Native plants are well established
Is vegetation overgrown? Invasive, overgrown weeds,
0
No overgrown invasive or woody
Dead vegetation/exposed soil?
0
None present this day
Signs of mulch layer thinning (or pea gravel)
0
Mulch layer appears adequate
Condition of filter media
0
Multiple soil probes confirmed well
D. OVERFLOW/OUTLET STRUCTURE
Stable conveyance out of facility provided?
0
Via Area Inlet L -N.1
Excessive trash/debris/sediment accumulation?
0
Clear/working
Evidence of erosion at/around?
0
None present
E. HAZARDS
Complaints from local residents? (describe if any)
None of which I'm aware
Any public hazards observed? (describe if any)
0
None noted
F. CORRECTIVE ACTIONS*
* If any 2 - 3 ratings are given in Sections A -E of this checklist, list corrective actions recommented or completed during inspection.
NAME
DATE IDENTIFIED
CORRECTIVE ACTION
N/A
G. PHOTOGRAPHS
Please attach photographs, with descriptions, showing current condition of the system and any deficiencies noted in this inscpection.
Millipore Sigma - Laclede
BM P Inspection Photos
11/17/23
comments: MulOple sotl probe sarfl)les confirm we constructed !1. e' media of the prope1 clepth within all of the Biocletenuon Basins. This soil probe •Has cotlectecl horn the South Biodetent1on Bas n .
..
Comments: Looking north acmss the cemer BIOdetenc,on Basin
Comments: view into Grate Inlet L-S.J
. "Comments: v,:e1·., rito G•ai � ,nlet L·C l
VVIIOIg1IW. rNICJ 4„V DC1.1N,1DIVLaICV •IV'.1'1 Vl 1 IC basin
Comments: View into Area Inlet LA 1 w run Noah Bicaatenuon Basin
Comments: _oolano across the North Btottetentton Bastn
Comments: Inlet east cr the North Btodetenttcn eastn
1�
L 0 Y E T
Landscape
Maintenance
Loyet Landscape. LLC
261 Hughes Lane
St. Charles, MO 63301
(636) 487-4799 Jerry Brandt
POST CONSTRUCTION STORMWATER BMP INSPECTION REPORT
Inspection Date:
Reporting Year:
MSD Project Number:
Project Name:
Address of RMP:
11/17/2023
2023
P-0030556-00
Millipore Sigma -Laclede Ave
9Qn9 I arlorlo Avonue, qt.I ni iic Mn 6.'21.01
Owner Change Since Last Inspection? No
Property Owner:
Property Owner's Address:
Inspector's Name:
Inspector's Email:
Sigma -Aldrich Corporation
3050 Spruce Street
St Louis, MO 63103
Jerry Brandt
Property Owner's Agent: J Brandt
OwnerlAgent Email: JBrandt@LoyetLandscape.com
Inspector's Phone: (636) 487-2799
JBrandt@LoyetLandscape.com Conditions During Inspection: Sunny
INSPECTOR'S OBSERVATION SUMMARY
According to MSD records, construction approval for the Millipore Sigma Laclede Campus stormwater treatment system
improvements was granted on November 8, 2017 and consists of three biodentention basins. one pretreatment forebay, a permeable
concrete paver patio along with associated private inlets, piping, underdrains, manholes and structures. The fourth 2023 inspection
was performed the morning of November 17, 2023. Stewardship was performed on May 22nd, July 14th, August 28th, September
29th and October 24th. After carefully reviewing each component of the DeKalb Campus stormwater treatment system this day, I'm
confident confirming: based on what was observed, this stormwater treatment sytem appears to be functioning in accordance with its
design intent.
STORMWATER BEST MANAGEMENT PRACTICE (BMP) - SITE COMPONENT SUMMARY
SURFACE COMPONENTS
BMP TYPE
Biodetention / Rain
Garden Permeable
Pavement Pre -Treatment
NUMBER ON SITE
3
0
0
!Total civic Curripunerri 011 Site
3
Loyet Landscape. LLC
1�
L 0 Y E T
L an dsc a pe
Maintenance
261 Hughes Lane
St. Charles, MO 63301
(636) 487-4799 Jerry Brandt
BIORETENTION /RAIN GARDEN (Laclede Campus South Biodetention Basin)
INSPECTION RATING SYSTEM
Conditon
0
1
2
Assessment and Actions
Performance
Good
Moderate
Degraded
Serious
Well maintained, no action required
Should monitor
Routine maintenance and repair needed
Immediate need for repair or replacement
Satisfactory
Satisfactory
Unsatisfactory
Unsatisfactory
Color
NOTE TO INSPECTORS: �:,�nnel ent�..:,y �, , ,'fined spaces must take appropriate safety
measures and follow applicable OSHA regulations.
