HomeMy Public PortalAbout14-8815 Aextreme Road Maintenance for Completion of Abandonment of Old Wells Sponsored by: City Manager
Resolution No. 14-8815
A RESOLUTION OF THE CITY COMMISSION OF THE
CITY OF OPA-LOCKA, FLORIDA, TO RESCIND
RESOLUTION NO. 13-8591, AND TO AUTHORIZE THE
CITY MANAGER TO ENTER INTO AN AGREEMENT WITH
AEXTREME ROAD MAINTENANCE FOR COMPLETION OF
ABANDONMENT OF OLD WELLS AT THE OLD WATER
PLANT AS PART OF THE WATER PLANT DEMOLITION
PROJECT IN AN AMOUNT NOT TO EXCEED SEVEN
THOUSAND SEVEN HUNDRED DOLLARS ($7,700.00),
PAYABLE FROM ACCOUNT NUMBER 64-533822, A
BUDGETED ITEM;PROVIDING FOR INCORPORATION OF
RECITALS; PROVIDING FOR AN EFFECTIVE DATE
WHEREAS,there are at least eight(8)wells located at the Old Opa-locka Water Plant that
need to be abandoned, and according to historical knowledge there may be more; and
WHEREAS,as of August 2010,International Salvage,the company originally awarded the
contract, did not complete the project; and
WHEREAS,Resolution No. 13-8591 was adopted,but the services were not completed,and
Resolution No. 13-8591 should now be rescinded; and
WHEREAS, the City reissued a Request for Proposals (RFP), and received new bids for
completion of the project; and
WHEREAS,the servicer will provide services to log,locate,uncover,clean,remove casing
below land surface, plug, flush, and grout abandoned wells; and
WHEREAS,the staff recommends Aextreme Road Maintenance to receive the contract for
abandonment of the wells at the Old Water Plant, as the lowest bidder; and
Resolution No. 14-8815
WHEREAS, the budget amount allocated for this project was $123,000.00, and to date,
$93,690.00 has been expended, leaving an available balance of$29,310.00; and
WHEREAS, the City Commission of the City of Opa-locka desires to authorize the City
Manager to enter into a contract with Aextreme Road Maintenance for the completion of
abandonment of the old wells at the Old Water Plant, in an amount not to exceed $7,700.00.
NOW,THEREFORE,BE IT DULY RESOLVED BY THE CITY COMMISSION OF
THE CITY OF OPA-LOCKA,FLORIDA:
Section 1. The recitals to the preamble herein are incorporated by reference.
Section 2. The City Commission of the City of Opa-locka hereby authorizes and directs
the City Manager to enter into an agreement with Aextreme Road Maintenance for completion of
abandonment of old wells at the Old Water Plant as part of the water plant demolition project,in an
amount not to exceed Seven Thousand Seven Hundred Dollars ($7,700.00), payable from account
number 64-533822, a budgeted item.
Section 3. This resolution shall take effect immediately upon adoption.
PASSED AND ADOPTED this 11`i' day of June, 014. �1
Y'' TAYLOR
MAYOR
Att- t to: Approved as to form and legal suffliency:
Jo.f na Flores Jol'.ph S. Feller
City Clerk G.''4 ENS'OON MARDER, PA
C. y Attorney
Resolution No. 14-8815
Moved by: COMMISSIONER JOHNSON
Seconded by: COMMISSIONER SANTIAGO
Commission Vote: 5-0
Commissioner Holmes: YES
Commissioner Johnson: YES
Commissioner Santiago: YES
Vice-Mayor Kelley: YES
Mayor Taylor: YES
10284230 vl
,CQp-IOCkQ
OF,
~ Ci
U la
unnF
City of Opa-Locka
Agenda Cover Memo
Commission Meeting Item Type: R08o1 Orh.jn$nee 0 j
Date: 06/11/2014 X
(EnterXin box)
Fiscal Impact: Ordinance Reading: .v.. 211'1 R Ird ng
(Enter X in box) Yes No (Enter X in box)
x Public Hearing: Yeti Cg µ NO
(EnterXin box) X X
Funding Source: (Enter Fund&Dept) Advertising Requirement: Id
Ex: (EnterXin box) X
Account#64-533822
Contract/P.O.Required: „ `i ; RFP/RFQ/Bid#:
(EnterXin box)
Strategic Plan Related Strategic Plan Priority Area: Strategic Plan Obj./Strategy: (list the
(Enter X in box) specific objective/strategy this item will address)
X Enhance Organizational
Bus.&Economic Dev rr1 Remove inherit danger of
Public Safety 'M having open wells within
Quality of Education I 1 property boundary in
Qual.of Life&City Image re residential community.
Communication
Sponsor Name Department: City Manager-CIP
City Manager
Resolution for City Manager to rescind Resolution No. 13-8591 and receive services from Aextreme Road
maintenance for the abandonment of wells at the old water plant
There are eight (8) wells located at the Old Opa-locka Water Plant that need to be properly abandoned.
These wells are located on two parcels of land and according to historical knowledge there may be
additional wells above and beyond the eight that may also need to be abandoned. An RFP was issued and
bids received to perform the required services. Aextreme Road Maintenance was the low bidder to locate,
uncovered clean, log, remove casing below land surface, plug, flush and grout abandoned wells.
Since the location of the wells is not exactly known, Aextreme Road Maintenance will be required to
locate the wells by scratching the soil surface to uncovered them. Once uncovered, the wells will be
verified and measured to log the wells (i.e., determine total depth, depth of casing, casing material, casing
diameter, casing thickness). After logging, the well drilling contractor will fill the wells from bottom to
top with grout. After completing the abandonment, the well drilling contractor will submit documentation
to the South Florida Water Management District informing them that the abandonment was completed in
accordance with regulations. The Contractor is required to seek the necessary permit approval and follow
all procedures as required by all regulatory authorities and South Florida Management District throughout
this process.
