HomeMy Public PortalAbout11) 10A Review of Live Oak Park and Temple City Park Facility Master PlansAG E NDA IT E M 10.A PARKS AND RECREATION DEPARTMENT M EMORANDUM DATE : August 4, 2015 TO: The Honorable City Council FROM: Cathy Burroughs, Director of Parks and Recreation ~ S UBJECT: REVIEW OF LIVE OAK PARK AND TEMPLE CITY PARK FACILITY MASTER PLANS RECOMMENDATION: The City Council is requested to : a) Receive a presentation on the Live Oak Park and Temple City Park Facility Master Plans (Master Plans) from Community Works Design Group (CWDG); and b) Provide input and recommendations as deemed appropriate. BACKGROUND: 1. On April 2 , 2014 , the City Council adopted a Parks and Open Space Master Plan (POSMP), prepared by RHA Landscape Architects Planne rs, Inc. 2 . On June 3, 2014, the City Council reviewed the priorities established by the Parks and Recreation Commission for the Action Plan Matrix from the POSMP and approved the priority list. The highest priority item on the list was the preparation of Facility Master Plans for Live Oak Park and Temple City Park . 3. On September 16, 2014 , the City Council approved a Design Professional Services Agreement with CWDG for development of Facility Master Plans for Live Oak Park and Temple City Park in an amount not to exceed $34,530 . 4 . On November 6, 2014 , City staff met with CWDG to review the project and discuss recommendations from the POSMP. Also on that date, CWDG met with representatives from the va rious tai chi, exercise, and dance groups that meet in the parks to determine what types of facilities or amenities would best meet their needs. City Council August 4, 2015 Page 2 of 3 5. On December 17, 2014, CWDG met with representatives from the local youth sports organizations that use the facilities at Live Oak Park to discuss their future needs. 6. On January 21, 2015 , the Parks and Recreation Commission established an ad hoc committee to review and provide input into the preliminary Master Plans. Commissioners Georgina and Lopez were appointed to the Committee . 7. On January 28, 2015 , CWDG presented the preliminary Master Plans to staff and the Commission's ad hoc committee. Feedback and recommendations were provided. 8. On March 18, 2015, the preliminary Master Plans were presented to the Parks and Recreation Commission. The Commission approved , i n concept, the Master Plan for Temple City Park, but tabled further discussion on the Live Oak Park Master Plan requesting revisions to the proposed plan. 9. On April 15 , 2015 , a revised Master Plan for Live Oak Park was presented to the public and the Commission ad hoc committee . 