Loading...
HomeMy Public PortalAbout2006 Mapping Services Relative to the 3-Year Post-Construction Pipeline Corridor to the VKB Beach Renourishment ProjectCOASTAL SYSTEMS INTERNATIONAL COASTAL SYSTEMS INTERNATIONAL INC 464 South Dixie Highway • Coral Gables Florida 33146 Tel 305 661 3655 • Fax 305 661 1914 www coastalsystemsint com August 1, 2006 Mr Armando Nunez Public Works Director VILLAGE OF KEY BISCAYNE 88 West McIntyre Street Key Biscayne, Flonda 33149 135040 01-A RE MMM liPPiN G SER v TCLS RELA [IV E t O 1 H1E. 3-1 EAR POST -CONSTRUCTION PIPELINE CORRIDOR MONITORING OF THE VILLAGE OF KEY BISCAYNE BEACH RENOURISHMENT PROJECT, VILLAGE OF KEY BISCAYNE, MIAMI-DADE COUNTY, FLORIDA Dear Mr Nunez Pursuant to our recent discussions with Miami -Dade County, Coastal Systems International, Inc (Coastal Systems) is pleased to submit this proposal relative to the 3 -year Post -Construction Pipeline Comdor biological monitoring of the Village of Key Biscayne Beach Renounshment Project in Miami -Dade County Video monitonng of the pipeline comdor utilized for the project is required in accordance with Florida Department of Environmental Protection (DEP) Permit No 0160856-001-JC and for Miami -Dade County Department of Environmental Resources Management (DERM) Permit No CC99-347 Specifically, the following presents the scope of work for services to be provided by Coastal Systems for The Village of Key Biscayne PART XIX — THREE-YEAR UNDERWATER VIDEO MAPPING OF PIPELINE CORRIDOR Coastal Systems will perform an underwater video survey of the pipeline comdor, along the previously recorded track varallel to the comdor The mapping will be conducted with vessel - based automated hydrographic survey system consisting of DGPS for honzontal positioning and towed underwater video equipment Navigation and positioning information will be logged with an on -board computer operating Hypack software All video documentation will be enhanced by a data overlay illustrating DGPS coordinates including date and time Deliverables Eight (8) copies of video (distributed to the agencies) Three (3) copies of trackline map Coastal Environmental Civil Engineering and Management 135040 01 Mr Armando Nunez August 1, 2006 Page 2 GENERAL Fees This fee proposal is valid for 60 days Fees for the above services are summarized in the attached Table 1 Schedule The services for Part XIX will be completed within 45 days of receiving a Notice to Proceed and favorable weather conditions Contract Services will be provided as an addendum to the Beach Nourishment contract dated June 6, 2000 We look forward to continuing to provide mapping services for the Key Biscayne Beach Renounshment Project Please provide a work order, which will serve as our authorization to proceed Should you have any questions or if we may be of further assistance, please do not hesitate to contact me at (305) 669-8650 or tblankenship@coastalsystemsint com Sincerely, COSTA SYST M NTERNATIONAL, INC SIGNED Ti Director ankens % ip, P E DATE Y/1/ /o /6- VILLAGE OF KEY BISCAYNE PRINT ______M A- / V VI' 17- W kik()?}I)sre__ NAME TITLE TB mr FILE TKB NR CT Contract Book Acctg F \P oiect\135040 01\Proposal\(06 08 01) PRO S rveymg Services doc Coastal Environmental Civil Engineering and Management TABLE 1 SUMMARY OF MAPPING FEES KEY BISCAYNE 3 YR POST CONSTRUCTION VIDEO MAPPING OF PIPELINE CORRIDOR VILLAGE OF KEY BISCAYNE, FLORIDA DESCRIPTION TYPE FEES Part XIX 3 Year Underwater Video Mapping of Pipeline Corridor Lump Sum $5 000 Subtotal $5,000 Estimated Expenses $425 Subtotal $425 GRAND TOTAL $5,425 Coastal Environmental Civil Engineering and Management