The eight(8) wells that we know about are outlined below:
Size Quantity Depth Comment
8" 1 48' Abandon only
12" 1 120' Abandon only
12" 6 120' Flush sand and grout from the bottom to top
Staff recommends approval in order to eliminate any potential hazard associated with these wells as soon
as possible.
• Agenda
• Quotes
• Wells Abandonment-SCOPE
• Resolutions
• Exhibit
MEMORANDUM
To: Mayor Myra L.Taylor
Vice Mayor Jose L.Kell
Commissioner Timo iy Hol
Commissioner Doroti Joh i s
Commissioner Luis B. a 'a
FROM: Kelvin L.Baker,City Manager
DATE: June 03,2014
RE: Well Abandonment at Old Water Plant
Request:
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF OPA-
LOCKA,FLORIDA REQUESTING APPROVAL FOR THE CITY MANAGER TO
RESCIND RESOLUTION NO. 13-8591 AND RECEIVE SERVICES FROM
AEXTREME ROAD MAINTENANCE FOR THE ABANDONEMENT OF WELLS
AT THE OLD WATER PLANT AS PART OF THE WATER PLANT
DEMOLITION PROJECT IN AN AMOUNT NOT TO EXCEED SEVEN
THOUSAND SEVEN HUNDRED DOLLARS ($7,700.00) PAYABLE FROM
ACCOUNT NO.64-533822. (BUDGETED)
Description: The demolition of the Old Water Plant was awarded to contractor International
Salvage Inc. in January 2010. The agreement involved removal of the structures and clear wells
as well as abandoning old supply wells and site clearing. As of August 2010, International
Salvage expressed an unwillingness to complete the project as contracted. The City re-advertised
and received six (6) bids to complete the project and is recommending using Aextreme Road
Maintenance to complete the process of well abandonment. The wells must be capped in order to
comply with Florida Department of Environmental Protection(FDEP)Agency.
Account Number: 64-533822
Financial Impact: The original project budget for demolition of the water plant is$123, 000. To date,
$93, 690.00 has been expended resulting in a balance of$29, 310. This amount is to cover the costs of
well abandonment and site clearing.
Implementation Timeline: Immediate
Legislative History: Resolution# 09-7978, 13-8591
Recommendation(s): Staff recommends Aextreme Road Maintenance to complete the well
abandonment based on quotes received and an evaluation performed resulting in them being the most
responsive and lowest bidder.
Analysis: The three lowest bids are summarized below:
VENDOR QUOTE
Aextreme Road Maintenance $7,700.00
Earth Tech Drilling $24,828.00
Hydrologic Associates $44,500.00
Attachments: 1.Quotes
2. Wells Abandonment-SCOPE
3. Resolutions
4. Exhibit
PREPARED BY: Mohammad Nasir,PE,City Engineer/CIP Director
Erskin M.Howard,Project Manager
END OF MEMORANDUM
I w ,�
i b .—
qq iI' UI rl� il 1 6 Y f
4
> , f of 1a1t9I
\\\..liztl \ .
1
w
N -i ,,.':\,:,4y. In,'.,;,,,'',* !\:\lk ,,'L„,.:,,,, \..,■.,' ,, ;
"‹ 1, it () \ . , _ . :_. . ,, .
, . 00 „...,..
v.(NI k--- ,11400.i., i
_f I (
.9;1 .1— -2“, t. - .o.'',' ' ' —
'to Ag
1 iil
•
I 0 0 J
\I. '\
€I i
r » 4 I `
s U
\ ce'' •`1 9i1Y1% i
\\\ It L
„")-i V'
i Noo{,1
bib 2 W . h
W2 L � E9z 111050 z q ,0 i
hi e Wp z
v w-z S '1- bi oA
yF°}Qj zao0= ro Via. Z5
F YM O;ZCN §W 3,-< >i 0
\ Q o bj Enh 'S !f p$ !=3
L
Sponsored by: City Manager
RESOLUTION NO. 09_7978
A RESOLUTION OF THE CITY COMMISSION OF THE
CITY OF OPA-LOCKA, FLORIDA, ACCEPTING THE BID
FROM INTERNATIONAL SALVAGE, INC., IN RESPONSE
TO INVITATION FOR BID ("IFB") NO. 09-1123 FOR
DEMOLITION OF THE OLD WATER TREATMENT
FACILITY; FURTHER AUTHORIZING THE CITY
MANAGER TO NEGOTIATE AN AGREEMENT WITH
INTERNATIONAL SALVAGE, INC., FOR SERVICES
CONSISTENT WITH THE IFB IN AN AMOUNT NOT TO
EXCEED ONE HUNDRED FIFTY THOUSAND DOLLARS
($150,000.00) IN A FORM ACCEPTABLE TO THE CITY
ATTORNEY AND TO BE APPROVED BY THE CITY
COMMISSION
WHEREAS,the City of Opa-locka("City")desires to demolish the old water plant,cap the
existing wells and clear all other associated structures with the site; and
WHEREAS,the City requires the services of a qualified demolition contractor to undertake
the demolition and clearing of the Old Water Plant and adjacent potable well fields; and
WHEREAS, on July 22, 2009, the City Commission adopted Resolution 09-7901,
authorizing the City Manager to issue an Invitation to Bid(ITB)for the demolition of the old water
plant; and
WHEREAS,IFB No.09-1123 requested bids from qualified firms to demolish the old water
plant; and
WHEREAS,the City Manager is recommending that the City Commission accept the bid
from International Salvage,Inc.,as the lowest and most responsive bidder in response to IFB No.09-
1123 for the demolition of the old water plant,and further authorizes the City Manager to negotiate
an agreement with International Salvage, Inc. for the demolition of the old water plant.
