HomeMy Public PortalAbout1997 Proposal Revisions for VKBCOASTAL
SYSTEMS
(N TERN AT tON AL
COASTAL SYSTEMS INTERNATIONAL, INC.
464SouthDixieHighway • CoralGables, Florida 33146
TeI:305/661-3655 • Fax.305/661-1914
COMM: 135010
FACSIMILE TRANSMITTAL
DATE: January 28, 1997
TO: Mr James Decocq FAX: (305) 365-8936
COMPANY: Village Of Key Biscayne TEL: (305) 365-5S00
FROM: Dr. Paul C. -P Lin, P E. (D� RE: PROPOSAL REVISIONS FOR THE
VILLAGE
TOTAL PAGES (Including Cover): 5
❑ Urgent
NOTES:
Dear James,
❑ For Review ❑ Please Comment
Li Please Reply As Requested
Pursuant to your request, this is to fax you the revised proposal for the long-term Beach Management
Plan tier the Vill age of Key Biscayne. Please review and call us it' you have any question` Thank
you.
Coastal Systems International. Inc is a processional engineering firm specializing exclusively in protects within the coastal and
maiine environment Our experience includes projects in the following areas-
• Beach Restoration
• Shoreline Stabilization
• Wetland Restoration
• Environmental & CCCL Permit Processing
• Hydrographic Evaluations
• Physical Model Studies
• Inlet Management Planning
• Marine Structures
Coastal, Environmental, Civil, Engineering and Management
J el I —GO-7♦ Vim. —ter
COASTAL
SYSTEMS
IN 1ERN 4T ION AI.
COASTAL SYSTEMS INTERNATIONAL, INC.
464SouthDixieHighway • CoralGables,Florida 33146
Tel:305/661-3655•Fax•305/661-1914
January 28, 1997
Mr. C. Samuel Kissinger
Village Manager
VILLAGE OF KEY BISCAYNE
85 West McIntyre Street
Key Biscayne, Florida 33149
135010
RE: ENGINEERING SERVICES RELATIVE To THE VILLAGE OF KEY BISCAYNE LONG-TERM
BEACH RENOURISHMENT PROJECT, DARE COUNTY, FLORIDA
Dear Mr. Kissinger:
This is to submit the proposal for coastal engineering services relative to the Village of Key
Biscayne Long -Term Beach Renourishment project. This engineering service is to develop a 50 -
year beach management plan that would outline the Village's needs for future beach
renourishments and identify the procedures required to secure necessary permits, fundings and
commitment of offshore sand sources from the regulatory agencies. The following are the
proposed terms of agreement for engineering services to be provided by Coastal Systems
International, Inc (Coastal Systems) for the Village of Key Biscayne (Village)•
PART I - COASTAL ENGINEERING EVALUATION
Pic following coastal engineering evaluations will be conducted to determine the Village beach
performance subsequent to the 1987 beach nourishment project, understand the littoral processes
within the project region, and develop a conceptual beach design plan. The specific components
of this engineering evaluation are described in the following:
a) Data Collection: Coastal Systems will collect and review available data relating to
shoreline changes along the island of Key Biscayne (Key Biscayne). Reports prepared by
the US Army Corps of Engineers (COE) and other studies describing the history and
performance of beach nourishment projects within the project area will be reviewed. All
available hydrographic survey data will also be compiled within Coastal Systems'
computer database, in the format of range and elevation for each beach profile, to
facilitate volumetric change comparisons along the project shoreline and vicinity. The
compiled hydrographic survey database will later be transferred to the Village for their
own use.
h) Shoreline/Volurnetric Changes and Regional Sediment Budget: Coastal Systems will
calculate the historical shoreline and volumetric changes within Key Biscayne using
available hydrographic surveys. In addition, these available hydrographic surveys will be
Coastal, Environmental, Civil, Engineering and Management
aJd r7- Cd- ✓ I V -T - JV'` 1. -NJ
135010
Mr. C. Samuel Kissinger
January 28, 1997
Page 2
compared to the original project design as outlined in the COE's General Design
Memorandum and as built during the 1987 beach nourishment project The performance
of the beach nourishment project constructed within Key Biscayne will be evaluated. The
historical rate of erosion or accretion along the Key Biscayne beach will be assessed.
This evaluation of historical shoreline and volumetric changes may be utilized to identify
"hot spots" along the project shoreline, where exceptional erosion rates are noted. In
addition, these evaluations will assist in understanding littoral processes within the
project area and in developing the conceptual beach design plan.