10. On June 17, 2015, the Parks and Recreation Commission recommended approval of the Live Oak Park Master Plan-Option 7, with minor revisions. ANALYSIS: Since last fall , CWDG has been working with City staff and specific fo c us groups to develop Master Plans for both Live Oak Park and Temple City Park, consistent with recommendations in the POSMP adopted by the City Council in 2014 . The purpose of the Master Plans is to provide a guiding document for improvements and renovations to the City's existing parks for the next 20 years . The consultant was directed to utilize the information contained in the POSMP, in particular in regards to facilities and amenities desired by the community. Representatives from CWDG will present the Master Plans for Live Oak Park and Temple City Park, as recommended by the Parks and Recreation Commission. They will also provide information on preliminary cost estimates for each park, and phasing plans . As a reminder, other than the rubberized walking/jogging path , none of the improvements identified in the Master Plans are funded. However, staff will util ize the Master Plan documents to apply for various grants and other fund ing opportunities when they arise . The City Council is requested to review the information presented by CWDG , provide input and recommendations into the plans. The final Master Plan do cument will be prepared by CWDG based on approval of the preliminary Master Plans (as presented City Council August 4, 2015 Page 3 of 3 or revised), and will be brought back to the City Council within the next few months for formal adoption . Adoption of the Facility Master Plans is exempt from environmental review under the California Environmental Quality Act (CEQA) pursuant to Section 15301 of the State CEQA Guidelines pertaining to alterations and additions to existing facilities. CONCLUSION: After several months of study CWDG has developed Master Plans for Live Oak Park and Temple City Park. These Plans, once adopted by the City Council, will establish a strategic direction for delivery of public facilities and amenities that will focus on meeting the needs of the changing demographics and ensure sustainable operations of the City's parks over the next 20 years . FISCAL IMPACT: Approval of the Master Plans presents no fiscal impact to the FY 2015-16 City Budget. Master Plan implementation will result in fiscal impact , with all funding appropriations to be considered as part of the annual City Budget process . ATTACHMENTS: A . Live Oak Park Preliminary Plan -Option 7 B. Live Oak Park 3D Renderings (4) C . Live Oak Park Phasing Plan D. Live Oak Park Preliminary Cost Estimate E. Temple City Park Preliminary Plan F. Temple City Park 3D Renderings (2) G. Temple City Park Preliminary Cost Estimate LIVE OAK PARK-OPTION 7 CITY OF TEMPLE CITY NORTH 0 40' 80' DATE: 07/14/2015 PRO/ECf /1: 141032 ATTACHMENT A Rir~nidl', CA 91506 t9J itJrW-moo 160' Fa.r t9jl J .l69-IOJ9 LIVE OAK PARK 3D RENDERING -NORTHWEST CORNER ~~~~~~~~~~~~~~~~~~~~~~~~~~ [D LIVE OAK PARK 3D RENDERING-SOUTHWEST CORNER LIVE OAK PARK 3D RENDERING-SOUTHEAST CORNER LIVE OAK PARK 3D RENDERING-NORTHEAST CORNER PHASE 1 DAINES DRIVE LIVE OAK PARK-PHASING CITY OF TEMPLE CITY ATTACHMENT C LEGEND: D PHASE 1 • RUBBERIZED WALK W / CONCRETE MOWCURB D PHASE2 • (2) TOT LOTS • (2) CH I LD PLAY AREAS • SHADE SAI LS AT TAl CHI & PLAYS AREAS • (2) 40' HEXAGON PICNIC SHELTERS • (2) 3 6' HEXAGON PICNIC SHELTERS • (17) PICNIC TABLES • (3 ) BENCHES LU ::::> z LU • NEW DIAGONAL PARK I NG ALONG GRACEWOOD AVE. ~ 0 0 0 ~ • NEW BASK ETBALL COURT • LANDSCAPI NG • MAINTENANCE YA RD • TENNIS COURT RESURFACING LU u <( 0::: 1..? D PHASE3 • NEW COMMUNITY CENTER • COMMUN ITY CENTER DROP-OFF • PARKING LOT RESURFACING /RESTRIPING • LANDSCAPI NG D PHASE4 N0/11H 0 40' DATE: 07/14/2015 PRO]f:Cf N: 741002 80' • T UR F HYDROSEED • SUBS URFACE DRAIN • F RENCH DRAIN AT SOFTB ALL FI ELD • WALKWAY/PLAY AREA LIGHTING 160' R i1v rlifk. CA. 91506 (951 J .f69.()7(}() r at f9.'i i)J09·-IOJ 9 flllp:f:n11"U'.l'OI If'IITII J..jJ.'(.I."IJI /I ·------···--··--·---······-·······-············-····-········-····-····---·----·----···--·-----------------····-··---········--······-·---····---··-··········-·········· .............. ., .. _____ ............. _ .... _, __ _,.,,.,._,., ... _, ______ _, __ , .................... _._ ..... ---------·""'-"'•"'"'"""'"""""""""""'-- ATTACHMENT D COMMUNITY WORKS DESIGN GROUP PRELIMINARY COST ESTIMATE DATE: 07/20/15 PROJECT: LIVE OAK PARK PROJECT# 141032 PHASE 1 DESCRIPTION MOBILIZATION DEMOLITION AND CLEARING CLEAR AND GRUB HARDSCAPE MOWSTRIP-6"X 6" RUBBERIZED WALK MISCELLANEOUS PAINT STRIPING-RUBBERIZED WALK ••• SUBTOTAL ••• 10.00% CONTINGENCY ••• GRAND TOTAL -PHASE 1 PHASE 2 DESCRIPTION MOBILIZATION DEMOLITION AND CLEARING REMOV E EXISTING CONCRETE 4" REMOV E EX ISTING ASPHALT REMOVE HANDBALL CONCRETE WALL REMOV E CONCRETE PLANTERS REMOVE EXISTING PLAY EQUIPMENT REMOV E EXISITNG PLAY MATTING REMOV E EXISTING CONCRETE CURB REMOV E EX ISTING LIGHT POLE SHADE SHELTER RE MOVAL REMOV E CONCRETE UNDER SHELTER REMOVE TRASH ENCLOSURE TREE REMOVAL PALM REMOVAL ESTIMATE BY: DIEGO LOPEZ UNIT QTY. UNIT COST L.S . $19,105.00 8,350 S .F. $0 .25 2,900 L.F . $15.00 8,350 S .F . $25 268 L.F . $1.50 UNIT QTY. UNIT COST L.S . $162,785.00 21,500 S.F. $1.75 1,870 S.F. $0.75 25 S.F. $25 .00 190 S .F . $3.00 1 L.S . $10 ,000.00 12,650 S.F . $2.50 820 L.F. $5.00 10 EACH $500.00 2,565 S.F. $5.00 2 ,565 S.F . $1.75 40 L.F . $40 .00 12 EACH $500.00 1 EACH $250.00 Page:1 TOTAL COST $19 ,105 $2,088 $43,500 $208,750 $402 $273,845 $2 7 ,384 $301,229 TOTAL COST $162,785 $3 7 ,625 $1,403 $625 $570 $10,000 $31,625 $4,100 $5 ,000 $12,825 $4,489 $1,600 $6,000 $250 DATE: 07120115 ESTIMATE BY: DIEGO LOPEZ Page:2 PROJECT: LIVE OAK PARK PROJECT# 141032 CLEAR AND GRUB 106,900 S.F. $0.25 $26,725 GRADINGIDRAINAGEISEWERIW ATER DRAINAGE SEWER L.S. $10,000.00 $10,000 GRADING L.S . $20,000.00 $20,000 CONSTRUCTION PLAYGROUND *PLAY EQUIPMENT-TOT LOT 2 ALLOW $100,000 $200,000 *PLAY EQUIPMENT-CHILD PLAY 2 ALLOW $100,000 $200,000 CONCRETE CURB-12" 665 L.F. $50.00 $33,250 RUBBER MATTING 8,800 S.F. $17 $149,600 3" CONCRETE BASE 8,800 S.F. $5 $44,000 3' TUBE STEEL FENCING 165 L.F. $150.00 $24,750 SITE FEATURES PICNIC TABLE-6' 17 EACH $1,250.00 $21,250 BENCH-WIBACK-METAL (6') 3 EACH $725.00 $2,175 TREE WELL D.G. 20 EACH $250.00 $5,000 HARDSCAPE ASPHALT PAVING (3" WI 4" BASE) WISEALCOAT 3,500 S.F. $4.00 $14,000 CONCRETE CURB -6" 890 L.F. $18.00 $16,020 CONCRETE PAVING-4" 52,000 S.F. $5.50 $286,000 LANDSCAPING SOIL PREP I FINE GRADING 61,270 S.F. $0.45 $27,572 WEED ABATEMENT 61,270 S.F. $0.05 $3,064 90 DAY MAINTENANCE PERIOD 61,270 S .F . $0.15 $9,191 LANDSCAPE AREAS 61,270 S.F. $1.50 $91,905 TREES (PALMS) 12 EACH $3,000.00 $36,000 TREES (24" BOX) 20 EACH $275.00 $5,500 TREES (36" BOX) 9 EACH $750.00 $6,750 WOOD MULCH-3" 509 C.Y. $50.00 $25,450 D.G.-3" 29 C.Y. $130.00 $3,770 IRRIGATION AUTOMATIC IRRIGATION SYSTEM HARDLINE DRIP AREAS 24,508 S.F. $1.20 $29,410 DRIP AREAS 36,762 S.F. $1.30 $47,791 CONTROLLER 2 EACH $15,000.00 $30,000 FLOW METER 1 L.S. $650.00 $650 BACKFLOW PREVENTER 1 L.S. $4,000.00 $4,000 MASTER VALVE 1 L.S. $1,500.00 $1,500 MAINTENANCE YARD 6" AGGREGATE BASE 184 C.Y. $45.00 $8,280 6' HIGH WALL 220 L.F. $100.00 $22,000 TUBULAR STEEL SWING GATE 1 EACH $2,500.00 $2,500 TRASH ENCLOSURE & GATES 1 EACH $17,500.00 $17,500 ARCHITECTURE FABRIC SHADE SAIL-PLAY AREAS 3,145 S.F. $50.00 $157,250 FABRIC SHADE SAIL-TAl CHI AREAS 1,885 S.F. $50.00 $94,250 PICNIC SHELTER-40' HEX 2 EACH $47,000.00 $94,000 DATE: 07120115 ESTIMATE BY : D IEGO LOPEZ Page:3 PROJECT: LIVE OAK PARK PROJECT# 141032 PICN IC S HELTER-36' HEX 2 EACH $37,500 .00 $75 ,000 BASKETBALL POLE I 2 BACKBOARD I 2 HOOPS I 2 NETS 2 EACH $3,500 $7 ,000 LIGHT POLE 3 EACH $7 ,500 $22,500 BASKETBALL SURFACE PAINT & STRIPING 6,560 S.F. $2.5 $16,400 TENN IS RESURFACEIRESTRIP 51,050 S .F. $3.00 $153,150 MISCE LLANEOUS STRIPING-SINGLE LINE STALLS 43 EACH $15.00 $645 STRIPING -CENTERLINE ON GRACEWOOD 710 L.F. $1.50 $1,065 TRAFFIC CONTROL 1 L.S . $7,500.00 $7,500 ... SUBT OTAL $2,333,257 ••• 10.00% CONTINGENCY $233,326 ••• GRAND TOTAL -PHASE 2 $2,566,583 PHASE 3 UNIT TOTAL DESCRIPTION QTY. UNIT COST COST MOBILIZATION L.S. $802,900.00 $802,900 DEMOLIT ION AND CLEARING REMOVE EXISTING ASPHALT 2 ,500 S.F. $0.75 $1 ,875 REMOVE EX ISTING CONCRETE 