Loading...
HomeMy Public PortalAbout12-0656 Davis \oc oxS' CITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 12 -12 -2012 PERMIT #: 120656 WORK DESCRIPTION REPLACE WINDOWS WORK LOCATION 206 JONES OWNER NAME GEORGE DAVIS ADDRESS 206 JONES AVE CITY, ST, ZIP TYBEE ISLAND GA 31328 -9677 PHONE NUMBER CONTRACTOR NAME WINDOW WORLD OF SAVANNAH ADDRESS 2708 LEGION DR CITY STATE ZIP THUNDERBOLT GA 31404 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 88.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $5,242.00 TOTAL BALANCE DUE: $ 88.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: , U P. 0. Box 2749 - 403 Butler Av enue, Tybee Island, Georgia 31328 (912) 786 - 4573 - FAX (912) 786 -9539 w w.city ofty bee.org . :-. ; I /' C ").a.C r Ct C L. e j 5 �� City Tybee Island • Planning & Zoning Dept. m�� c . 7 ; y-- Inspect Report s, 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 " . INTERNATIONA1 Phone 912.472.5032 • Fax 912.786.9539 CODE COUNCIL MEMBER Permit No. , _ L w . r `-) f , Date Requested °° 2 Owner's Name �� , Date Needed 1 �� "®� /i�; :( Gen. Contractor 1 ;+;/ 1 p dou1 \ o r i cL Subcontractor _ k C -7 Contact Information ( 2" r G,..- \-- ),-R,1, , �, ! tt -/ 0 w 6 0 1 1 ... S _s.m..c Project Address W= \J 0 re_Q_ - s . t v Scope of Work r 1 a c42,, ;,�� ," � 0,, 5 Inspector 3 Date of Inspection's,'/ / --, Inspection ■-`) (- < ° c' , ;Z 1 Pass - Fall la Fee Inspection Pass 0 Fail 0 Fee Inspection Pass El Fail ❑ Fee Inspection Pass 0 Fail ❑ Fee i fi ` v l City of Tybee Island, Georgia . , Ty 912- 472 -5033 or 912- 472 -5031 Fax 912- 786 -9539 Vs I APPLICATION FOR BUILDING PERMIT Property Address: CD 0 c J A Le-2 Name Mailing Address Telephone Home: Owner 6e f h. D ,, ._0( „, jo\-.s 4--yc Cell: Qt). - 5, Architect or Engineer Office:1a `5S- - Contractor ' d ly .1f (J '.".--10i, ' O','vQ._ Cell: (Check all that apply) Single Family ❑ Discovery/Tearout ❑ Demolition of Structure Duplex ❑ Footprint Changes — ❑ Other ❑ Multi - Family units new square feet ❑ Commercial units heated /cooled Details of Project: R< r 1 G L*. i dok.✓-s Estimated Cost of Construction: $ T ). .00 (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon the scope of the work, two sets of construction drawings and /or a site plan may be required. Year Built: Listed on National Historic Register or located within a National Historic District? Y / N * Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. * Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On -site restroom facilities will be provided through 6 ,' 61, a v _.) . Construction debris will be disposed by Li r Arta Wart J by means of . I understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: Ig ? 2_ Signature of Applicant: ,, 6 . pc' FEES Printed Name (,moo r, P • ia.,, -i Permit Inspections Note: A permit normally takes 7 to 10 days to process Cap Cost Rec Water Tap Approvals: ig t r Date Sewer Stub Planning & Zoning Manager l a...4 -1.). Eng. Fees Building Official Aid to Const. Water /Sewer Storm /Drainage City Manager TOTAL LEAD -BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363 -7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead -based painted or coated surfaces or components more than 6 ft per interior room or 20 ft of exterior surfaces AND all window replacements and partial demolitions of any size. * * * * * * * * * * * * * * * * * * * ** Asbestos /Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. * * * * * * * * * * * * * * * * * * * ** BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http://www.gaswcc.orgidocs/field_manual_4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5 " -3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or wood posts, post spacing, Type C or A. A tI • Oc r i 1 L Signatur for receipt of Lead Paint, Asbestos, and BMP notices. Date Printed Name W indo w Legion Drive W or ld Thun derbolt of Sava G . 