NOW,THEREFORE,BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF OPA-LOCKA,FLORIDA:
Resolution No. 09-7378
Section 1. The recitals to the preamble herein are incorporated by reference.
Section 2. The City Commission of the City of Opa-locka hereby accepts the bid
submitted by International Salvage, Inc., in response to IFB No. 09-1123 for the demolition of the
Old Water Treatment Facility.
Section 3. The City Commission of the City of Opa-locka hereby authorizes the City
Manager to negotiate an agreement with International Salvage,Inc.,in an amount not to exceed One
Hundred and Fifty Thousand Dollars($150,000.00), in a form acceptable to the City Attorney and
approved by the City Commission.
Section 4. This resolution shall take effect immediately upon adoption.
PASSED AND ADOPTED this g day of DECEMBER , 2009.
r
‘‘..-}311r
- SE . ELLEY
MAYO
Attest: Approved as to form and legal sufficiency:
ARO
ea: .. :uY r'
!
i rah S. Irb Burnadette Nods eeks
City Clerk City Attorney
Moved by: TAYLOR
Seconded by: HOLMEs
Commission Vote: 3-0
Commissioner Holmes: YES
Commissioner Johnson: OUT OF ROOM
Commissioner Tydus: OUT OF ROOM
Vice-Mayor Taylor: YES
Mayor Kelley: YES
\9
•
t .
Memorandum
To: Mayor Joseph L.Kelley
Vice Mayor Myra L.Taylor
Commissioner Timothy Holmes
Commissioner Dorothy Johnson
Commissioner Rose Tydus
From: Bryan K. Finnie - 'm City Manager
Date: November .4' 109
Re: '/VOLITION AND CLEARING OF OLD WATER
P •7.
Request: A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF OPA-
LOCKA, FLORIDA AUTHORIZING THE CITY MANAGER TO ENTER
INTO AN AGREEMENT WITH INTERNATIONAL SALVAGE INC. IN AN
AMOUNT NOT TO EXCEED ONE HUNDRED FIFTY THOUSAND
DOLLARS ($150,000)FOR DEMOLITION WORK AND CLEARING OF THE
OLD WATER TREATMENT PLANT PAYABLE FROM ACCOUNT NO.64-
533822: PROVIDING FOR AN EFFECTIVE DATE
Description: The City of Opa-locka desires to demolish and clear two local sites :Old Water Plant
and adjacent well fields. On November 2009, an Invitation for Bids (IFB 09-1123) was issued to
procure a construction firm and bids received. This item allows the City Manager to enter into an
agreement with the most responsive bidder to demolish the Water Plant. These construction
services will cover demolition of above and below ground structures, capping of wells and utilities
and grading of the site amongst other things.
Financial Impact: The budgeted cost for this project in FY 2010 is $125,000. Based on the current
bids, the work is expected to cost $25,000 beyond the anticipated budget. The shortfall between
budgeted and actual costs is minor in comparison to the expected benefits from the completed
project.
1
Demolition and Clearing of The Old Water Plant
Page Two
November 30,2009
Implementation Timeline: The contract's execution between International Salvage Inc. and the
City is expected to be completed within 30 days of approval of this resolution.
Legislative History:
09-7425,09-7901
Analysis: The demolition of the Old Water Treatment Plant is of great benefit to the City of Opa-
locka. Among other things,it will allow the City to properly abandon the drinking wells and prevent
potential contamination to the ground water or the Florida aquifer. Additionally, the work will
provide for increase safety, reduced illegal dumping and overall beautification for the residents
adjacent to the plant and Opa-locka as a whole.
Attachments
END OF MEMORANDUM
2
.. Ilirdu.11ul II 111111111 O'IIIII gala IIIIINII II III 1111111110111111111MIiI'1'111l11111111111111111111111ii14111111 1111111 1111'lll11111141111 11111 111111111111111 I 11111Ii16u 111 11111 01111!011110111111 Illml l 111111 i.:n:..J
111711 111
I1NI�II�y
CITY OF OPA-LOCKA
BID CERTIFICATION
INVITATION FOR BIDS(IFB)NO.09-1123
DEMOLITION OF OLD WATER TREATMENT FACILITY
I,Deborah S.Irby,City Clerk of the City of Opa-locka,Florida,do hereby certify that
according to the provisions of Sec.2-320.1 of the City's Code of Ordinances,sealed bids were
opened at the Office of the City Clerk,780 Fisherman Street,4T11 floor,Opa-locka,Florida,at
1:05 p.m.this 23''d day of November,2009.