4" 16,500 S.F. $1.75 $28,875 REMOVE EX ISTING CONCRETE CURB 580 L.F . $5.00 $2,900 TREE REMOVAL 12 EACH $500.00 $6,000 PALM REMOVAL 5 EACH $250.00 $1,250 CLEAR AND GRUB 20,300 S.F. $0.25 $5,075 COMMUN ITY BU IL DING DEMO 15,400 S.F. $25.00 $385,000 REMOVE STAIRS-COMMUNITY BLDG 375 S .F. $2.50 $938 GRADINGIDRAI NAGE/SEWERIW ATER CURB&GUT TER~RONTSOUTHPAR~NG 475 L.F. $20 .00 $9,500 SITE FEATURES TREE WELL D.G. 4 EACH $250.00 $1,000 HARDSCAPE ASPHALT PAVING (3" W/4" BASE) W/SEALCOAT 1,650 S.F . $4.00 $6,600 CONCRETE CURB -6" 240 L.F. $18 .0 0 $4,320 CONCRETE PAVING-4" COLORED 6,530 S .F. $8.00 $52,240 CONCRETE PAVING-4" 850 S.F. $5.50 $4,675 CONCRETE STAIRS-Community Center 205 L.F. $25.0 0 $5,125 DATE: 07/20/15 ESTIMATE BY: DIEGO LOPEZ Page:4 PROJECT: LIVE OAK PARK PROJECT# 141032 CONCRETE RAMPS-Community Center 1 L.S $10 ,000.00 $10,000 ASPHALT RESURFACING-COLD PLANING 42 ,220 S.F. $3 .00 $126,660 LANDSCAPING SOIL PREP I FINE GRADING 14,390 S.F. $0.45 $6,476 WEED ABATEMENT 14,390 S .F . $0 .05 $720 90 DAY MAINTENANCE PERIOD 14,390 S.F. $0.15 $2,159 LANDSCAPE AREAS 14,390 S.F. $1 .50 $21,585 TREES (PALMS) 2 EACH $3,000.00 $6,000 WOOD MULCH-3" 133 C.Y. $50.00 $6,650 IRRIGATION AUTOMATIC IRRIGATION SYSTEM HARDLINE DRIP AREAS 5,755 S.F. $1 .20 $6 ,906 DRIP AREAS 8,635 S.F . $1 .30 $11,226 ARCHITECTURE COMMUNITY CENTER BUILDING 33,300 S.F. $300.00 $9 ,990,000 MISCELLANEOUS STRIPING-SINGLE LINE STALLS 105 EACH $15.00 $1,575 **• SUBTOTAL $11,508,228 ••• 10.00% CONTINGENCY $1 ,150,823 ••• GRAND TOTAL -PHASE 3 $12 ,659,050 PHASE4 UNIT TOTAL DESCRIPTION QTY. UNIT COST COST MOBILIZATION L.S. $96,132.00 $96,132 DEMOLITION AND CLEARING CLEAR AND GRUB 1,620 S.F . $0.25 $405 SITE FEATURES 6' HIGH FENCE AT SOCCER FIELD 450 L.F. $65 $29,250 LANDSCAPING TREES (24" BOX ) 12 EACH $275.00 $3,300 TREES (36" BOX) 5 EACH $750 .00 $3 ,750 TURF HYDROSEED 262,670 S.F. $0.25 $65,668 SUBSURFACE DRAI N 262,670 S.F. $2.50 $656 ,675 D .G .-3" 15 C.Y. $130.00 $1,950 FRENCH DRAIN 165 L.F. $25 $4,125 IRRIGATION AUTOMATIC IRRIGATION SYSTEM DATE: 07120115 PROJ ECT: LIVE OAK PARK PROJECT# 141032 ROTOR AREAS PU MP LIGHTING I ELECTRICAL PLAY AREA LIGHTS **' **' SECURITY WALKWAY I LIGHTS CONDUIT, CONDUCTOR & MISC . ITEMS SUBTOTAL 1 0.00% CONTINGENCY GRAND TOTAL-PHASE 4 GRAND TOTAL -ALL PHASES ESTIMATE BY: DIEGO LOPEZ 262,670 S.F. $0.80 1 L.S . $20 ,000.00 8 EACH $3,000.00 25 EACH $4,500.00 1 L.S. $150,000 *Site specific equipment, obtain a quote from the manufacturer **Rough estimate cost. Obtain a specific quote from the specific water district. Page:5 $210,136 $20 ,000 $24,000 $112,500 $150,000 $1,377,891 $137,789 $1,515,680 $17,042 ,541 CIVIC CENTER CAMELLIA GARDEN TRELLIS TEMPLE CITY PARK PRELIMINARY LANDSCAPE PLAN-CITY OF TEMPLE CITY LIBRARY