A sediment budget will be developed for the region, describing sand movement within
specific segments established from Crandon Park south to Bill Baggs State Park. The net
longshore sediment transport rate within the active littoral system, extending offshore to
the depth of closure, within each of the established segments will be confirmed.
c) Conceptual Beach Design: Coastal Systems will review the design plan developed in
1987 by the U.S. Army Corps of Engineers. Coastal Systems will develop a conceptual
beach design for renourishing the entire beach along the Village based on the historic
erosion rate within the area. This beach design plan will identify the extent of beach fill
along the Village shoreline and design beach cross section with specified berm elevation
and beach slope. The development of the conceptual plan will also take into
consideration of the extent of the nearshore seagrasses, which will be delineated by
DERM. Coastal Systems will calculate the quantity of sands required for the beach
renourishment project and identify the frequency of the beach renourishment project
within a 50 year time frame. The costs associated with implementation of the plan using
various sand sources will be calculated.
PART II - SAND SOURCE ASSESSMENT
Coastal Systems will coordinate with DERM and COE to evaluate the available sources of sand
fill suitable for the beach renourishment. Coastal Systems will review available geotechnical
data towards assessing the quality and compatibility of these various beach fill materials. The
expected performance and estimated cost of the various sand fill materials will be compared.
The sand fill materials to be considered include offshore borrow sites, upland sources and Turks
and Caicos sand. The methods of construction and associated costs of using various sand fill
materials will be analyzed.
PART III - FUNDING PROCESSES
Coastal Systems will explore the funding availability from the U.S. Army Corps of Engineers,
the State of Florida and Dade County for implementation of this long-term beach renourishment
COASTAL SYSTEMS INTERNATIONAL, INC. • Coastal, Environmental, Civil Engineering and Management
JdT I -LO-7/
VY . JV f" I u'.c
135010
Mr. C. Samuel Kissinger
January 28, 1997
Page 3
project. Based on the above identified plan, Coastal Systems will coordinate with DERM (Dade
County) to explore the feasibility of Federal participation for the project under the provisions of
Section 103. Coastal Systems will also evaluate the present state funding status and coordinate
with DERM to include this project in the Dade County funding application to the State. The
processes and time required for obtaining the Federal, State and/or County fundings will be
presented. The deadlines for funding applications for various regulatory agencies will be
identified and incorporated into the 5 -year beach management plan schedule. The amount of
funding available from various agencies will also be presented.
PART IV - BEACH MANAGEMENT PLAN
A preliminary beach management plan report will be prepared summarizing the findings and
making recommendations for the optimum design of beach renourishment along the Village of
Key Biscayne. This beach management plan will be submitted to the Federal, State and County
to express the Village's needs for beach renourishment project and request the Federal acceptable
offshore sand sources and funding support. Specifically, this report will include detailed
descriptions of coastal processes, sand source and funding evaluations and beach management
plan. Potential sand sources will be identified and available funding sources at Federal, State and
local levels will be explored. A 50 -year beach management plan will be developed, outlining
quantity of sands needed for the Village over a 50 -year time span as well as identifying the most
cost effective sand source to meet the needs. An immediate 5 -year detailed plan will also be
included in the report. This plan will specify the details of the plan elements and sequential
occurrence of each plan element towards implementing the first beach renourishment project
within 5 years. Upon completion, Coastal Systems will make a presentation to the Village
Council regarding engineering findings and the 50 -year Beach Management Plan.
PART V - CLIENT DIRECTED MEETINGS
The phases of services provides for all local meetings with the Village, DERM and other
professionals. Specifically, Coastal Systems will attend meetings with the Village, DERM,
and/or other professionals, as required by the Village, to discuss permitting and funding strategy
and/or progress and review the beach management plan. Coastal Systems may also meet with the
Village and/or regulatory agency staff on site to observe project status.
GENERAL
Fees: Coastal Systems will invoice the Village for Parts I through IV services on a percentage
complete basis for the fees identified herein. Fees for Part V services will be invoiced on an
hourly basis pursuant to the Rate Schedule identified in our current agreement with Dade County.
Expenses, report preparation and costs relative to travel and accommodations will be invoiced
separately pursuant to the above -mentioned Rate Schedule.
