Loading...
HomeMy Public PortalAbout14-8877 Rejecting all Proposals for the Construction of the New City hallSponsored by: City Manager RESOLUTION NO. 14 -8877 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF OPA- LOCKA, FLORIDA, REJECTING ALL PROPOSALS FOR THE CONSTRUCTION OF THE NEW CITY HALL PROJECT AND DIRECTING THE CITY MANAGER TO ISSUE A NEW RFP; PROVIDING FOR INCORPORATION OF RECITALS; PROVIDING FOR AN EFFECTIVE DATE WHEREAS, the City of Opa -locka issued a Request for Proposals (RFP) for the construction of the New City Hall project; and WHEREAS, the City Commission of the City of Opa -locka wishes to reject all proposals and issue a new RFP for the design build project. NOW, THEREFORE, BE IT DULY RESOLVED BY THE CITY COMMISSION OF THE CITY OF OPA- LOCKA, FLORIDA: Section 1. The recitals to the preamble herein are incorporated by reference. Section 2. The City Commission of the City of Opa- locka, rejects all proposals received for the New City Hall project. Section 3. The City Manager is directed to issue a new Request for Proposals for the construction of this project. Section 4. This resolution shall take effect immediately upon adoption. I PASSED AND ADOPTED this 15r Resolution No. 14 -8877 Attest to: Jo #a Flores City Clerk Moved by: Seconded by: Commission Vote: Commissioner Kelley: Commissioner Pinder: Commissioner Santiago: Vice -Mayor Holmes: Mayor Taylor: Approved as to form and legal sufficiency: 1ja C )gAb Joseph S. Geller / J hn Dellagloria GREENSPOON MARDER, PA City Attorney COMMISSIONER SANTIAGO VICE MAYOR HOLMES 4 -0 YES OUT OF ROOM YES YES YES 2 City of Opa -Locka Agenda Cover Memo Commission Meeting Item Type: Resolution Ordinance Other Date: 12/10/2014 X (EnterX in box) Fiscal Impact: (EnterXinbox) Yes No Ordinance Reading: (EnterXinbox) 1st Reading 2nd Reading x Public Hearing: Yes No Yes No (Enter X in box) X X Funding Source: (Enter Fund & Dept) Advertising Requirement: Yes No Ex: (Enter X in box) 43- 5386327 Fund for new city hall X Contract /P.O. Required: Yes No RFP /RFQ /Bid #: (Enter X in box) Strategic Plan Related Yes No Strategic Plan Priority Area: Strategic Plan Obj. /Strategy: (list the (Enter X in box) specific objective /strategy this item will address) X Enhance Organizational 0 Bus. & Economic Dev Public Safety - [ Required to expedite the construction of the new City Hall Building. Quality of Education � Qual. of Life & City Image j Communcation Q Sponsor Name Department: City Manager City Manager -CIP Short Title: RFP for New City Hall Staff Summary: The evaluation committee has completed the evaluation of the only one bid package city received from D. Stephenson design build team for RFP #14 - 1107100 (The city of Opa -Locka Administrative Building /New City Hall RFP). The bid package scored 391 points out of 500 points. The bid price is about 11.7 million which exceeds our budget. Proposed Action: The evaluation committee has completed the evaluation of the only one bid package city received from D. Stephenson design build team for RFP #14 - 1107100 (The city of Opa -locka Administrative Building/New City Hall RFP). The bid package scored 391 points out of 500 points. The bid price is about 11.7 million dollar which is very high per current industry standards. $11.70 million for a 40,000 sft building yields about $300 + /- cost per square foot. Based on my engineering judgment it should be within 6 to 7 million dollars range for a 40,000 sft building. The bid package acknowledged the receipt of the addendums for detail specifications and city's specific requirements but were not attached. As the bid price is very high and city received only one bid staff recommends to re- advertise with revised RFP Attachment: 1. Agenda To: Mayor Vice Mayor Commissioner Commissioner Commissioner FROM: Kelvin L. Baker, City DATE: December 2, 2014 RE: New City Hall Bid X%VJVVL.U., Mvra L. Tavlor Request: A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF OPA- LOCKA, FLORIDA AUTHORIZING THE CITY TO REJECT THE SOLE BID AND READVERTISE FOR THE CONSTRUCTION OF THE NEW CITY HALL FACILITY. Description: The evaluation committee has completed the evaluation of the only one bid package city received from D. Stephenson design build team for RFP #14- 1107100 (The city of Opa -Locka Administrative Building/New City Hall RFP). The bid package scored 391 points out of 500 points. The bid price is about 11.7 million which exceeds our budget. Account Number: 43- 5386327 Financial Im act: This project is budgeted at plus /minus eight million dollars. Implementation Time Line: As soon as possible. Recommendation(s): Reject this bid and advertise for the construction of the new city hall facility. Analysis: The city advertised and issued an RFP for competitive bids. More than eighteen vendors participated in the mandatory pre -bid meeting however; only one vendor responded. ATTACHMENT(S): 1. RFP PREPARED BY: Maqsood Mohammad Nasir, PE, CIP Director /City Engineer END OF MEMORANDUM