f RELOCATED CAMELL~fl MONUMENT NORTH 0 20' 40' DATE: 2015-07-21 ATTACHMENT E 80' J' • Nil~oidt', CA 9.?500 (9S/} J69-U7UO F'u 1 (9JI}3tN-II).l9 ltttp:lllm\a'.l"l.lllh\~Jtl$t.f~ .. t"'HII TEMPLE CITY PARK 3D RENDERING-SOUTHEAST CORNER ~~~~~~~~~~~~~~~~~~~~~~~~~~~ il TEMPLE CITY PARK 3D RENDERING-SOUTHWEST CORNER ATTACHMENT G Page:1 COMMUNITY WORKS DESIGN GROUP PRELIMINARY COST ESTIMATE DATE: 07/21/15 ESTIMAT E BY: ALLISON RUSH PROJECT: TEMPLE CITY PARK PROJECT# 141032 UNIT TOTAL DE SCRIPTION QTY. UNIT COST COST MOBILIZATION L.S. $81,000.00 $81,000 DEMOLITION AND CLEARING REMOVE EXISTING CONC RETE 14500 S.F. $0.90 $13,050 REMOV E EXISTING PLAY EQUI P 1 L.S. $5,000.00 $5,000 REMOVE EXISTING TRELLIS 1 L.S. $5,000.00 $5 ,000 CLEAR AND G RUB 53000 S.F. $0.25 $13 ,250 TREE REMOVAL 5 EA CH $300.00 $1 ,500 CONSTRUCTION PLAY GROUND *PLAY EQUIPMENT 1 ALLOW $1 00,000.00 $100,000 PLAY AREA CONC CURB 12" x 18" 100 L.F . $50.00 $5,000 DRAINAGE IMPROV EM ENTS 2 EACH $1,000.00 $2,000 RUBBER MATTING 2550 S.F. $15.00 $38,250 3" CONCRETE BASE 2550 S.F. $5.00 $12,750 S ITE FEATURES BENC H -W /BACK-METAL (6 ') 22 EACH $725.00 $15,950 BIKE RACK LOOP (5BIKES) 1 EAC H $750.00 $750 TREE WELL D.G. 2 EAC H $250.00 $500 HARDSCAPE CONCR ETE CURB -6" 1335 L.F. $18.00 $24,030 CO NCRETE PAVING-4" 27450 S.F. $5.50 $150,975 PAV ERS ON SAND 2590 S.F. $15.00 $38,850 ARCHITECTURE ENTRY TRELLI S ES 4 ,530 S.F. $95 $430,350 FABRI C S HA DE SAILS 3 ,270 S.F. $50 $163,500 LANDSCAPING SOI L PREP I FINE GRADING 48645 S.F. $0.45 $21,890 WEED ABATEMENT 48645 S .F. $0.05 $2 ,432 90 DAY MAINTENANCE PERI OD 4 86 45 S .F. $0.15 $7,297 S HRUBS (1 GAL) 240 EA CH $7.50 $1 ,800 SHRUBS (5 GAL) 735 EACH $16.50 $12 ,128 S HRUBS (5 GAL) -Camell ias 31 4 EACH $45.0 0 $14 ,130 SHRUBS (5 GAL) -Vines 16 EACH $16.50 $264 PALM TREES 1 EACH $3,000 $3,000 W OOD MU LCH-3" 133 C.Y. $50.00 $6,650 TURF HYD ROSEED 36,700 S .F. $0.25 $9,175 DATE: 07/21/15 ESTIMATE BY: ALLISON RUSH PROJECT: TEMPLE CITY PARK PROJECT# 141032 UNIT DESCR I PTION QTY. UNIT COST IRRIGATION AUTOMATIC IRRIGATION SYSTEM ROTOR AREAS 27,525 S.F. $0.80 ROTARY SPRAY AREAS 9,175 S.F . $1.25 CONVENTIONAL DR IP AREAS 13,530 S.F . $1.10 CONTROLLER 1 EACH $15 ,000.00 FLOW METER 1 L.S. $650.00 BACKFLOW PREVENTER 1 L.S. $4,000.00 MASTER VALVE 1 L.S. $1 ,500.00 PUMP 1 L.S . $15 ,000.00 LIGHTING I ELECTRICAL RELOCATE EXISTING WALKWAY LIGHTING 4 EACH $1 ,000.00 PLAY AREA LIGHTS 6 EACH $3 ,000.00 **' SUBTOTAL **' 10 .00% CONTINGENCY ••• GRAND TOTAL *Site specific equipment, obtain a quote from the manufacturer **Rough estimate cost. Obtain a specific quote from the specific water district. Page:2 TOTAL COST $22 ,020 $1 1,469 $14 ,883 $15,000 $650 $4,000 $1,500 $15 ,000 $4,000 $18,000 $1,286,993 $128,699 $1 ,415,692