OVERALL DRAINAGE AREA CONDITIONS
Laclede South Biodetention Basin Site Well Stabilized
INSPECTION ITEMS
RATING
COMMENTS
A. INLETS (if not piped, identify as overland flow)
Provide stable conveyance into facility?
0
overland Flow via grass and rock swale
connections to curb cuts on conventional
parking surfaces. No debris present
Excessive trash/debris/sediment accumulation?
0
Site generally well maintained
Evidence of erosion?
0
None noted
B. PRETREATMENT (if applicable)
Excessive trash/debris/sediment accumulation?
NA
Evidence of standing water (Ponding, Noticable Odors,
Water Stains, Algae?
NA
Evidence of clogging?
NA
Dead vegetation/exposed soil?
NA
Evidence of erosion?
NA
C. TREATMENT AREA AND VEGETATION
Excessive trash/debris/sediment accumulation? 0 Site generally well maintained
Signs of erosion or movement of mulch (or pea gravel)?
0
No evidence of erosion in this Basin
Evidence of oil/chemical accumulation? 0 None present
Evidence of standing water (Ponding, Noticable Odors,
Water Stains, Algae?
0
None noted
Underdrain system (if equipped) broken/clogged? 0 Clear / working
Adequate plant covering present? 0 Native plants are well established
Is vegetation overgrown? Invasive, overgrown weeds,
woody vegetation?
0
No overgrown invasive or woody
vegetation present.
Dead vegetation/exposed soil? 0 None present this day
Signs of mulch layer thinning (or pea gravel) 0 Mulch layer appears adequate
Condition of filter media
0
Multiple soil probes confirmed well
constructed filter media of proper
D. OVERFLOW/OUTLET STRUCTURE
Stable conveyance out of facility provided?
0
Via Area Inlet D.E-1
Excessive trash/debris/sediment accumulation?
0
Clear/working
Evidence of erosion at/around?
—
0
None present
E. HAZARDS
Complaints from local residents? (describe if any)
0
None of which I'm aware
Any public hazards observed? (describe if any)
0
None noted
F. CORRECTIVE ACTIONS*
* If any 2 - 3 ratings are given in Sections A -E of this checklist, list corrective actions recommented or completed during inspection.
NAME
DATE IDENTIFIED
CORRECTIVE ACTION
N/A
G. PHOTOGRAPHS
Please attach photographs, with descriptions, showing current condition of the system and any deficiencies noted in this inscpection.
BIORETENTION / RAIN GARDEN
Laclede Campus Center Biodetention Basin
INSPECTION RATING SYSTEM
Conditon
0
1
2
3
Assessment and Actions
Performance
Color
Good
Moderate
Degraded
Serious
Well maintained, no action required
Should monitor
Routine maintenance and repair needed
Immediate need for repair or replacement
Satisfactory
Satisfactory
Unsatisfactory
Unsatisfactory
NOTE TO INSPECTORS: All personnel entering any confined spaces must take appropriate safPfv
measures and follow applicable OSHA regulations.
OVERALL DRAINAGE AREA CONDITIONS
Laclede South Biodetention Basin
INSPECTION ITEMS
Site Well Stabilized
RATING
COMMENTS
A. INLETS (if not piped, identify as overland flow)
Provide stable conveyance into facility?
0
overland Flow via rock swale to curb
cut. No debris present
Excessive trash/debris/sediment accumulation?
0
Site generally well maintained
Evidence of erosion?
0
None noted
B. PRETREATMENT (if applicable)
Excessive trash/debris/sediment accumulation?
NA
Evidence of standing water (Ponding, Noticable Odors,
NA
Evidence of clogging?
NA
Dead vegetation/exposed soil?
NA
Evidence of erosion?
