HomeMy Public PortalAbout14-8887 Central Florida Equipment Rentals IncSponsored by: City Manager
Resolution No. 14 -8887
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF
OPA- LOCKA, FLORIDA, AUTHORIZING APPROVAL OF AN
ADDITIONAL SCOPE OF SERVICES FOR CENTRAL FLORIDA
EQUIPMENT RENTALS, INC., TO INCLUDE PUMP STATION 7
GRAVITY SEWER SYSTEM REPAIR/ REPLACEMENT/ LINING,
TO ALLEVIATE INFILTRATION, IN AN AMOUNT NOT TO
EXCEED SEVENTY ONE THOUSAND THREE HUNDRED
DOLLARS ($71,300.00), PAYABLE FROM ACCOUNT NUMBER
35- 535630, A BUDGETED ITEM; PROVIDING FOR
INCORPORATION OF RECITALS; PROVIDING FOR AN
EFFECTIVE DATE.
WHEREAS, Central Florida Equipment Rentals, Inc., was awarded the contract (RFP
No. 14-2606 100 for Pump Station 7; and
WHEREAS, due to a video inspection it was found that additional work was needed, as the
contractor found twenty five (25) major leaks, 24 which can be repaired by lining existing pipe and
the other leak along NW 135th Street requiring excavation and replacement, which are needed in
order to comply with regulatory agencies requirements; and
WHEREAS, in the best interest of public health and to facilitate the requirements of
DERM, staff recommends approval, as the station is maintained on an "as needed basis ", and the
station run time is 24 hours per day (a contributing factor to the elevated run time); and
WHEREAS, the pump station and the related infrastructure is in critical need of complete
rehabilitation, if repairs/ replacements are not made, it will result in Pump Station 7 failure.
NOW, THEREFORE, BE IT DULY RESOLVED BY THE CITY COMMISSION OF
THE CITY OF OPA- LOCKA, FLORIDA:
Resolution No. 14 -8887
Section 1. The recitals to the preamble herein are incorporated by reference.
Section 2. The City Commission of the City of Opa -locks hereby authorizes the City
Manager to approve the additional scope of work for Central Florida Equipment Rentals, Inc., to
include Pump Station 7 Gravity Sewer System Repair/ Replacement/ Lining per CCTV findings to
alleviate infiltration and to comply with Regulatory Agencies requirement, in an amount not to
exceed Seventy One Thousand Three Hundred Dollars ($71,300.00), payable from Account Number
35- 535630, a budgeted item.
Section 3. This resolution shall take effect immediately upon adoption.
PASSED AND ADOPTED this 15th day of December, 2014.
test to:
J nna Flores
City Clerk
Moved by:
Seconded by:
Commission Vote:
Commissioner Kelley:
Commissioner Pinder:
Commissioner Santiago:
Vice -Mayor Holmes:
Mayor Taylor:
Approved as to form and legal sufficiency:
Joseph S. Geller / Jfohn Dellagloria
GREENSPOON MARDER, PA
City Attorney
VICE MAYOR HOLMES
COMMISSIONER SANTIAGO
4 -0
YES
RECUSED
YES
YES
YES
City of Opa -Locka
Agenda Cover Memo
Commission Meeting
Item Type:
Resolution
Ordinance
Other
X
Date: 12/10/2014
(EnterX in box)
Fiscal Impact:
Ordinance Reading:
1s' Reading
2nd Reading
(EnterXin box)
Yes
No
(EnterXin box)
X
Public Hearing:
Yes
No
Yes
No
(Enter X in box)
X
X
Funding Source:
(Enter Fund & Dept)
Advertising Requirement:
Yes
No
Ex:
(EnterXin box)
Account# 64- 541630
X
Contract /P.O. Required:
Yes
No
RFP /RFQ /Bid #:
(EnterXin box)
x
Strategic Plan Related
Yes
No
Strategic Plan Priority Area:
Strategic Plan Obj. /Strategy: Gist the
(Enter X in box)
specific objective /strategy this item will address)
X
Enhance Organizational 0
Bus. & Economic Dev p
Is required in order to move ahead
Public Safety =I
Quality of Education E�
with the capital improvement
program, funding, budget
Qual. of Life & City Image m ;
Communcation
planning, and implementation
strategy.
