STAFF REPORT
This Staff Report is a technical analysis of the submitted application material and the required
findings of the Watertown Zoning Ordinance. It is based only upon information submitted prior
to the public hearing and may be revised or updated with new recommendations, findings and/or
conditions as new information is obtained by Planning Staff during the public hearing process.
Case #: ZBA-2012-10-ASP/ASPF
Subject Property: 805 Mt. Auburn St, Watertown, MA
Parcel ID: 1609-1-0
Zoning District: Limited Business Zoning District
Petitioner: Sprint Spectrum, LP.
Address of Petitioner: c/o Prince Lobel Tye LLP, 100 Cambridge St, Suite
2200, Boston, MA. 02114
Owner: Adams Realty, LLC, 16 Garden St., Cambridge, MA
02138
Zoning Relief Sought: Amendment to #99-13SP/SPF & #10-10ASP/ASPF
§5.13 Wireless Telecommunication Facilities
Special Permit Granting Authority: Zoning Board of Appeals
Date of Staff Report(s): July 31, 2012
Staff Recommendation: Conditional Approval
Date of Planning Board Meeting: Scheduled August 8, 2012
Date of ZBA Meeting: Scheduled August 22, 2012
805 Mt. Auburn Street
ZBA-2012-10
July 31, 2012
Staff Report
I. PUBLIC NOTICE (M.G.L. c. 40A, § 11)
"805 Mt. Auburn Street - Amendment to Special Permit/Finding
Sprint Spectrum, L.P. herein request the Zoning Board of Appeals to grant an
Amendment to Special Permit/Finding #99-13; #10-10 to replace existing antennae and
equipment. LB (Limited Business) Zoning District."
II. DESCRIPTION
A. Nature of the Request
The Petitioner requests an Amendment to ZBA case #99-13 & #10-10 (Special Permit/Special
Permit Finding) so as to permit the modification of an existing wireless telecommunication
facility. The modification is part of Sprint Nextel's plans to modernize and upgrade its network
including its first 4th generation ("4G") nationwide broadband mobile network to provide high
speed internet access.
• Remove 3 existing panel antennas and
replacing them with 3 new panel
antennas within the existing stealth
enclosure.
• Replace 2 existing equipment cabinets
• Insta11 9 RRH (remote radio head)
units
• Replace faux flue with a faux chimney
that will better conceal the mounting
hardware.
B. Site Characteristics
View of existing rooftop equipment from rear.
Sprint's stealth enclosure located at far left.
The subject property is a 25,262 s.f. lot on Mt Auburn Street containing a six -story residential
apartment building built in 1967. The height of the building at the top of the roof is 60' and
62' at the top of the parapet. Several different wireless carriers are located on the roof
including AT&T/Cingular, Sprint, and Clear Wireless. The height measured to the top of the
highest wireless facility is 80'6" (AT&T).
C. Land Use
This site is located in the Limited Business (LB) Zone in East Watertown near the border
with the City of Cambridge. Reflective of the LB Zone, the site is surrounded by a variety of
residential, commercial, and retail uses.
2
805 Mt. Auburn Street
ZBA-2012-10
July 31, 2012
Staff Report
D. Relevant Permitting History
February 26, 1997 ZBA Case #96-33 (AT&T)
Erect triangular shaped antenna array on a 25' tall pole and install associated equipment.
• Special Permit Finding to alter a nonconforming structure
• Variance from maximum height (9'6" higher than existing 76'5" tall penthouse
where the maximum height is 40')
• Special Permit for Exceptions to Height Regulations (no longer applicable to
wireless installations)
July 30, 1997 Modification of Control Documents for ZBA Case #96-33 (AT&T)
Antenna array redesigned to replace original AT&T array that was found to be "aesthetically
obj ectionable."
June 30, 1999 ZBA Case #99-13 (Sprint)
Erect 18' tall antenna array and associated equipment
• Special Permit Finding to alter a nonconforming structure
• Variance from maximum height
• Special Permit for Exceptions to Height Regulations (no longer applicable to
wireless installations)
May 26, 2010 ZBA Case #10-10 (Clear Wireless/Sprint)
Amend ZBA Case #99-13 to add WiMAX installation to deploy Sprint's new 4G broadband
network.