NA
C. TREATMENT AREA AND VEGETATION
Excessive trash/debris/sediment accumulation?
0
Site generally well maintained
Signs of erosion or movement of mulch (or pea gravel)?
0
No evidence of erosion in this Basin
Evidence of oil/chemical accumulation?
0
None present
Evidence of standing water (Ponding, Noticable Odors. Water
0
None noted
Underdrain system (if equipped) broken/clogged?
0
Clear / working
Adequate plant covering present?
0
Native plants are well established
Is vegetation overgrown? Invasive, overgrown weeds, woody
0
No overgrown invasive or woody
Dead vegetation/exposed soil?
0
None present this day
Signs of mulch layer thinning (or pea gravel)
0
Mulch layer appears adequate
Condition of filter media
0
Multiple soil probes confirmed well
D. OVERFLOW/OUTLET STRUCTURE
Stable conveyance out of facility provided?
0
Via underdrain to grate L -C.1
Excessive trash/debris/sediment accumulation?
0
Clear/working
Evidence of erosion at/around?
0
None present
E. HAZARDS
Complaints from local residents? (describe if any)
None of which I'm aware
Any public hazards observed? (describe if any)
None noted
F. CORRECTIVE ACTIONS*
* If any 2 - 3 ratings are given in Sections A -E of this checklist, list corrective actions recommented or completed during inspection.
NAME DATE IDENTIFIED CORRECTIVE ACTION
N/A
G. PHOTOGRAPHS
Please attach photographs. with descriptions, showing current condition of the system and any deficiencies noted in this inscpection.
BIORETENTION / RAIN GARDEN (Laclede Campus North Biodetention Basin)
INSPECTION RATING SYSTEM
Conditon
0
1
2
Lib
Assessment and Actions
Performance
Color
3ood
Moderate
Degraded
Serious
Well maintained, no action required
Should monitor
Routine maintenance and repair needed
Immediate need for repair or replacement
Satisfactory
Satisfactory
Unsatisfactory
Unsatisfactory
NOTE TO INSPECTORS: Ail personnel entering any confined spaces must take appropriate sc
measures and follow applicable OSHA regulations.
OVERALL DRAINAGE AREA CONDITIONS
Laclede North Biodetention Basin
INSPECTION ITEMS
Site Well Stabilized
RATING
COMMENTS
A. INLETS (if not piped, identify as overland flow)
Provide stable conveyance into facility?
0
overland Flow via rock swale to curb
Excessive trash/debris/sediment accumulation?
0
Site generally well maintained
Evidence of erosion?
0
None noted
6. PRETREATMENT (if applicable)
Excessive trash/debris/sediment accumulation?
NA
Evidence of standing water (Ponding, Noticable Odors,
NA
Evidence of clogging?
NA
Dead vegetation/exposed soil?
NA
Evidence of erosion?
NA
C. TREATMENT AREA AND VEGETATION
Excessive trash/debris/sediment accumulation?
0
Site generally well maintained
Signs of erosion or movement of mulch (or pea gravel)?
0
No evidence of erosion in this Basin
Evidence of oil/chemical accumulation?
0
None present
Evidence of standing water (Ponding, Noticable Odors,
0
None noted
Underdrain system (if equipped) broken/clogged?
0
Clear / working
Adequate plant covering present?
0
Native plants are well established
Is vegetation overgrown? Invasive, overgrown weeds,
0
No overgrown invasive or woody
Dead vegetation/exposed soil?
0
None present this day
Signs of mulch layer thinning (or pea gravel)
0
Mulch layer appears adequate
Condition of filter media
0
Multiple soil probes confirmed well
D. OVERFLOW/OUTLET STRUCTURE
Stable conveyance out of facility provided?
0
Via Area Inlet L -N.1
Excessive trash/debris/sediment accumulation?
0
Clear/working
Evidence of erosion at/around?
0
None present
E. HAZARDS
Complaints from local residents? (describe if any)
None of which I'm aware
Any public hazards observed? (describe if any)
0
None noted
F. CORRECTIVE ACTIONS*
* If any 2 - 3 ratings are given in Sections A -E of this checklist, list corrective actions recommented or completed during inspection.
