HomeMy Public PortalAbout2006 Mapping Services Relative to the 3-Year Post-Construction Pipeline Corridor to the VKB Beach Renourishment ProjectCOASTAL
SYSTEMS
INTERNATIONAL
COASTAL SYSTEMS INTERNATIONAL INC
464 South Dixie Highway • Coral Gables Florida 33146
Tel 305 661 3655 • Fax 305 661 1914
www coastalsystemsint com
August 1, 2006
Mr Armando Nunez
Public Works Director
VILLAGE OF KEY BISCAYNE
88 West McIntyre Street
Key Biscayne, Flonda 33149
135040 01-A
RE MMM liPPiN G SER v TCLS RELA [IV E t O 1 H1E. 3-1 EAR POST -CONSTRUCTION PIPELINE
CORRIDOR MONITORING OF THE VILLAGE OF KEY BISCAYNE BEACH
RENOURISHMENT PROJECT, VILLAGE OF KEY BISCAYNE, MIAMI-DADE COUNTY,
FLORIDA
Dear Mr Nunez
Pursuant to our recent discussions with Miami -Dade County, Coastal Systems International, Inc
(Coastal Systems) is pleased to submit this proposal relative to the 3 -year Post -Construction
Pipeline Comdor biological monitoring of the Village of Key Biscayne Beach Renounshment
Project in Miami -Dade County Video monitonng of the pipeline comdor utilized for the project
is required in accordance with Florida Department of Environmental Protection (DEP) Permit
No 0160856-001-JC and for Miami -Dade County Department of Environmental Resources
Management (DERM) Permit No CC99-347 Specifically, the following presents the scope of
work for services to be provided by Coastal Systems for The Village of Key Biscayne
PART XIX — THREE-YEAR UNDERWATER VIDEO MAPPING OF PIPELINE CORRIDOR
Coastal Systems will perform an underwater video survey of the pipeline comdor, along the
previously recorded track varallel to the comdor The mapping will be conducted with vessel -
based automated hydrographic survey system consisting of DGPS for honzontal positioning and
towed underwater video equipment Navigation and positioning information will be logged with
an on -board computer operating Hypack software All video documentation will be enhanced by
a data overlay illustrating DGPS coordinates including date and time
Deliverables Eight (8) copies of video (distributed to the agencies)
Three (3) copies of trackline map
Coastal Environmental Civil Engineering and Management
135040 01
Mr Armando Nunez
August 1, 2006
Page 2
GENERAL
Fees This fee proposal is valid for 60 days Fees for the above services are summarized in the
attached Table 1
Schedule The services for Part XIX will be completed within 45 days of receiving a Notice to
Proceed and favorable weather conditions
Contract Services will be provided as an addendum to the Beach Nourishment contract dated
June 6, 2000
We look forward to continuing to provide mapping services for the Key Biscayne Beach
Renounshment Project Please provide a work order, which will serve as our authorization to
proceed Should you have any questions or if we may be of further assistance, please do not
hesitate to contact me at (305) 669-8650 or tblankenship@coastalsystemsint com
Sincerely,
COSTA SYST M NTERNATIONAL, INC
SIGNED
Ti
Director
ankens % ip, P E
DATE Y/1/ /o /6-
VILLAGE OF KEY BISCAYNE
PRINT ______M A- / V VI' 17- W kik()?}I)sre__
NAME TITLE
TB mr
FILE TKB NR CT Contract Book Acctg
F \P oiect\135040 01\Proposal\(06 08 01) PRO S rveymg Services doc
Coastal Environmental Civil Engineering and Management
TABLE 1
SUMMARY OF MAPPING FEES
KEY BISCAYNE 3 YR POST CONSTRUCTION VIDEO MAPPING OF PIPELINE CORRIDOR
VILLAGE OF KEY BISCAYNE, FLORIDA
DESCRIPTION
TYPE
FEES
Part XIX 3 Year Underwater Video Mapping of Pipeline Corridor
Lump Sum
$5 000
Subtotal
$5,000
Estimated Expenses
$425
Subtotal
$425
GRAND TOTAL
$5,425
Coastal Environmental Civil Engineering and Management