HomeMy Public PortalAboutPRR 16-2169.01Danny Brannon From: Lehr, John <John.Lehr@fpl.com> Sent: Wednesday, December 05, 201211:30 AM To: Danny Brannon Subject: FW: PDF - 44 Drawings WR - 4442448 Attachments: A05BP22.pdf A05BP30.pdf A05BP3.pdf A05BP6.pdf, A05BR50.pdf A05BR71.pdf, A05BV2.pdf, A05CK116.pdf A05CK158.pdf, A05CK159.pdf A05R115.pdf, A0511149.pdf, A0511160.pdf, A05R161.pdf A05R162.pdf,, A05R163.pdf A05R164.pdf A05R166.pdf, A05R167.pdf A05R168.pdf, A05R169.pdf A05R170.pdf A0511171.pdf, A05R172.pdf A0511173.pdf, A05R174.pdf A05R175.pdf, A05R176.pdf A0511177.pdf A05R178.pdf A05Rl79.pdf A0511180.pdf AOSR181.pdf A0511182.pdf AOSR183.pdf A05R184.pdf, A05R185.pdf, A05R186.pdf A05R187.pdf, A05R188.pdf A05R189.pdf, A05R190.pdf A05R53.pdf A05R73.pdf Danny, FYI, Attached are the revised drawings for Phase #1. Thanks, John C. Lehr, Jr. Project Manager - Distribution FPL (0) 561.845.4624 From: Lehr, John Sent: Wednesday, December 05, 2012 11:09 AM To: Lehr, John Subject: PDF - 44 Drawings WR - 4442448 Copyright 2012 FPL All Rights Reserved The material contained herein may contain Inaccuracies. There are no expressed or implied warranties. The user is warned to utilize at hislher own dsk. User assumes risk of any and all loss. Al boundaries are approximate. Only accurate on the day of this transmission. Facility location and depth subject to change without notice. Not to be used for survey or excavation purposes. In accordance with FL Statue 556, prior to construction call for locations of all underground facilities 1-800-432-4770. PDFs will print more reliably if you check the'Pdnt as Image' checkbox in the advanced button on the Adobe Reader Pdnt box. 38 Danny Brannon From: Lehr, John <John.Lehr@fpl.com> Sent: Tuesday, January 15, 2013 2:40 PM To: Danny Brannon Subject: Town of Gulf Stream - Phase #1- 2nd Estimate - Town Performs ALL Underground Attachments: TOGS - Phs 1 - BCE - GAF Cust All UG 1-13.pdf, TOGS - Phase 1- dwgs 1-13 .pdf Danny, FYI, Attached the revised BCE for the Gulf Stream -Phase #1 Project assuming the Town performs ALL the underground work. John C. Lehr, Jr. Project Manager - Distribution FPL (0) 561.845.4624 From: Danny Brannon(mailto:DBrannon@BnGEngineers.com] Sent: Wednesday, December 12, 2012 10:38 AM To: Lehr, John Subject: Deposit Coupon - Gulf Stream - $1350 Status Danny P. Brannon, P.E. Brannon & Gillespie, L c Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com 39 Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Tuesday, January 15, 2013 3:54 PM To: 'Lehr, John' Subject: RE: Town of Gulf Stream - Phase #1- 2nd Estimate - Town Performs ALL Underground So what was the answer relative to the number of Vista Switches? Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.EnGEngineers.com From: Lehr, John [mallto:John.Lehr@fpl.com] Sent: Tuesday, January 15, 2013 2:40 PM To: Danny Brannon Subject: Town of Gulf Stream - Phase #1 - 2nd Estimate -Town Performs ALL Underground Danny, FYI, Attached the revised BCE for the Gulf Stream -Phase #1 Project assuming the Town performs ALL the underground work. John C. Lehr, Jr. Project Manager - Distribution FPL (0) 561.845.4624 From: Danny Brannon rmailto:DBrannonOBnGEnolneers.coml Sent: Wednesday, December 12, 2012 10:38 AM To: Lehr, John Subject: Deposit Coupon - Gulf Stream - $1350 Status GP] Danny P. Brannon, P.E. Brannon & Gillespie, zsc Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com 41 Danny Brannon From: Lehr, John <1ohn.Lehr@fpl.com> Sent: Wednesday, January 30, 2013 3:01 PM To: Danny Brannon Subject: Town of Gulf Stream - Phase #1 - Revised BCE - 3 VISTA's Attachments: TOGS - Phs 1 - BCE - GAF Cust All UG 1-30-13.pdf, TOGS - Phs 1 - BCE - GAF FPL All UG 1-30-13.pdf Danny, As we discussed, attached are the revised BCE's with 3 Vista's for the Phase #1 project. Further, the revised prints should be available next week. Thx! John C. Lehr, Jr. Project Manager - Distribution FPL (0) 561.845.4624 From: Danny Brannon[mailto:DBrannon@BnGEngineers.com] Sent: Tuesday, January 15, 2013 3:54 PM To: Lehr, John Subject: RE: Town of Gulf Stream - Phase #1 - 2nd Estimate - Town Performs ALL Underground So what was the answer relative to the number of Vista Switches? Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com From: Lehr, John [mailto:John.Lehr@fpl.com] Sent: Tuesday, January 15, 2013 2:40 PM To: Danny Brannon Subject: Town of Gulf Stream - Phase #1 - 2nd Estimate - Town Performs ALL Underground Danny, FYI, Attached the revised BCE for the Gulf Stream -Phase #1 Project assuming the Town performs ALL the underground work. 42 John C. Lehr, Jr. Project Manager -Distribution FPL (0) 561.845.4624 From: Danny Brannon rmailto:DBrannon(a)BnGEnalneers.coml Sent: Wednesday, December 12, 2012 10:38 AM To: Lehr, John Subject: Deposit Coupon - Gulf Stream - $1350 Status Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com 43 Danny Brannon From: Lehr, John <John.Lehr@fpl.com> Sent: Wednesday, February 06, 201310:06 AM To: Danny Brannon Cc Patrick Figurella Subject: Re: Status - GS Prints and Meeting with Jupiter AIA designer I know the designer has requested the backgrounds for the project, so I'll ask for an update ...... I'll also ask for his availability next week John Sent from my iPhone On Feb 6, 2013, at 9:27 AM, "Danny Brannon" <DBrannon(ZDBnGEneineers.com> wrote: John, What is the status on the prints? Now that we have a designer, We need to have a pre -design meeting with the Jupiter A1A designer. I will be out next week except for Monday. Tuesday mornings 8 to 9:30am are booked for me, but I will be across the street from WPB svc center if he is out of WPB. Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 12798 West Forest HIII Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com 44 Danny Brannon From: Arthus, Charles <Charles.Arthus@fpl.com> Sent: Wednesday, February 06, 201311:09 AM To: Danny Brannon Cc: Lehr, John; Bill Thrasher, Orozco, Geezella Subject: RE: Harbor View Estates Danny, Please send me the plan related to Harbor View Estates. I have to find a way to incorporate my design into yours. I do not know when your conversion will be executing. Should my job starts before yours, you might have to modify your design. Thanks, Charles Arthus Engineer II 9329 5 Military Trl. Boynton Beach,FL33436 [561] 742-2085 Office Tel [561]742-2016 Fax From: Danny Brannon[mallto:DBrannon@BnGEngineers.com] Sent: Wednesday, February 06, 2013 10:07 AM To: Arthus, Charles Cc: Lehr, John; Bill Thrasher Subject: Harbor View Estates Charles, The Town of Gulf Stream has a plan to underground that portion of the Town lying east of the Intracoastal waterway. I understand you are looking at the requirements for this new development. We had previously discussed their plans with them. It is essential that any work you do conform to the FPL undergrounding plans. John Lehr or I can provide you with these plans as they are to be completed in drafting and sent out this week. Don't hesitate to call me or John on this matter. Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off. (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com 45 Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Wednesday, February 06, 2013 11:31 AM To: 'Arthus, Charles' Cc: 'Lehr, John'; 'Bill Thrasher'; 'Orozco, Geezella' Subject: RE: Harbor View Estates Our design will be the formal FPL design and will be under contract with FPL. We have the contract in hand and are waiting on the FPL prints. Please contact John Lehr, FPL Statewide Project Manager for Municipal Overhead to Underground Conversion Projects. He can have the FPL designer out of Plantation contact you. We will be going out to Bid within the next 30 days. Danny P. Brannon, P.E. Brannon & Gillespie, Lr,c Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com From: Arthus, Charles [mailto:Charles.Arthus@fpl.com] Sent: Wednesday, February 06, 2013 11:09 AM To: Danny Brannon Cc: Lehr, John; BIII Thrasher; Orozco, Geezella Subject: RE: Harbor View Estates Danny, Please send me the plan related to Harbor View Estates. I have to find a way to incorporate my design into yours. I do not know when your conversion will be executing. Should myjob starts before yours, you might have to modify your design. Thanks, Charles Arthus Engineer II 9329 S Military TH. Boynton Beach, FL 33436 [561] 742-2085 Office Tel [561]742-2016 Fax From: Danny Brannon[mailto:DBrannonCalBnGEnoineers.coml Sent: Wednesday, February 06, 2013 10:07 AM 46 To: Arthus, Charles Cc: Lehr, John; Bill Thrasher Subject: Harbor View Estates Charles, The Town of Gulf Stream has a plan to underground that portion of the Town lying east of the Intracoastal waterway. I understand you are looking at the requirements for this new development. We had previously discussed their plans with them. It is essential that any work you do conform to the FPL undergrounding plans. John Lehr or I can provide you with these plans as they are to be completed in drafting and sent out this week. Don't hesitate to call me or John on this matter. Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com 47 Danny Brannon From: Lehr, John <John.Lehr@fpl.com> Sent: Wednesday, February 06, 2013 2:57 PM To: Danny Brannon Subject: Town of Gulf Stream - Phase #1- WR - 4442448 - Revised Drawings Attachments: A05BP22.pdf A05BP30.pdf A05BP3.pdf A05BP6.pdf A05BR50.pdf AOSBR71.pdf A05BV2.pdf A05CK116.pdf A05CK158.pdf A05CK159.pdf A05Rll5.pdf A05R149.pdf, AOSR160.pdf A05R161.pdf, AOSR162.pdf, A05R163.pdf A05R164.pdf A0511166.pdf A05R167.pdf A05R168.pdf A05R169.pdf, A05R170.pdf, A0511171.pdf, A05R172.pdf, AOSR173.pdf A05R174.pdf, A05R175.pdf A05R176.pdf A05R177.pdf A05R178.pdf, A05R179.pdf A05R180.pdf, A05R18Lpdf A05R182.pdf, A05R183.pdf, A05R1B4.pdf, A05R185.pdf A05R186.pdf A05R187.pdf, A05R188.pdf A05R189.pdf A05R190.pdf A05R53.pdf A05R73.pdf Danny, FYI ................. attached are the revised drawings, i.e. removing VISTA #2 from the underground design, for the Gulf Stream Phase #1 project. If you need anything more, let me know. Thanks[ John C. Lehr, Jr. Project Manager - Distribution FPL (0) 561.845.4624 From: Lehr, John Sent: Wednesday, February 06, 2013 12:47 PM To: Lehr, John Subject: PDF - 44 Drawings WR - 4442448 Copyright 2013 FPL All Rights Reserved The material contained herein may contain inaccuracies. There are no expressed or implied warranties. The user is warned to utilize at his/her own risk. User assumes risk of any and all loss. All boundaries are approximate. Only accurate on the day of this transmission. Facility location and depth subject to change without notice. Not to be used for survey or excavation purposes. In accordance with FL Statue 556, prior to construction call for locations of all underground facilities 1-800-432-4770. PDFs will print more rellably if you check the 'Print as Image' checkbox in the advanced button an the Adobe Reader Print box. 48 Danny Brannon From: Lehr, John <John.Lehr@fpl.com> Sent: Wednesday, March 13, 2013 5:29 PM To: Danny Brannon Subject: Town of Gulf Stream - Phase #2 Conversion - Timeline Danny, As we discussed, to follow up on our telephone conversation on Wednesday, March 13, 2013, below is a summary of our discussion and agreement regarding the conversion of the electrical service from overhead to underground in the Phase #2 project, Little Club Road to Golf View Drive. During our telephone conversation on February 08, 2013, we discussed the subject project and agreed to the following schedule: • FPL will provide the Town of Gulf Stream with the preliminary layout and design for Phase #2 in14 to16 weeks once FPL receives the existing underground utility survey drawings in AutoCAD from the Town of Gulf Stream. • Once the Town has approved the preliminary underground design and equipment locations, FPL will produce the binding cost estimate (B.C.E.) within 8 weeks. Please note that FPL records indicate the non-refundable deposit for Phase #2 has been received. 1 hope you find this information helpful, and please feel free to contact me should you have any questions or additional concerns. 1 can be reached at (561) 845-4624. Thanks, John C. Lehr, Jr. Project Manager - Distribution FPL (0) 561.845.4624 99 Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Thursday, March 14, 2013 9:21 AM To: 'Lehr, John' Subject: RE: Town of Gulf Stream - Phase #2 Conversion - Timeline John, Will this be an ongoing FPL policy relative to the delivery of future Binding Cost Estimates, or is this a only a one time response to the problem? Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGBnzineers.com From: Lehr, John [mailto:John.Lehr@fpl.com] Sent: Wednesday, March 13, 2013 5:29 PM To: Danny Brannon Subject: Town of Gulf Stream - Phase #2 Conversion - Timeline Danny, As we discussed, to follow up on our telephone conversation on Wednesday, March 13, 2013, below is a summary of our discussion and agreement regarding the conversion of the electrical service from overhead to underground in the Phase #2 project, Little Club Road to Golf View Drive. During our telephone conversation on February 08, 2013, we discussed the subject project and agreed to the following schedule: • FPL will provide the Town of Gulf Stream with the preliminary layout and design for Phase #2 in14 to16 weeks once FPL receives the existing underground utility survey drawings in AutoCAD from the Town of Gulf Stream. • Once the Town has approved the preliminary underground design and equipment locations, FPL will produce the binding cost estimate (B.C.E.) within 8 weeks. Please note that FPL records indicate the non-refundable deposit for Phase #2 has been received. I hope you find this information helpful, and please feel free to contact me should you have any questions or additional concerns. I can be reached at (561) 845-4624. Thanks, 50 John C. Lehr, Jr. Project Manager -Distribution FPL (0) 561.845.4624 51 Danny Brannon From: Lehr, John <John.Lehr@fpl.com> Sent: Friday, March 15, 2013 8:31 AM To: Danny Brannon Subject: RE: Town of Gulf Stream - Phase #2 Conversion - Timeline / Danny, Yes, this should be the norm for the conversion projects; however, it's also based on the project size, e.g. conversion area / pole line feet, larger -longer, smaller -shorter. With the Gulf Stream Phase #1 project, I know there was an issue with the drawings that increased finalizing the B.C.E.'s delivery time. I hope this helps John C. Lehr, Jr. Project Manager - Distribution FPL (0) 561.845.4624 From: Danny Brannon[mailto:DBrannon@BnGEngineers.com] Sent: Thursday, March 14, 2013 9:21 AM To: Lehr, John Subject: RE: Town of Gulf Stream - Phase #2 Conversion - Timeline John, Will this be an ongoing FPL policy relative to the delivery of future Binding Cost Estimates, or is this a only a one time response to the problem? Danny P. Brannon, P.E. Brannon & Gillespie, L c Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off. (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com From: Lehr, John [mailto:John.Lehr@fpl.com] Sent: Wednesday, March 13, 2013 5:29 PM To: Danny Brannon Subject: Town of Gulf Stream - Phase #2 Conversion - Timeline Danny, 52 As we discussed, to follow up on our telephone conversation on Wednesday, March 13, 2013, below is a summary of our discussion and agreement regarding the conversion of the electrical service from overhead to underground in the Phase #2 project, Little Club Road to Golf View Drive. During our telephone conversation on February 08, 2013, we discussed the subject project and agreed to the following schedule: • FPL will provide the Town of Gulf Stream with the preliminary layout and design for Phase #2 in14 to16 weeks once FPL receives the existing underground utility survey drawings in AutoCAD from the Town of Gulf Stream. • Once the Town has approved the preliminary underground design and equipment locations, FPL will produce the binding cost estimate (B.C.E.) within 8 weeks. Please note that FPL records indicate the non-refundable deposit for Phase #2 has been received. I hope you find this information helpful, and please feel free to contact me should you have any questions or additional concerns. 1 can be reached at (561) 845-4624. Thanks, John C. Lehr, Jr. Project Manager - Distribution FPL (0) 561.845.4624 53 Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Thursday, April 18, 2013 11:20 AM To: Lehr, John (John.Lehr@fpl.com) Subject: Meeting on the Gulf Stream Project John, When can we meet with your engineers. The design is unclear in several places. This needs to occur asap. Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com 54 Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Thursday, April 18, 201311:53 AM To: Lehr, John (1ohn.Lehr@fpl.com) Subject: FDOT permit for AIA for Gulf Stream Do you have the permit, or have you applied for it yet Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com 55 Danny Brannon From: Lehr, John <John.Leh r@fpl.com> Sent: Monday, April 22, 2013 5:06 PM To: Danny Brannon Subject: Town of Gulf Stream Undergrounding - Live -Front TX's Danny, FYI .................... I've forwarded the request on to the designer. Regarding the live -front TX's, FPL will handle these units similar to the previous projects, Jupiter Island, e.g. radials will be changed -out to loop -style. I'll keep you advised on the response from the engineer .................. Also, give me a call tomorrow so we can determine a date & time to review the design for Phase #1. Thanks! John C. Lehr, Jr. Project Manager - Distribution FPL (0) 561.845.4624 From: Danny Brannon[mailto:DBrannon@BnGEngineers.com] Sent: Thursday, April 18, 2013 2:55 PM To: Lehr, John Subject: Gulf Stream Undergrounding It seems they are changing out all the live front padmount transformers. Are these live fronts all radials or are they loop style? Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com 56 Danny Brannon From: Lehr, John <John.Lehr@fpl.com> Sent: Monday, April 29, 2013 9:06 AM To: Danny Brannon Subject: Town of Gulf Stream Undergrounding - WR # 44442448 - CIAC Invoice Attachments: TOGS - Phase 1 - CIAC inv 4-13 .pdf Danny, FYI ...................... As you requested, attached is the invoice for the Gulf Stream — Phase #1 project assuming the Town elects to perform "ALL" the underground work. Thanks! John C. Lehr, Jr. Project Manager - Distribution FPL (0) 561.845.4624 57 Danny Brannon From: Lehr, John <John.Lehr@fpl.com> Sent: Wednesday, May 22, 2013 9:51 AM To: Bonnoront, Mark Cc: Danny Brannon Subject: Town of Gulf Stream - Phase #1 - Drwg. Updates Mark, What's the status on the Phase #1 drwg. revisions? Thxl John C. Lehr, Jr. Project Manager - Distribution FPL (0) 561.845.4624 From: Danny Brannon[mailto:DBrannon@BnGEngineers.com] Sent: Wednesday, May 22, 2013 8:23 AM To: Lehr, John; Bonnoront, Mark Subject: Gulf Stream Do you have a status on the prints? Danny P. Brannon, P.E. Brannon & Gillespie, rsc Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com 58 Danny Brannon From: Bonnoront, Mark <Mark.Bonnoront@fpl.com> Sent: Thursday, May 30, 2013 5:09 PM To: Lehr, John; Danny Brannon Cc: Martin, Kyle Subject: Gulf Stream Phase 1 Info - 1 Attachments: 4442448_A05CK159.pdf;4442448 A05R160.pdf;4442448_A05R161.pdf;4442448 A05CK158.pdf Danny, Attached are the Gulf Stream Drawings with the updates. If you have any questions please contact John or myself. Due to the number of drawings and FPL limitation on email size I have broken this into 8 emails each with 4 files. Thanks Mark Mark Bonnoront Engineering & Technical Services FPL Distribution 561-640-2587 Work 561-670-5086 Cell mark.bonnoront@fpl.com Below is the list of transformer updates: 1) Originally identified as Live Front, but actually Dead Front Loop Style (no need to change out equipment and updated inventory) - Locations: 97(WYE), 94, 85.5(OD), 81, 65, 68(WYE), 29(WYE) 2) Originally identified as Live Front and correct (equipment still needs to be changed out to Dead Front Loop Style and no change to inventory) - Location: 89 3) Originally identified as Dead Front Radial and correct (equipment still needs to be changed out to Dead Front Loop Style and no change to inventory) - Location: 14 4) Identified as single transformer but should have been Open Delta (Updated inventory) - Location: 58 5) Re-route cable and eliminate need for transformer (updated inventory) - Location: 54 Thanks Mark 59 Mark Bonnoront Engineering & Technical Services FPL Distribution 561-640-2587 Work 561-670-5086 Cell mark.bonnoront@fpl.com --Original Message— From: Lehr, John Sent: Wednesday, May 29, 2013 9:20 AM To: Bonnoront, Mark Cc: Martin, Kyle; Harlacher, P C; Beck, Bret; Allain, Tom Subject: Gulf Stream Phase 1 Info Mark Are the print revisions complete w/ Gulf Stream Phase 17 And did you ever compile the TX info, LF loop they or not ...... Sent from my iPhone Gal Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Friday, May 31, 2013 9:08 AM To: 'Bonnoront, Mark' Subject: RE: Gulf Stream Phase 1 Info - 8 Mark, Drawing A05R163 shows changing the "T" numbers on an existing open delta bank only (T-1 to T-56 and T-2 to T57), while the circuit dwg shows changing out the transformers? Am I reading this wrong? Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com -----Original Message ----- From: Bonnoront, Mark [mailto:Mark.Bonnoront@fpl.com] Sent: Thursday, May 30, 2013 5:13 PM To: Lehr, John; Danny Brannon Cc: Martin, Kyle Subject: RE: Gulf Stream Phase 1 Info - 8 Danny, Attached are the Gulf Stream Drawings with the updates. If you have any questions please contact John or myself. Due to the number of drawings and FPL limitation on email size I have broken this into 8 emails each with 4 files. Thanks Mark Mark Bonnoront Engineering & Technical Services FPL Distribution 561-640-2587 Work 561-670-5086 Cell mark.bonnoront@fpl.com Below is the list of transformer updates: 1) Originally identified as Live Front, but actually Dead Front Loop Style (no need to change out equipment and updated inventory) - Locations: 97(WYE), 94, 85.5(OD), 81, 65, 68(WYE), 29(WYE) 2) Originally identified as Live Front and correct (equipment still needs to be changed out to Dead Front Loop Style and no change to inventory) - Location: 89 61 3) Originally identified as Dead Front Radial and correct (equipment still needs to be changed out to Dead Front Loop Style and no change to inventory) - Location: 14 4) Identified as single transformer but should have been Open Delta (Updated inventory) - Location: 58 5) Re-route cable and eliminate need for transformer (updated inventory) - Location: 54 Thanks Mark Mark Bonnoront Engineering & Technical Services FPL Distribution 561-640-2587 Work 561-670-5086 Cell mark. bonnoront@fpl.com --Original Message— From: Lehr, John Sent: Wednesday, May 29, 2013 9:20 AM To: Bonnoront, Mark Cc: Martin, Kyle; Harlacher, P C; Beck, Bret; Allain, Tom Subject: Gulf Stream Phase 1 Info Mark Are the print revisions complete w/ Gulf Stream Phase 17 And did you ever compile the TX info, LF loop they or not ...... Sent from my iPhone 62 Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Friday, May 31, 2013 10:05 AM To: 'Bonnoront, Mark' Subject: RE: Gulf Stream Phase 1 Info -1 CKT Dwg shows replacing the TX at location 817 Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com --Original Message— From: Bonnoront, Mark [mailto:Mark.Bonnoront@fpl.com] Sent: Thursday, May 30, 2013 5:09 PM To: Lehr, John; Danny Brannon Cc: Martin, Kyle Subject: Gulf Stream Phase 1 Info -1 Danny, Attached are the Gulf Stream Drawings with the updates. If you have any questions please contact John or myself. Due to the number of drawings and FPL limitation on email size I have broken this into 8 emails each with 4 files. Thanks Mark Mark Bonnoront Engineering & Technical Services FPL Distribution 561-640-2587 Work 561-670-5086 Cell mark.bonnoront@fpl.com Below is the list of transformer updates: 1) Originally identified as Live Front, but actually Dead Front Loop Style (no need to change out equipment and updated inventory) - Locations: 97(WYE), 94, 85.5(OD), 81, 65, 68(WYE), 29(WYE) 2) Originally identified as Live Front and correct (equipment still needs to be changed out to Dead Front Loop Style and no change to Inventory) - Location: 89 63 3) Originally identified as Dead Front Radial and correct (equipment still needs to be changed out to Dead Front Loop Style and no change to inventory) - Location: 14 4) Identified as single transformer but should have been Open Delta (Updated inventory) - Location: 58 5) Re-route cable and eliminate need for transformer (updated inventory) - Location: 54 Thanks Mark Mark Bonnoront Engineering & Technical Services FPL Distribution 561-640-2587 Work 561-670-5086 Cell mark.bonnoront@fpl.com --Original Message -- From: Lehr, John Sent: Wednesday, May 29, 2013 9:20 AM To: Bonnoront, Mark Cc: Martin, Kyle; Harlacher, P C; Beck, Bret; Allain, Tom Subject: Gulf Stream Phase 1 Info Mark Are the print revisions complete w/ Gulf Stream Phase 17 And did you ever compile the TX info, LF loop they or not ...... Sent from myiPhone 64 Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Friday, May 31, 2013 10:12 AM To: 'Bonnoront, Mark' Subject: RE: Gulf Stream Phase 1 Info -1 Location 92 on ckt shows replacing transformers and on a05R163 shows changing T numbers? (Open delta) Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com -----Original Message ----- From: Bonnoront, Mark [mailto:Mark.Bonnoront@fpl.com] Sent: Thursday, May 30, 2013 5:09 PM To: Lehr, John; Danny Brannon Cc: Martin, Kyle Subject: Gulf Stream Phase 1 Info -1 Danny, Attached are the Gulf Stream Drawings with the updates. If you have any questions please contact John or myself. Due to the number of drawings and FPL limitation on email size I have broken this into 8 emails each with 4 files. Thanks Mark Mark Bonnoront Engineering & Technical Services FPL Distribution 561-640-2587 Work 561-670-5086 Cell mark.bonnoront@fpl.com Below is the list of transformer updates: 1) Originally identified as Live Front, but actually Dead Front Loop Style (no need to change out equipment and updated inventory) - Locations: 97(WYE), 94, 85.5(OD), 81, 65, 68(WYE), 29(WYE) 2) Originally identified as Live Front and correct (equipment still needs to be changed out to Dead Front Loop Style and no change to inventory) - Location: 89 65 3) Originally identified as Dead Front Radial and correct (equipment still needs to be changed out to Dead Front Loop Style and no change to inventory) - Location: 14 4) Identified as single transformer but should have been Open Delta (Updated inventory) - Location: 58 5) Re-route cable and eliminate need for transformer (updated inventory) - Location: 54 Thanks Mark Mark Bonnoront Engineering &Technical Services FPL Distribution 561-640-2587 Work 561-670-5086 Cell mark.bonnoront@fpl.com --Original Message -- From: Lehr, John Sent: Wednesday, May 29, 2013 9:20 AM To: Bonnoront, Mark Cc: Martin, Kyle; Harlacher, P C; Beck, Bret; Allain, Tom Subject: Gulf Stream Phase 1 Info Mark Are the print revisions complete w/ Gulf Stream Phase 1? And did you ever compile the TX info, LF loop they or not ...... Sent from myiPhone G'.; Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Friday, May 31, 2013 10:33 AM To: 'Bonnoront, Mark' Subject: RE: Gulf Stream Phase 1 Info -1 t-61 location 97 shows replacing on the ckt dwg. Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com ---Original Message— From: Bonnoront, Mark [mailto:Mark.Bonnoront@fpl.com] Sent: Thursday, May 30, 2013 5:09 PM To: Lehr, John; Danny Brannon Cc: Martin, Kyle Subject: Gulf Stream Phase 1 Info -1 Danny, Attached are the Gulf Stream Drawings with the updates. If you have any questions please contact John or myself. Due to the number of drawings and FPL limitation on email size I have broken this into 8 emails each with 4 files. Thanks Mark Mark Bonnoront Engineering & Technical Services FPL Distribution 561-640-2587 Work 561-670-5086 Cell mark.bonnoront@fpl.com Below is the list of transformer updates: 1) Originally identified as Live Front, but actually Dead Front Loop Style (no need to change out equipment and updated inventory) - Locations: 97(WYE), 94, 85.5(OD), 81, 65, 68(WYE), 29(WYE) 2) Originally identified as Live Front and correct (equipment still needs to be changed out to Dead Front Loop Style and no change to inventory) 67 Location: 89 3) Originally identified as Dead Front Radial and correct (equipment still needs to be changed out to Dead Front Loop Style and no change to inventory) - Location: 14 4) Identified as single transformer but should have been Open Delta (Updated inventory) - Location: 58 5) Re-route cable and eliminate need for transformer (updated inventory) - Location: 54 Thanks Mark Mark Bonnoront Engineering & Technical Services FPL Distribution 561-640-2587 Work 561-670-5086 Cell mark.bonnoront@fpl.com -----Original Message ----- From: Lehr, John Sent: Wednesday, May 29, 2013 9:20 AM To: Bonnoront, Mark Cc: Martin, Kyle; Harlacher, P C; Beck, Bret; Allain, Tom Subject: Gulf Stream Phase 1 Info Mark Are the print revisions complete w/ Gulf Stream Phase 1? And did you ever compile the TX info, LF loop they or not ...... Sent from my iPhone N Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Friday, May 31, 20131:29 PM To: 'Bonnoront, Mark' Subject: RE: Gulf Stream Phase 1 Info - 8 (updated circuit dwg) I noticed T-61 was not fixed on the CKT. Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com --Original Message -- From: Bonnoront, Mark (mailto:Mark.Bonnoront@fpl.com] Sent: Friday, May 31, 2013 9:27 AM To: Danny Brannon Subject: RE: Gulf Stream Phase 1 Info - 8 (updated circuit dwg) Drawing is attached Mark Bonnoront Engineering & Technical Services FPL Distribution 561-640-2587 Work 561-670-5086 Cell mark.bonnoront@fpl.com --Original Message— From: Bonnoront, Mark Sent: Friday, May 31, 2013 9:16 AM To: 'Danny Brannon' Subject: RE: Gulf Stream Phase 1 Info -8 Danny, Circuit drawing did not get updated. The OD transformers are not getting changed out. I will get the circuit drawing corrected and send it over. Thanks Mark Mark Bonnoront Engineering & Technical Services FPL Distribution 69 561-640-2587 Work 561-670-5086 Cell mark.bonnoront@fpl.com -----Original Message ----- From: Danny Brannon[mailto:DBrannon@BnGEngineers.com] Sent: Friday, May 31, 2013 9:08 AM To: Bonnoront, Mark Subject: RE: Gulf Stream Phase 1 Info -8 Mark, Drawing AOSR163 shows changing the "T" numbers on an existing open delta bank only (T-1 to T-56 and T-2 to T57), while the circuit dwg shows changing out the transformers? Am I reading this wrong? Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 -Cell: (561) 307-9454 Website: www.BnGEngineers.com -----Original Message ----- From: Bonnoront, Mark [mailto:Mark.Bonnoront@fpl.com] Sent: Thursday, May 30, 2013 5:13 PM To: Lehr, John; Danny Brannon Cc: Martin, Kyle Subject: RE: Gulf Stream Phase 1 Info - 8 Danny, Attached are the Gulf Stream Drawings with the updates. If you have any questions please contact John or myself. Due to the number of drawings and FPL limitation on email size I have broken this into 8 emails each with 4 files. Thanks Mark Mark Bonnoront Engineering & Technical Services FPL Distribution 561-640-2587 Work 561-670-5086 Cell mark.bonnoront@fpl.com Below is the list of transformer updates: 1) Originally identified as Live Front, but actually Dead Front Loop Style (no need to change out equipment and updated inventory) - Locations: 97(WYE), 94, 85.5(OD), 81, 65, 68(WYE), 29(WYE) 2) Originally identified as Live Front and correct (equipment still needs to be changed out to Dead Front Loop Style and no change to inventory) Location: 89 3) Originally identified as Dead Front Radial and correct (equipment still needs to be changed out to Dead Front Loop Style and no change to inventory) - Location: 14 4) Identified as single transformer but should have been Open Delta (Updated inventory) - Location: 58 5) Re-route cable and eliminate need for transformer (updated inventory) - Location: 54 Thanks Mark Mark Bonnoront Engineering & Technical Services FPL Distribution 561-640-2587 Work 561-670-5086 Cell mark. bon noront@fpl.com --Original Message -- From: Lehr, John Sent: Wednesday, May 29, 2013 9:20 AM To: Bonnoront, Mark Cc: Martin, Kyle; Harlacher, P C; Beck, Bret; Allain, Tom Subject: Gulf Stream Phase 1 Info Mark Are the print revisions complete w/ Gulf Stream Phase 17 And did you ever compile the TX info, LF loop they or not ...... Sent from my iPhone 71 Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Friday, May 31, 2013 1:30 PM To: 'Bonnoront, Mark' Subject: RE: Gulf Stream Phase 1 Info - 8 (updated circuit dwg) Also t-45 not fixed Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com -----Original Message ----- From: Bonnoront, Mark [mailto:Mark.Bonnoront@fpl.com) Sent: Friday, May 31, 2013 9:27 AM To: Danny Brannon Subject: RE: Gulf Stream Phase 1 Info - 8 (updated circuit dwg) Drawing is attached Mark Bonnoront Engineering & Technical Services FPL Distribution 561-640-2587 Work 561-670-5086 Cell mark.bonnoront@fpl.com -----Original Message ----- From: Bonnoront, Mark Sent: Friday, May 31, 2013 9:16 AM To: 'Danny Brannon' Subject: RE: Gulf Stream Phase 1 Info -8 Danny, Circuit drawing did not get updated. The OD transformers are not getting changed out. I will get the circuit drawing corrected and send it over. Thanks Mark Mark Bonnoront Engineering & Technical Services FPL Distribution 72 561-640-2587 Work 561-670-5086 Cell mark.bonnorant@fpl.com —Original Message -- From: Danny Brannon[mailto:DBrannon@BnGEngineers.com] Sent: Friday, May 31, 2013 9:08 AM To: bonnoront, Mark Subject: RE: Gulf Stream Phase 1 Info -8 Mark, Drawing A05R163 shows changing the "T" numbers on an existing open delta bank only (T-1 to T-56 and T-2 to T57), while the circuit dwg shows changing out the transformers? Am I reading this wrong? Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com ---Original Message -- From: Bonnoront, Mark (mailto:Mark.Bonnoront@fpl.com) Sent: Thursday, May 30, 2013 5:13 PM To: Lehr, John; Danny Brannon Cc: Martin, Kyle Subject: RE: Gulf Stream Phase 1 Info - 8 Danny, Attached are the Gulf Stream Drawings with the updates. If you have any questions please contact John or myself. Due to the number of drawings and FPL limitation on email size I have broken this into 8 emails each with 4 files. Thanks Mark Mark Bonnoront Engineering & Technical Services FPL Distribution 561-640-2587 Work 561-670-5086 Cell mark.bannoront@fpl.com Below is the list of transformer updates: 1) Originally identified as Live Front, but actually Dead Front Loop Style (no need to change out equipment and updated inventory) - Locations: 97(WYE), 94, 85.5(OD), 81, 65, 68(WYE), 29(WYE) 2) Originally identified as Live Front and correct (equipment still needs to be changed out to Dead Front Loop Style and no change to inventory) 73 - Location: 89 3) Originally identified as Dead Front Radial and correct (equipment still needs to be changed out to Dead Front Loop Style and no change to inventory) - Location: 14 4) Identified as single transformer but should have been Open Delta (Updated inventory) - Location: 58 5) Re-route cable and eliminate need for transformer (updated inventory) - Location: 54 Thanks Mark Mark Bonnoront Engineering & Technical Services FPL Distribution 561-640-2587 Work 561-670-5086 Cell mark.bonnoront@fpl.com -----Original Message ----- From: Lehr, John Sent: Wednesday, May 29, 2013 9:20 AM To: Bonnoront, Mark Cc: Martin, Kyle; Harlacher, P C; Beck, Bret; Allain, Tom Subject: Gulf Stream Phase 1 Info Mark Are the print revisions complete w/ Gulf Stream Phase 1? And did you ever compile the TX info, LF loop they or not ...... Sent from my whone 74 Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Friday, May 31, 2013 5:09 PM To: 'Bonnoront, Mark' Subject: RE Gulf Stream Phase 1 Info - 8 (updated circuit dwg) Wonderful...... Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com —Original Message --- From: Bonnoront, Mark [mailto:Mark.Bonnoront@fpl.com] Sent: Friday, May 31, 2013 3:38 PM To: Danny Brannon Subject: RE: Gulf Stream Phase 1 Info - 8 (updated circuit dwg) Danny, Attached is the updated print. Thanks Mark Mark Bonnoront Engineering & Technical Services FPL Distribution 561-640-2587 Work 561-670-5086 Cell mark.bonnoront@fpl.com —Original Message -- From: Danny Brannon ]mailto:DBrannon@BnGEngineers.com] Sent: Friday, May 31, 2013 1:30 PM To: Bonnoront, Mark Subject: RE: Gulf Stream Phase 1 Info - 8 (updated circuit dwg) Also t-45 not fixed Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 75 Wellington, FL 33414-4704 Off: (561)795-0833 -Cell: (561) 307-9454 Website: www.BnGEngineers.com ---Original Message— From: Bonnoront, Mark [mailto:Mark.Bonnoront@fpl.com] Sent: Friday, May 31, 2013 9:27 AM To: Danny Brannon Subject: RE: Gulf Stream Phase 1 Info - 8 (updated circuit dwg) Drawing is attached Mark Bonnoront Engineering & Technical Services FPL Distribution 561-640-2587 Work 561-670-5086 Cell mark.bonnoront@fpl.com --Original Message ---- From: Bonnoront, Mark Sent: Friday, May 31, 2013 9:16 AM To: 'Danny Brannon' Subject: RE: Gulf Stream Phase i Info - 8 Danny, Circuit drawing did not get updated. The OD transformers are not getting changed out. I will get the circuit drawing corrected and send it over. Thanks Mark Mark Bonnoront Engineering & Technical Services FPL Distribution 561-640-2587 Work 561-670-5086 Cell mark.bonnoront@fpl.com ---Original Message -- From: Danny Brannon[mailto:DBrannon@BnGEngineers.com] Sent: Friday, May 31, 2013 9:08 AM To: Bonnoront, Mark Subject: RE: Gulf Stream Phase 1 Info -8 Mark, Drawing AOSR163 shows changing the "T" numbers on an existing open delta bank only (T-1 to T-56 and T-2 to T57), while the circuit dwg shows changing out the transformers? Am I reading this wrong? 76 Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com --Original Message --- From: Bonnoront, Mark [mailto:Mark.Bonnoront@fpl.com) Sent: Thursday, May 30, 2013 5:13 PM To: Lehr, John; Danny Brannon Cc: Martin, Kyle Subject: RE: Gulf Stream Phase 1 Info -8 Danny, Attached are the Gulf Stream Drawings with the updates. If you have any questions please contact John or myself. Due to the number of drawings and FPL limitation on email size I have broken this into 8 emails each with 4 files. Thanks Mark Mark Bonnoront Engineering & Technical Services FPL Distribution 561-640-2587 Work 561-670-5086 Cell mark.bonnoront@fpl.com Below is the list of transformer updates: 1) Originally identified as Live Front, but actually Dead Front Loop Style (no need to change out equipment and updated inventory) - Locations: 97(WYE), 94, 85.5(OD), 81, 65, 68(WYE), 29(WYE) 2) Originally identified as Live Front and correct (equipment still needs to be changed out to Dead Front Loop Style and no change to inventory) - Location: 89 3) Originally identified as Dead Front Radial and correct (equipment still needs to be changed out to Dead Front Loop Style and no change to inventory) - Location: 14 4) Identified as single transformer but should have been Open Delta (Updated inventory) - Location: 58 5) Re-route cable and eliminate need for transformer (updated inventory) -Location: 54 77 Thanks Mark Mark Bonnoront Engineering & Technical Services FPL Distribution 561-640-2587 Work 561-670-5086 Cell mark.bonnoront@fpl.com —Original Message -- From: Lehr, John Sent: Wednesday, May 29, 2013 9:20 AM To: Bonnoront, Mark Cc: Martin, Kyle; Harlacher, P C; Beck, Bret; Allain, Tom Subject: Gulf Stream Phase 1 Info Mark Are the print revisions complete w/ Gulf Stream Phase 1? And did you ever compile the TX info, LF loop they or not ...... Sent from myiPhone 78 Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Tuesday, June 04, 2013 5:19 PM To: 'Bonnoront, Mark'; 'Lehr, John' Cc: 'Martin, Kyle' Subject: RE: Gulf Stream Phase 1 Info - 8 Mark, The transformer that was added to create an open delta bank by the vista switch is marked as T-39. You deleted T-27 anc have marked the transformer south of what was T-27 as T-39 ( 1315 N Ocean Blvd. Can you renumber the transformer at 1315 N. Ocean as T-27. And leave the open delta bank as T-39 and T-38. A05CKT159 is OK A05CKT358, change T-39 to T-27 A0511171 is OK, A05R172 change T-39 to T-27 Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com -----Original Message ----- From: Bonnoront, Mark [mailto:Mark.Bonnoront@fpl.com) Sent: Thursday, May 30, 2013 5:13 PM To: Lehr, John; Danny Brannon Cc: Martin, Kyle Subject: RE: Gulf Stream Phase 1 Info -8 Danny, Attached are the Gulf Stream Drawings with the updates. If you have any questions please contact John or myself. Due to the number of drawings and FPL limitation on email size I have broken this into 8 emails each with 4 files. Thanks Mark Mark Bonnoront Engineering & Technical Services FPL Distribution 561-640-2587 Work 561-670-5086 Cell mark.bonnoront@fpl.com Below is the list of transformer updates: 79 1) Originally identified as Live Front, but actually Dead Front Loop Style (no need to change out equipment and updated inventory) - Locations: 97(WYE), 94, 85.5(OD), 81, 65, 68(WYE), 29(WYE) 2) Originally identified as Live Front and correct (equipment still needs to be changed out to Dead Front Loop Style and no change to inventory) - Location: 89 3) Originally identified as Dead Front Radial and correct (equipment still needs to be changed out to Dead Front Loop Style and no change to inventory) - Location: 14 4) Identified as single transformer but should have been Open Delta (Updated inventory) - Location: 58 5) Re-route cable and eliminate need for transformer (updated inventory) - Location: 54 Thanks Mark Mark Bannoront Engineering & Technical Services FPL Distribution 561-640-2587 Work 561-670-5086 Cell mark.bonnoront@fpl.com —Original Message— From: Lehr, John Sent: Wednesday, May 29, 2013 9:20 AM To: Bonnoront, Mark Cc: Martin, Kyle; Harlacher, P C; Beck, Bret; Allain, Tom Subject: Gulf Stream Phase 1 Info Mark Are the print revisions complete w/ Gulf Stream Phase 1? And did you ever compile the TX info, LF loop they or not ...... Sent from myiPhone so Danny Brannon From: Lehr, John <John.Lehr@fpl.com> Sent: Monday, June 17, 2013 10:57 AM To: Danny Brannon Subject: Town of Gulf Stream FDOT Permit Danny, FYI .................... It appears FPL received the CIAC payment; however, the GAF agreement is still outstanding, so FPL has not submitted for the FDOT permit yet. I'll forward the FDOT permit request this week. Can you determine what the status is on the agreement? John C. Lehr, Jr. Project Manager - Distribution FPL (0) 561.845.4624 From: Danny Brannon[mallto:DBrannon@BnGEngineers.com] Sent: Saturday, June 15, 2013 5:54 PM To: Lehr, John Subject: Gulf Stream FDOT Permit John, Do you have the permit yet? Danny P. Brannon, P.E. Brannon & Gillespie, rsc Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com 81 Danny Brannon From: Arthus, Charles <Charles.Arthus@fpl.com> Sent: Monday, July 29, 2013 4:30 PM To: Tom Laudani; Danny Brannon; Lehr, John Cc: Robert McDonald; tlaudani@seasidebuildersfla.com Subject: RE: Undergrounding Overhead facilities in Gulf Stream -1200 N. Ocean Blvd Tom, There is no plan to do anything else at this time. We will move forward as planned. At this time, you should pick up the materials and install them per FPL drawing. AS a reminder, once you install all the materials, it will take about 8 weeks for FPL to complete thejob. I hope you install the materials soon so I can release thejob. Should you have any other questions, please contact me. Regards, Charles Arthus 9329 S Military Trl Boyton Beach, FL 33436 Phone: [561] 742-2085 Fax: [561] 742.2016 From: Tom Laudani [mailto:tlaudani@northpointllc.com] Sent: Saturday, July 27, 2013 5:09 PM To: Danny Brannon; Arthus, Charles; Lehr, John Cc: Robert McDonald; tiaudani@seasidebuildersfla.com Subject: Re: Undergrounding Overhead facilities In Gulf Stream - 1200 N. Ocean Blvd This is an urgent matter that needs to be addressed asap. Please set up a meeting to review,also I will be away from Aug2nd till Aug 11th.thanks From: Danny Brannon <DBrannon(a)BnGEnaineers.com> Date: Sat, 27 Jul 2013 14:22:21-0400 To: Charles Arthus <Charles.Arthus(afol.com>'John Lehr <iohn lehr(cDFPL.com> Cc: Robert McDonald <rmcdonald@sea sidebuildersfla.com>, <tlaudani@seasidebuildersfla.com> Subject: Undergrounding Overhead facilities in Gulf Stream -1200 N. Ocean Blvd John, The Town has received the bids on the undergrounding of the overhead lines. The Town has executed the contracts with FPL and will begin the work as provided in the FPL plans by the end of September. In a meeting with the developers, Seaside Builders, at 1200 N. Ocean Blvd, they have indicated that the plan for running power into these 6 new lots does not comply with the plan agreed to with the developer during the platting process which was based on the FPL undergrounding plan. I had sent Charles a copy of the FPL plan via email, but it could have been derailed by FPL's email security. It is critical that we 82 have a meeting (Charles Arthus, John Lehr, Seaside Project Mgr Robert McDonald, Seaside Principal Thomas Laudani, and myself) to get on the same page. Change from original plan — Install two transformers on the south side. Danny P. Brannon, P.E. Brannon & Gillespie, rsc Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com 83 Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Tuesday, July 30, 201310:19 AM To: 'Arthus, Charles' Cc John Lehr oohn_lehr@FPLcom) Subject: RE: Undergrounding Overhead facilities in Gulf Stream -1200 N. Ocean Blvd Attachments: 4442448_A05R173.pdf, 4442448 AOSR174.pdf; 4442448_AOSR182.pdf, 4442448 _A05R181.pdf Attached are the FPL plans. There will be some minor changes as easements are negotiated. In this area, there is a 10 foot utility easement running across the north property side of this development which will be where the transformers are placed. There is a 10 foot easement running parallel to A1A behind the buffer easement. The road on the south side is a 30 foot utility and roadway easement. The road on the west side is a 20 foot road and utility easement. Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 12798 West Forest HIII Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEneineers.com From: Arthus, Charles [mallto:Charles.Arthus@fpl.com] Sent: Tuesday, July 30, 2013 9:10 AM To: Rob McDonald Cc: Tom Laudani; Danny Brannon; Lehr, John; tlaudani@seasidebuildersfla.com Subject: RE: Undergrounding Overhead facilities In Gulf Stream - 1200 N. Ocean Blvd Thursday @ 10:00 AM. Thanks, From: Rob McDonald rmallto:rmcdonaldCalseasidebuildersfla coml Sent: Monday, July 29, 2013 5:02 PM To: Arthus, Charles Cc: Tom Laudani; Danny Brannon; Lehr, John; tlaudaniCalseasidebuildersfla.com Subject: Re: Undergrounding Overhead facilities In Gulf Stream - 1200 N. Ocean Blvd When is everyone available to meet. Sent from my Verizon Wireless 4G LTE DROID "Arthus, Charles" <Charles.Arthus(afnl.com> wrote: 84 Tom, There is no plan to do anything else at this time. We will move forward as planned. At this time, you should pick up the materials and install them per FPL drawing. AS a reminder, once you install all the materials, it will take about 8 weeks for FPL to complete the job. I hope you install the materials soon so I can release the job. Should you have any other questions, please contact me. Regards, Charles Arthus 9329 S Military Trl Boyton Beach, FL 33436 Phone: [561] 742-2085 Fax: [561] 742 2016 From: Tom Laudani(mailto:daudani(&northtwintllc.coml Sent: Saturday, July 27, 2013 5:09 PM To: Danny Brannon; Arthus, Charles; Lehr, John Cc: Robert McDonald; tlaudanl(dseasidebuildersfla.com Subject: Re: Undergrounding Overhead facilities in Gulf Stream - 1200 N. Ocean Blvd This is an urgent matter that needs to be addressed asap. Please set up a meeting to review,also I will be away from Aug2nd till Aug 11 th.thanks From: Danny Brannon <DBrannon(a4BnGEnsineers.com> Date: Sat, 27 Jul 2013 14:22:21 -0400 To: Charles Arthus <Charles.ArthusA4bl.com>, John Lehr <iohn lehr(&,,FPL.com> 85 Cc: Robert McDonald<rmcdonald@.seasidebuildersfla.com>,<tlaudani(a)seasidebuildersfla.com> Subject: Undergrounding Overhead facilities in Gulf Stream - 1200 N. Ocean Blvd John, The Town has received the bids on the undergrounding of the overhead lines. The Town has executed the contracts with FPL and will begin the work as provided in the FPL plans by the end of September. In a meeting with the developers, Seaside Builders, at 1200 N. Ocean Blvd, they have indicated that the plan for running power into these 6 new lots does not comply with the plan agreed to with the developer during the platting process which was based on the FPL undergrounding plan. I had sent Charles a copy of the FPL plan via email, but it could have been derailed by FPL's email security. It is critical that we have a meeting (Charles Arthus, John Lehr, Seaside Project Mgr Robert McDonald, Seaside Principal Thomas Laudani, and myself) to get on the same page. Change from original plan — Install two transformers on the south side. 86 Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com 87 Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Wednesday, July 31, 2013 1:51 PM To: 'Lehr, John'; 'Arthus, Charles'; 'Rob McDonald' Cc: 'Tom Laudani';'tlaudani@seasidebuildersfla.com' Subject: RE: Undergrounding Overhead facilities in Gulf Stream -1200 N. Ocean Blvd John, Can you and Charles come up with a meeting date & time? Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com From: Lehr, John [mailto:John.Lehr@fpl.comj Sent: Wednesday, July 31, 2013 8:17 AM To: Danny Brannon; Arthus, Charles; 'Rob McDonald' Cc: Tom Laudani'; tlaudani@seasidebuildersFla.Com Subject: RE: Undergrounding Overhead facilities In Gulf Stream - 1200 N. Ocean Blvd To All, I have a prior engagement on Thursday, Aug. 1", and therefore, I'll be unable to attend. Thanks! John C. Lehr, Jr. Project Manager - Distribution FPL (0) 561.845.4624 From: Danny Brannon rma!Ito:DBrannon(c)BnGEnalneers.coml Sent: Tuesday, July 30, 2013 5:01 PM To: Arthus, Charles; 'Rob McDonald' Cc: Tom Laudani'; Lehr, John; tlaudani( seasidebuildersFla.com Subject: RE: Undergrounding Overhead facilities in Gulf Stream - 1200 N. Ocean Blvd Is the meeting at 10AM or 1:30PM? And Where? 88 Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 12798 West Forest HIII Blvd, Ste 102 Wellington, FL 33414-4704 Off. (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEneineers.com From: Arthus, Charles rmailto•Charles ArthusCalfpl coml Sent: Tuesday, July 30, 2013 9:10 AM To: Rob McDonald Ce: Tom Laudani; Danny Brannon; Lehr, John; tlaudani(a)seasidebuildersfla.com Subject: RE: Undergrounding Overhead facilities in Gulf Stream - 1200 N. Ocean Blvd Thursday @ 10:00 AM. Thanks, From: Rob McDonald fmaiito:rmcdonaldclaseasidebuildersfla comj Sent: Monday, July 29, 2013 5:02 PM To: Arthus, Charles Ce: Tom Laudani; Danny Brannon; Lehr, John; tlaudaniCalseasidebuildersfla com Subject: Re: Undergrounding Overhead facilities in Gulf Stream - 1200 N. Ocean Blvd When is everyone available to meet. Sent from my Verizon Wireless 4G LTE DROID "Arthus, Charles" <Charles.Arthusna,fol.com> wrote: Tom, There is no plan to do anything else at this time. We will move forward as planned. At this time, you should pick up the materials and install them per FPL drawing. AS a reminder, once you install all the materials, it will take about 8 weeks for FPL to complete the job. I hope you install the materials soon so I can release the job. Should you have any other questions, please contact me. Regards, 89 Charles Arthus 9329 S Military Trl Boyton Beach, FL 33436 Phone: [561] 742-2085 Fax: [561 ] 742.2016 From: Tom Laudani[mailto:tlaudan[Onorthuointllc.coml Sent: Saturday, July 27, 2013 5:09 PM To: Danny Brannon; Arthus, Charles; Lehr, John Cc: Robert McDonald; tlaudaniaseasidebuildersfla.com Subject: Re: Undergrounding Overhead facilities in Gulf Stream - 1200 N. Ocean Blvd This is an urgent matter that needs to be addressed asap. Please set up a meeting to review,also I will be away from Aug2nd till Aug IIth.thanks From: Danny Brannon <DBrannon( BnGEnsineers.com> Date: Sat, 27 Jul 2013 14:22:21 -0400 To: Charles Arthus <Charles.Arthus0,fnl.com>, John Lehr <iohn lehrna.FPL.com> Cc: Robert McDonald<rmcdonaldCaseasidebuildersfla.com>, <tlaudani n,seasidebuildersfla.com> Subject: Undergrounding Overhead facilities in Gulf Stream - 1200 N. Ocean Blvd John, The Town has received the bids on the undergrounding of the overhead lines. The Town has executed the contracts with FPL and will begin the work as provided in the FPL plans by the end of September. In a meeting with the developers, Seaside Builders, at 1200 N. Ocean Blvd, they have indicated that the plan for running power into these 6 new lots does not comply with the plan agreed to with the developer during the platting process which was based on the FPL undergrounding plan. I had sent Charles a copy of the FPL plan via email, but it could have been derailed by FPL's email security. It is critical that we have a meeting (Charles Arthus, John Lehr, Seaside Project Mgr Robert McDonald, Seaside Principal Thomas Laudani, and myself) to get on the same page. 90 Change from original plan — Install two transformers on the south side. Danny P. Brannon, P.E. Brannon & Gillespie, rsc Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off. (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com 91 Danny Brannon From: Lehr, John <John.Lehr@fpl.com> Sent: Wednesday, July 31, 2013 2:02 PM To: Danny Brannon Cc: Arthus, Charles; Rob McDonald; Tom Laudani; tlaudani@seasidebuildersfla.com Subject: Re: Undergrounding Overhead facilities in Gulf Stream -1200 N. Ocean Blvd Danny, Yes ..... I'll get w/ Charles on a date & time Sent from my iPhone ... It will be some time next week ...... thx..... John On Jul 31, 2013, at 1:52 PM, "Danny Brannon" <DBmnnon(@BnGEnyineers.com wrote: John, Can you and Charles come up with a meeting date & time? Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com From: Lehr, John rmailto:John.Lehra I.coml Sent: Wednesday, July 31, 2013 8:17 AM To: Danny Brannon; Arthus, Charles; 'Rob McDonald' Cc: Tom Laudanl'; Uaudani(a)seasidebuildersFla.com Subject: RE: Undergrounding Overhead facilities in Gulf Stream - 1200 N. Ocean Blvd To All, I have a prior engagement on Thursday, Aug. 1'% and therefore, I'll be unable to attend. Thanksl John C. Lehr, Jr. Project Manager - Distribution FPL (0) 561.845.4624 92 From: Danny Brannon fmailto:DBrannon(a1BnGEnaineers.coml Sent: Tuesday, July 30, 2013 5:01 PM To: Arthus, Charles; 'Rob McDonald' Cc: Tom Laudanl'; Lehr, John; tlaudani(alseasidebuildersfla.com Subject: RE: Undergrounding Overhead facilities In Gulf Stream - 1200 N. Ocean Blvd Is the meeting at LOAM or 1:30PM? And Where? Danny P. Brannon, P.E. Brannon & Gillespie, L Lc Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com From: Arthus, Charles [mailto:Charles.Arthus(&fol.coml Sent: Tuesday, July 30, 2013 9:10 AM To: Rob McDonald Cc: Tom Laudani; Danny Brannon; Lehr, John; tlaudanieseasidebuildersfla.com Subject: RE: Undergrounding Overhead facilities in Gulf Stream - 1200 N. Ocean Blvd Thursday @ 10:00 AM. Thanks, From: Rob McDonald rmallto:rmcdonald(alseasidebuildersfla.coml Sent: Monday, July 29, 2013 5:02 PM To: Arthus, Charles Cc: Tom Laudani; Danny Brannon; Lehr, John; tlaudani()seasidebuildersfia.com Subject: Re: Undergrounding Overhead facilities in Gulf Stream - 1200 N. Ocean Blvd When is everyone available to meet. Sent front my Verizon Wireless 4G LTE DROID "Arthus, Charles" <Charles.Arthusna fnl.com> wrote: Tom, There is no plan to do anything else at this time. We will move forward as planned. At this time, you should pick up the materials and install them per FPL drawing. AS a reminder, once you install all the materials, it will take about 8 weeks for FPL to complete the job. I hope you install the materials soon so I can release the job. Should you have any other questions, please contact me. 93 Regards, Charles Arthus 9329 S Military Trl Boyton Beach, FL 33436 Phone: [561] 742-2085 Fax: [561] 742.2016 From: Tom Laudani[mailto:daudaniCalnorthoointilc.coml Sent: Saturday, July 27, 2013 5:09 PM To: Danny Brannon; Arthus, Charles; Lehr, John Cc: Robert McDonald; tlaudaniCla seasidebuildersfla.com Subject: Re: Undergrounding Overhead facilities in Gulf Stream - 1200 N. Ocean Blvd This is an urgent matter that needs to be addressed asap. Please set up a meeting to review,also I will be away from Aug2nd till Aug l Ith.thanks From: Danny Brannon <DBrannonaa.BnGEneineers.com> Date: Sat, 27 Jul 2013 14:22:21 -0400 To: Charles Arthus <Charles.Arthus6Ml.com>, John Lehr <iohn lehr(a),FPL.com> Cc: Robert McDonald<rmcdonaldnaseasidebuildersfla.com>, <tlaudani @,seasidebuildersfla.com> Subject: Undergrounding Overhead facilities in Gulf Stream - 1200 N. Ocean Blvd John, 94 The Town has received the bids on the undergrounding of the overhead lines. The Town has executed the contracts with FPL and will begin the work as provided in the FPL plans by the end of September. In a meeting with the developers, Seaside Builders, at 1200 N. Ocean Blvd, they have indicated that the plan for running power into these 6 new lots does not comply with the plan agreed to with the developer during the platting process which was based on the FPL undergrounding plan. I had sent Charles a copy of the FPL plan via email, but it could have been derailed by FPL's email security. It is critical that we have a meeting (Charles Arthus, John Lehr, Seaside Project Mgr Robert McDonald, Seaside Principal Thomas Laudani, and myself) to get on the same page. <image001.jpg> Change from original plan — Install two transformers on the south side. Danny P. Brannon, P.E. Brannon & Gillespie, L c Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com 95 Danny Brannon From: Lehr, John <John.Lehr@fpl.com> Sent: Friday, August 09, 2013 10:05 AM To: Danny Brannon Cc: John Roeser, Rob McDonald; Arthus, Charles Subject: RE: Undergrounding Overhead facilities in Gulf Stream - 1200 N. Ocean Blvd Danny, FYI ................. I'm still awaiting input from the local area regarding the 1200 N Ocean site/ UG Conversion —Phase 41. 1 hope to have an answer early next week and then, schedule the meeting. Thanksl John C. Lehr, Jr. Project Manager -Distribution FPL (0) 561.845.4624 From: Rob McDonald [mailto:rmcdonald@seasidebuildersFla.com] Sent: Thursday, August 08, 2013 3:52 PM To: Arthus, Charles Cc: Danny Brannon; Lehr, John; John Roeser Subject: FW: Undergrounding Overhead facilities in Gulf Stream - 1200 N. Ocean Blvd From: Danny Brannon[mallto:DBrannon@BnGEngineers.com] Sent: Saturday, July 27, 2013 2:22 PM To: Charles.Arthus@fpl.com; John Lehr Cc: rmcdonald@seasidebuildersFla.com; tiaudanl@seasidebuildersFla.com Subject: Undergrounding Overhead facilities in Gulf Stream - 1200 N. Ocean Blvd John, The Town has received the bids on the undergrounding of the overhead lines. The Town has executed the contracts with FPL and will begin the work as provided in the FPL plans by the end of September. In a meeting with the developers, Seaside Builders, at 1200 N. Ocean Blvd, they have indicated that the plan for running power into these 6 new lots does not comply with the plan agreed to with the developer during the platting process which was based on the FPL undergrounding plan. I had sent Charles a copy of the FPL plan via email, but it could have been derailed by FPL's email security. It is critical that we have a meeting (Charles Arthus, John Lehr, Seaside Project Mgr Robert McDonald, Seaside Principal Thomas Laudani, and myself) to get on the same page. 96 Change from original plan — Install two transformers on the south side. Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com 97 Danny Brannon From: Arthus, Charles <Charles.Arthus@fpl.com> Sent: Tuesday, September 10, 2013 9:50 AM To: Lehr, John; Danny Brannon (DBrannon@BnGEngineers.com) Subject: Gulfstream conversion Attachments: GoogleEarth_Imagejpg Hello Danny, Please take a look at the attached picture. We have some constructions going on the west of 4001 N Ocean Blvd. I'm not sure if yourjob encompasses this area as well. If that's the case, the customer would like to know if you will convert the single phase lateral and set a pad mounted transformer for his new buildings. I would like to discuss this issue today as well in our meeting. Regards, Charles Arthus 9329 S Military Trl Boyton Beach, FL 33436 Phone: [561] 742-2085 Fax: [561] 742.2016 98 Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Tuesday, September 10, 2013 10:02 AM To: 'Arthus, Charles'; 'Lehr, John' Subject: RE: Gulfstream conversion This area will be converted also. As FPL's policy is not to install transformers or connection points not accessible to vehicles, I would have to see the plans to determine what access would be available to vehicles to maintain the equipment. I would not use the overhead lateral pulling off North Ocean unless there was a open driveway or parking area next to the line. Danny P. Brannon, P.E. Brannan & Gillespie, LLC Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com —Original Message -- From: Arthus, Charles [mailto:Charles.Arthus@fpl.com] Sent: Tuesday, September 10, 2013 9:50 AM To: Lehr, John; Danny Brannon (DBrannon@BnGEngineers.com) Subject: Gulfstream conversion Hello Danny, Please take a look at the attached picture. We have some constructions going on the west of 4001 N Ocean Blvd. I'm not sure if yourjob encompasses this area as well. If that's the case, the customer would like to know if you will convert the single phase lateral and set a pad mounted transformer for his new buildings. I would like to discuss this issue today as well in our meeting. Regards, Charles Arthus 9329 S MilitaryTrl Boyton Beach, FL 33436 Phone: [561] 742-2085 Fax: [561] 742.2016 99 Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Tuesday, September 10, 2013 2:45 PM To: 'Arthus, Charles' Subject: RE: Gulfstream conversion Try to get one of John Lehr's stainless steel padmounts if possible. Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 -Cell: (561) 307-9454 Website: www.BnGEngineers.com —Original Message -- From: Arthus, Charles [mailto:Charles.Arthus@fpl.com] Sent: Tuesday, September 30, 201310:25 AM To: Danny Brannon; Lehr, John Subject: RE: Gulfstream conversion I have already discussed with the customer and we both agreed that the pad mounted transformer can be installed by N Ocean Blvd. New easement will be provided as well. Thanks, --Original Message -- From: Danny Brannon [mailto:DBrannon@BnGEngineers.com) Sent: Tuesday, September 10, 2013 10:02 AM To: Arthus, Charles; Lehr, John Subject: RE: Gulfstream conversion This area will be converted also. As FPL 's polity is not to install transformers or connection points not accessible to vehicles, I would have to see the plans to determine what access would be available to vehicles to maintain the equipment. I would not use the overhead lateral pulling off North Ocean unless there was a open driveway or parking area next to the line. Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com 100 --Original Message ---- From: Arthus, Charles [mailto:Charles.Arthus@fpl.com] Sent: Tuesday, September 10, 2013 9:50 AM To: Lehr, John; Danny Brannon (DBrannon@BnGEngineers.com) Subject: Gulfstream conversion Hello Danny, Please take a look at the attached picture. We have some constructions going on the west of 4001 N Ocean Blvd. I'm not sure if yourjob encompasses this area as well. If that's the case, the customer would like to know if you will convert the single phase lateral and set a pad mounted transformer for his new buildings. I would like to discuss this issue today as well in our meeting. Regards, Charles Arthus 9329 S Military Trl Boyton Beach, FL 33436 Phone: [561] 742-2085 Fax: [561] 742.2016 101 Danny Brannon From: Arthus, Charles <Charles.Arthus@fpl.com> Sent: Tuesday, September 10, 2013 2:59 PM To: Danny Brannon Subject: RE: Gulfstream conversion I will try but I'm not sure if we can get 3 of them. --Original Message -- From: Danny Brannon [mailto:DBrannon@BnGEngineers.com] Sent: Tuesday, September 10, 2013 2:45 PM To: Arthus, Charles Subject: RE: Gulfstream conversion Try to get one of John Lehr's stainless steel padmounts if possible. Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com —Original Message -- From: Arthus, Charles [mailto:Charles.Arthus@fpl.com] Sent: Tuesday, September 10, 2013 10:25 AM To: Danny Brannon; Lehr, John Subject: RE: Gulfstream conversion I have already discussed with the customer and we both agreed that the pad mounted transformer can be installed by N Ocean Blvd. New easement will be provided as well. Thanks, —Original Message --- From: Danny Brannon [mailto:DBrannon@BnGEngineers.com] Sent: Tuesday, September 10, 2013 10:02 AM To: Arthus, Charles; Lehr, John Subject: RE: Gulfstream conversion This area will be converted also. As FPL 's policy is not to install transformers or connection points not accessible to vehicles, I would have to see the plans to determine what access would be available to vehicles to maintain the equipment. I would not use the overhead lateral pulling off 102 North Ocean unless there was a open driveway or parking area next to the line. Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com —Original Message -- From: Arthus, Charles [mailto:Charles.Arthus@fpl.com] Sent: Tuesday, September 30, 2013 9:50 AM To: Lehr, John; Danny Brannon (DBrannon@BnGEngineers.com) Subject: Gulfstream conversion Hello Danny, Please take a look at the attached picture. We have some constructions going on the west of 4001 N Ocean Blvd. I'm not sure if your job encompasses this area as well. If that's the case, the customer would like to know if you will convert the single phase lateral and set a pad mounted transformer for his new buildings. I would like to discuss this issue today as well in our meeting. Regards, Charles Arthus 9329 S Military Trl Boyton Beach, FL 33436 Phone: [561] 742-2085 Fax: [561] 742.2016 103 Danny Brannon From: Lehr, John <John.Lehr@fpl.com> Sent: Wednesday, November 27, 2013 2:57 PM To: Danny Brannon (DBrannon@BnGEngineers.com) Cc: Orozco, Geezella; Williams, Ethel Subject: Town of Gulf Stream - Phase #1 Conversion - Start Date - Mid -January 2014 Danny, At the meeting in Gulf Stream last week, you had indicated that the Town had hired a contractor and that I should expect a call from the contractor regarding the material pick-up. I still have not received a call for the request for material and is the project still on schedule to commence in January 20147 Thanks & have a great holidayl John C. Lehr, Jr. Project Manager FPL (561)-845-4624 104 Danny Brannon From: Lehr, John <John.Lehr@fpl.com> Sent: Wednesday, December 04, 2013 4:10 PM To: Danny Brannon (DBrannon@BnGEngineers.com) Cc: Orozco, Geezella; Williams, Ethel; 'Bill Thrasher' Subject: - Town of Gulf Stream - Phase #1 Conversion - Start Date - Mid -January 2014 - Danny, FYI ................... Any movement with the Town's contractor regarding the material request? I still have not heard from them, and as you know, December can be a short month here at FPL. Should I still forecast the material for a December drop /pick-up or should I move it out to sometime in mid-January 2014? Further, ifs my understanding that FPL is receiving customer calls with regards to the underground project. The Town still has it scheduled to commence sometime in January 2014, correct? If this is the case, I will forward this start date info on to FPL's local area, so they can inform the customers should they inquire at FPL. Thanksl John C. Lehr, Jr. Project Manager FPL (561)-845-4624 From: Lehr, John Sent: Wednesday, November 27, 2013 2:57 PM To: Danny Brannon (DBrannon@BnGEngineers.com) Cc: Orozco, Geezella (Geezella.Orozco@fpl.com); Williams, Ethel Subject: Town of Gulf Stream - Phase #1 Conversion - Start Date - Mid -January 2014 Danny, At the meeting in Gulf Stream last week, you had indicated that the Town had hired a contractor and that I should expect a call from the contractor regarding the material pick-up. I still have not received a call for the request for material and is the project still on schedule to commence in January 2014? Thanks & have a great holidayl John C. Lehr, Jr. Project Manager FPL (561)-845-4624 105 Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Wednesday, December 04, 2013 5:41 PM To: 'Lehr, John' Cc: Orozco, Geezella (Geezella.Orozco@fpl.com); Williams, Ethel (EthelJ.Williams@fpl.com); Bill Thrasher (bthrasher@gulf-stream.org); John Zoerhof Subject: RE: - Town of Gulf Stream - Phase #1 Conversion - Start Date - Mid -January 2014 - John, We are clearing the easements now. 50% complete. Will complete the clearing next week. Hypower, the Construction Contractor, has been issued a notice to proceed with material acquisition and permitting. Do you have your FPL FDOT permits for the road crossings, etc? I expect the contractor to start the construction the first or second week of January. Issuing material now will just run up his storage costs. I understood that the conduit and the vista switches are available. Is all the material available? Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com From: Lehr, John [mailto:John.Lehr@fpl.com] Sent: Wednesday, December 04, 2013 4:10 PM To: Danny Brannon (DBrannon@BnGEngineers.com) Cc: Orozco, Geezella; Williams, Ethel; '13111 Thrasher' Subject: - Town of Gulf Stream - Phase #1 Conversion - Start Date - Mid -January 2014 - Danny, FYI ................... Any movement with the Town's contractor regarding the material request? I still have not heard from them, and as you know, December can be a short month here at FPL. Should I still forecast the material for a December drop /pick-up or should I move it out to sometime in mid-January 2014? Further, it's my understanding that FPL is receiving customer calls with regards to the underground project. The Town still has it scheduled to commence sometime in January 2014, correct? If this is the case, I will forward this start date info on to FPL's local area, so they can inform the customers should they inquire at FPL. Thanks] John C. Lehr, Jr. Project Manager 106 FPL (561)-845-4624 From: Lehr, John Sent: Wednesday, November 27, 2013 2:57 PM To: Danny Brannon (DBrannonC5)BnGEnoineers.corn Cc: Orozco, Geezella (Geezella.Orozcoefol.com); Williams, Ethel Subject: Town of Gulf Stream - Phase #1 Conversion - Start Date - Mid -January 2014 Danny, At the meeting in Gulf Stream last week, you had indicated that the Town had hired a contractor and that I should expect a call from the contractor regarding the material pick-up. I still have not received a call for the request for material and is the project still on schedule to commence in January 20147 Thanks & have a great holidayl John C. Lehr, Jr. Project Manager FPL (561)-845-4624 107 Danny Brannon From: Lehr, John <John.Lehr@fpl.com> Sent: Thursday, December 05, 2013 4:46 PM To: Danny Brannon Cc: Orozco, Geezella; Williams, Ethel; Bill Thrasher, John Zoerhof Subject: RE: - Town of Gulf Stream - Phase #1 Conversion - Start Date - Mid -January 2014 - Danny, FYI ...................... The FDOT permits are approved and are in -hand; however, they are ready to expire (late Jan. '14), so FPL has filed for an extension. Regarding the material, all is available; however, it will take sometime to gather the material that exists throughout the system (2 to 3 weeks). Yes, the VISTA's are in and located in Boca yard. For the flex conduit, similar to the Jupiter Island project, I can/will have it direct ship from the factory to a site location designated by the Town/ Hy -Power. Just have the Town or Hy -Power provided FPL the delivery location. I believe the turnaround time is 2 to 3 weeks for the "flex". Additionally, is the Town going to provide any additional communication to the residents as to the schedule for the underground work/ project? If not, they still may want to update the website regarding the underground project (see below). If you need anything more, let me know. Thanksl John C. Lehr, Jr. Project Manager FPL (561)-845-4624 108 Done News - Microsoft Internet Expbre� ed y r �ml Vew Favorites Tools Favorites i is http--cipcicapps-mileage-.- �j Web Slice Gallery Citrix Access Platform Best of the Web R Emp Employee Web Homepage News X Undergminidhig Update Based on the result of a 2011 straw poll of residents, the Totten is in the process of I lines, underground. Projected completion date for the entire project bill be Dlarch 2014. Austtulian Pines UPD.ATE: And it has begun!!!!! The process has s- 109 From: Danny Brannon[mailto:DBrannon@BnGEngineers.com] Sent: Wednesday, December 04, 2013 5:41 PM To: Lehr, John Cc: Orozco, Geezella; Williams, Ethel; Bill Thrasher; John Zoerhof Subject: RE: - Town of Gulf Stream - Phase #1 Conversion - Start Date - Mid -January 2014 - John, We are clearing the easements now. 50% complete. Will complete the clearing next week. Hypower, the Construction Contractor, has been issued a notice to proceed with material acquisition and permitting. Do you have your FPL FDOT permits for the road crossings, etc? I expect the contractor to start the construction the first or second week of January. Issuing material now wiI I just run up his storage costs. I understood that the conduit and the vista switches are available. Is all the material available? Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com From: Lehr, John r_mailto:John.Lehr(olfol.coml Sent: Wednesday, December 04, 2013 4:10 PM To: Danny Brannon (DBrannonaa BnGEngineers com) Cc: Orozco, Geezella; Williams, Ethel; 'Bill Thrasher' Subject: - Town of Gulf Stream - Phase #1 Conversion - Start Date - Mid -January 2014 - Danny, FYI ................... Any movement with the Town's contractor regarding the material request? I still have not heard from them, and as you know, December can be a short month here at FPL. Should I still forecast the material for a December drop /pick-up or should I move it out to sometime in mid-January 2014? Further, it's my understanding that FPL is receiving customer calls with regards to the underground project. The Town still has it scheduled to commence sometime in January 2014, correct? If this is the case, I will forward this start date info on to FPL's local area, so they can inform the customers should they inquire at FPL. Thanksl John C. Lehr, Jr. Project Manager FPL (561)-845.4624 110 From: Lehr, John Sent: Wednesday, November 27, 2013 2:57 PM To: Danny Brannon (DBrannon(BnGEnoineers.com) Cc: Orozco, Geezella (Geezella.Orozco(@f)l.com); Williams, Ethel Subject: Town of Gulf Stream - Phase #1 Conversion - Start Date - Mid -January 2014 Danny, At the meeting in Gulf Stream last week, you had indicated that the Town had hired a contractor and that I should expect a call from the contractor regarding the material pick-up. I still have not received a call for the request for material and is the project still on schedule to commence in January 20147 Thanks & have a great holidayl John C. Lehr, Jr. Project Manager FPL (561)-845-4624 111 Danny Brannon From: Lehr, John <John.Lehr@fpl.com> Sent: Friday, January 10, 2014 8:45 AM To: Danny Brannon Subject: RE: Town of Gulf Stream - status on FDOT PERMIT - Extension Received Attachments: 101773328 - wr4442448 4442449 4442451 DOT part 2 of 3 .pdf; 101773354 - wr4442448 4442449 4442451 DOT part 3 of 3 .pdf; 101923220 - approved exten 131-14960212 wr4442448,49,52.pdf; wr4442448 4442449 4442451 DOT part 1 of 3 .pdf Danny, FYI ............... Here it is ............................ Full Copy ............ Thx! John C. Lehr, Jr. Project Manager FPL (561)-845-4624 From: Lehr, John Sent: Thursday, January 09, 2014 4:54 PM To: 'Danny Brannon' Subject: Town of Gulf Stream - status on FDOT PERMIT - Extension Received Danny, FYI ....................... FPL received the permit extension via email, see the attached. I'm having trouble accessing page 1 of 3 of the permit for some reason. Once I can access it, I'll forward it on. Thx! John C. Lehr, Jr. Project Manager FPL (561)-845-4624 From: Danny Brannon[mailto:DBrannon(o)BnGEnaineers.coml Sent: Thursday, January 09, 2014 10:26 AM To: Lehr, John Subject: status on FDOT PERMIT John, Did you get the extension? 112 Danny P. Brannon, P.E. Brannon & Gillespie, rsc Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEngineers.com 113 Danny Brannon From: Lehr, John <John.Lehr@fpl.com> Sent: Tuesday, January 28, 201411:49 AM To: Danny Brannon Subject: Town of Gulf Stream - Phase #1 - Golf View Addresses ..................... South Danny, FYI ................ Below are the TX locations just S/0 Golf View Dr. Address TLN Meter Number 344 GOLFVIEW DR # MAINT 6-8107-7302-0-3 ACD8747 344 GOLFVIEW DR 6-8107-7302-0-3 ACD8746 2401 N OCEAN BLVD # GOLF PRO'S HSE 6-8107-7302-0-3 AC41125 DDB Coordinate 6-8107-6805-0-8 346 GOLFVIEW DR 6-8107-6805-0-8 DNL4195 2900 POLO DR 6-8107-6805-0-8 ACD8762 DDB Coordinate 6-8107-6406-0-3 6-8107-6406-0-3 7085783 545 GOLFVIEW DR # NS 6-8107-6406-0-3 ACD8768 547 GOLFVIEW DR 6-8107-6406-0-3 ACD8744 6-8107-6406-0-3 5051887 6-8107-6406-0-3 5C16234 549 GOLFVIEW DR 6-8107-6406-0-3 KEL4766 DDB Coordinate 6-8107-5704-0-1 2401 N OCEAN BLVD If PMP STATION 6-8107-5704-0-1 5N00081 DDB Coordinate 6-8106-5597-0-5 346 GOLFVIEW DR # N PMP 6-8106-5597-0-5 6JO1945 I hope this helps! John C. Lehr, Jr. Project Manager FPL (561)-845-4624 114 From: Danny Brannon[mailto:DBrannon@BnGEngineers.com] Sent: Friday, January 24, 2014 6:16 PM To: Lehr, John Subject: Gulf Stream John, To be sure we gat all the services south of Golfview Road converted, can you send a list of the service addresses so we can add it to our checklist as we move thru the project. Do not send any names, account information, or other confidential information. lust a list of service addresses. Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEngineers.com This email is free from viruses and malware because avastl Antivirus protection is active. 115 Danny Brannon From: Lehr, John <John.Lehr@fpl.com> Sent: Thursday, March 20, 2014 4:30 PM To: Danny Brannon Cc: John Zoerhof Subject: Town of Gulf Stream - 2665 Ocean Blvd. Danny, It appears the database does not have the record drawing of the radial installation at 2665 Ocean. I will contact the local area to see if there' s a print available or any local "knowledge". I'll keep you advised on my progress. Thanksl John C. Lehr, Jr. Project Manager FPL (561)-845-4624 From: Danny Brannon[mailto:DBrannon@BnGEngineers.com] Sent: Friday, March 14, 2014 8:41 AM To: Lehr, John Cc: John Zoerhof Subject: FW: 2665 Ocean John, Can you have someone pull the record drawing on the three phase padmount at 2665 North Ocean, Gulf Stream, to see what was done. The transformer is on top of a concrete structure. The windows for the cables coming in look standard, but the pad foundation is not the typical. Did you get anything on Old Pompano yet. Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off. (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEngineers..com 116 From: John Zoerhof[mailto:jzoerhof@HYPOWERINC.COM] Sent: Friday, March 14, 2014 7:44 AM To: Danny Brannon (DBrannon@BnGEngineers.com) Cc: Lehr, John; Cliff Spitzer Subject: 2665 Ocean Yesterday Cliff was told that FPL installed the transformer and associated pad at this location. Which would lead me to believe it is possibly a pad atop a switch chamber. Is there any way to find out from the history on that property through FPL? Regards, John Zoerhof Division Manager - Pooer Services Direr[ 954.917.1439 01 HJ►P ER Om Cxp�cy. Paacrtul a^:trona J fW.nypowerinc,com MCA )3; 07F, D3G9-h.11: 951.9789r -d -F,+ ns Pkess mnsder the emxnant befrne Plnling MIs a -mall NOTICE: This email is Intended solely for the use of the individual to whom It is addressed and may contain Information that is privileged, confidential or otherwise exempt from disclosure. If the reader of this email is not the Intended recipient or the employee or agent responsible for delivering the message to the Intended recipient, you are hereby notified that any dissemination, distribution, or copying of this communication is strictly prohibited. If you have received this communication in error, please Immediately notify us by telephone and return the original message to us at the listed email address. Thank You. This email is free from viruses and malware because avastl Antivirus protection is active. 117 Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Wednesday, March 26, 20141:25 PM To: John Lehr Qohn_lehr@FPLcom) Cc: John Zoerhof Bill Peery (BillPeeryU@yahoo.com) Subject: Gulf Stream I met with Hypower in the field this morning. We will not meet this week at 2PM. We need a couple of things done, 1. The riser pole set at the north end of phase one has two sets of feeder switches, instead of one set of Feeder switches and one set of 200 amp fused cutouts. FPL needs to change out one set. 2. At the north property line of 925 North Ocean Blvd, we have some down guys we need to have removed or relocated so we can place the transformer. We would coordinate with your crew as the down guys have no GFI and run up between two primary back-to-back risers. We need to shift the anchors to the east about 5 feet or remove them. 118 Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 8474435 Cell: (561) 307-9454 Website: www.BnGEngineers.com 119 Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Thursday, April 03, 2014 9:32 PM To: John Lehr Qohn_lehr@FPLcom) Subject: Gulf Stream Phase Two Our phase two files are at http://www.bngengineers.com/gulf-stream-phase-2.html I will be glad to discuss with your folks. The north two Vista switches ended up with half a load on them, so we wil have to install two vista switches at Golfview Road, one for the two interior loops which we planned and a second one for the AlA loop since the AlA loop is 50% used up. I did not do a layout as the transformer sizes will dictate what can be done. Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEngineers.com 120 Danny Brannon From: Lehr, John <John.Lehr@fpl.com> Sent: Wednesday, June 04, 201410:03 AM To: Danny Brannon Subject: RE: Town of Gulf Stream - Phase #1- WR # 4442448 - Golf Pro shop TX C/O - LF to OF Attachments: 201406031358.pdf Danny, FYI ........................... Attached are the revised circuit prints John C. Lehr, Jr. Project Manager FPL (561)-845-4624 From: Danny Brannon[mailto:DBrannon@BnGEngineers.com] Sent: Wednesday, June 04, 2014 9:51 AM To: Lehr, John Subject: RE: Town of Gulf Stream - Phase #1 - WR # 4442448 - Golf Pro shop TX C/O - LF to DF Looks like a class in print reading might be in order..... Danny P. Brannon, P.E. Brannon & Gillespie, rac Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEneineers..com From: Lehr, John fmailtoJohn.LehrCalfol.coml Sent: Wednesday, June 04, 2014 8:14 AM To: John Zoerhof; Danny Brannon Ce: Cliff Spitzer; Owen, Jay D Subject: Town of Gulf Stream - Phase #1 - WR # 4442446 - Golf Pro shop TX C/O - LF to DF To All, 121 FYI .......................... Based on the drawings, it appears the TX C/O was included on the WR, so a deadfront (RS) TX should have been provided w/ the material. Is this not the case? John C. Lehr, Jr. Project Manager FPL (561)-845-4624 From: John Zoerhof rmallto:izoerhof(a1HYPOWERINC.COM1 Sent: Wednesday, June 04, 2014 7:19 AM To: Danny Brannon Cc: Cliff Spitzer; Lehr, John Subject: RE: Golf Pro shop If I am looking at the correct location this would be T-55 on the original FPL drawings Thanks, n Zoerhof yp i Manager - r Services ��MhTri From: Danny Brannon [mallto:DBrannon�BnGEnain���ml Sent: Tuesday, June 03, 2014 3:55 PM To: John Zoerhof Cc: Cliff Spitzer; John Lehr Subject: FW: Golf Pro shop There are some padmounts that are called to be changed out. Look at the circuit diagram and let me know the TX number. --------------------------------------------------------------------------------------------- Danny, This TX also does not appear to be a loop type either. Thanks, John Zoerhof Division Manager - Por,er Services From: John Zoerhof Sent: Tuesday, June 03, 2014 10:24 AM To: Danny Brannon Cc: Wayne Wilson; Cliff Spitzer Subject: Fwd: Pro shop 122 FYI Sent from my Verizon Wireless 4G LTE Smartphone ----- Forwarded message ----- From: "Cliff Spitzer" <cspitzer@HYPOWERINC.COM> To: "John ZoerhoP' <izoerhof@HYPOWERINC.COM> Subject: Pro shop Date: Tue, Jun 3, 2014 10:18 AM John Tx at pro shop is a LIVE FRONT Not a dead front as thought the conduit is stubbed outside the Tx Will need JHV to cover up or change Tx out to a dead front With the golf course closed this would be a good time to do this Sent from my iPhone at/Etsff This email is free from viruses and malware because avast! Antivirus protection is active. N 64d i�I Si!