NAME
DATE IDENTIFIED
CORRECTIVE ACTION
N/A
G. PHOTOGRAPHS
Please attach photographs, with descriptions, showing current condition of the system and any deficiencies noted in this inscpection.
Millipore Sigma - Laclede
BM P Inspection Photos
11/17/23
comments: MulOple sotl probe sarfl)les confirm we constructed !1. e' media of the prope1 clepth within all of the Biocletenuon Basins. This soil probe •Has cotlectecl horn the South Biodetent1on Bas n .
..
Comments: Looking north acmss the cemer BIOdetenc,on Basin
Comments: view into Grate Inlet L-S.J
. "Comments: v,:e1·., rito G•ai � ,nlet L·C l
VVIIOIg1IW. rNICJ 4„V DC1.1N,1DIVLaICV •IV'.1'1 Vl 1 IC basin
Comments: View into Area Inlet LA 1 w run Noah Bicaatenuon Basin
Comments: _oolano across the North Btottetentton Bastn
Comments: Inlet east cr the North Btodetenttcn eastn
1�
L 0 Y E T
Landscape
Maintenance
Loyet Landscape. LLC
261 Hughes Lane
St. Charles, MO 63301
(636) 487-4799 Jerry Brandt
POST CONSTRUCTION STORMWATER BMP INSPECTION REPORT
Inspection Date:
Reporting Year:
MSD Project Number:
Project Name:
Address of RMP:
11/17/2023
2023
P-0030556-00
Millipore Sigma -Laclede Ave
9Qn9 I arlorlo Avonue, qt.I ni iic Mn 6.'21.01
Owner Change Since Last Inspection? No
Property Owner:
Property Owner's Address:
Inspector's Name:
Inspector's Email:
Sigma -Aldrich Corporation
3050 Spruce Street
St Louis, MO 63103
Jerry Brandt
Property Owner's Agent: J Brandt
OwnerlAgent Email: JBrandt@LoyetLandscape.com
Inspector's Phone: (636) 487-2799
JBrandt@LoyetLandscape.com Conditions During Inspection: Sunny
INSPECTOR'S OBSERVATION SUMMARY
According to MSD records, construction approval for the Millipore Sigma Laclede Campus stormwater treatment system
improvements was granted on November 8, 2017 and consists of three biodentention basins. one pretreatment forebay, a permeable
concrete paver patio along with associated private inlets, piping, underdrains, manholes and structures. The fourth 2023 inspection
was performed the morning of November 17, 2023. Stewardship was performed on May 22nd, July 14th, August 28th, September
29th and October 24th. After carefully reviewing each component of the DeKalb Campus stormwater treatment system this day, I'm
confident confirming: based on what was observed, this stormwater treatment sytem appears to be functioning in accordance with its
design intent.
STORMWATER BEST MANAGEMENT PRACTICE (BMP) - SITE COMPONENT SUMMARY
SURFACE COMPONENTS
BMP TYPE
Biodetention / Rain
Garden Permeable
Pavement Pre -Treatment
NUMBER ON SITE
3
0
0
!Total civic Curripunerri 011 Site
3
Loyet Landscape. LLC
1�
L 0 Y E T
L an dsc a pe
Maintenance
261 Hughes Lane
St. Charles, MO 63301
(636) 487-4799 Jerry Brandt
BIORETENTION /RAIN GARDEN (Laclede Campus South Biodetention Basin)
INSPECTION RATING SYSTEM
Conditon
0
1
2
Assessment and Actions
Performance
Good
Moderate
Degraded
Serious
Well maintained, no action required
Should monitor
Routine maintenance and repair needed
Immediate need for repair or replacement
Satisfactory
Satisfactory
Unsatisfactory
Unsatisfactory
Color
NOTE TO INSPECTORS: �:,�nnel ent�..:,y �, , ,'fined spaces must take appropriate safety
measures and follow applicable OSHA regulations.
OVERALL DRAINAGE AREA CONDITIONS
Laclede South Biodetention Basin Site Well Stabilized
INSPECTION ITEMS
RATING
COMMENTS
A. INLETS (if not piped, identify as overland flow)
Provide stable conveyance into facility?
0
overland Flow via grass and rock swale
connections to curb cuts on conventional
parking surfaces. No debris present
Excessive trash/debris/sediment accumulation?