Sponsor Name
Department:
CIP
Short Title:
Request for Additional Scope for Sanitary Sewer Pump Station # 7 Project
Staff Summary:
The purpose of this Request for is to repair /replace the existing sanitary sewer clay pipe network that is
associated with pump station No.7. Central Florida Equipment the awarded contractor for this project under RFP
No. 14- 2606100 recently completed a video inspection of this existing pump station 7 sewer network and found
twenty five (25) major leaks. Of these 25 locations, 24 can be repaired by lining the existing pipe. The other
location along NW 1351h Street requires the excavation and replacement of pipe segments, since the failure is at
the pipe joint and cannot be repaired by lining. This is in the best interest of Public Health, for the conservation of
environment and also to comply with regulatory agencies requirements.
Proposed Action:
Staff recommends approval in order to facilitate the requirements of DERM. Currently the station run time is 48
hours per day and is maintained on as "as needed" basis this damage to the gravity is a contributing factor to this
elevated run time.
Attachment:
1. Agenda
2. Proposal
MEMORANDUM
To: Mayor
Vice Mayor
Commissioner
Commissioner
Commissioner
FROM: Kelvin L. Baker, City
DATE: November 26, 2014
PP -LOCk
O 4
O�;'
F O
i ry'
i4 if Vtki�T
: 6ognp wptE 9 .
Myra L. Taylor
Timothy HoAge
Jose h L. el
Luis. S i 2c
RE: Request for Additional Scope for Sanitary Sewer Pump Station # 7 Project
Request: A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF OPA- LOCKA,
FLORIDA AUTHORIZING THE CITY MANAGER TO APPROVE ADDITIONAL
SCOPE FOR CENTRAL FLORIDA EQUIPMENT RENTALS INC.TO INCLUDE
PUMP STATION 7 GRAVITY SEWER SYSTEM REPAIR/ REPLACE/LINING
PER CCTV FINDINGS TO ALLEVIATE INFILTRATION AND ALSO TO
COMPLY WITH REGULATORY AGENCIES REQUIREMENTS IN THE
AMOUNT NOT TO EXCEED SEVENTY ONE THOUSAND THREE HUNDRED
DOLLARS ($71,300.00), PAYABLE FROM ACCOUNT NUMBER 35- 535630
(BUDGETED).
Description: The purpose of this Request for is to repair /replace the existing sanitary sewer clay pipe
network that is associated with pump station No.7. Central Florida Equipment the awarded contractor for
this project under RFP No. 14- 2606100 recently completed a video inspection of this existing pump station
7 sewer network and found twenty five (25) major leaks. Of these 25 locations, 24 can be repaired by
lining the existing pipe. The other location along NW 135th Street requires the excavation and replacement
of pipe segments, since the failure is at the pipe joint and cannot be repaired by lining. This is in the best
interest of Public Health, for the conservation of environment and also to comply with regulatory agencies
requirements.
Account Number: 35- 535630.
Financial Impact: This additional scope is budgeted.
Implementation Time Line: As soon as possible since the station is under moratorium from 03/2010.
Legislative History: RFP No. 14-2606100 awarded July 30th 2014.
Recommendation(s): Staff recommends approval in order to facilitate the requirements of DERM.
Currently the station run time is 48 hours per day and is maintained on as "as needed" basis this damage to
the gravity is a contributing factor to this elevated run time.
Analysis:
The pump station No.7 and the related infrastructure is in critical need of complete rehabilitation. The
station is in conditional moratorium since March, 2010. Per consent agreement with DERM if these
repair /replacements are not made it will result in the pump station failure after rehabilitation. Based on the
assessment of the current assessment of the gravity system it is highly recommends that repaired
immediately to eliminate potential health risks and the infiltration of ground water into the sanitary sewer
system.
ATTACHMENT(S):
1. Proposal
PREPARED BY: Maqsood Mohammad Nasir, PE, CIP Director /City Engineer
END OF MEMORANDUM
CP-...:�y° �' ��` ,"O) POj1�1� t!'�?j�1�
EARTHWORK AND ENGINEERING CONTRACTORS
r,_' A COMPLETE LINE OF EQUIPMENT RENTALS
November 18, 2014
Mr. Maqsood Mohammad Nasir, P.E.
City Engineer /CIP Director
City of Opa -locka
3400 NW 135 Street, Building -B
Opa- locka, FL 33054
RE: Pump Station 7
Mr. Nasir,
Attached herewith is our price proposal to repair /replace the existing sanitary sewer clay pipe network
that is associated with subject project. As you are aware, Central Florida Equipment (CFE) recently
completed a video inspection of this existing sewer network which revealed 25 major leaks. Of these 25
locations, 24 can be repaired by lining the existing pipe. The other location along NW 135 ST requires
the excavation and replacement of pipe segments since the failure is at the pipe joint and it cannot be
repaired by lining.
We have also attached our Engineer of Record professional opinion as to the need to get this work
completed before the new Pump Station 7 is placed in service. We appreciate your expeditious handling
and approval of this matter.
M';�
Robert Baer Jr.
Central Florida Equipment
Attachments
��usr�y
9030 N. W. 97 Terrace c Medley. Florida 33178 a Telephone: (305) 888 -3344 o Far.: (305) 887 -7804
Central Florida . qu *went .pentads Inc.
47 EARTHWORK AND ENGINEERING CONTRACTORS
A COMPLETE LINE OF EQUIPMENT RENTALS
PCO -001 Rehabilitation of r sanitary sewer lines by Short Cured In Place Pipe SCIPP method Includes cleaning, prepping pipe
( except Offset Joint in pipe MI-12 to MH3), and post CCTV video of repaired sanitary sewer segments
Proposal Summary _ �[
4' SCIPP 5' SCIPP 6' SCIPP 8' SCIPP
MHITOMH2
25' TO 28' 1
33' TO 36' 1
265' M ED OF SET 1
MH3TOMH2
30' TO 32'
270' TO 274'
300' TO 304'
MH6TOMH3
0' TO 4'
l0' TO 14'
18' TO 21'
246' TO 248'
MH7TOMH6
0' TO 4'
324' TO 326'
MH8TOMH7
6' TO 7'
318' TO 320'
326' MULTIPLE
MH8TOMH7
136' BROKEN PIPE
1
1
1
1
1
1
1
1
1
Total SCIPP
UNIT PRICING
SCIPPTOTALS
135th Street Gravity Sewer Point Repair on joint.
MOBILIZATION
MOT
1
11
5
1
24
$1,950
$1,850
1
$2,050
$3,900
$20,350
$9,750
$12,300
1
1
$19,000
$19,000
1
1
$3,000
$3.000
1
1
MH10TO MH9
0 -3 1
8' TO 10' 1
334' TO 337' 1
MH32 TO MHS
71' TO 76'
81' TO 85'
87' TO 95'
103 TO 105
138' T0144'
1
1
1
1
1
Total SCIPP
UNIT PRICING
SCIPPTOTALS
135th Street Gravity Sewer Point Repair on joint.
MOBILIZATION
MOT
2
11
5
6
24
$1,950
$1,850
$1,950 1
$2,050
$3,900
$20,350
$9,750
$12,300
$46,300
1 LS
$19,000
$19,000
$3,000
$3.000
TOTAL $71,300
,aars
_9.
F
9030 N.W. 97 Terrace a Medley, Florida 33178 • Telephone: (305) 888 -3344 • Fax: (3051887-7804
S ENGIN14 73RING, LLCI
5433 Sea line Blvd., Greenacres, Florida 33463
Ph: (561) 951 -3864, Fax (561) 232 -3220
Web.- www.ssnengineeringcom
November 13, 2014
Maqsood Mohammad Nasir, P.E.
City Engineer /C1P Director
City Of Opa -Locka
3400 NW 135th Street, Building -B
Opa- Locka, Fl 33054
RE: City of Opa -locka Pump Station 7
(Existing Sewer Network Lining Requirements)
Mr. Nasir,
The City of Opa -locka Pump Station 7 was designed to carry wastewater from toilets,
dishwashers, sinks, or showers in homes or businesses within the sewer system networks
for PS7. The sewer system network of PS7 is a gravity system which was constructed long
time ago and the pipe materials area clay. A video inspection of the existing sewer network
was conducted recently and numerous cracks or leaks were detected in the pipes which
may be caused by age related deterioration, loose joints, damage or root infiltration.
There are several places where the groundwater is entering into the sanitary sewer
systems through cracks and /or leaks in the sanitary sewer pipes. This unwanted water to
sewer systems increases the load on the systems, which will ultimately impacts the pump
station 7 performance. Overflow to the system will make the Pump Station 7 to run longer
than the manufacturer's recommended guidelines, which will ultimately fail the Pumps and
complete system failure.
Overflow occurrences put public health at risk and violates state and federal environmental
regulations. So, we must repair and /or line the existing sanitary sewer network for proper
operation of the proposed new pump station 7.
We appreciate your attention to this important project. Please call me at (561) 951 -3864
with any questions, comments or requests for additional information.
Sincerely,
r:
Rubel Siddique, PE
SSN Engineering, LLC.