HomeMy Public PortalAbout10-0090 Haywood CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 03 -3 -2010 PERMIT #: 100090
WORK DESCRIPTION SHEATHING /WRAP /SIDING; HNDRAILS
WORK LOCATION 22 & 24 CAPTAIN'S VIEW
OWNER NAME ROBERT HAYWOOD
ADDRESS 28 BUCKHEAD LN
CITY, ST, ZIP FORSYTH GA 31029 -8225
PHONE NUMBER
CONTRACTOR NAME HUNT DEVELOPMENT INC
ADDRESS PO BOX 525
CITY STATE ZIP BOLINGBROKE GA 31004
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 335.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $40,000.00
TOTAL BALANCE DUE: $ 335.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
I ' •
1 1
T I
,
City of Tybee Island • Community Deveiopment Dept.
.... — a.
';::.• ' : . ...-, . .4 Inspection Report
Kgcira:ry4
403 Butler Ave. . R.O. Box 2749 • Tybee Island, GA 31328
Phone 912.736.4573 ext. 114 • Fax 912.736.9539 ...,:•'.:-;,',.;•',`;)
.__....
1 / ' /
Permit No. '''‘
I n - I .ki , :fi ) Date Requested
, _ _
i I
fr 4 1 i
„ ---/ ,,
' * 1
Owner's Name - 1 - 17. - ....q i, )-?\ Date Needed " t / (...)
/
Gen. Contractor 1 Ill\ 1 ' ) .
1.__ , ,, Subcontractor
Contact Information __ ' c. "28__
Project Address _ , '72 - 'Li
Scope of Work 1,- e V 't51( ' i I 1::Jir _L.N)7a.. - , 6..› - ) 1 -717 ' , 1 ■ t)(a.
,
i
1
.1
Inspector (
/ Date of Inspection .s:..:
4
Inspection 117: t( 4 Li 4/.-1 — no 1'1
Pass wi. - -,-, 1 Fee
,.. 4 _______
■
Inspection Pass 0 Fail 0 Fee
Inspection_ Pass Fail 0 Fee
_
inspection Pass 0 Fao 0 Fee
1 ,
, r
,,, f2
Aten tt
!, City of Tybee Island • Community Development Dept. 441#21N':
,-. - • -,-, , Inspection Report
403 Butler Ave. • P.O. Box 2740 - Tybee Island, GA 31328 •n HU
Phone 912.756..4573 ext. 114 - Fax 912.756.9539
Permit No 1 0 -15"390 Date Requested
r . •
I_
,....... ,....,
Owner's Nam I
e 1- TheA13,&001:::) Date Needed :: :5 •• /
Gen. Contractor '..„...._,lt‘- Subcontractor
Contact Information Obj 13/E
I ,
.27 1 Z 4,-, --i>,q, ,15
Project Address
• , (
Scope of Work
, ,---
1 Inspector Date of ( 1_ 4 13ortion
1 1
Inspection 0-1 Ago
' ...S.) ?-: ' Fail 0 Fee
1 ,3 Ft-TaVA 3rksIA)f-- '
I Do):) Ir - /
_ Ig sf_ 1 5/06e,....6 1.44, 5 5•". eg .1 itli. C I
(10 k i I '; C 6 / AP )daL6
Inspectio il _ : -- - 7 Fail n Fee
— _
I
Inspection • rl _. Fail 0 Fee
Inspection - .: - Fail Fee
A2-.7
City of Tybee tand Con Development Dept.
Law,-
• Inspection Report
. 403 Butler Ave. P.O. Box 2749 Tybee Island, GA 31328
Phone 912.786.4573 ext. 114 Fax 912.786.9539
Permit No. 16 4 1 0 Date Requested r 0
Owner's 14 agree ___ Date Needed
-7 /
/
Gen. Contractor FL /04 I Subcontractor
Contact Information
Project Address 2Z 1 / 4 . 2
r: 1
4
Scope of Work
Inspecto jg Date of Inspection , / 9
I nspectio n .1\)( - 7) 2 P'14rf - T :7 -0 Pass Fee
I ,s
titi4
Inspection ' Pass Fail ( - 3 Fee
Inspection Pass Fail Fee
Inspection Pass c3 Fail ..] Fee
_ _ _
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
/ �r �1 ,,
I 0 - o 04 0 ,,, ; 1,;)
J04„,.„,„0,,,,
, . .,,,,
Location: ', )-. j L i Cc I✓ c' t PIN #
NAME ADDRESS TELEPHONE
Owner Eli/ fl
6411csri 7f 7/ 7 JJcr
Architect
or Engineer U /C
Building l ���`�11 ��
Contractor 1i 11 L i
(Check all that apply)
1X Repair Residential 7 Footprint Changes
Renovation n Single Family n Discovery
n Minor Addition 1 Duplex 1 Demolition
❑ Substantial Addition ❑ Multi- Family
Other 1 Commercial
Details of Project: 7 iJ'G'V c i.--any 5 id iie t/ f` 94 ci i7Y ',) p/ 1 , r e e /
: k V . 1/6 4 1 l ; � , / .7 s / / 5' / 1 e . . - - - ; o A, _ , /s
e. tl' " - ci c"
Estimated Cost of Construction: $ , + C. - 3 °C - ()
Construction Type j. (Enter appropria - • • -
(1) Wood Frame (4) Masonry (6) Other (please specify)
(2) Wood & Masonry (5) Steel & Masonry
(3) Brick Veneer
Proposed use: , 1 e
Remarks:/ .� M C
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
# Units # Bedrooms # Bathrooms
Lot Area Living space (total sq. ft.)
# Off - street parking spaces
Trees located & listed on site plan
Access:
Driveway (ft.) With culvert? With swale?
Setbacks: Front Rear Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through
On -site waste and debris containers will be provided by
Construction debris will be disposed by by means of
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: Signature of Applicant:
Note: A pei normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone
Approved rezoning/variance?
Street address and number: New Existing
Is it in compliance with City map?
If not, has street name and /or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: Signature Date FEES
Zoning Administrator Permit 2t
Code Enforcement Officer Inspections 1 2 D
Water /Sewer Water Tap
Storm /Drainage Sewer Stub
Inspections Aid to Const.
City Manager
TOTAL 33C.