0
Site generally well maintained
Evidence of erosion?
0
None noted
B. PRETREATMENT (if applicable)
Excessive trash/debris/sediment accumulation?
NA
Evidence of standing water (Ponding, Noticable Odors,
Water Stains, Algae?
NA
Evidence of clogging?
NA
Dead vegetation/exposed soil?
NA
Evidence of erosion?
NA
C. TREATMENT AREA AND VEGETATION
Excessive trash/debris/sediment accumulation? 0 Site generally well maintained
Signs of erosion or movement of mulch (or pea gravel)?
0
No evidence of erosion in this Basin
Evidence of oil/chemical accumulation? 0 None present
Evidence of standing water (Ponding, Noticable Odors,
Water Stains, Algae?
0
None noted
Underdrain system (if equipped) broken/clogged? 0 Clear / working
Adequate plant covering present? 0 Native plants are well established
Is vegetation overgrown? Invasive, overgrown weeds,
woody vegetation?
0
No overgrown invasive or woody
vegetation present.
Dead vegetation/exposed soil? 0 None present this day
Signs of mulch layer thinning (or pea gravel) 0 Mulch layer appears adequate
Condition of filter media
0
Multiple soil probes confirmed well
constructed filter media of proper
D. OVERFLOW/OUTLET STRUCTURE
Stable conveyance out of facility provided?
0
Via Area Inlet D.E-1
Excessive trash/debris/sediment accumulation?
0
Clear/working
Evidence of erosion at/around?
—
0
None present
E. HAZARDS
Complaints from local residents? (describe if any)
0
None of which I'm aware
Any public hazards observed? (describe if any)
0
None noted
F. CORRECTIVE ACTIONS*
* If any 2 - 3 ratings are given in Sections A -E of this checklist, list corrective actions recommented or completed during inspection.
NAME
DATE IDENTIFIED
CORRECTIVE ACTION
N/A
G. PHOTOGRAPHS
Please attach photographs, with descriptions, showing current condition of the system and any deficiencies noted in this inscpection.
BIORETENTION / RAIN GARDEN
Laclede Campus Center Biodetention Basin
INSPECTION RATING SYSTEM
Conditon
0
1
2
3
Assessment and Actions
Performance
Color
Good
Moderate
Degraded
Serious
Well maintained, no action required
Should monitor
Routine maintenance and repair needed
Immediate need for repair or replacement
Satisfactory
Satisfactory
Unsatisfactory
Unsatisfactory
NOTE TO INSPECTORS: All personnel entering any confined spaces must take appropriate safPfv
measures and follow applicable OSHA regulations.
OVERALL DRAINAGE AREA CONDITIONS
Laclede South Biodetention Basin
INSPECTION ITEMS
Site Well Stabilized
RATING
COMMENTS
A. INLETS (if not piped, identify as overland flow)
Provide stable conveyance into facility?
0
overland Flow via rock swale to curb
cut. No debris present
Excessive trash/debris/sediment accumulation?
0
Site generally well maintained
Evidence of erosion?
0
None noted
B. PRETREATMENT (if applicable)
Excessive trash/debris/sediment accumulation?
NA
Evidence of standing water (Ponding, Noticable Odors,
NA
Evidence of clogging?
NA
Dead vegetation/exposed soil?
NA
Evidence of erosion?
NA
C. TREATMENT AREA AND VEGETATION
Excessive trash/debris/sediment accumulation?
0
Site generally well maintained
Signs of erosion or movement of mulch (or pea gravel)?
0
No evidence of erosion in this Basin
Evidence of oil/chemical accumulation?
0
None present
Evidence of standing water (Ponding, Noticable Odors. Water
0
None noted
Underdrain system (if equipped) broken/clogged?
0
Clear / working
Adequate plant covering present?
0
Native plants are well established
Is vegetation overgrown? Invasive, overgrown weeds, woody
0
No overgrown invasive or woody
Dead vegetation/exposed soil?
0
None present this day
Signs of mulch layer thinning (or pea gravel)
0
Mulch layer appears adequate
Condition of filter media
0
Multiple soil probes confirmed well
D. OVERFLOW/OUTLET STRUCTURE
Stable conveyance out of facility provided?
0
Via underdrain to grate L -C.1
Excessive trash/debris/sediment accumulation?