BIDS RECEIVED
Name of Company Bid Amount
International Salvage $ 146,159.00
4611 S. University Drive, Suite 316
Davie,FL 33328
Contact: Robert Brack
Tele: 954-587-1966
Fax: 954-587-1670
Email: intlsalvage @aol.com
Miami Wrecking Co. $ 193,057.00
4540 NW 8 Terrace
Oakland Park,FL 33309
Contact: Karen Harrington,President
Tele: 954-492-2727
Fax: 954-492-2726
I further certify that sealed bids submitted were properly opened in my presence and also the following:
CITY CLERK
1
01115n,.nNMIMMI1ugIMMMmAINI MNAMMXX _, MMMMMTMM!MMMOMNAMIRPRIMIM
. RM411WWIeeMNMnMINmnpIMMNAPmeMM"."A"'NPMMIA1XnM+XIAXmm'eMluNleulryy lwnnlluMNN
Sponsored by: City Manager
RESOLUTION NO. 13-8591
A RESOLUTION OF THE CITY COMMISSION OF THE
CITY OF OPA-LOCKA,TO AUTHORIZE THE CITY MANAGER
TO ACCEPT THE PROPOSAL FROM EARTH TECH DRILLING
FOR THE ABANDONMENT OF WELLS AT THE OLD WATER
PLANT AS PART OF THE WATER PLANT DEMOLITION
PROJECT, IN AN AMOUNT NOT TO EXCEED SIX THOUSAND
NINE HUNDRED THIRTY DOLLARS ($6,930.00)PAYABLE FROM
ACCOUNT NO. 64-533822, THIS ITEM IS NOT BUDGETED;
PROVIDING FOR INCORPORATION OF RECITALS; PROVIDING
FOR AN EFFECTIVE DATE
WHEREAS, pursuant to Resolution 09-7978, the demolition of the Old Water Plant
originally awarded to International Salvage Inc., which did not complete the project, needs to be
completed; and
WHEREAS, to comply with requirements of the Florida Department of Environmental
Protection (FDEP) Agency, the City seeks an alternative contractor to complete the project and
to finalize the completion of the well abandonment/capping;and
WHEREAS, four proposals were received, and staff recommends Earth Tech Drilling to
complete the well abandonment based on their bid, which is the lowest, responsive and
responsible proposal;and
WHEREAS, since the item is not budgeted,the project will be funded from the$300,000
originally budgeted for FY 2012-2013, (Account number 64-533822) for SSES CCTV& Lining
project; and
WHEREAS, $93,960 of the $123,000 originally budgeted for demolition of the water
plant has been expended, leaving$29,310, that will cover the costs of well abandonment and site
clearing; and
Resolution No. 13-8591
WHEREAS, the City Commission of the City of Opa-locka approves Earth Tech
Drilling for the Abandonment of Wells at the Old Water Plan.
NOW, THEREFORE, BE IT DULY RESOLVED BY THE CITY COMMISSION
OF THE CITY OF OPA-LOCKA,FLORIDA:
Section 1. The recitals to the preamble herein are incorporated by reference.
Section 2. The City Commission of the City of Opa-locka, authorizes the City
Manager to contract with Earth Tech Drill for the completion of the abandonment of wells at the
Old Water Plant (a non-budgeted item), in an amount not to exceed $6,930.00, payable from
Account 64-533022, With the understating that the contractor shall be required to specify
procedures acceptable to the city for identifying the location of all wells to be capped prior to
receiving a notice to proceed.
Section 3. This resolution shall take effect immediately upon adoption.
PASSED AND ADOPTED this 8th day of May,2013.
/
YRA t�• YLOR
i MAYOR
testto:
&L.A.. A •
J. a Flores
City Clerk
Approved to form and legal s fficiency:
!' ° I ,,
.
J'. :. Geller
EE SPOON MARDER PA
0 ty Attorney
Resolution No. 13-8591
Moved by: COMMISSIONER SANTIAGO
Seconded by: VICE MAYOR KELLEY
Commission Vote: 5-0
Commissioner Holmes: YES
Commissioner Johnson: YES
Commissioner Santiago: YES
Vice-Mayor Kelley: YES
Mayor Taylor: YES
_... ... ...... .. .,x„;. ......,,.,•. _:... „«.v ,. .e... m,;;.....,muss -: a.r,„es,, a°r:
OOh`7
<0
y p
~ C
U pp p
City of Opa-Locka
Agenda Cover Memo
Commission Meeting 05/08/2013 Item Type: O Other
Date: X
(Enter Xin box)
Fiscal Impact: Ordinance Reading: 1st Reading 2lid Reading
(Enter X in box) Yes (Enter X in box)
X Public Hearing: Yes No Yes No
(Enter Xin box) x x
Funding Source: (Enter Fund&Dept) Advertising Requirement: Yes No _
Ex: (EnterXin box) X
Account#64-533822
ITEM BUDGETED:NO
Contract/P.O.Required: Yes No RFP/RFQ/Bid#:
(Enter X in box) X N/A
Strategic Plan Related Yes No Strategic Plan Priority Area: Strategic Plan Obj./Strategy: (list the
(Enter X in box) specific objective/strategy this item will address)
X Enhance Organizational El
Bus.&Economic Dev p 1. Need to comply with FDEP
Public Safety requirements
Quality of Education
Qual.of Life&City Image E.
Communcation 0
Sponsor Name City Manager Department: City Manager's Office
, Ȣx
Well Abandonment at Old Water Plant
a R ,
Staff recommends Earth Tech Drilling to complete the well abandonment based on quotes submitted to
Procurement.
Proposed Action:
The wells must be capped in order to comply with Florida Department of Environmental Protei:tior
(FDEP)Agency.
Attachment:
1. Agenda 2.Quotes 3.Well Abandonment-SCOPE 4. Resolution#09-7978
n
O
J [`
MEMORANDUM
To: Mayor Myra L.Taylor
Vice Mayor Joseph L. elley
Commissioner Timothy olm•
Commissioner Dorothy J i h i •I n
Commissioner Luis B.Say: _o
FROM: Kelvin L.Baker,Sr.,City M ,
DATE: April 12,2013
RE: Well Abandonment at Old Water Plant
Request:
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF OPA-
LOCKA,FLORIDA REQUESTING APPROVAL FOR THE CITY MANAGER TO
RECEIVE SERVICES FROM EARTH TECH DRILLING FOR THE
ABONDONEMENT OF WELLS AT THE OLD WATER PLANT AS PART OF
THE WATER PLANT DEMOLITION PROJECT IN AN AMOUNT NOT TO
EXCEED SIX THOUSAND NINE HUNDRED THIRTY DOLLARLS ($6,930.00)
PAYABLE FROM ACCOUNT NO.64-533822,THIS ITEM IS NOT BUDGETED.