COASTAL SYSTEMS INTERNATIONAL, INC. • Coastal, Environmental, Civil Engineering and Management
JCif I -GO -✓/ v.t . sir r-'. ov.... .u.....-.
135010
Mr. C. Samuel Kissinger
January 28, 1997
Page 4
Invoices will be submitted by the 15th of each month for the previous month's work. Invoices
are to be paid within 30 days of receipt of the invoice by the Village. Invoices not paid after 30
days and not in dispute will incur interest at a rate of 1.5 percent per month.
We look forward to working with you towards developing a successful 50 -year beach
management plan for the Village of Key Biscayne. Please return a signed copy of this agreement
to us which will serve as our Authorization to Proceed. Should you have any questions or require
any additional information, please do not hesitate to contact me.
Sincerely,
COASTAL SYSTEMS INTERNATIONAL, INC.
Paul C. -P. Q in, Ph.D., P.E.
Associate
SIGNED: DATE:
Mr. Samuel Kissinger, Village Manager
Village of Key Biscayne
PL:ba:jrc
Attachment
cc: R. Harvey Sasso, P.E., Coastal Systems
James Decocq, Village of Key Biscayne
F ,PRC)JFCT, i"r)I'JiC(JAS1 Al ,KISS_PRO WPC)
COASTAL SYSTEMS INTERNATIONAL, INC.. Coastal, Environmental, Civil Engineering and Management
il
NATIONWIDE
INSURANCE
Nationwide is on your side
CERTIFICATE OF INSURANCE
HOME OFFICE ONE NATIONWIDE PLAZA • COLUMBUS OHIO 43216
The company indicated below certifies that the insurance afforded by the policy or policies numbered and
described below is in force as of the effective date of this certificate. This Certificate of Insurance
does not amend, extend, or otherwise alter the Terms and Conditions of Insurance coverage contained in any
policy numbered and described below.
CERTIFICATE HOLDER: INSURED:
VILLAGE OF KEY BISCAYNE COASTAL SYSTEMS INTERNATIONAL
ATTN SAMUEL KISSINGER MNGR INC
85 WEST MCINTYRE STREET 464 S DIXIE HWY
KEY BISCAYNE, FL 33149 CORAL GABLES, FL 33146
I
TYPE OF INSURANCE
POLICY NUMBER
& ISSUING CO.
POLICY
EFF. DATE
POLICY
EXP. DATE
LIMITS OF LIABILITY
(*LIMITS AT INCEPTION)
LIABILITY
[X] Liability and
Medical Expense
[X] Personal and
Advertising Injury
[X] Medical Expenses
[X] Fire Legal
Liability
[ ] Other Liability
77 -PR -176895-0001
NATIONWIDE
MUTUAL
INSURANCE CO.
01-20-96
01-20-97
Any One Occurrence $ 1,000,000
Any One Person/Org $ 1,000,000
ANY ONE PERSON $ 5,000
Any One Fire or Explosion $ 50,000
General Aggregate* $ 1,000,000
Prod/Comp Ops Aggregate* $
AUTOMOBILE LIABILITY
[X] BUSINESS AUTO
[X] Owned
[X] Hired
[X] Non -Owned
77 -BA -176895-3001
NATIONWIDE
MUTUAL
INSURANCE CO.
01-20-96
01-20-97
Bodily Injury
(Each Person) $
(Each Accident) $
Property Damage
(Each Accident) $
Combined Single Limit $
500,000
EXCESS LIABILITY
[ ] Umbrella Form
Each Occurrence $
Prod/Comp Ops/Disease
Aggregate* $
[ ] Workers'
Compensation
and
[ ] Employers'
Liability
STATUTORY LIMITS
BODILY INJURY/ACCIDENT $
Bodily Injury by Disease
EACH EMPLOYEE $
Bodily Injury by Disease
POLICY LIMIT $
Should any of the above described policies be cancelled before the
expiration date, the insurance company will mail 30 days
written notice to the above named certificate holder.
DESCRIPTION OF OPERATIONS/LOCATIONS
VEHICLES/RESTRICTIONS/SPECIAL ITEMS
ADD ABOVE CERTIFICATE HOLDER
AS ADDITIONAL INSD, ALSO.
Effective Date of Certificate: 01-06-1997 Authorized Representative: RANDALL L. ITEN
Date Certificate Issued: 01-06-1997 Countersigned at: 1229 NORTH STATE ROAD 7
HOLLYWOOD, FL 33021