0
Clear/working
Evidence of erosion at/around?
0
None present
E. HAZARDS
Complaints from local residents? (describe if any)
None of which I'm aware
Any public hazards observed? (describe if any)
None noted
F. CORRECTIVE ACTIONS*
* If any 2 - 3 ratings are given in Sections A -E of this checklist, list corrective actions recommented or completed during inspection.
NAME DATE IDENTIFIED CORRECTIVE ACTION
N/A
G. PHOTOGRAPHS
Please attach photographs. with descriptions, showing current condition of the system and any deficiencies noted in this inscpection.
BIORETENTION / RAIN GARDEN (Laclede Campus North Biodetention Basin)
INSPECTION RATING SYSTEM
Conditon
0
1
2
Lib
Assessment and Actions
Performance
Color
3ood
Moderate
Degraded
Serious
Well maintained, no action required
Should monitor
Routine maintenance and repair needed
Immediate need for repair or replacement
Satisfactory
Satisfactory
Unsatisfactory
Unsatisfactory
NOTE TO INSPECTORS: Ail personnel entering any confined spaces must take appropriate sc
measures and follow applicable OSHA regulations.
OVERALL DRAINAGE AREA CONDITIONS
Laclede North Biodetention Basin
INSPECTION ITEMS
Site Well Stabilized
RATING
COMMENTS
A. INLETS (if not piped, identify as overland flow)
Provide stable conveyance into facility?
0
overland Flow via rock swale to curb
Excessive trash/debris/sediment accumulation?
0
Site generally well maintained
Evidence of erosion?
0
None noted
6. PRETREATMENT (if applicable)
Excessive trash/debris/sediment accumulation?
NA
Evidence of standing water (Ponding, Noticable Odors,
NA
Evidence of clogging?
NA
Dead vegetation/exposed soil?
NA
Evidence of erosion?
NA
C. TREATMENT AREA AND VEGETATION
Excessive trash/debris/sediment accumulation?
0
Site generally well maintained
Signs of erosion or movement of mulch (or pea gravel)?
0
No evidence of erosion in this Basin
Evidence of oil/chemical accumulation?
0
None present
Evidence of standing water (Ponding, Noticable Odors,
0
None noted
Underdrain system (if equipped) broken/clogged?
0
Clear / working
Adequate plant covering present?
0
Native plants are well established
Is vegetation overgrown? Invasive, overgrown weeds,
0
No overgrown invasive or woody
Dead vegetation/exposed soil?
0
None present this day
Signs of mulch layer thinning (or pea gravel)
0
Mulch layer appears adequate
Condition of filter media
0
Multiple soil probes confirmed well
D. OVERFLOW/OUTLET STRUCTURE
Stable conveyance out of facility provided?
0
Via Area Inlet L -N.1
Excessive trash/debris/sediment accumulation?
0
Clear/working
Evidence of erosion at/around?
0
None present
E. HAZARDS
Complaints from local residents? (describe if any)
None of which I'm aware
Any public hazards observed? (describe if any)
0
None noted
F. CORRECTIVE ACTIONS*
* If any 2 - 3 ratings are given in Sections A -E of this checklist, list corrective actions recommented or completed during inspection.
NAME
DATE IDENTIFIED
CORRECTIVE ACTION
N/A
G. PHOTOGRAPHS
Please attach photographs, with descriptions, showing current condition of the system and any deficiencies noted in this inscpection.
Millipore Sigma - Laclede
BM P Inspection Photos
11/17/23
comments: MulOple sotl probe sarfl)les confirm we constructed !1. e' media of the prope1 clepth within all of the Biocletenuon Basins. This soil probe •Has cotlectecl horn the South Biodetent1on Bas n .
..
Comments: Looking north acmss the cemer BIOdetenc,on Basin
Comments: view into Grate Inlet L-S.J
. "Comments: v,:e1·., rito G•ai � ,nlet L·C l
VVIIOIg1IW. rNICJ 4„V DC1.1N,1DIVLaICV •IV'.1'1 Vl 1 IC basin
Comments: View into Area Inlet LA 1 w run Noah Bicaatenuon Basin
Comments: _oolano across the North Btottetentton Bastn
Comments: Inlet east cr the North Btodetenttcn eastn