31404 I 1 ��II► !110 2708 • , A ,l l y o I, E° ,,,„,,,,v „,„,,,,v TY ” `O "sU 0 �lll ��,� ,III, Phone: 912 355 -5055 • 888 Fax: (912) 355 -5017 ( ) 418 -9800 GOOD `,. HOUSEKEEPING BBB www.windowworld.com E 5 ` °`• * E E ° ACCREDITED Simply the Best for Less ME � • - "E.�� BUSINESS Customer: Phone (h) - . Install Address: - Phone (w) Bill Address: E -mail WINDOW WORLD GLASS OPTIONS 4000 Series DH All -Weld $200 , SolarZone Elite* $79-, _ 6000 Series DH All -Weld $235 Solarzone Glass* $59 Triple Glazed TG2 ** (Argon Filled) $155 2 Lite Slider $329 Triple Glazed TK2 ** (Krypton Filled) $196 2 Lite Slider Swing & Clean $389 3 Lite Slider (1/3, 1/3, 1/3) (1/4, 1/2, 1/4) $520 ( *Series 4000 & 6000 Only - Energy Star Compliant by Geographic Region) 3 Lite Slider Swing & Clean (1/3,1/3,1/3) (1/4,1/2,1/4) $595 (* *Series 6000 Only) Picture / Fixed Lite $329 WINDOW OPTIONS Awning $255 ' .. 1/2 Screens $9 INC' l IDED Casement $285 „ Foam Insulation on Jambs and Head $11 INCLUDFD 2 Lite Casement $570 • _ Double Strength Glass $15 INCUJDFD 3 Lite Casement (1/3, 1/3, 1/3) (1/4,1/2,1/4) $855 s Double Locks (> 26 ") $5 INCLUDED Full Screens $22 Basement Hopper $200 Colonial Grids (Contoured /Flat) , ' k $38 Bay Window $2350 �~ Prairie Grids ' $44 Bow Window $2475 Diamond Grids $69 Garden Window $1875 Simulated Divided Lite $182 Specialty Window $ Tempered DH Sash (BSO) (TSO) $65 Beige $35 Tempered Other $8 /Sq. ft. Wood Grain Interior (Series 4000 / 6000 only) $95 Obscure Glass (BSO) (TSO) $35 Oriel Style (40/60 or 60/40) $30 Colored Exterior (Series 4000 / 6000 only) $138 Foam Enhanced Frame (Series 5000/6000 Only) $25 Window Color ; . / Inside " Outside PRE 1978 BUILT HOMES (Federal Lead Containment Law) ` Lead Paint Containment Charge, $ DOORS MY HOME WAS BUILT IN THE YEAR .. " .; Initial ' Vinyl Rolling Patio Door Eft. $895 Vinyl Rolling Patio Door 8ft. $995 MISCELLANEOUS Vinyl Rolling Patio Door 9ft. $1095 : Custom Exterior Trim $65 Includes Exterior Vinyl Trim Facing Color Facing Color Specialty Window , Exterior Trim $ Specialty Door Facing Color Grids Patio Door $100 Mull to Form Multi Unit $30 Solarzone Glass for Patio Door $125 Install Interior Stops $45 Solarzone Elite Glass for Patio Door* $168 Install Interior Casing $45 ( *Qualifies for Federal Tax Credit) Repair Sill or Jamb $50 $ Mullion Removal $30 $ Remove Old Window $30 Storm Door $ Remove and Install A/C $100 Door Color / WINDOW WORLD CARES Inside Outside St. Judes Children's Research Hospital $ 1 You the buyer are responsible for the removal and installation of any existing security system and window treatments. Initial: I DISCLAIMER: The information herein related to the Federal Stimulus Package is for informational purposes ONLY. This information is not intended to be legal or tax advice. You should contact your accountant or other tax professional for advice related to specific tax benefits of purchasing energy efficient windows. NO EXTRA WORK IF NOT IN WRITING! Customer agrees to the terms of payment as follows: pe,"> j x 7- Extra Labor $ Green Environmental Disposal Fee $ $150.00 Total Amount $ ` Custom Order Deposit,50% C :.:k # /CC Balance Paid to Installer upon Completion $ 3 7 LEAD TIME WEEKS. Amount Financed $ i Customer agrees to pay as agreed per terms on unpaid balances. A 1.5% (18% annual) finance charge will be added after 30 days. Any and all costs incurred for collection of the accounts will be at the expense of customer (Including all attorney fees up to 50%). You the buyer may cancel this transaction at any time prior to midnight of the third business day after the date of this transaction. Notice of cancellation must be in writing postmarked no later than midnight of the following third business day. THIS IS A CUSTOM ORDER NOT FOR RESALE! Owner Date Salesman Date Owner Date Thunderbolt WC 05 -12 White Copy - Original Yellow Copy - File Pink Copy - Customer