• Add three (3) "WiMAX" panel antennas and one (1) backhaul dish to existing
chimney within new RF transparent faux chimney.
• Install one (1) backhaul dish antenna mounted on new 12" standoff pipe mount on
penthouse wall.
• One (1) new GPS antenna mounted to the existing elevator penthouse.
• Relocate existing Sprint antenna inside new faux stove pipe.
July 27, 2011 ZBA Case #2011-19 (AT&T/Cingular) *Planning Staff has been in
communication with AT&T regarding the appearance of the stealth box vs. the approved
plans. The issue still has not been resolved.
Amend ZBA case #96-33 to upgrade AT&T's facility to provide high speed data services.
• Remove existing mast and relocate existing (6) six antennas and add (3) three new
LTE antennas to new mounting frame.
• Locate all antennas (as well as a surge arrestor and RRH) within new stealth box on
top of existing penthouse (lower height to 80'6")
• Add additional associated equipment cabinets and cabling.
3
805 Mt. Auburn Street
ZBA-2012-10
July 31, 2012
Staff Report
III. FINDINGS
A. Amendment to Special Permit
The proposal was reviewed for compliance with the criteria for wireless telecommunication
facilities outlined in §5.13(a) of the WZO as well as the conditions for approval of a Special
Permit as outlined in §9.05 of the WZO, which are as follows:
5.13(a) Wireless Telecommunications Facilities
The wireless telecommunications facility must:
1. Be located within one of the following zoning districts: CB, LB, I-1, I-2, I-3, & CR.
Met: This modified wireless facility is in the LB district and meets this condition.
2. Not be located on a structure containing residences nor within 50 feet of a residential
zone or any structure containing a residential use.
Met: The existing facility is on a residential building for which approval was granted for
case #99-13 and has already been found to be appropriate.
3. In the case of an antenna mounted on a building or structure, not extend more than (15)
fifteen feet above the height of such structure or building.
Met: The modified facility will not extend 15 feet above the height of the building.
4. In the case of a tower, not exceed the height allowed in the zoning district.
Not Applicable.
5. Be fully concealed or camouflaged, i.e. disguised, shielded, hidden, or made to appear as
an architectural component of an existing or proposed structure.
Met: The replacement panel antennas would be located within the existing stealth
enclosure/faux chimney and would not be visible. The Petitioner also plans to replace the
faux flue with a faux chimney to better conceal the mounting hardware and to better integrate
the installation with the building.
9.05 Conditions for approval of a Special Permit
1. The specific site is an appropriate location for such a use, structure or condition.
Met: The site is located within the LB (Limited Business) district, which permits the use. The
use is already in existence and was found to be an appropriate location when the previous Special
Permit was granted.
2. The use as developed will not adversely affect the neighborhood.
Met: The existing wireless facility has not been found to have adversely affected the
neighborhood. The proposed modifications would not change the use.
4
805 Mt. Auburn Street
ZBA-2012-10
July 31, 2012
Staff Report
3. There will be no nuisance or serious hazard to vehicles or pedestrians.
Met: The existing wireless facility has not been found to have caused a nuisance or serious
hazard to vehicles or pedestrians. The proposed modifications are not expected to generate any
significant traffic as it is an unmanned facility and will be serviced approximately one to two
times per month.
4. Adequate and appropriate facilities will be provided for the proper operation of the
proposed use.
Met: Adequate and appropriate facilities are provided through existing utilities (electrical and
telephone service) for the proper operation of the proposed use. The facilities will be inspected
monthly to ensure it remains in good working order and in compliance with all applicable local,
state, and federal laws.
B. Amendment to Special Permit Finding §4.06(a)
In accordance with §4.06(a), pre-existing non -conforming structures or buildings may be
extended or altered provided that the Board makes the finding under §4.06(a) that "such
change, extension or alteration shall not be substantially more detrimental than the existing
non -conforming use, structure or building to the neighborhood."