Description: The demolition of the Old Water Plant was awarded to contractor International
Salvage Inc. in January 2010. The agreement involved removal of the structures and clear wells
as well as abandoning old supply wells and site clearing. As of August 2010, International
Salvage expressed an unwillingness to complete the project as contracted. The City is seeking
alternatives to complete the project and is recommending using alternative specialized
contractors to complete the process of well abandonment. The wells must be capped in order to
comply with Florida Department of Environmental Protection(FDEP)Agency.
Account Number: Account #64-533822; the item is not budgeted. We will fund this project
using dollars originally budgeted for SSES CCTV& Lining. The FY 2012-2013 budget includes
$300,000 for SSES CCTV&Lining which will not be done this year.
Financial Impact: The original project budget for demolition of the water plant is $123,000.
To date $93,690.00 has been expended resulting in a balance of$29,310. This amount is to cover
the costs of well abandonment and site clearing.
Implementation Timeline: Immediate
Legislative History: Resolution#09-7978
1
Recommendation(s): Staff recommends Earth Tech Drilling to complete the well abandonment based
on quotes submitted to Procurement.
Analysis: Earth Tech Drilling is the lowest bidder as summarized the received quotes below:
VENDOR QUOTE
Earth Tech Drilling $ 6,930.00
Envirospec,Inc. $ 8,580.00
Wingerter Laboratories, Inc. $18,600.00
Best Wells, Inc. $25,000.00
Attachments: 1. Four(4)Quotes
2. Well Abandonment-SCOPE
3. Resolution#09-7978
PREPARED BY: Mohammad Nasir,PE,City Engineer/CIP Director
END OF MEMORANDUM
2
QP lock
O
c 2 D
• +�1� a'4'L'Y•
OLD WATER PLANT
WELL ABANDONMENT
3/20/13
PURPOSE
The purpose of this request is to seek proposals for the abandonment of twelve (12) wells at an
Old Water Treatment Facility located at 1025 Burlington Street, Opa-locka Florida.
DESCRIPTION
The site comprises two parcels of land that total 44, 60sq.ft. The larger parcel of land is west of
Codadad Street, folio number 08-2121-007-2090. The second parcel of land is east of Codadad
Street folio number 08-2121-007-2390.
SCOPE OF WORK
The wells are to be located and uncovered by the Contractor and verified by the Owner's
Consultant, Langan Engineering& Environmental such that measurements can be taken and then
properly abandoned. For this purpose, the Contractor must prepare a unit cost for well
abandonment presuming a depth of 30 ft. South Florida Water Management District has the
permit and exact locations of the wells.The permit no. is 23222 dated 27 January 1975.
As the well construction is not known, at a minimum the well drilling contractor will have to log
the wells (i.e., determine total depth, depth of casing, casing material, casing diameter, casing
thickness). After logging, the well drilling contractor will fill the wells from bottom to top with
neat grout, according to Chapter 40E-3.531, Florida Administrative Code. After completing the
abandonment, the well drilling contractor will submit documentation to the district that the
abandonment was done according to the regulation. The Contractor is required to seek the
necessary permit approval and follow all procedures as required by all regulatory authorities and
South Florida Management District throughout this process.
Submittal deadline: FRIDAY.APRIL 5,2013 AT 1:00 P.M.
Submit via: U S mail;email or fax to: Rose McKay,Purchasing Officer
780 Fisherman Street, 4th fl; Opa Locka,Fl 33054
305-953-2900 fax email: rmckav @opalockafl.gov
M's/V1 GqN ATR . IN C;
BEST WELLS, INC.
BWI CONSTRUCTION,INC
GENERAL CONTRACTORS&WELL DRILLING CONTRACTORS
April 5,20130
Attn:Mrs. Rose A.McKay
Purchase Officer
City of Opa-Locka Phone: 305-953-2868
780 Fisherman Street,4th Floor Fax: 305-953-2900
Opa-Locka,Florida 33054
Re: Old Water Plant
Well Abandonment
Capping of underground wells
1025 Burlington Street
Opa-Locka,Florida
Abandonment of six(6)wells(diameter 4-12")of existing well up to 30 feet,in accordance with the
South Florida Water Management District,Miami-Dade Health Department and South Florida Building
Code as follows:
TOTAL PRICE: 525,000.00 up to 30 feet each.
The price will include:
• Abandonment of existing well up to 30 feet
• Material&Labor
• permitting
• Completion Report
• Final Inspection
Exclusion:Pump,connection of well to pump,structure over well,laterals,layout,site access,
Maintenance of traffic if need be,underground clearance other than Sunshine,disposition of cuttings,
performance bond.
13350 Le Jeune Road,Suite 15.Opa-Locka,Florida 33054
Tel.305-235-9901 Fax.305-666-8457
Low iconstructionincarlyahoo.com
lb er ret(a,bestw e I Is.com
04/05/13 01:58PR YINGERTER LABORATORIES 3059496698 p.01
WINGERTER WINGERTER LABORATORIES, INC.
usoureants Engineering Testing & Inspection Services
1820 N. E. 144th Street, North Miami, FL 33181
Professional Engineering iTesting Telephone No.: (305)944-3401 Fax No. (305) 949-8698
Established 1949
PRICE QUOTATION
To: City of Opa Locka Date: April 5th,2013
•
Attn: Rose McKay Phone:
780 Fisherman Street Fax: (305)953-2900
Opa Locka,Florida 33054 E-mail: rmckay c(,opalocka.gov
Project: Old Water Plant Well Abandonment
1025 Burlington Street,Opa Locka,Florida
PROPOSED SERVICES:
1 - Perform Monitoring Well Abandonment,max.diameter 12"PCV to an assumed depth of 30'
Estimate Twelve(12)wells x $1,500.00/Each = $18,000.00
2- Mobilization/Demobilization of Equipment& Personnel = $600.00
ESTIMATED COST = $18,600.00
PAYMENT TERMS: NET 30 DAYS WITH PO
NOTES:
Conducting the above reference tests involves driving a heavy truck mounted drill rig into the property,and drilling holes into the ground iYingerter
Laboratories,Inc.will contact local utility companies through the Sunshine(lotillcation Network,which will locate and mark ony of their underground
facilities present in the vicinity of the proposed test locations prior to us performing the work However,we will not assume responsibility for damage to
privately owned underground utilities(such as sprinklers,street lighting,etc.),septic tanks or other underground structures which may result from drilling
activities or mobilization of the truck mounted equipment,if not identified to us prior to mobilization to the site,nor we will be responsible to damage to
lawn or soft ground which may result from driving the truck mounted equipment into the property
pete7 '. L' -1/ia
Prepared By: -- ...
