Loading...
HomeMy Public PortalAboutORD14459 BILL NO. 2008-110 SUBSTITUTE SPONSORED BY COUNCILMAN Penfold ORDINANCE NO. AN ORDINANCE OF THE CITY OF JEFFERSON, MISSOURI, EXECUTING A CHANGE ORDER TO A CONSTRUCTION CONTRACT WITH SAK CONSTRUCTION, LLC FOR THE BASIN 17 REHABILITATION. BE IT ENACTED BY THE COUNCIL OF THE CITY OF JEFFERSON, MISSOURI, AS FOLLOWS: Section 1. The Mayor and City Clerk are hereby authorized to execute Change Order No. 2 with SAK Construction, LLC in the amount of $15:7,536-66$207,578.65, attached hereto as Exhibit A. Section 2. This Ordinance shall be in full force and effect from and after the date of its passage and approval. Passed: Approve `'7 • r siding Officer Mayor A T. APPROVED A§40 FORM: ity Cl k City Counselor • DEPARTMENT OF COMMUNITY DEVELOPMENT ENGINEERING DIVISION 320 EAST McCARTY STREET JEFFERSON CITY, MISSOURI 65101 Change Order No. Two(2) Project No. 31085 Date: DRAFT Job & Location: BASIN 17 REHABILITATION Contractor: SAK Construction LLC .................................................................................................................................................................................:.................................................................................................. It is hereby mutually agreed that when this change order has been signed by the contracting parties,the following described changes in the work required by the contract shall be executed by the contractor without changing the terms of the contract except as herein stipulated and agreed. ..................................................................................................................................................................................................................................................................................... DESCRIPTION OF CHANGES: (See Attached Sheet for Detailed Description/Explanation) Note:Item numbers prefixed with "EW"(Extra Work)are new line items to the contract. Quantity in Revised Amount of Item Quantity in Change Contract Overrun or No. Description Unit Contract Order Quantity Unit Price Underrun 3 8-inch full length cured-in-place lining LF 17281 2447 19728 $23.50 $57,504.50 6 12-inch full length cured-in-place lining LF 132 565 697 $45.00 $25,425.00 7 15-inch full length cured-in-place lining LF 944 248 1192 $35.50 $8,804.00 10 36-inch full length cured-in-place lining LF 4715 690 5405 $123.00 $84,870.00 21 A Clean,Televise and Evaluate-All sizes of LF 1200 2081 3281 $3.15 $6,555.15 EW 2.1 18-inch cured-in-place lining LF 0 370 370 $66.00 $24,420.00 CONTRACTORS PROPOSAL FOR THE ABOVE DESCRIBED CHANGES: Wechereby agree to the modifications of the contract as described above and agree to furnish all materials and labor and perform wk in connection therewith in accordance with the requirements for similar work in existing contract except as otherwise stipulated herein,for the following considerations: Contract Amount-Add$207,578.65 (Two Hundred Seven Thousand Five Hundred Seventy Eight Dollars and Sixty Five Cents)to the Contract Amount Contract Time-There is no change to the Contract Time STATEMENT OF CONTRACT AMOUNT: Amount %Change Time ORIGINAL CONTRACT $1,597,779.50 270 PREVIOUS APPROVED CHANGE ORDERS $30,250.65 1.9% 0 TOTAL THIS CHANGE ORDER $207,578.65 13.0% 0 TOTAL OF ALL CHANGE ORDERS $237,829.30 14.9% 0 CONTRACT AMOUNT TO DATE $1,835,608.80 270 ................................................................... ...................... ......... ........... ....... ............................................. SAK Construction LL , -Z� / ,Z7 Contrac r bate Recommended by: 17—r 3o-T"m Comm.Development Director/Deputy Director Date Verification of Encumbrance: i� /Iul uu � Finance Director Date Occepted by: 6� Owner-City Administrator/Mayor Date