Loading...
HomeMy Public PortalAbout10-0094 Gill F 14 ) ti CITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 03 -5 -2010 PERMIT #: 100094 WORK DESCRIPTION REMOVE OVERHANG & FLOORING WORK LOCATION 7 EIGHTEENTH ST -APTS OWNER NAME GEORGE GILL ADDRESS PO BOX 30653 CITY, ST, ZIP SAVANNAH GA 31410 -0653 PHONE NUMBER 220 -228 -1755 CONTRACTOR NAME ADIEV RESTORATION INC ADDRESS 214 RIDGE RD CITY STATE ZIP ELLABELL GA 31308 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 120.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $5,600.00 TOTAL BALANCE DUE: $ 120.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Or w...0) DA ... Signature of Building Inspector or Authorized Agent: taA P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4.573 - FAX (912) 786 -9539 www.cityoftybee.org Z City of Tybee Island • Community Development Cept. Infspection Report 403 Butler AVE'. Sox 7749 • Tyboe Nandri GA 313-28 sea MI Phone 912.7E6.4573 ext. 114 - Fax 912.78639 Permit (,. , 57_ ./ Date Requested i Owner's Name k 11 Date Weeded 1 4 1 () Gen. Contractor 4- A 4 cj P 1,/ t\t- Contact Inforinataon ,/.; Flroject Adress ki • Scope of Work rt okieJ 04. er ti a e -4700 Inspector jj 16] z - Date of Inspectiors ° f • , lrimarq Inspection Lg e. 17 .„. Pass Fee I FP.SPeCtiO Pass Fail Fee 7 IC - r. • Inspection Pass Fail 0 Fee • • Inspection_ Pass ri Fail Fee • - - - - - _ _ 2010 -03 -05 09 :18 ADIEU RESTORATION 'N 8584335 » 912 786 9539 P 1/4 CITY OF T, IA APP YBEE FOR ISLAND BUILDING GEORG PERMIT IM� Location: 4 4 ' 7 r 34h 5 I�S�Q t Jc a PIN # _ NAME ADDRESS Owner r t . TELEPHONE Architect I � � � !� )C? I to • a2t1- or Engineer Building A41lt4V 'f!17 0, Contractor Ralph -�c�i 1 Li p,;(j[ ectx ganabesi UDE q r d , if ►$ '4 3, ) (Check all that apply) ❑ Repair ❑ Residential ❑ Renov ation Single Family 0 Footprint Changes © ❑ ❑ Minor Addition p Duplex Discovery ] Demolition ❑ Substantial Addition ❑ Multi - Family Other ❑ Commercial Details of Project: • LI.I i , 9..ernime e,Nl&rt t( cectil cry Estimated Cost of Construction: OD d i -;n- ` Construction Type t (Enter appropriate number) (1) Wood Frame (4) Masonry (6) Other (please specify) (2) Wood & Masonry (5) Steel & Masonry (3) Brick Veneer Proposed use: CC.(11Gf t 1)3 5-fucAu.(e Remarks: 5-�(L C4 use. i 5 CC..k ] Li ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following information based on the construction drawings and site plan: # Units # Bedrooms # Bathrooms Lot Area Living space (total sq. ft.) # Off - street parkitg spaces Trees located & listed on site plan Access: Driveway (ft.) With culvert? - With swale? Setbacks: Front Rear Sides (L) (R) # Stories _ Height Vertical distance measured from the average adjacent grade of the bui to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. 2010 -03 -05 09:18 ADIEU RESTORATION 'N 8584335 » 912 786 9539 P 2/4 During construction: On -site restroom facilities will be provided through Q(,A,o'1l'( On -site waste and debris containers will be provided by 1JJ4 Construction debris will be disposed by gown 5*(}i ( by means of 1g-5i-ft. d Rosa I. 1 understand that 1 must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances. FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. 1 understand also that a certified plot plan showing elevation must he attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is establish. Drainage: 1 realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: 1. ! i ID Signature of Applicant: No te : A permit normallyakes 7 to 10 dayssproeess. The following is to be completed by city personnel; Zoning certification , , NFIP Flood Zone Approved rezoning /variance? Street address and number: New Existing Is it in compliance with City map? If not, has street name and /or number been reported to MPC? _- FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site _ 4 Distance to water main tap Site Distance to sewer stub site _ Water meter size Storm drainage Approvals: Signature Date FEES ,, // Zoning Administrator , Permit `:3 Code Enforcement Office Inspections Water /Sewer Water Tap Storm/Drainagc Sewer Stub Inspections Aid to Const. City Manager 3 CAC- u,3',40 rpgr-o-A L`` o kta k TOTAL d� x r2. 0 2010 -03 -05 09:18 ADIEU RESTORATION"N 8584335 » 912 786 9539 P 3/4 REQUIRED FOR: Building Permits Relocation Permits Sign Permits Demolition Permits Land Clearing, Disturbance or Excavation Permits Tree Removal Permits Relocation Permits Special Review Permits Site Plan Approval Subdivision of Land Sketch Plan Approval Preliminary Plan Approval Final Plat Approval Minor Subdivision Plat Approval Major Subdivision Plat Approval In addition to specific requirements for the above permits and approvals, applicants must demonstrate that they are in compliance with the City of Tybee Island Storm Water Management requirements as outlined in Chapter 5 -4, Code of Ordinances. Suction 5-4-9 Prohibition provides, in part, as follows: (4.) It is unlawful for any person to cause or permit any storm water to flow from their property onto the property of another person, unless such storm water naturally flowed thereon prior to any development activity. (5.) It is unlawful for any person to interrupt the flow of any storm water runoff from adjacent property onto their property by any development activity. As part of the City's approval process applicants must illustrate how these storm water management prohibitions will be met, including a showing of how storm water naturally flowed on the affected property (prior to any development activity), and what changes in storm water flow have occurred or are expected to occur, as attachments to this fonn. The City's approval or permit does not guarantee that the applicant's plans will result in meeting requirements. The final product must actually meet the City Ordinance requirements. Applicant name: 12 , 1V Project LD.: Attachments approved by: Date: