HomeMy Public PortalAbout2017-07-27 Ai3 Timeline for WatertownWatertown Public Schools Timeline
�� 526 Boston Post Road
�) Wayland, MA 01778
architects �V TEL. 508.358.0790
�, FAX.508.358.0791
2020 2021
J F M A M J J A S 0 N D J FM A M J
I �
2017 2018 2019
J F M A M J J A S 0 N D J F M A M J J A S 0 N D J F MIA M J J A S 0 N D
Watertown Elementary Schools
Approve proceeding w/ three elementary scnooTprojects
Procure designer services for preliminary & schematic design
Establish ui mg committee to steer project
Begin detailed programming for each elementary school-Y A p p r7) nV;
Complete geo-techand environmental investigations, traffic
study, and site survey at each elementary school site
Develop preliminary design and phasing solutions
Conduct community meetings for each elementary school
Preliminary meeting with panning, zoning, police & fire o
Develop preliminary design project cost estimates a
Select preferred option at each schoola
Proceed w schematic design on each elementary school
Community meetings on proposed design solution
o
r. P ATI( - np�_qrw
�
�
TOTAL PROJECT FUNDS
ELEMENTARY SCHOOLS
Schematic design cost estimates
Establish total budget for elementary school projects
City approval or total project funds
Design and constructio�ments
Construction
�
L —1
CONSTRUCTION
E
L —1
CONSTRUCTION
Occupancy of completed elementary school projectsr.I'TY
Watertown High School
Review previous Statements of Interest s
Align SOI w priorities
Finalize and submit new SOI
Arrange legislators tour and review of SOI
Prepare for MSBA senior study visits
MSBA invitation to eligibility
Eligibility peso - Initial Compliance Certification (ICC)
Eligibility peso - School Building Committee (SB_C�
Eligibility period - Education Profile and Enrollment Projections
Eligibility period - Maintenanc—eD—ocumen s
F_
Eligibility peso - City Approval / LocalAuthorization of Funding
CFY
APPIRm/w
Feasibility and schematic design
CONSTRUCTION
BEGINS
Design development and construction documents
I
CITY APPROVAL
TOTAL PROJECT FUNDS
HIGH SCHOOL
Construction Commencement
Phillips Administration Building
Keep
avauapie tor possible relief during elementary scnoo
construction
Keep available as part of panning and potential expansion or
support for high school project
Watertown Middle School
Prepare and submit Statement of Interest (SOI)
Prepare for MSBA senior study visits
MSBA invitation to eligibility
Eligibility peso - Initial Compliance Certification (ICC)
Eligibility peso - S—chool Building Committee (SB_G�
Eligibility period - Education Profile and Enrollment Projections
Eligibility peso - Maintenance Documents
Eligibility peso - Local Authorization of Funding
Feasibility and schematic design
Design development and construction documents
Construction Commencement(Estimated or 2024)