Jill W.Chin-You –_—~
President
I hereby authorize WINGERTER LABORATORIES, INC. to proceed with above referenced scope
of work and agree to pay for these services as per the terms described above.
Accepted By: Date:
Name: Title:
EARTH TECH DRILLING
2703 NW 19TH STREET,POMPANO BEACH,FL 33069
954.9742424 FAX:954.9742423
Contractor Name: City of Opa-Locka,FL
•
Site Name: Old Water Plant 1028 Burlington St.Opa-Locke,FL Data:4-4-13 FAC!DM
PROPOSED SCOPE OF WORK:
Locate and Abandonment of 12-12",5",6"x 90'Welk
•
— i
DRILLING Unit Unit Rah Number
Extended Pries
Mg Type:Support TYUcic W
Unite
Split Spoon Cobbled grime..w e•Wands)Kid be wed le oan(rasah Wh well hwrerhhy tndeepe Wen)
HAND CLEARING to lf 11.5 ._
per foot
c5o fool baba depth per
4e foot to 160 foot boring depth per foot t �.�per foot
•100 fool baring depth per NO i $0.00
Borehole Grouting
4.Inch borehole diameter per f -- 3000
6•Inch borehole diameter per loot _.-.30.0
S.•blob borehole diameter pm loot I ----- ��
i".2"WeN habitation(rdewe enm hwerNre dawn,walk AWr.erdpere,MI rd prp J
si0 foal boring depth r er trot 1 $0.00
60 hallo 100 foot boring dept
7 per foot 1I
5100 toot boring depth I per foot J $0.00
4"Well Installation*AWN awwhwengeecea.Immo per.ee a pick peel ro amp
410 fool bears depth ' per foot I ._ $0.00
60 hallo 1e0 foot boring depth
lD0t $0.00
5100 foot beaus depth per foot _.
Recovery Noll Diameter. per foot
Double Cased Welk
4"Swage Casing per foot 1
6"Swab Casing I $0.00 per foot 8"Surface Casino per Soot
1 $0.00
Well Completion teverve.0o.eweae e,npenae.wearepee.WIMPwebalb I per well 1 I I T------- $0.00,
12"Welt Abandonmentnwogwpwwet per foot $27.00 30 $810.00
8"Well Abandonment poem gmeinp per foot Sit 00 90 _ 51.440.00
6"wen Abendonlent endue*endow per foot $12.00 740 $29ao03
2'x 3'Weil Pad Removal and Patcn
each
30.00
MISCELLANEOUS •
Mobilisation rourdblp I $400.00 3 i 51.200.00
Par Diem
511/01 Drum per craw I per rigright$
$0.00
DOT Approved 5
50.00 each
Pent*,(OheM r aardrpew My:wet ewrwrp he MC t each wrerNaaleN each I 560.00E 12 $100.00
Coombe Con and pardi
TnfRo Salty Correa ore $0.00
*ovum I AM%bra nw►4lew* per day I $0.00
Development Time
per hour j 50.00
Additional Decontmiatkn Time Per hour
$tandby/Oelay/DINkWt Access Time $0.00
per hour r $0.00
TOTAL QUOTE PRICE I 84,930.00
Days to Complete Scope of Work:_3.4_
Project No.:
Subcontract Company Nam.:EARTH TECH DR1WNG 1164.574.2424
Subcontract Melling Address: 2703 NW 111th It,Pompano Ban FL J� !/`
Signature end Title of Person Submitting Quote:Bob Orlando , Date: 7.. y"/3
Monitoring Wells Sperge Wells Horizontal and Vertical Vapor Extraction Wells Geotechnical Drilling Direct Push
Apr 01 13 05:21p Envirospec, Inc. 561-369-8282 p.2
Envirospec, Inc.
Environmental Specialists
OLD WATER PLANT WELL ABANDONMENT
BID#0405100
Envirospec, Inc. is a qualified minority, small business that employs four environmental
professionals with over 70 years experience performing various environmental assessment
projects in The south Florida area. Envirospec specializes in the assessment and remediation of
soil and groundwater contaminated with petroleum products, solvents, pesticides, metals and
other hazardous materials. Additional services include groundwater modeling, monitoring well
installations and abandonment, contamination assessments and remediation, Phase UPhase II
Investigations,and Hazardous Materials Management Services. Envirospec is a State qualified
contractor for the Petroleum Storage Tank Pre-Approval Program.
This bid is for the abandonment of 12 wells at the Old Water Plant located at 1025 Burlington
Street, Opa Locka, FL on two parcels of land (08-2121-007-2090 and 08-2121-007-2390).
Envirospec will contact SFWMD for permitting and the exact locations of each of the 12 wells.
Envirospec will then locate the wells and confirm well locations with Langan Engineering &
Environmental. Once confirmation is complete, the wells will be logged (casing diameter and
depth, total depth of well, casing material, and casing thickness) and then properly abandoned
according to FAC Chapter 40E-531. A report will be prepared documenting all site activities for
submittal to SFWMD and the City of Opa Locke.