The proposal to replace existing antennas with new antennas would not create any visual change
as the changes would occur within the existing faux chimney. In addition, in response to
concerns from Planning Staff, the Petitioner proposes to replace the faux flue with a new faux
chimney to better conceal the existing installation.
IV. STAFF RECOMMENDATIONS
Staff recommends conditional approval of the requested Amendment to the ZBA Case #99-13
& #10-10 based upon the findings that it meets the criteria set out in the Zoning Ordinance.
V. CONDITIONS:
#
Condition
Compliance
Timeframe
Verified
by:
1
Approval is for the modification of Sprint's existing wireless facility.
The Control Plans shall be: the plan set entitled "Sprint Vision 805 Mt.
Auburn BS13XC738 805 Mt. Auburn Street Watertown, MA 02472
Middlesex County" Title Sheet, T-1; General Notes, GN-1; General
Notes & Structural Design Parameters, GN-2; Plot Plan, C-1; Rooftop
Plan & Equipment Platform Layout, A-1; Elevations, A-2; Antenna
Scenario & RF System Schedule, A-3; Equipment Details, A-4;
Structural Details, S-1; Electrical Notes & Riser Diagram, E-1;
Grounding Details & notes, E-2; Antenna Wiring Diagram, E-3; all
dated 10/20/11 and final revision date 6/12/12 and prepared by EBI
Consulting.
BP,
Perpetual
ZEO/
ISD
5
805 Mt. Auburn Street
ZBA-2012-10
July 31, 2012
Staff Report
#
Condition
Compliance
Timeframe
Verified
by:
2.
Prior to installation, the Petitioner shall bring in sample materials for the
faux chimney for review and approval by Planning Staff to ensure that
the color and texture of the faux chimney will match the building.
Prior to
Building
Permit
Signoff
Planning
3.
Neither the Petitioner nor any present or future owner of any interest in
the project shall change or modify either the control plans referenced in
this decision, or the project itself, without first filing a formal request
with the DCD&P, Zoning Enforcement Officer, and Building Inspector,
for an opinion as to whether or not such change or modification requires
further review from the Granting Authority. Minor modifications, which
are found to be consistent with the project approval granted by the
Granting Authority, may be considered and approved by DCD&P
Director.
Perpetual
ZEO/
ISD
4.
Upon application for a Building Permit, the Petitioner shall provide
evidence to the Zoning Enforcement Officer that this entire decision has
been filed with the Re ist of Deeds.
BP
ZEO
5'
The Petitioner shall comply with all other applicable local, state, and
federal requirements, ordinances, and statutes.
Perpetual
ZEO/
ISD
6.
A copy of the Building Permit with final approval signatures from all
relevant inspectors must be submitted to the Zoning Enforcement
Officer upon completion of the project.
CO
ZEO
The Petitioner shall maintain the antennas and appurtenant facilities in7.
good condition at all times and shall inspect them on a regular basis.
Perpetual
ZEO
8.
The Petitioner shall be subject to Section 5.13(b) of the Ordinances of
the Town of Watertown re ardin Removal of Abandoned Facilities.
Perpetual
ZEO
9.
The Petitioner shall comply with all applicable federal, state, and local
requirements with respect to its operation of the wireless communication
facility.
Perpetual
ZEO
10.
There shall be no signs posted at the wireless communication facility,
except for the required signs identifying the facility, the operator, and an
emergency telephone number where the operator can be reached at any
time.
perpetual
ZEO
11.
In accordance with WZO §9.13, a special permit granted under §9.04
shall lapse one year from the date of grant thereof if substantial use
thereof has not sooner commenced except for good cause, or, in the case
of a permit for construction, if the construction has not begun by such
date except for good cause, or as allowed by applicable State or Federal
law.
Perpetual
ZEO
12.
All conditions of the original #99-13 SP/SPF and #10-10ASP/ASPF
shall remain in full force.
Perpetual
ZEO
6