The project is projected for 2 days with the following costs proposed:
Field Geologist on site to locate and log 12 wells $ 440.00
Mobilization(2 trips) $ 850.00
Permit Fee x 12 S 900.00
Report $ 450.00
Known Costs $2,640.00
Abandonment Costs:
1-2 inch wells x 30 feet x 12 $ 2,700.00
3-4 inch wells x 30 feet x 12 $ 3,420.00
5-6 inch wells x 30 feet x 12 $ 4,500.00
8-10 inch wells x 30 feet x.12 $ 5,940.00
12-14 inch wells x 30 feet x 12 $ 9,900.00
16-18 inch wells x 30 feet x 12 $12,060.00
Total Project Cost $TBD based on size of wells
Estimate based on twelve 8-10 inch wells $ 8,580.00
Should you require further information,contact our office at 561-369-8885.
Respectfully Submitted,
Enviros ,
i runt, .G.
President
2755 South Federal Highway • Unit 3 • Boynton Beach, Florida 33435
Phone(561)369-8885 • Fax(561)369-8282
Sponsored by: City Manager
RESOLUTION NO. n g-7 g 7R
A RESOLUTION OF THE CITY COMMISSION OF THE
CITY OF OPA LOCKA,FLORIDA, ACCEPTING THE BID
FROM INTERNATIONAL SALVAGE,INC.,IN RESPONSE
TO INVITATION FOR BID ("IFS") NO. 09-1123 FOR
DEMOLITION OF THE OLD ;WATER TREATMENT
FACILITY; FURTHER AUTHORIZING THE CITY
MANAGER TO NEGOTIATE AN AGREEMENT WITH
INTERNATIONAL SALVAGE, INC., FOR SERVICES
CONSISTENT WITH THE IFB IN AN AMOUNT NOT TO
EXCEED ONE HUNDRED FIFTY THOUSAND DOLLARS
($150,000.00) IN A FORM ACCEPTABLE TO THE CITY
ATTORNEY AND TO BE APPROVED BY THE CITY
COMMISSION
WHEREAS,the City of Opa locka("City")desires to demolish the old water plant,cap the
existing wells and clear all other associated structures with the site;and
WHEREAS,the City requires the services of a qualified demolition contractor to undertake
the demolition and clearing of the Old Water Plant and adjacent potable well fields;and
WHEREAS, on July 22, 2009, the City Commission adopted Resolution 09-7901,
authorizing the City Manager to issue an Invitation to Bid(ITB)for the demolition of the old water
plant;and
WHEREAS,IPB No.09-1123 requested bids from qualified firms to demolish the old water
plant;and
•
WHEREAS,the City Manager is recommending that the City Commission accept the bid
from International Salvage,Inc.,as the lowest and most responsive bidder in response to IFB No.09-
1123 for the demolition of the old water plant,and further authorizes the City Manager to negotiate
an agreement with International Salvage,Inc.for the demolition of the old water plant.
NOW,THEREFORE,BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF OPA LOCKA,FLORIDA:
.
Resolution No. 09—79 12
•
Section 1. The recitals to the preamble herein are incorporated by reference.
Section 2. The City Commission of the City of Opa-locka hereby accepts the bid
submitted by International Salvage,Inc.,in response to IFBNo.09-1123 for the demolition of the
Old Water Treatment Facility.
Section 3. The City Commission of the City of Opa locka hereby authorizes the City
Manager to negotiate an agreement with International Salvage,Inc.,in an amount not to exceed One
Hundred and Fifty Thousand Dollars($150,000.00),in a form acceptable to the City Attorney and
approved by the City Commission.
Section 4. This resolution shall take effect immediately upon adoption.
PASSED AND ADOPTED this A_day of DECEMBER ,2009.
• E, , •11 LEY
YO.
Attest: Approved as to fo PP and legal sufficiency:
1 ah.S.Ir. Burnadette No + ecks
City Clerk City Attorney
Moved by: TAYLOR .
Seconded by: HOLMES
Commission Vote: 3-0
Commissioner Holmes: • YES
Commissioner Johnson: OUT OF ROOM _
Commissioner Tydus: OUT OF ROOM .
Vic Mayor Tayk,r
Mayor ICe_lley _... DIES_._ _ - --
I
I
1
1
• t P sly
§ Fag pi ggM IIII
s — � i '
s _ �-
W W O u •�• �• O 2
i 12os of : MMfi_ dh i,iIj ! !L> .p . lit tit a N o A101 �Q" ¢ ;
1 1 -#.: h 0217 - 'Rill/ <01 1 M
.. .9901. R Wg vu. jil"ml 0 el. A ',J
21U g 41 .sozispe141°411mtit, lig :6:A ; .1
.� •-� ��i CO 1.- {
CF. v '
e
i
:81 1 .1
..,
,
1 a
a.
1
ils
IP ' :
r—as 'WO
Ug, § o c a g i
I 2 _ :
s' g • • 'NI :
0.6 A Pp
i g 4 8 6 aq, ', phi
1 ii ti i ("- i i , Hi
r Api i dii i
P -g ,iiii , ..
1 gdg i 1111 it .2 1, a JIJIjIg.� a i ;
1 o ! I Hi' il Mr, 1,
_ i.
k::::,...
._. .
Z -
• :
.(,
..,
I
9 I
g 8 $ 8 I g ..1
818 88 *lill it t 1
1 § §8 V§ 8 l§K 1 -
c g$ vin
x i Na aa ia ga I' as --azi i I .
f-
8 E0 1 81 •
I .s
g 1 :.1 8 : a. ..st&
1 w VI ! 1Pils I
.. 'il
1118
inotoci 2 1. 012 S. id gl 1 tA WI Mill
,
i A' 8
re 1 ; h i a
Z < h. el 1
E ''i
a 1.1 2
,-- Z-2E4 °I - . 1
081wt; Li
, ; _ Ilifigc IIIII*Iiin I P. T ips 1
81 0- . 5 g g
vg
Et AIR 15 . 0 ifal )-mgv 5 z A
. .08!. 1 grgslIgiallglI 'g. E
5 ii I ii _t 1.11,01LL A.
I I- s g 1111 .z 11, 111 . -6:9 -meAt e IP '''
s 1 mattspils,. ce.142.m. sla. e. 5 of
2 g 1 '- : 12vzloi " 1 -16" g ' iR1 Oh ,
1 .. .0z001- 2- . „ FAO enZ
1 0
In.- N mvol co N coo
6
, 0 0 •
i
I
tlAi
411i -. I
a s JQ
illi 6 i
i 1 I
ttt o
A.°
1 19411
§
; 2 III! iii0g
wo N !J5F
8f, < < S 881a ggE
Fig 5 0- a
IX w tifg OW
8 2 §
C mlil
.Bm 1 11111
t . Ez1
os _______AAVI 1 A Ilig
a 3
1 VI iih 4 i .. ,
4 t zi 1 1 • . ;
1 is 84 g cL .
0. >- , 1
1 il 81 ii
1 .2.5g Die I .tm , 9111 i r,:).57---,
0 rw7 lb d 01; 1
v g All V . DM__
0 11; lia a relp_ 1 _ _ 144_ 1 . 2
3 oi mai - OW t 1 k g 1 pi \,. . riSill
(4 IA io,! - 8E1 1 2‹
p$;./. w I
i glg 14 rbl BM
. i 01 tliAsi . , 1 § 1
.
1 0 lig
n "II il r T. \ i il
0 E 1.E
ar I- u.cg 0 ou . 24.2 A 8 k -Eilig
____ - •,-6.-•••1! ,., ....-..
International Salvage Inc.
4611 S.University Drive,Suite 316-Davie,FL 33328 Office(954)587-1966 Fax(954)387-1670
May 6,2010
Fernand Thorny
City of Opa-Locka
780 Fisherman Street -
Opa-Locka,FL 33054
Re: Old Water Plant
1025 Burlington Street
Opa-Locka,FL 33054 •
Dear Mr.Thony,
As the demolition contractor on the above project,I feel that some of the work has not
progressed as scheduled. I feel the drawings on this project were not sufficient at the
time of bidding. The plans provided towards the capping phase of the job should have
been submitted with the bid packages. In the bid package,on page 31"Scope of
Services"paragraph A,line 3 reads:Disconnecting capping or sealing and abandoning
all site utilities in place. Nowhere does the bid package imply or state that line stops
may have to be used to cap all utilities. I have contacted and spoken to three other
colleagues that were also at the Fe-bid meeting and it was agreed that the City was
going to shut down the water so we could cap the utilities. Line stops were never
mentioned or discussed.
Normal practice dictates that the water valves should be exercised a certain amount of
times per year,however according to your employees they never have. Also,the City
was reluctant in the beginning of the process to assist us as needed. Only later did
Owen come forward with some type of as bunts to help us move forward with the job.
We thank and commend him for his efforts. International Salvage Inc.put in a set price
for capping utilities. Given that the City could not control the water,line stops had to
be used to cap utilities at a much higher price which should not be incurred by
International Salvage Inc. As it is now,International Salvage is over budget on the
plumbing aspect of this job,due to exploratory digging due to the lack of detail in the
plans provided.
In closing,we submitted the invoice for plumbing on this project which was for
$41,180.00 and we allowed for$11;000.00 in plumbing work. Therefore we are
respectfully requesting a change order for the difference of$30,180.00.
_Sincerely
Robert Brack
Project Manager
�p.ir.Csp
® O
O
� 2
U
a
0
t vµ .
OLD WATER PLANT
WELL ABANDONMENT
02/28/14
PURPOSE
The purpose of this request is to seek proposals for the abandonment of eight (8) wells at an Old
Water Treatment Facility located at 1025 Burlington Street, Opa-locka Florida.
DESCRIPTION
The site comprises two parcels of land that total 44, 60sq.ft. The larger parcel of land is west of
Codadad Street, folio number 08-2121-007-2090. The second parcel of land is east of Codadad
Street folio number 08-2121-007-2390.
SCOPE OF WORK
The wells are to be located and uncovered by the Contractor and verified by the Owner's
Consultant, Langan Engineering & Environmental such that measurements can be taken and then
properly abandoned. For this purpose, the Contractor is required provide quote to abandon total
eight wells as outlined below:
Size Quantity Depth Comment
8" 1 48' Abandon only
12" 1 120' Abandon only
12" 6 120' Flush sand and grout from the bottom to top
South Florida Water Management District has the permit and exact locations of the wells. The
permit no. is 23222 dated 27 January 1975.
As the well construction is not known, at a minimum the well drilling contractor will have to log
the wells (i.e., determine total depth, depth of casing, casing material, casing diameter, casing
thickness). After logging, the well drilling contractor will fill the wells from bottom to top with
neat grout, according to Chapter 40E-3.531, Florida Administrative Code. After completing the
abandonment, the well drilling contractor will submit documentation to the district that the
abandonment was done according to the regulation. The Contractor is required to seek the
necessary permit approval and follow all procedures as required by all regulatory authorities and
South Florida Management District throughout this process.
Submittal deadline: FRIDAY, March 7, 2014 AT 1:00 P.M.
Submit via: U S mail; email or fax to: Rose McKay, Purchasing Officer
3400 NW 135th Street, Buidling-B; Opa Locka, Fl 33054
305-953-2900 fax email: rmckay(a,opalockafl.gov