�El��This email is free from viruses and malware because avastl Antivirus protection is active. _ � If Ercc 123 Danny Brannon From: Lehr, John <John.Lehr@fpl.com> Sent: Tuesday, July 22, 2014 9:03 AM To: Danny Brannon Subject: Town of Gulf Stream - Phase #2 - Preliminary Equipment Layout - PDF's Attachments: WR# 4618489 E SZ 80 scale PRELIMINARY NORTH.pdf, WR* 4618489 E SZ 80 scale PRELIMINARY SOUTH.pdf, WR# 4618489 E SZ 80 scale PRELIMINARY MIDDLE pdf Danny, FYI ........................ Please see the attached drawings for the preliminary equipment locations for Gulf Stream Phase #2. As we previously discussed, this may be a good time to review w/the designer in order to determine the cable routing. Please review and then, give me a call when you have a free minute. Thanks! John C. Lehr, Jr. Project Manager FPL (561)-845-4624 124 Dannv Brannon From: Lehr, John <John.Lehr@fpl.com> Sent: Tuesday, July 22, 201411:07 AM To: Danny Brannon Subject: RE: Town of Gulf Stream - Phase #2 - Preliminary Equipment Layout - PDF's Danny, FYI .................... Tomorrow at 2 PM is fine ....................... however, I do have another meeting in WPB at 4 PM that I'll need to leave by say 3:30ish ...................... John C. Lehr, Jr. Project Manager FPL (561)-845-4624 From: Danny Brannon[mailto:DBrannon@BnGEngineers.com] Sent: Tuesday, July 22, 2014 9:40 AM To: Lehr, John Subject: RE: Town of Gulf Stream - Phase #2 - Preliminary Equipment Layout - PDF's Can we meet on this tomorrow at Gulf Stream 2pm meeting Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEngineers.com From: Lehr, John fmailto:John.LehrWol.coml Sent: Tuesday, July 22, 2014 9:03 AM To: Danny Brannon Subject: Town of Gulf Stream - Phase #2 - Preliminary Equipment Layout - PDF's Danny, FYI ........................ Please see the attached drawings for the preliminary equipment locations for Gulf Stream Phase #2. As we previously discussed, this may be a good time to review w/ the designer in order to determine the cable routing. Please review and then, give me a call when you have a free minute. 125 Thanksl John C. Lehr, Jr. Project Manager FPL (561)-845-4624 oVIJWWIW This email is free from viruses and malware because avast! Antivirus protection is active. rim 126 Dannv Brannon From: Lehr, John <John.Lehr@fpl.com> Sent: Wednesday, July 23, 201411:47 AM To: Danny Brannon (DBrannon@BnGEngineers.com) Subject: Town of Gulf Stream - Phase #2 - Revised Prel. Prints Attachments: WR# 4618489 E SZ 80 scale BKG REV TO JOHN FOR PDF COPIES PG 2 OF 3.pdf, WR# 4618489 E SZ 80 scale BKG REV TO JOHN FOR PDF COPIES PG 3 OF 3.pdf; WR# 4618489 E SZ 80 scale BKG REV TO JOHN FOR PDF COPIES PG 1 OF 3.pdf Danny, FYI ...................... Please see the attached revised prel. prints. Thanks! John C. Lehr, Jr. Project Manager FPL (561)-845-4624 127 Danny Brannon From: Lehr, John <1ohn.Lehr@fpl.com> Sent: Friday, September 12, 2014 2:10 PM To: Danny Brannon Subject: Re: Status on Gulf Stream Phase 2 I'll have to make an inquiry ..... I think the prints are in drafting .... So .... Since it's mid -Sept . ..... I'd say it should be ready by mid to late October 2014........ I'll let you know ...... Thx!!! Sent from my Phone On Sep 12, 2014, at 8:41 AM, "Danny Brannon" <DBrannon(a)BnGEngineers.com> wrote: <image001.gif> Where are we on this? When do you think we will get the BCE? Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off. (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEngineers.com n' 3VEIS�� This email is free from viruses and malware because avast! Antivirus protection is active. _ 7 r<cec 128 Danny Brannon From: Lehr, John <John.Leh r@fpl.com> Sent: Tuesday, December 30, 2014 2:24 PM To: Danny Brannon Subject: Re: Statue on Gulf Stream BCE? Danny ..... I'll have to make a call .... Last I heard is that they were close to revision / changes to the LIG ...... And I do not remember, but I'm sure the Town wants a second estimate, assuming the Appl. Performs all the LIG and I cannot remember if FPL sent an invoice for the 2nd estimate . I'll inquire on both and let you know .... Sent from my iPhone On Dec 26, 2014, at 1:07 PM, "Danny Brannon" <D Brannon aa)BnGEnoineers.com> wrote: <image001.gif> Status? Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEneineers.com �tomt• This email has been checked for viruses by Avast antivirus software. wrw www.avast.com 129 Danny Brannon From: Lehr, John <John.Leh r@fpl.com> Sent: Friday, February 06, 2015 8:14 AM To: Danny Brannon (DBrannon@BnGEngineers.com) Subject: Town of Gulf Stream - Phase #2 - 33 Prints Attachments: TOGS - Phs 2 - drwgs 1 2-15.pdf, TOGS - Phs 2 - dnvgs 2 2-15.pdf Danny, FYI .................. Please find attached the first 33 prints. The remainder of the prints should be ready later next week. Please accept my apologies for any inconvenience this may have cause John C. Lehr, Jr. Project Manager FPL (561)-845-4624 130 Danny Brannon From: Lehr, John <John.Lehr@fpl.com> Sent: Tuesday, February 10, 2015 5:01 PM To: Danny Brannon (DBrannon@BnGEngineers.com) Subject: Town of Gulf Stream - Phase #2 - Next Set of Drwgs. Attachments: TOGS - Phs #2 -dgwgs 4 2-15.pdf, TOGS - Phs #2 -dgwgs 3 2-15.pdf Danny, FYI ......................... Please find attached the next set of drawings for the Gulf Stream — Phase ##2 project. I hope to have the remainder of the drawings by the end of the week. John C. Lehr, Jr. Project Manager FPL (561)-845-4624 From: Lehr, John Sent: Friday, February 06, 2015 8:14 AM To: Danny Brannon (DBrannon@BnGEngineers.com) Subject: Town of Gulf Stream - Phase #2 - 33 Prints Danny, FYI .................. Please find attached the first 33 prints. The remainder of the prints should be ready later next week. Please accept my apologies for any inconvenience this may have cause ............... John C. Lehr, Jr. Project Manager FPL (561)-845-4624 131 Danny Brannon From: Lehr, John <John.Lehr@fpl.com> Sent: Thursday, February 12, 2015 7:12 AM To: Danny Brannon Subject: Town of Gulf Stream - Phase #2 - Symbols Danny, Interesting .................. I believe it means the transformer(s) needs to be changed out to a loop style transformer (CT) ........... I'll check and get back w/ you.......... John C. Lehr, Jr. Project Manager FPL (561)-845-4624 From: Danny Brannon [mallto:DBrannon()a BnGEnalneers.com1 Sent: Wednesday, February 11, 2015 4:00 PM To: Lehr, John Subject: Symbols John, When I see something like this T-1 8100 608107-7807-0-4 T-65 8100 608107-7807-0-4 Does that mean they are replacing the transformer Or should it be T1/T-65 8100 608107-7807-0-4 132 Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEngineers.com 411vastr This email has been checked for viruses by Avast antivirus software. p: fnf www.avast.com 133 Danny Brannon From: Lehr, John <John.Lehr@fpl.com> Sent: Thursday, February 12, 2015 7:22 AM To: Danny Brannon Subject: RE: Overhead Line Removal Labor Costs Danny, I believe there was additional discussion on this WR(s), let me investigate and get back w/ you ............ John C. Lehr, Jr. Project Manager FPL (561)-845-4624 From: Danny Brannon[mailto•DBrannon@BnGEngineers.com] Sent: Wednesday, February 11, 2015 1:45 PM To: Lehr, John Subject: Overhead Line Removal Labor Costs John, have you found out anything that would explain how the labor costs to remove the old lines is almost the same as the labor costs to install new hardened lines? Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561)847-4435 Cell: (561) 307-9454 Website: www.BnGEneineers.com , C1vastr This email has been checked for viruses by Avast antivirus software. &r," www.avast.com 134 Danny Brannon From: Lehr, John <John.Lehr@fpl.com> Sent: Thursday, February 12, 2015 7:24 AM To: Danny Brannon Subject: Town of Gulf Stream - Phase #2 - Last Set of Drwgs. Attachments: TOGS - Phs #2 -dgwgs 5 2-15.pdf Danny, FYI .................. Attached is an additional and last set of prints for the Gulf Stream —Phase #2 project. I'm now told there is a total of 70 prints, e.g. 56 + 14(attached). Thanksl John C. Lehr, Jr. Project Manager FPL (561)-845-4624 From: Danny Brannonrmailto:DBrannon(cbBnGEnoineers.coml Sent: Wednesday, February 11, 2015 9:21 AM To: Lehr, John Subject: RE: / Town of Gulf Stream - Phase #2 - Next Set of Drwgs. Yes I got the 56 sheets yesterday, but many were reference drawings. 12 were "R" drawings and the missing 27 +/- drawings all seem to be "R' drawings which we need. The schematic look good. It was a shame that we ended up with a half loaded vista switch one phase one which has caused us to have a half loaded switch on phase two. Otherwise, the drawings look good. Maybe I need to hire Chicco. I ned the rest "R" darwings to see what easements are needed and start laying out ATT and Comcast. Danny P. Brannon, P.E. Brannon & Gillespie, rac Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEngineers.com From: Lehr, John rmailto:John.Lehr(afol.coml Sent: Wednesday, February 11, 2015 7:01 AM 135 To: Danny Brannon (DBrannonCla BnGEngineers.coml Subject: / Town of Gulf Stream - Phase #2 - Next Set of Drwgs. Danny, I believe there are a total of 85 drawings. Further, I have sent you four files totaling, 56 drawing. 1 of 4 attached............ John C. Lehr, Jr. Project Manager FPL (561)-845-4624 From: Lehr, John Sent: Tuesday, February 10, 2015 5:01 PM To: Danny Brannon (DBrannon(&BnGEngineers.coml Subject: Town of Gulf Stream - Phase #2 - Next Set of Drwgs. Danny, FYI ......................... Please find attached the next set of drawings for the Gulf Stream —Phase #2 project. I hope to have the remainder of the drawings by the end of the week. John C. Lehr, Jr. Project Manager FPL (561)-845-4624 From: Lehr, John Sent: Friday, February 06, 2015 8:14 AM To: Danny Brannon (DBrannonaBnGEnaineers.coml Subject: Town of Gulf Stream - Phase #2 - 33 Prints Danny, FYI .................. Please find attached the first 33 prints. The remainder of the prints should be ready later next week. Please accept my apologies for any inconvenience this may have cause John C. Lehr, Jr. Project Manager FPL (561)-845-4624 136 This email has been checked for viruses by Avast antivirus software. Ek www.avast.com 137 Danny Brannon From: Lehr, John <John.Lehr@fpl.com> Sent: Monday, February 16, 2015 11:10 AM To: Danny Brannon (DBrannon@BnGEngineers.com) Subject: Town of Gulf Stream - Overhead Line Removal Labor Costs Danny, I forwarded your request on to be reviewed by the Business Systems Analyst & the Designer(s). There have been some increases / decreases in costs; however, their review appears to be consistent with the design/ MECA components of the WR's: install/ removal of equipment, hot (minimal)/cold labor, MOT and accessible/ inaccessible applications. Conversely, the Business Analyst did mention that in their review of the Phase #1 - OH Removal WR, the resultant cost was in favor of the Town. John C. Lehr, Jr. Project Manager FPL (561)-845-4624 From: Danny Brannon [mailto:DBrannon@BnGEngineers.com] Sent: Wednesday, February 11, 2015 1:45 PM To: Lehr, John Subject: Overhead Line Removal Labor Costs John, have you found out anything that would explain how the labor costs to remove the old lines is almost the same as the labor costs to install new hardened lines? Danny P. Brannon, P.E. Brannon & Gillespie, rzc Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEnpineers.com 138 This email has been checked for viruses by Avast antivirus software. �•.. www.avast.com 139 Danny Brannon From: Lehr, John <John.Lehr@fpl.com> Sent: Monday, February 16, 2015 4:37 PM To: Danny Brannon Subject: RE: Town of Gulf Stream - Overhead Line Removal Labor Costs Danny, Yes ...................... 1.2% hot labor for the OH Removal & 0.4% hot labor for the OH Equivalent .......... Basically ........... the detach / attach ................... John C. Lehr, Jr. Project Manager FPL (561)-845-4624 From: Danny Brannon[maiito:DBrannon@BnGEngineers.com] Sent: Monday, February 16, 2015 1:51 PM To: Lehr, John Subject: RE: Town of Gulf Stream - Overhead Line Removal Labor Costs The only hot overhead removal work would be the make ready at the riser poles on the north end. Is that the scope of what you refer to as minimal? Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEnpineers.com From: Lehr, John rmailto:John.Lehr5fol.coml Sent: Monday, February 16, 2015 11:10 AM To: Danny Brannon (DBrannon(clBnGEnaineers.com) Subject: Town of Gulf Stream - Overhead Line Removal Labor Costs Danny, 140 I forwarded your request on to be reviewed by the Business Systems Analyst & the Designer(s). There have been some increases / decreases in costs; however, their review appears to be consistent with the design/ MECA components of the WR's: install/ removal of equipment, hot (minimal)/cold labor, MOT and accessible/ inaccessible applications. Conversely, the Business Analyst did mention that in their review of the Phase #1 - OH Removal WR, the resultant cost was In favor of the Town. John C. Lehr, Jr. Project Manager FPL (561)-845-4624 From: Danny Brannon rmailto:DBrannonCibBnGEnoineers.coml Sent: Wednesday, February 11, 2015 1:45 PM To: Lehr, John Subject: Overhead Line Removal Labor Costs John, have you found out anything that would explain how the labor costs to remove the old lines is almost the same as the labor costs to install new hardened lines? Danny P. Brannon, P.E. Brannon & Gillespie, rsc Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEngineers.com 04 P.ewtr This email has been checked for viruses by Avast antivirus software. trip www.avast.com This email has been checked for viruses by Avast antivirus software. tr1,21 www.avast.com 141 Danny Brannon From: Lehr, John <John.Lehr@fpl.com> Sent: Tuesday, February 24, 2015 4:17 PM To: Danny Brannon Subject: Town of Gulf Stream - Phase #2 - Prints - Larger / Clearer Scale Attachments: AOSCK159.pdf; A05CK163.pdf, A05CK164.pdf, A05CK165.pdf, AOSBP9.pdf, A05BPlO.pdf, A05BP12.pdf; A05BP27.pdf; A05BR44.pdf, A05BR46.pdf A05BR59.pdf; A05BR64.pdf, A05BR80.pdf, A05CK2.pdf, A05CK94.pdf Danny, FYI ................. See the attached prints. ... sub set of the total ............. I'm told .................. they should be clearer when you use the "zoom" feature. If they're good, I'll forward you the remainder. John C. Lehr, Jr. Project Manager FPL (561)-845-4624 142 Danny Brannon From: Lehr, John <John.Lehr@fpl.com> Sent: Monday, March 09, 2015 12:27 PM To: Danny Brannon Subject: Re: Statue on Gulf Stream BCE? Danny, FYI .... For Gulf Stream .... It was more of a call by the drafting group for clarity on the drwgs ...... I told them to turn back on the layers for the drwgs in Gulf Stream .... Sent from my Phone On Mar 8, 2015, at 11:53 AM, "Danny Brannon" <DBrannonCa)BnGEngineers.com> wrote: Why doesn't FPL'a construction drawings show the underground utilities that we were required to provide with the survey drawing? Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEneineers.com From: Lehr, John [mailto:John.Lehr(alfol.coml Sent: Wednesday, December 31, 2014 12:15 PM To: Danny Brannon Subject: Re: Statue on Gulf Stream BCE? In 2015 .... Stainless pad mounts will be the new UG standard ..... So it will be like for like or at 100 % design load for UG Sent from my Phone On Dec 30, 2014, at 4:12 PM, "Danny Brannon" <DBrannon(a7BnGEngineers. com> wrote This is an EXTERNAL email. Exercise caution. DO NOT open attachments or click links from unknown se 143 You guys plan to replace 25 and 37.5 Aerials with 50KVA padmounts typically. Danny P. Brannon, P.E. Brannon & Gillespie, rsc Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEngineers.com From: Lehr, John [mailto:John.Lehr(a)fol.corn Sent: Tuesday, December 30, 2014 2:24 PM To: Danny Brannon Subject: Re: Statue on Gulf Stream BCE? Danny ..... I'll have to make a call .... Last I heard is that they were close to revision / changes to the UG ...... And I do not remember, but I'm sure the Town wants a second estimate, assuming the Appl. Performs all the UG and I cannot remember if FPL sent an invoice for the 2nd estimate . I'll inquire on both and let you know .... Sent from my Phone On Dec 26, 2014, at 1:07 PM, "Danny Brannon" <DBrannon(c BnGEnoineers.com> wrote: <image001.gifl Status? Danny P. Brannon, P.E. Brannon &Gillespie, LT Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEngineers.com 144 This email has been checked for viruses by Avast antivirus software. ffew www.avast.com This email has been checked for viruses by Avast antivirus software. Frtti www.avast.com This email has been checked for viruses by Avast antivirus software. 47it tGu. www.avast.com 145 Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Wednesday, March 25, 2015 8:22 AM To: John Lehr (ohn_lehr@FPLcom) Subject: Gulf Stream We are preparing a supplemental drawing set for the FPL conduits and transformers. Do you have time Friday or Monday to go over the urd drawings with me. WE want to verify existing services versus new services, new service handholes next to new padmount transformers, new transformer and switch locations, new cable routes. I don't think the CKT sequencing has changed. Can you confirm that the two existing duplex padmounts north of Little club Rd are radials. Danny P. Brannon, P.E. Brannon & Gillespie, rsc Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEngineers.com 146 Danny Brannon From: Lehr, John <John.Lehr@fpl.com> Sent: Thursday, March 26, 2015 9:07 AM To: Danny Brannon Subject: Town of Gulf Stream - Service HH's Danny, FYI.. FPL does this for conversion to assist the individual homeowner w/ the installation of the service conduit prior to the service conversion. This saves time & money, i.e. service appoints for standby's ($$$'s) while the customer installs the service conduits in the transformers. Again, FPL designs the project assuming it's a FPL install. John C. Lehr, Jr. Project Manager FPL (561)-845-4624 From: Danny Brannon[mailto:DBrannon@BnGEngineers.com] Sent: Friday, March 20, 2015 5:18 PM To: Lehr, John Subject: service handholes When they are installing new services out of a new transformer, they are installing a handhole 5 feet away from the transformer. Why? Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEngineers.com 147 This email has been checked for viruses by Avast antivirus software. www.avast.com 148 Danny Brannon From: Lehr, John <John.Lehr@fpl.com> Sent: Thursday, May 07, 2015 7:34 AM To: Danny Brannon Subject: Town of Gulf Stream - Service Rework Danny Dry run today ....................... I know Chico is working on reviewing the services, I just need to find out a status. I'll make an inquiry & let you know the outcome. John C. Lehr, Jr. Project Manager FPL (561)-845-4624 Danny Brannon From: Lehr, John <John.Leh r@fpl.com> Sent: Thursday, June 11, 2015 9:50 PM To: Danny Brannon (DBrannon@BnGEngineers.com) Subject: Town of Gulf Stream - Phase #2 - BCE Package - WR # 4618489 Attachments: TOGS - Phse #2 GAF Agmt -FPL ALL UG 1-15.pdf; TOGS - Phse #2 GAF Agmt - Cust ALL UG 1-15.pdf; TOGS - Phs #2 - OR 1-15.pdf Danny, FYI .............. As you requested. Please see the attached. John C. Lehr, Jr. Project Manager FPL (561)-845-4624 150 Danny Brannon From: Lehr, John <John.Lehr@fpl.com> Sent: Friday, June 26, 2015 9:38 AM To: Danny Brannon (DBrannon@BnGEngineers.com) Subject: Town of Gulf Stream - Phase #2 - WR # 4618489 - Print Revisions -1 of 3 Attachments: WR* 4618489 2 R203 -R215 11 SHTS.pdf, WR# 46184891 SCHEMATICS 6 SHTS.pdf Danny, FYI ................. Attached are the "Red -lines" following the review by Chico. There are six files, so I'll forward them in three emails. Note, I have submitted these to drafting for the updates/revisions. Thanksl John C. Lehr, Jr. Project Manager FPL (561)-845-4624 151 Danny Brannon From: Lehr, John <1ohn.Lehr@fpl.com> Sent: Thursday, July 02, 2015 1:57 PM To: Danny Brannon Subject: Re: Gulf stream Yes ....... I can ..... I'll be back in town during the week of 7/13 ...... Have a great 4th ...... Sent from my iPhone > On Jul 1, 2015, at 10:09 PM, "Danny Brannon" <DBrannon@BnGEngineers.com> wrote: > This is an EXTERNAL email. Exercise caution. DO NOT open attachments or click links from unknown senders or unexpected email. > Do you want to pick up this contract and check when we have it ready > Danny Brannon, P. E. > Brannon & Gillespie LLC > Sent from my iPhone 152 Danny Brannon From: Lehr, John <John.Lehr@fpl.com> Sent: Thursday, July 02, 2015 4:32 PM To: Danny Brannon Subject: Re: Gulf stream Correct ..... No issues ..... Sent from my Thone > On Jul 2, 2015, at 2:12 PM, "Danny Brannon" <DBrannon@BnGEngineers.com> wrote: > This is an EXTERNAL email. Exercise caution. DO NOT open attachments or click links from unknown senders or unexpected email. I > No issue with being afterJuly8th, right? > > Danny P. Brannon, P.E. > Brannon & Gillespie, LLC > Consulting Engineers > 631 US Highway One, Suite 301 > North Palm Beach, Florida 33408 > Off: (561) 847-4435 Cell: (561) 307-9454 > Website: www.BnGEngineers.com > -----Original Message----- * From: Lehr, John [mailto:John.Lehr@fpl.com] > Sent: Thursday, July 02, 2015 1:57 PM > To: Danny Brannon > Subject: Re: Gulf stream > > Yes ....... I can ..... I'll be back in town during the week of 7/13 ...... > Have a great 4th ...... > Sent from my Whone >>> On Jul 1, 2015, at 10:09 PM, "Danny Brannon" <DBrannon@BnGEngineers.com> >> wrote: >> This is an EXTERNAL email. Exercise caution. DO NOT open attachments or > click links from unknown senders or unexpected email. » 153 >> Do you want to pick up this contract and check when we have it ready >> Danny Brannon, P. E. >> Brannon & Gillespie LLC >> Sent from my Whone > This email has been checked for viruses by Avast antivirus software. > https://www.avast.com/antivirus 154 Danny Brannon From: Lehr, John <1ohn.Lehr@fpl.com> Sent: Thursday, July 23, 2015 6:22 PM To: Danny Brannon Subject: Town of Gulf Stream - Phase #2 - CIAC Invoice Attachments: TOGS - Phase 2 - CIAC inv 7-15.pdf Danny, FYI .............. Attached is a copy of the Phase #2 CIAC invoice for your records. Thanksl John C. Lehr, Jr. Project Manager FPL (561)-845-4624 From: Danny Brannon[mailto:DBrannon@BnGEngineers.com] Sent: Tuesday, July 14, 2015 9:23 PM To: Lehr, John Subject: Gulf Stream FYI- Gulf Stream has the contract and check ready . I may go there tomorrow and pick them up. I have to sign a two year extension to my contract and pick up a check. Danny Brannon, P. E. Brannon & Gillespie LLC Sent from my iPhone 155 ATT EMAILS ON PROJECT PROCESS Danny Brannon From: LOWEN, ROBERT C <r14510@att.com> Sent: Tuesday, January 03, 2012 8:39 AM To: Danny Brannon Cc: John Lehr, 'Archie Griggs'; BROWER, ED; KESSELL, GREGORY Subject: RE: Gulf Stream Undergrounding Project Attachments: image001jpg; image002jpg Danny, Please forward to Greg Kessell all plans and contact information regarding this project. Please reach him at: 09318@att.com or by phone: 5612 988-6535. Robert C. Lowen Manager:Operations-Planning & Design SE/CA 2021 South Military Trail West Palm Beach, Florida 33415 Office: 561357-6615 Cell: 561 329-5451 Fax: 561964-3499 E-mail: robert.lowen(@att.com This e-mail and any files transmitted with it are the property of AT&T and/or its affiliates, are confidential, and are intended solely for the use of the individual or entity to whom this e-mail is addressed. If you are not one of the named recipients or otherwise have reason to believe that you have received this message in error, please notify the sender and delete this message immediately from your computer. Any other use, retention, dissemination, forwarding, printing, or copying of this e-mail is strictly prohibited From: Danny Brannon[mailto:dbrannon(@bngengineers.coml Sent: Tuesday, December 27, 201111:31 AM To: DAVIS, DARRELL Cc: robert.lowenaatt.com: John Lehr; 'Archie Griggs' Subject: Gulf Stream Undergrounding Project Darrell, This first phase of the undergrounding project will place the overhead utilities underground in that part of the Town of Gulf Stream lying east of the Intracoastal Waterway and South of Golfview Road. Please advise us as to who your engineer will be. We need to meet as soon as possible after the first of the year to discuss. Danny P. Brannon, P.E. Brannon & Gillespie, LLC 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Office: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com From: MORELAND, THOMAS W [mallto:tm7708(a)att.coml Sent: Monday, December 05, 20113:10 PM To: Danny Brannon; robert.lowen(a)att.com: HOOS, DAVID M; DAVIS, DARRELL Subject: RE: Gulf Stream Undergrounding Project Adding Darrell Davis to the string as he is now the engineering area manager for this area. Thomas W. Moreland SFL Implementation Area Manager AT&T Network Ops - C&E cell: (561) 797-4055 e-mail: tm7708(aatt.com mel This email, and any attachments, are intended only for use by the addressee(s) named herein and may contain legally privileged and/or confidential information. It is the property of AT&T and its Affiliates. If you are not the intended recipient of this email, you are hereby notified that any dissemination, distribution or copying of this email, any attachments thereto, and any use of the information contained is strictly prohibited. If you have received this email in error, please notify me and permanently delete the original and any copy thereof. From: Danny Brannon[mailto:dbrannon(@bnaenalneers.coml Sent: Monday, December 05, 20112:45 PM To: MORELAND, THOMAS W; robert.lowen(a)att.com: HOGS, DAVID M Subject: Gulf Stream Undergrounding Project Do you guys know who would be the AT&T design contact for undergrounding the overhead utilities within the Town of Gulf Stream? Danny P. Brannon, P.E. Brannon & Gillespie, LLC 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Office: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com Danny Brannon From: KESSELL, GREGORY <gk9318@att.com> Sent: Tuesday, January 03, 2012 2:05 PM To: Danny Brannon Subject: RE: Undergrounding Gulf Stream east of the intracoastal waterway Attachments: image001jpg; image002jpg Danny, I can meet Thursday afternoon or Friday morning. What's best for you? Greg Kessell Mgr Osp Ping & Engrg Design AT&T Florida 321 SE 2nd St 2nd FI Delray Beach, FL 33483 561988-6535 sk9318@att.com From: Danny Brannon [mailto:dbrannon(aa bnoenaineers.coml Sent: Tuesday, January 03, 2012 9:35 AM To: KESSELL, GREGORY Subject: FW: Undergrounding Gulf Stream east of the Intracoastat waterway Greg, We are working on undergrounding the overhead utilities within that part of the Town of Gulf Stream lying south of Golfview Road and east of the Intracoastal Waterway. This will be our phase one. Later we will underground the portion north of Golfvioew road, (Phase two). Attached are the sheets for our phase one with the conceptual routes. We would like to meet as soon as possible to discuss. Danny P. Brannon, P.E. Brannon & Gillespie, LLC 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Office: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com Danny Brannon From: KESSELL, GREGORY <gk9318@att.com> Sent: Tuesday, January 03, 2012 3:19 PM To: Danny Brannon Subject: RE: Undergrounding Gulf Stream east of the intracoastal waterway Attachments: image001jpg; image002jpg 1 PM works for me. From: Danny Brannon [mailto:dbrannon6ncenoineers.coml Sent: Tuesday, January 03, 2012 2:48 PM To: KESSELL, GREGORY Subject: RE: Undergrounding Gulf Stream east of the intracoastal waterway How about Thursday Afternoon at Gulfstream Town Hall (100 Sea Road) would be good. What Time? Danny P. Brannon, P.E. Brannon & Gillespie, LLC 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Office: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com From: KESSELL, GREGORY [mailto:ak9318C@att.coml Sent: Tuesday, January 03, 2012 2:05 PM To: Danny Brannon Subject: RE: Undergrounding Gulf Stream east of the intracoastal waterway Danny, can meet Thursday afternoon or Friday morning. What's best for you? Greg Kessell Mgr Osp Ping & Engrg Design AT&T Florida 3215E 2nd St 2nd FI Delray Beach, FL 33483 561988-6535 gk9318@att.com From: Danny Brannon [mailto:dbrannon(albnoenoineers.coml Sent: Tuesday, January 03, 2012 9:35 AM To: KESSELL, GREGORY Subject: FW: Undergrounding Gulf Stream east of the intracoastat waterway Greg, We are working on undergrounding the overhead utilities within that part of the Town of Gulf Stream lying south of Golfview Road and east of the Intracoastal Waterway. This will be our phase one. Later we will underground the portion north of Golfvioew road, (Phase two). Attached are the sheets for our phase one with the conceptual routes. We would like to meet as soon as possible to discuss. Danny P. Brannon, P.E. Brannon & Gillespie, LLC 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Office: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com Danny Brannon From: BUCK, STEPHEN <sb0454@att.com> Sent: Wednesday, January 04, 2012 11A5 AM To: 'Danny Brannon'; BROWER, ED Subject: RE: Gulf Stream Undergrounding Project Attachments: image002.png; image004jpg; image005 jpg Danny, when would you like to meet in the field? I have Friday Morning available. Thanks, Stephen R. Buck MGR. OPS. PLANNING & DESIGN SE/CA AT&T SouthEast Florida Steohen.buck(a)att. com 561988-6507 - (Ofc) 561272-7289 - (Fax) Rethink Possible 60 From: Danny Brannon(mailto:dbrannon(o)bnoenoineers.coml Sent: Friday, December 30, 201112:28 PM To: BROWER, ED; BUCK, STEPHEN Subject: RE: Gulf Stream Undergrounding Project Will Stephen be handling this? Danny P. Brannon, P.E. Brannon & Gillespie, LLC 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Office: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com From: DAVIS, DARRELL rmailto:dd8715(dlatt.coml Sent: Tuesday, December 27, 20111:43 PM To: dbrannon5bnoenaineers.com Cc: BROWER, ED; BUCK, STEPHEN Subject: FW: Gulf Stream Undergrounding Project Danny- Ed Brower is my engineering manager counterpart down there handling South Palm and he can provide you information on who your working contact will be going forward. I believe it will be Steve Buck since this Is out of our Boynton CO. I've copied him as well. Any questions please let me know. Thanks,Darrell Darrell Davis AT&T -Florida Area Manager,OSP PLNG & Eng Design office (561)357-6450 cell (561)389-3707 Da rre I I. Davis @ a tt.com ***This e-mail and any files transmitted with it are AT&T property, are confidential, and are intended solely for the use of the individual or entity to whom this e-mail is addressed. If you are not one of the named recipient(s) or otherwise have reason to believe that you have received this message in error, please notify the sender and delete this message immediately from your computer. Any other use, retention, dissemination, forwarding, printing, or copying of this e-mail is strictly prohibited.*** From: Danny Brannonrmailto:dbrannon(dbncenaineers.coml Sent: Tuesday, December 27, 201111:31 AM To: DAVIS, DARRELL Cc: robert.lowen(alatt.com: John Lehr; 'Archie Griggs' Subject: Gulf Stream Undergrounding Project Darrell, This first phase of the undergrounding project will place the overhead utilities underground in that part of the Town of Gulf Stream lying east of the Intracoastal Waterway and South of Golfview Road. Please advise us as to who your engineer will be. We need to meet as soon as possible after the first of the year to discuss. Danny P. Brannon, P.E. Brannon & Gillespie, LLC 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Office: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com From: MORELAND, THOMAS W rmailto:tm7708(alatt.corn Sent: Monday, December 05, 20113:10 PM To: Danny Brannon; robert.lowen anatt.com: HOOS, DAVID M; DAVIS, DARRELL Subject: RE: Gulf Stream Undergrounding Project Adding Darrell Davis to the string as he is now the engineering area manager for this area. Thomas W. Moreland SFL Implementation Area Manager AT&T Network Ops - UE cell: (561) 797-4055 e-mail: tm77080Datt.com mel This email, and any attachments, are intended only for use by the addressee(s) named herein and may contain legally privileged and/or confidential information. It is the property of AT&T and its Affiliates. If you are not the intended recipient of this email, you are hereby notified that any dissemination, distribution or copying of this email, any attachments thereto, and any use of the information contained is strictly prohibited. If you hove received this email in error, please notify me and permanently delete the original and any copy thereof. From: Danny Brannon[mailto:dbrannon(abncienalneers.coml Sent: Monday, December 05, 20112:45 PM To: MORELAND, THOMAS W; robert.lowen(a)att.com; HOOS, DAVID M Subject: Gulf Stream Undergrounding Project Do you guys know who would be the AT&T design contact for undergrounding the overhead utilities within the Town of Gulf Stream? Danny P. Brannon, P.E. Brannon & Gillespie, LLC 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Office: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEnzineers.com Danny Brannon From: Danny Brannon <dbrannon@bngengineers.com> Sent: Thursday, February 02, 2012 11:26 AM To: 'Gregory.Kessell@att.com' Subject: Gulf Stream Overhead Utility Undergrounding Attachments: ATT Engr Deposit Ebill ret-Itr JupinCo.doc Attached is the standard form for the engineering deposit.(this one was for Jupiter Inlet Colony) Danny P. Brannon, P.E. Brannon & Gillespie, LLC 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Office: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com Danny Brannon From: Danny Brannon <dbrannon@bngengineers.com> Sent: Thursday, February 02, 201211:25 AM To: 'Gregory.Kessell@att.com' Subject: FW: Status Attachments: -WRD000jpg;image001jpg FYI, Attached is our ballpark estimate for Jupiter Inlet Colony provided by Tom Moreland. Danny P. Brannon, P.E. Brannon & Gillespie, LLC 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Office: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com From: MORELAND, THOMAS W (ATTBST) fmailto:tm77080)att.coml Sent: Monday, May 10, 2010 8:13 AM To: Danny Brannon Cc: LOWEN, ROBERT C (ATTBST); HOOS, DAVID M (ATTBST) Subject: RE: Status Danny, Our ballpark estimate is $375,000. Obviously this is a ballpark and non-binding. Our engineering preparation fee will be $15,000. If you need anything else please let me know. Thomas W. Moreland AT&T Florida Area Manager - OSPE Southeast FL Office: 561-357-6550 Cell: 561-7974055 e-mail: tm7708(c1att.com This e-mail and any files transmitted with it are AT&T property, are confidential, and are intended solely for the use of the individual or entity to whom this email is addressed. If you are not one of the named recipient(s) or otherwise have reason to believe that you have received this message in error, please notify the sender and delete this message immediately from your computer. Any other use, retention, dissemination, forwarding, printing, or copying of this e-mail is strictly prohibited. From: Danny Brannon [mailto:dbrannon(dbnaenaineers.coml Sent: Friday, May 07, 2010 4:24 PM To: MORELAND, THOMAS W (ATTBST) Subject: RE: Status I need the engineering deposit amount. 10 Danny P. Brannon, P.E. Brannon & Gillespie, LLC 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Phone: (561)795-0833 - Fax: (561) 795-5678 Website: www.BnGEngineers.com From: MORELAND, THOMAS W (ATTEST) rmallto:tm77080att.coml Sent: Friday, May 07, 2010 2:43 PM To: dbrannon(ftnoenaineers.com Subject: Re: Status We will get you a ballpark in the morning. Thomas W. Moreland Area Manager - OSPE SE Florida District 561-357-0550 (o) 561-797-4055 (c) From: Danny Brannon <dbrannon (@bngenoineers.com> To: MORELAND, THOMAS W (ATTBST) Cc: Joann Manganlello <jicolonvCalbellsouth.net> Sent: Fri May 07 13:30:012010 Subject: RE: Status Thomas, Our commission meeting is Monday evening. I need this before the meeting. Danny P. Brannon, P.E. Brannon & Gillespie, LLC 12798 West Forest HIII Blvd, Ste 102 Wellington, FL 33414-4704 Phone: (561)795-0833 - Fax: (561) 795-5678 Website: www.BnGEngincers.com From: MORELAND, THOMAS W (ATTBST) [mailto:tm7708(&att.coml Sent: Friday, May 07, 2010 1:52 PM To: Danny Brannon Subject: RE: Status Danny, Fell a little behind. We will have our estimate for you first thing next week. Sorry about that. Thomas W. Moreland AT&T Florida Area Manager -OSPE Southeast FL Office: 561-357-6550 Cell: 561-797-4055 e-mail: tm7708@att.com 11 This e-mail and any files transmitted with it are AT&T property, are confidential, and are intended solely for the use of the individual or entity to whom this email is addressed. If you are not one of the named recipients) or otherwise have reason to believe that you have received this message in error, please notify the sender and delete this message immediately from your computer. Any other use, retention, dissemination, forwarding, printing, or copying of this e-mail is strictly prohibited. From: Danny Brannon rmailto:dbrannon@)bnoenoineers.coml Sent: Wednesday, May 05, 2010 11:13 AM To: thomas.moreland( att.com Cc: LOWEN, ROBERT C (ATTBST) Subject: Status Can you provide a status on your cost estimates for Jupiter Inlet Colony. FPL is finalizing their estimate. Comcast has provided a ballpark estimate and an engineering deposit amount. AT&T ???? Danny P. Brannon, P.E. Brannon & Gillespie, LLC 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Phone: (561)795-0833 - Fax: (561) 795-5678 Website: www.BnGEngineers.com 12 Danny Brannon From: Danny Brannon <dbrannon@bngengineers.com> Sent: Friday, February 03, 2012 2:42 PM To: 'Gregory.Kessell@att.com' Subject: Gulf Stream Undergrounding Have you started looking at this yet? Danny P. Brannon, P.E. Brannon & Gillespie, LLC 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Office: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com 13 Danny Brannon From: KESSELL, GREGORY <gk9318@att.com> Sent: Tuesday, February 07, 2012 8:27 AM To: Danny Brannon Subject: RE: Gulf Stream Undergrounding Attachments: image001Jpg; image003 jpg I've been able to have a preliminary look at them. Upon discussing the scope of the project with my supervisor he is advising me to work out a bill for upfront engineering charges in order for me to proceed further. I'm putting that together this week and will have it for you shortly. Greg Kessell Mgr Osp Ping & Engrg Design AT&T Florida 321 SE 2nd St 2nd FI Delray Beach, FL 33483 561988-6535 Rk9318@att.com From: Danny Brannon[mailto:dbrannonObncencfneers.coml Sent: Friday, February 03, 2012 2:42 PM To: Gregory. Kessell(aatt.com Subject: Gulf Stream Undergrounding Have you started looking at this yet? Danny P. Brannon, P.E. Brannon & Gillespie, LLC 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Office: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com 14 Danny Brannon From: Danny Brannon <dbrannon@bngengineers.com> Sent: Friday, February 17, 2012 12:02 PM To: 'Greg ory.Kessell@att.comI Subject: Gulf Stream Engineering Deposit Greg, Has this been sent out yet? Danny P. Brannon, P.E. Brannon & Gillespie, LLC 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Office: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGGngineers.com 15 Danny Brannon From: KESSELL, GREGORY <gk9318@att.com> Sent: Friday, February 17, 2012 3:34 PM To: Danny Brannon Subject: RE: Gulf Stream Engineering Deposit Attachments: image001jpg; image003.jpg Danny, No, I apologize it hasn't been sent out yet. I will have it next week. From: Danny Brannon(mailto:dbrannonibnoengineers.coml Sent: Friday, February 17, 2012 12:02 PM To: Gregory. Kessell(a)att.com Subject: Gulf Stream Engineering Deposit Greg, Has this been sent out yet? Danny P. Brannon, P.E. Brannon & Gillespie, LLC 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Office: (561)795-0833 - Cell: (561) 307-9454 Website: vvww.13nGEngineers.corn 16 Danny Brannon From: KESSELL, GREGORY <gk9318@att.com> Sent: Friday, February 24, 2012 3:54 PM To: Danny Brannon Subject: RE: Gulf Stream Engineering Deposit Attachments: image001jpg; image003 jpg; engquote.pdf Danny, See attached. Greg Kessell Mgr Osp Ping & Engrg Design AT&T Florida 321 SE 2nd St 2nd FI Delray Beach, FL 33483 561988-6535 gk9318@att.com From: Danny Brannon[mailto:dbrannon@)bnaenoineers.coml Sent: Friday, February 17, 2012 12:02 PM To: Greoory.Kessell att.com Subject: Gulf Stream Engineering Deposit Greg, Has this been sent out yet? Danny P. Brannon, P.E. Brannon & Gillespie, LLC 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Office: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com 17 Danny Brannon From: Danny Brannon <dbrannon@bngengineers.com> Sent: Wednesday, March 14, 2012 8:42 AM To: 'Gregory.Kessell@att.com' Subject: Gulf Stream Update Can you give me a status on your work on the undergrounding project in Gulf Stream. I need a reply today or tomorrow. Danny P. Brannon, P.E. Brannon & Gillespie, LLC 12798 West Forest HIII Blvd, Ste 102 Wellington, FL 33414-4704 Office: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEneineers.com 18 Danny Brannon From: KESSELL, GREGORY <gk9318@att.com> Sent: Wednesday, March 14, 2012 1:21 PM To: Danny Brannon Subject: RE: Gulf Stream Update Attachments: image001jpg; image003.jpg; engquote.pdf Danny, The quote I sent you was for the upfront engineering charges for me to proceed with any further work (see attached). I have not received notice of payment so I haven't started. My apologies if I didn't make this more clear but it's company policy. Greg Kessell Mgr Osp Ping & Engrg Design AT&T Florida 321 SE 2nd St 2nd FI Delray Beach, FL 33483 561988-6535 Rk9318@att.com From: Danny Brannon(mallto:dbrannonColbnaengineers.coml Sent: Wednesday, March 14, 2012 8:42 AM To: Gregory.KesselWatt.com Subject: Gulf Stream Update Can you give me a status on your work on the undergrounding project in Gulf Stream. I need a reply today or tomorrow. Danny P. Brannon, P.E. Brannon & Gillespie, LLC 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Office: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com 19 Danny Brannon From: KESSELL, GREGORY <gk9318@att.com> Sent: Tuesday, April 17, 2012 9:30 AM To: Danny Brannon Subject: RE: Gulf Stream Attachments: image001jpg; image003jpg Danny, This project is out to bid with our contract engineering company. I'm no longer in the Delray wire center; George Thomas is the new engineer for this area. His contact information is as follows: George Thomas 561988-6506 etS1963@att.com From: Danny Brannon rmailto:dbrannon(abbnoenaineers.coml Sent: Thursday, April 12, 2012 4:09 PM To: Gregory. Kessell(alatt.com Subject: Gulf Stream Greg, what is the status on your review of our proposed route concept? Danny P. Brannon, P.E. Brannon & Gillespie, LLC 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Office: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com 20 Danny Brannon From: KESSELL, GREGORY <gk9318@att.com> Sent: Tuesday, April 17, 2012 9:37 AM To: Danny Brannon Subject: RE: Gulf Stream Attachments: image001.jpg; image003jpg Yes, he's got them. He's located in the same office. From: Danny Brannon [mailto:dbrannonCalbnaenoineers.coml Sent: Tuesday, April 17, 2012 9:34 AM To: KESSELL, GREGORY Subject: RE: Gulf Stream Did you get him the set of plans? Danny P. Brannon, P.E. Brannon & Gillespie, LLC 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Office: (561)795-0833 - Cell: (561) 307-9454 Website: wWW.BnGEngineers.com From: KESSELL, GREGORY [mailto:ak931BCalatt.coml Sent: Tuesday, April 17, 2012 9:30 AM To: Danny Brannon Subject: RE: Gulf Stream Danny, This project is out to bid with our contract engineering company. I'm no longer in the Delray wire center; George Thomas is the new engineer for this area. His contact information is as follows: George Thomas 561988-6506 gt51963@att.com From: Danny Brannon [mailto:dbrannonCalbnaenaineers.coml Sent: Thursday, April 12, 2012 4:09 PM To: Greoorv.Kessell(oatt.com Subject: Gulf Stream Greg, what is the status on your review of our proposed route concept? Danny P. Brannon, P.E. Brannon & Gillespie, LLC 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 21 Office: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com 22 Danny Brannon From: Harris, Dan <dhar0s@kgptel.com> Sent: Friday, May 04, 2012 3:20 PM To: dbrannon@bngengineers.com Cc: LOWEN, ROBERT C Subject: Gulfstream cable locates and conduit plan. Attachments: image001jpg; locate.dgn; gulfstream locates 100%.pdf Danny & Bob: Please see attached. The located cables are placed to scale. The proposed conduit plan depicts what & where conduit is required. The location is fluid within a couple of feet, at this point. Handholes on AIA need to be 20KIbs, FDOT rated. Conduit stub outs on the north end are important as the cable will not make the tight bend inside the HH, it must pass straight through from the opposite directions. The two additional 4" stub outs (capped) are to be Intercepted for the phase II portion. The town's contactor will not have to work inside the HH if provisioned for in advance. We can discuss at your earliest convenience. The PDF is small and cluttered from other info. Please advise. Thank you, dan harris, PMP of&i engineer II office: 561.547.8962 mobile: 561.389.5129 KGP Logistics This message is for the designated recipient only and may contain confidential, privileged. proprietary, or otherwise private information. Any review, use. distribution or disclosure by others is strictly prohibited. If you are not the intended recipient, please contact the sender and delete all copies of the message. Any other use of the email by you is prohibited. From: Harris, Dan Sent: Thursday, May 03, 2012 3:07 PM To: 'dbrannon@bngengineers.com' Subject: gulfstream contact info 1179 Carambola cir West Palm Beach, FL 33406 Thank you oil dan harris, PMP eW engineer II office: 561.547.8962 mobile: 561.389.5129 KGP Logistics This message is for the designated recipient only and may contain confidential. privileged, proprietary, or otherwise private information. Any review, use, distribution or disclosure by others is strictly prohibited. If you are not the intended recipient, please contact the sender and delete all copies of the message. Any other use of the email by you is prohibited. 24 Danny Brannon From: Harris, Dan <dharris@kgptel.com> Sent: Friday, May 04, 2012 3:26 PM To: dbrannon@bngengineers.com Cc: LOWEN, ROBERT C Subject: Gulfstream cable locate and Contuit Plan 1 of 2 (DGN file) Attachments: image001jpg; locate.dgn Danny & Bob: Please see attached. The located cables are placed to scale. The proposed conduit plan depicts what & where conduit is required. The location is fluid within a couple of feet, at this point. Handholes on AlA need to be 20KIbs, FDOT rated. Conduit stub outs on the north end are important as the cable will not make the tight bend inside the HH, it must pass straight through from the opposite directions. The two additional 4" stub outs (capped) are to be intercepted for the phase II portion. The town's contactor will not have to work inside the HH if provisioned for in advance. We can discuss at your earliest convenience. Please advise. Thank you, clan harris, PMP of&i engineer II office: 561.547.8962 mobile: 561.389.5129 KGP Logistics This message is for the designated recipient only and may contain confidential. privileged, proprietary, or otherwise private information. Any review, use, distribution or disclosure by others is strictly prohibited. If you are not the intended recipient, please contact the sender and delete all copies of the message. Any other use of the email by you is prohibited. From: Harris, Dan Sent: Thursday, May 03, 2012 3:07 PM To: 'dbrannon@bngengineers.com' Subject: gulfstream contact info 1179 Carambola cir West Palm Beach, FL 33406 Thank you, 25 can harris, PMP of&i engineer II office: 561.547.8962 mobile: 561.389.5129 KGP Logistics This message is for the designated recipient only and may contain confidential, privileged. proprietary, or otherwise private information. Any review, use, distribution or disclosure by others is strictly prohibited. If you are not the intended recipient, please contact the sender and delete all copies of the message. Any other use of the email by you is prohibited. From: Harris, Dan Sent: Thursday, May 03, 2012 3:07 PM To: 'dbrannon@bngengineers.com' Subject: gulfstream contact info 1179 Carambola cir West Palm Beach, FL 33406 Thank you, clan harris, PMP of&i engineer II office: 561.547.8962 mobile: 561.389.5129 KGP Logistics This message is for the designated recipient only and may contain confidential, privileged. proprietary. or otherwise private information. Any review, use, distribution or disclosure by others is strictly prohibited. If you are not the intended recipient, please contact the sender and delete all copies of the message. Any other use of the email by you is prohibited. 28 Danny Brannon From: Harris, Dan <dharris@kgptel.com> Sent: Friday, May 11, 201210:38 AM To: THOMAS, GEORGE Cc: VECCHIO, PHIL; LOWEN, ROBERT C; dbrannon@bngengineers.com; Toburen, Shannon Subject: RE: gulfstream underground locate and conduit proposal phase I; 8687379, po 00473855, pmdb 27329 Attachments: image001jpg; gulfstream ATTlocate5-11.pdf George, This is the locate/conduit plan for Gulfstream underground project resent (original sent 5/4 ). I have made a few cleanups of details. There is an added HH at Dwg # 7 and clarified HH location on 1#6. Kindly reply with approval of deliverable. Mr. Brannon, See print H6 W. Please advise if you need an updated cad file. Thank you, dan harris, PMP of&i engineer II office: 561.547.8962 mobile: 561.389.5129 KGP Logistics This message is for the designated recipient only and may contain confidential, privileged, proprietary, or otherwise private information. Any review, use. distribution or disclosure by others is strictly prohibited. If you are not the intended recipient, please contact the sender and delete all copies of the message. Any other use of the email by you is prohibited. From: THOMAS, GEORGE [mallto:gt5193@att.com] Sent: Tuesday, April 24, 2012 7:14 AM To: Harris, Dan Cc: VECCHIO, PHIL Subject: RE: gulfstream underground locate and conduit proposal phase I This will work for scope. George Thomas Manager -OSP Planning & Design SE/CA ATT Florida 29 Ph -561-988-65o6 Fax -561-272-8695 NOTICE: This e-mail and anyrfilestransmitterituith it areAT&T property, are cogfidential, and are intended solely for the use of the individual or entity to whom this email is addressed. Ifyou are not one of the named recipients) or otherwise have reason to believe that you have received this message in error, please notify the sender and delete this message immediatelyfrom your computer. Any other use, retention, dissemination, forwarding, printing, or copying of this e-mail is strictly prohibited. From: Harris, Dan [malito:dharris@kgptel.com] Sent: Friday, April 20, 2012 11:35 AM To: Harris, Dan; THOMAS, GEORGE Cc: LOWEN, ROBERT C; VECCHIO, PHIL; Toburen, Shannon Subject: RE: gulfstream underground locate and conduit proposal phase I George: I read the ACAS scope on the ACAS bid. I am concerned with the sentence: ALSO TO CREATE CONSTRUCTION DRAWINGS FOR JOB ASSOCIATED WITH THE PROPOSED UNDERGROUND PROJECT. This is a little loose with regards to my understood scope (see below). I believe the addition of "... Create [conduit route in advance of future] construction..." would appropriately define the scope. I do not see the north boundary of to Golfview Dr as Ph I. A separate locate/conduit place job will be Phase II, it will incorporate Golfview Dr and to the North. My scope is to provide G&B a plan for conduit and locate existing cable South of Golfview Dr. B&G will arrange for conduit install. A different future PO/job will scope the proposed place cable, terms, drops and cut over. Please advise if this email will suffice for the correction. Thank you, dan harris, PMP florida engineering mgr office: 561.547.8962 mobile: 561.389.5129 <00'K�G�P Logistics This message is for the designated recipient only and may contain confidential, privileged. proprietary, or otherwise private information. Any review, use, distribution or disclosure by others Is strictly prohibited. If you are not the intended recipient, please contact the sender and delete all copies of the message. Any other use of the email by you is prohibited. From: Harris, Dan Sent: Wednesday, April 18, 2012 2:52 PM To: 'gt5193@att.com' 30 Cc: 'LOWEN, ROBERT C'; Ralston, John; Harris, Dan Subject: RE: gulfstream underground locate and conduit proposal phase I George, KGP will provide services for $1800. Package back to ATT & B&G engineers (electronic files); RDD=5/4. Thanks, clan harris, PMP florida engineering mgr office: 561.547-8962 mobile: 561.389.5129 4rjK�G�P Logistics This message is for the designated recipient only and may contain confidential, privileged, proprietary, or otherwise private information. Any review, use, distribution or disclosure by others is strictly prohibited. If you are not the intended recipient, please contact the sender and delete all copies of the message. Any other use of the email by you is prohibited. From: Harris, Dan Sent: Tuesday, April 17, 2012 10:19 AM To: 'peter magnuson' Cc: TOWEN, ROBERT C'; 'gt5193@att.com'; Ralston, John Subject: gulfstream underground locate and conduit proposal phase I Scope: In the Town of Gulfstream: Golfview Dr south to Pelican Ln; locate all facilities east of Intacoastal, to underground for the town. Aerial cable, terminals and drops to be relocated. Propose HH/conduit route to accommodate for proposed buried ATT facilities. Pete, Reply to me only by Wednesday. Please review the above job for price and time required for you to accomplish the field work. I have a meeting this afternoon with Danny Brennan to discuss this, pick up the electronic file and hard copy of the job. clan harris, PMP Florida engineering mgr office: 561.586.6212 fax: 561.586.6245 mobile: 561.389.5129 31 KGP Logistics This message is for the designated recipient only and may contain confidential, privileged, proprietary, or otherwise private information. Any review, use, distribution or disclosure by others is strictly prohibited. If you are not the intended recipient, please contact the sender and delete all copies of the message. Any other use of the email by you is prohibited. 32 Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Monday, April 08, 2013 9:42 AM To: gt51963@att.com' Subject: FW: Gulf Stream Update Attachments: FPL-final-Gulf-Stream.zip See note below. Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www,BnGEngineers.com From: Danny Brannon [mai Ito:DBrannon@BnGEngineers.com] Sent: Monday, April 08, 2013 9:33 AM To: 'KESSELL, GREGORY'; Archie Griggs (Archie_Griggs@cable.comcast.com) Subject: RE: Gulf Stream Update Attached are the final plans from FPL that depict the route with some minor changes. I will be glad to meet with you to discuss if needed. Please advise as to when you can have your cost estimates completed. Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 12798 West Forest HIII Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com From: KESSELL, GREGORY [mailtomk93180att.coml Sent: Wednesday, March 14, 2012 1:21 PM To: Danny Brannon Subject: RE: Gulf Stream Update Danny, The quote I sent you was for the upfront engineering charges for me to proceed with any further work (see attached). I have not received notice of payment so I haven't started. My apologies if I didn't make this more clear but it's company policy. 33 Greg Kessell Mgr Osp Ping & Engrg Design AT&T Florida 321 SE 2nd St 2nd FI Delray Beach, Fl. 33483 561988-6535 gk9318@att.com From: Danny Brannon(malito:dbrannon@bngengineers.coml Sent: Wednesday, March 14, 2012 8:42 AM To: Gregory.Kessella)att.com Subject: Gulf Stream Update Can you give me a status on your work on the undergrounding project in Gulf Stream. I need a reply today or tomorrow. Danny P. Brannon, P.E. Brannon & Gillespie, LLC 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Office: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com 34 Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Wednesday, May 01, 2013 3:19 PM To: 'KESSELL, GREGORY'; 'THOMAS, GEORGE' Subject: RE: Gulf Stream Engineering Deposit We are looking for our cost estimate? Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com From: KESSELL, GREGORY [mailto:gk9318@att.com] Sent: Wednesday, May 01, 2013 2:49 PM To: Danny Brannon (dbrannon@bngengineers.com) Cc: THOMAS, GEORGE Subject: FW: Gulf Stream Engineering Deposit Danny, George Thomas is now your contact for this project. He can be reached at 561988-6506 and is cc'd on this email. Greg Kessell Mgr Osp Ping & Engrg Design AT&T Florida 321 SE 2nd St 2nd FI Delray Beach, FL 33483 561988-6535 gk9318@att.com From: Danny Brannon rmailto:DBrannon(a)BnGEnoineers.com] Sent: Wednesday, May 01, 2013 2:21 PM To: KESSELL, GREGORY; "'GREGORY "Y almlod191.enaf.sfdc.sbC.Com: Harris, Dan Subject: FW: Gulf Stream Engineering Deposit When will we get our cost estimate? 35 Danny P. Brannon, P.E. Brannon & Gillespie, Ltc Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com From: KESSELL, GREGORY [mailto:gk9318(&att.coml Sent: Friday, February 24, 2012 3:54 PM To: Danny Brannon Subject: RE: Gulf Stream Engineering Deposit Danny, See attached. Greg Kessell Mgr Osp Ping & Engrg Design AT&T Florida 321 SE 2nd St 2nd FI Delray Beach, FL 33483 561988-6535 sk9318@att.com From: Danny Brannon[mailto:dbrannon(abnaengineers.coml Sent: Friday, February 17, 2012 12:02 PM To: Gregory. KessellClaatt.com Subject: Gulf Stream Engineering Deposit Greg, Has this been sent out yet? Danny P. Brannon, P.E. Brannon & Gillespie, LLC 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Office: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com 36 Danny Brannon From: THOMAS, GEORGE <gt5193@att.com> Sent: Wednesday, August 14, 2013 8:44 AM To: DBrannon@BnGEngineers.com Subject: RE: Gulf Stream Update Danny, This status request was not delivered to my inbox.. To give you an update, we are still in the design process which will enable us to provide a cost for all the facility lowering. It Is a pretty time consuming process but we are going as speedily as we can. From: KESSELL, GREGORY Sent: Wednesday, August 14, 2013 8:34 AM To: THOMAS, GEORGE Subject: FW: Gulf Stream Update From: Danny Brannon rmaiIto:DBrannon(a)BnGEnoineers.coml Sent: Tuesday, August 06, 2013 5:37 PM To: gt51963Cabatt.com Cc: KESSELL, GREGORY Subject: FW: Gulf Stream Update AS of this date, we have not received our cost estimate. Please advise us of the status of this request. Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com From: KESSELL, GREGORY rmailto:ak9318@)att.coml Sent: Wednesday, March 14, 2012 1:21 PM To: Danny Brannon Subject: RE: Gulf Stream Update Danny, The quote I sent you was for the upfront engineering charges for me to proceed with any further work (see attached). I have not received notice of payment so I haven't started. My apologies if I didn't make this more clear but it's company policy. Greg Kessell 37 Mgr Osp Ping & Engrg Design AT&T Florida 321 SE 2nd St 2nd FI Delray Beach, FL 33483 561988-6535 gk9318(a7att.com From: Danny Brannon rmailto:dbrannon(a)bnaenaineers.coml Sent: Wednesday, March 14, 2012 6:42 AM To: Greoory.Kessell(aatt.com Subject: Gulf Stream Update Can you give me a status on your work on the undergrounding project in Gulf Stream. I need a reply today or tomorrow. Danny P. Brannon, P.E. Brannon & Gillespie, LLC 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Office: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com 38 Danny Brannon From: THOMAS, GEORGE <gt5193@att.com> Sent: Monday, September 09, 2013 7:52 AM To: Danny Brannon Cc: KESSELL, GREGORY Subject: RE: Engineering and a cost estimate Danny, Our contractors are getting close to completion of a design for us to be able to come up with a cost estimate for the cable relocation. They are working on getting all service accounted for within the city limits. As soon as we are able to get a final cost I will pass it on Thanks. cleoree Thomas Mgr -OSP Dsew �; ew99 ATT -FLORIDA 661988-6506 NOTICE: This e-mail and any files transmitted with it are AT&T property, are confidential, and are intended solely for the use of the individual or entity to whom this email is addressed. If you are not one of the named recipient(s) or otherwise have reason to believe that you have received this message in error, please notify the sender and delete this message immediately from your computer. Any other use, retention, dissemination, forwarding, printing, or copying of this e-mail is strictly prohibited 39 Danny Brannon From: THOMAS, GEORGE <gt5193@att.com> Sent: Tuesday, September 10, 2013 11:04 AM To: Danny Brannon Subject: RE: Engineering and a cost estimate The designs are being done based on the conduit plans that was passed on to you From: Danny Brannon[mailto:DBrannon@bngengineers.com] Sent: Monday, September 09, 2013 10:16 PM To: THOMAS, GEORGE Subject: Re: Engineering and a cost estimate When you get the design, send it so I can put the conduit plans together while you are figuring out the cost Danny Brannon Brannon & Gillespie, LLC Sent via iPhone. On Sep 9, 2013, at 7:52 AM, "THOMAS, GEORGE" <gt5193(cD..att.com> wrote: Danny, Our contractors are getting close to completion of a design for us to be able to come up with a cost estimate for the cable relocation. They are working on getting all service accounted for within the city limits. As soon as we are able to get a final cost I will pass it on Thanks. cleorge Ttiowias Mgr -OSP DSgw J Ewgg ATT-FLOP—IDA 561-9SS-6506 40 NOTICE: This e-mail and any files transmitted with it are AT&T property, are confidential, and are intended solely for the use of the individual or entity to whom this email is addressed. If you are not one of the named recipient(s) or otherwise have reason to believe that you have received this message in error, please notify the sender and delete this message immediately from your computer. Any other use, retention, dissemination, forwarding, printing, or copying of this e-mail is strictly prohibited 41 Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Tuesday, September 10, 2013 5:05 PM To: 'THOMAS, GEORGE' Subject: RE: Engineering and a cost estimate Are you talking about Hollywood? Or Gulf Stream, or?? I thought you were talking about Hollywood. Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com From: THOMAS, GEORGE [mailto:gt5193@att.com] Sent: Tuesday, September 10, 2013 11:04 AM To: Danny Brannon Subject: RE: Engineering and a cost estimate The designs are being done based on the conduit plans that was passed on to you. From: Danny Brannan[mailto:DBrannon(a)bnaengineers.coml Sent: Monday, September 09, 2013 10:16 PM To: THOMAS, GEORGE Subject: Re: Engineering and a cost estimate When you get the design, send it so I can put the conduit plans together while you are figuring out the cost Danny Brannon Brannon & Gillespie, LLC Sent via iPhone. On Sep 9, 2013, at 7:52 AM, "THOMAS, GEORGE" <gt5193(aatt.com> wrote: Danny, Our contractors are getting close to completion of a design for us to be able to come up with a cost estimate for the cable relocation. They are working on getting all service accounted for within the city limits. As soon as we are able to get a final cost I will pass it on 42 Thanks. ejeorge Ttiowk cls Mgr-O5P ASgw Jf Ewgg ATT -FLORIDA 5619 58-650 6 NOTICE: This e-mail and any files transmitted with it are AT&T property, are confidential, and are intended solely for the use of the individual or entity to whom this email is addressed. If you are not one of the named recipient(s) or otherwise have reason to believe that you have received this message in error, please notify the sender and delete this message immediately from your computer. Any other use, retention, dissemination, forwarding, printing, or copying of this e-mail is strictly prohibited 43 Danny Brannon From: Sent: To: Subject: Sorry, I am speaking of GulfStream THOMAS, GEORGE <gtS193@att.com> Wednesday, September 11, 2013 9:06 AM Danny Brannon RE: Engineering and a cost estimate From: Danny Brannon[maiito:DBrannon@BnGEngineers.com] Sent: Tuesday, September 10, 2013 5:05 PM To: THOMAS, GEORGE Subject: RE: Engineering and a cost estimate Are you talking about Hollywood? Or Gulf Stream, or 77 I thought you were talking about Hollywood. Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 12798 West Forest HIII Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com From: THOMAS, GEORGE rmailto:ot5193(&att.coml Sent: Tuesday, September 10, 2013 11:04 AM To: Danny Brannon Subject: RE: Engineering and a cost estimate The designs are being done based on the conduit plans that was passed on to you. From: Danny Brannon rmailto:DBrannon(la bnaenaineers.coml Sent: Monday, September 09, 2013 10:16 PM To: THOMAS, GEORGE Subject: Re: Engineering and a cost estimate When you get the design, send it so I can put the conduit plans together while you are figuring out the cost Danny Brannon Brannon & Gillespie, LLC Sent via iPhone. On Sep 9, 2013, at 7:52 AM, "THOMAS, GEORGE" <Et5193 a att.com> wrote: 44 Danny, Our contractors are getting close to completion of a design for us to be able to come up with a cost estimate for the cable relocation. They are working on getting all service accounted for within the city limits. As soon as we are able to get a final cost I will pass it on Thanks. ejeorge T1Iovuas Mgr -OSA AsgvL �§ 5n.00 ATT -FLORIDA 5619go-r"50r' NOTICE: This e-mail and any files transmitted with it are AT&T property, are confidential, and are intended solely for the use of the individual or entity to whom this email is addressed. If you are not one of the named recipient(s) or otherwise have reason to believe that you have received this message in error, please notify the sender and delete this message immediately from your computer. Any other use, retention, dissemination, forwarding, printing, or copying of this e-mail is strictly prohibited 45 Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Wednesday, September 11, 2013 9:24 AM To: 'THOMAS, GEORGE' Subject: RE: Engineering and a cost estimate OK, Yes we are good on Gulf Stream relative to our conduit plans. We have been pushing on Hollywood due to Town pressure, but got the schematics this week. Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off. (561)795-0833 Cell: (561) 307-9454 Website: www.BnGEngineers.com From: THOMAS, GEORGE [mallto:gt5193@att.com] Sent: Wednesday, September 11, 2013 9:06 AM To: Danny Brannon Subject: RE: Engineering and a cost estimate Sorry, I am speaking of Gulfstream From: Danny Brannon[mailto:DBrannon(&BnGEnaineers.coml Sent: Tuesday, September 10, 2013 5:05 PM To: THOMAS, GEORGE Subject: RE: Engineering and a cost estimate Are you talking about Hollywood? Or Gulf Stream, or ?? I thought you were talking about Hollywood. Danny P. Brannon, P.E. Brannon & Gillespie, ri:c Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com From: THOMAS, GEORGE [mallto:Qt5193(a)att.coml Sent: Tuesday, September 10, 2013 11:04 AM 46 To: Danny Brannon Subject: RE: Engineering and a cost estimate The designs are being done based on the conduit plans that was passed on to you. From: Danny Brannon rmallto:DBrannon(o)bnaenalneers.coml Sent: Monday, September 09, 2013 10:16 PM To: THOMAS, GEORGE Subject: Re: Engineering and a cost estimate When you get the design, send it so I can put the conduit plans together while you are figuring out the cost Danny Brannon Brannon & Gillespie, LLC Sent via iPhone. On Sep 9, 2013, at 7:52 AM, "THOMAS, GEORGE" <et5193na.att.com> wrote: Danny, Our contractors are getting close to completion of a design for us to be able to come up with a cost estimate for the cable relocation. They are working on getting all service accounted for within the city limits. As soon as we are able to get a final cost I will pass it on Thanks. cjeorge TCiDmOls Mgr-osp Dsgw ,� ewey ATT -FLORIDA 5619 82-650 6 NOTICE: This e-mail and any tiles transmitted with it are AT&T property, are confidential, and are intended solely for the use of the individual or entity to whom this email is addressed. If you are not one of the named recipient(s) or otherwise have reason to believe that you have received this message in error, please notify the sender and delete this message immediately from your computer. Any other use, retention, dissemination, forwarding, printing, or copying of this e-mail is strictly prohibited 47 48 Danny Brannon From: THOMAS, GEORGE <gt5193@att.com> Sent: Wednesday, December 04, 2013 9:18 AM To: DBrannon@BnGEngineers.com Subject: Gulfstream -underground facilities. Danny, I am currently working on the paperwork for the cost to do the requested work in the city of Gulfstream - Could you provide me with the names ,address of business and contact numbers to be placed on the bill. Thanks. cieoree chow, as Mgr-osP Dsew § Ew99 ATT -FLORIDA 561-J° SS -6506 NOTICE: This e-mail and any files transmitted with it are AT&T property, are confidential, and are intended solely for the use of the individual or entity to whom this email is addressed. If you are not one of the named recipient(s) or otherwise have reason to believe that you have received this message in error, please notify the sender and delete this message immediately from your computer. Any other use, retention, dissemination, forwarding, printing, or copying of this e-mail is strictly prohibited 49 Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Wednesday, December 04, 2013 10:02 AM To: 'THOMAS, GEORGE' Subject: RE: Gulfstream -underground facilities. Invoice to: The Town of Gulf Stream 100 Sea Road Gulf Stream, Florida 33483 Mail to: Danny Brannon Town of Gulf Stream 100 Sea Road Gulf Stream, FL 33483 Also Email me a copy if possible. Phone contacts should be to me at 561-307-9454 Town Hall phone number is 561-276-5116 Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com by From: THOMAS, GEORGE [mailto:gt5193@att.com] Sent: Wednesday, December 04, 2013 9:1B AM To: DBrannon@BnGEngineers,com Subject: Gulfstream -underground facilities. Danny, I am currently working on the paperwork for the cost to do the requested work in the city of Gulfstream - Could you provide me with the names ,address of business and contact numbers to be placed on the bill. Thanks. rJeorge T-homas Mgr -DSP Dsgw,F Et 00 ATT -FLORIDA 5619 88-650 6 so NOTICE: This e-mail and any files transmitted with It are AT&T property, are confidential, and are intended solely for the use of the individual or entity to whom this email is addressed. If you are not one of the named recipient(s) or otherwise have reason to believe that you have received this message in error, please notify the sender and delete this message immediately from your computer. Any other use, retention, dissemination, forwarding, printing, or copying of this e-mail is strictly prohibited 51 Danny Brannon From: THOMAS, GEORGE <gt5193@att.com> Sent: Monday, December 09, 2013 2:12 PM To: Danny Brannon Subject: RE: Gulfstream -underground facilities. Attachments: 1785_001.pdf Danny, Attached is the bill and contract for the above mentioned work. The originals will be put in the mail and sent over to the city hall. Thanks. c'eorge Tlhomns Mgr -OSP Asyw'F. Ew99 ATT -FLOP -MA 5619 SS -6506 NOTICE: This e-mail and any files transmitted with it are AT&T property, are confidential, and are intended solely for the use of the individual or entity to whom this email is addressed. If you are not one of the named recipient(s) or otherwise have reason to believe that you have received this message in error, please notify the sender and delete this message immediately from your computer. Any other use, retention, dissemination, forwarding, printing, or copying of this e-mail is strictly prohibited 52 Danny Brannon From: THOMAS, GEORGE <gt5193@att.com> Sent: Friday, January 10, 2014 3:03 PM To: DBrannon@BnGEngineers.com Cc: KESSELL, GREGORY Subject: Gulfstream Danny, Could you let me know when the conduits are in place for the cabling in the town of Gulfstream. Thanks. cieorge Thomas Mgr -DSP Dsgw F,�. Eweo ATT -FLORIDA 5619 8 8-650 6 NOTICE: This e-mail and any files transmitted with it are AT&T property, are confidential, and are intended solely for the use of the individual or entity to whom this email is addressed. If you are not one of the named recipient(s) or otherwise have reason to believe that you have received this message in error, please notify the sender and delete this message immediately from your computer. Any other use, retention, dissemination, forwarding, printing, or copying of this e-mail is strictly prohibited 53 Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Monday, January 13, 2014 9:32 AM To: 'THOMAS, GEORGE' Cc: 'KESSELL, GREGORY' Subject: RE: Gulfstream Can you send me a copy of your FDOT Permit for SR A1A Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 8474435 Cell: (561) 307-9454 Website: www.BnGEngineers.com From: THOMAS, GEORGE [mailto:gt5193@att.com] Sent: Friday, January 10, 2014 3:03 PM To: DBrannon@BnGEngineers.com Cc: KESSELL, GREGORY Subject: Gulfstream Danny, Could you let me know when the conduits are in place for the cabling in the town of Gulfstream. Thanks. e,eovge ThovmaS MOV -OSP Dso'A F, 6v 0. A ,TT-FLOR.IDA 561-9 ee-656 NOTICE: This e-mail and any files transmitted with it are AT&T property, are confidential, and are intended solely for the use of the individual or entity to whom this email is addressed. If you are not one of the named recipient(s) or otherwise have reason to believe that you have received this message in error, please notify the sender and delete this message immediately from your computer. Any other use, retention, dissemination, forwarding, printing, or copying of this e-mail is strictly prohibited 54 Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Tuesday, January 14, 2014 2:16 PM To: 'THOMAS, GEORGE' Subject: RE: Gulfstream Can you give me a specification for an AT&T traffic or driveway rated hand hole for backbone cable. Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEngineers.com From: THOMAS, GEORGE (mailto:gt5193@att.com] Sent: Friday, January 10, 2014 3:03 PM To: DBrannon@BnGEngineers.com Cc: KESSELL, GREGORY Subject: Gulfstream Danny, Could you let me know when the conduits are in place for the cabling in the town of Gulfstream. Thanks. George Thow R.; Mrgr-057> Dsgw F Ertigp ATT -FLOP -MA 5&:L7922-0506 NOTICE: This e-mail and any files transmitted with it are AT&T property, are confidential, and are intended solely for the use of the individual or entity to whom this email is addressed. If you are not one of the named recipient(s) or otherwise have reason to believe that you have received this message in error, please notify the sender and delete this message immediately from your computer. Any other use, retention, dissemination, forwarding, printing, or copying of this e-mail is strictly prohibited 55 Danny Brannon From: THOMAS, GEORGE <gt5193@att.com> Sent: Tuesday, January 14, 2014 3:11 PM To: Danny Brannon Subject: RE: Gulfstream Attachments: 18 86_001. p d f Hope this helps. FDOT requirements: 4.3.4.1 Post Construction Loads When within thirty (30) feet of the edge of pavement of a flush shoulder roadway or within the curbs of a curbed roadway, new and relocated utilities shall support the greater of the following conditions for a design truck in accordance with the AASHTO LRFD Specifications: 1) One wheel load of sixteen -thousand (16,000) pounds. 2) One axle load of thirty -two -thousand (32,000) pounds. 3) Two axle loads of twenty -four -thousand (24,000) pounds each, spaced four (4) feet apart. New and relocated utilities outside the above areas shall support FDOT maintenance equipment. FDOT does not guarantee the UAO's utilities will not be subject to greater loads. From: Danny Brannon[mailto:DBrannon@BnGEngineers.com] Sent: Tuesday, January 14, 2014 2:16 PM To: THOMAS, GEORGE Subject: RE: Gulfstream Can you give me a specification for an AT&T traffic or driveway rated handhole for backbone cable. Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEngineers.com From: THOMAS, GEORGE [mailto:ot5193Calatt.coml Sent: Friday, January 10, 2014 3:03 PM To: DBrannon(a)BnGEngineers.com Cc: KESSELL, GREGORY Subject: Gulfstream Danny, Could you let me know when the conduits are in place for the cabling in the town of Gulfstream. Thanks. 56 c'eorge T110MCIS Mgr -05P Ds9w PJ- Ewgg ATT -FLORIDA 5619 8 8-650 6 NOTICE: This e-mail and any files transmitted with it are AT&T property, are confidential, and are intended solely for the use of the individual or entity to whom this email is addressed. If you are not one of the named recipient(s) or otherwise have reason to believe that you have received this message in error, please notify the sender and delete this message immediately from your computer. Any other use, retention, dissemination, forwarding, printing, or copying of this e-mail is strictly prohibited 57 Danny Brannon From: THOMAS, GEORGE <gt5193@att.com> Sent: Monday, April 07, 20141:41 PM To: Danny Brannon Subject: RE: Gulfstream -underground facilities. Danny, Remember to let me know when the conduits are in place and ready for cable to be pulled. Cleorge Tf7omos Mgr -OSP Dsgw § FVLOg ATT -FLORIDA 561:9 8 8-650 6 NOTICE: This e-mail and any files transmitted with it are AT&T property, are confidential, and are intended solely for the use of the individual or entity to whom this email is addressed. If you are not one of the named recipient(s) or otherwise have reason to believe that you have received this message in error, please notify the sender and delete this message Immediately from your computer. Any other use, retention, dissemination, forwarding, printing, or copying of this e-mail is strictly prohibited FY:: Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Friday, February 13, 2015 1:31 PM To: 'THOMAS, GEORGE' Subject: RE: Gulfstream -underground facilities. I understand you have the as -constructed plans. Can you tell me what your schedule looks like. Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEngineers.com From: THOMAS, GEORGE [mailto:gt5193@att.com] Sent: Monday, April 07, 2014 1:41 PM To: Danny Brannon Subject: RE: Gulfstream -underground facilities. Danny, Remember to let me know when the conduits are in place and ready for cable to be pulled. George Thomas Mgr -OSP Dsgw � 6w00 ATT -FLORIDA 561 9 88-6506 NOTICE: This e-mail and any files transmitted with it are AT&T property, are confidential, and are intended solely for the use of the individual or entity to whom this email is addressed. If you are not one of the named recipient(s) or otherwise have reason to believe that you have received this message in error, please notify the sender and delete this message immediately from your computer. Any other use, retention, dissemination, forwarding, printing, or copying of this e-mail is strictly prohibited 59 Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Friday, February 13, 2015 3:37 PM To: 'THOMAS, GEORGE' Subject: RE: Gulfstream -underground facilities. Attachments: ATT- RED LINE - Signed.pdf I am resending now. Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEngineers.com From: THOMAS, GEORGE [mailto:gt5193@att.com] Sent: Friday, February 13, 2015 2:18 PM To: Danny Brannon Subject: RE: Gulfstream -underground facilities. If all the underground infrastructure is in place I have not received a copy of the as builts. I will need to know that all is in place before I can check on a schedule. From: Danny Brannon[mailto:DBrannon5BnGEnaineers.coml Sent: Friday, February 13, 2015 1:31 PM To: THOMAS, GEORGE Subject: RE: Gulfstream -underground facilities. I understand you have the as -constructed plans. Can you tell me what your schedule looks like. Danny P. Brannon, P.E. Brannon & Gillespie, ra,c Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEneineers.com From: THOMAS, GEORGE [mailto:ot5193Ca1att.coml Sent: Monday, April 07, 2014 1:41 PM 60 To: Danny Brannon Subject: RE: Gulfstream -underground facilities. Danny, Remember to let me know when the conduits are in place and ready for cable to be pulled. C,eorge Thow R.S Mgr -OSP Dsgw § Ewgg ATT -FLORIDA 561988-6506 NOTICE: This e-mail and any files transmitted with it are AT&T property, are confidential, and are intended solely for the use of the individual or entity to whom this email is addressed. If you are not one of the named recipient(s) or otherwise have reason to believe that you have received this message in error, please notify the sender and delete this message immediately from your computer. Any other use, retention, dissemination, forwarding, printing, or copying of this e-mail is strictly prohibited This email has been checked for viruses by Avast antivirus software. www.avast.com 61 Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Friday, February 27, 2015 10:53 AM To: THOMAS, GEORGE (gt5193@att.com) Subject: RE: Gulfstream -underground facilities. Can you give me a status on your undergrounding work on our phase 1 of the Gulf Stream Project. Do you have a schedule? Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEneineers.com From: Danny Brannon [mailto:DBrannon@BnGEngineers.com] Sent: Friday, February 13, 2015 1:31 PM To: THOMAS, GEORGE' Subject: RE: Gulfstream -underground facilities. I understand you have the as -constructed plans. Can you tell me what your schedule looks like. Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEngineers.com From: THOMAS, GEORGE [mailto:gt5193(&att.coml Sent: Monday, April 07, 2014 1:41 PM To: Danny Brannon Subject: RE: Gulfstream -underground facilities. Danny, Remember to let me know when the conduits are in place and ready for cable to be pulled. c,eorge Thomas mor -OSP Ds9w � Ewgq ATT -FLORIDA 62 561-982-6506 NOTICE: This e-mail and any files transmitted with it are AT&T property, are confidential, and are intended solely for the use of the individual or entity to whom this email is addressed. If you are not one of the named recipient(s) or otherwise have reason to believe that you have received this message in error, please notify the sender and delete this message immediately from your computer. Any other use, retention, dissemination, forwarding, printing, or copying of this e-mail is strictly prohibited 63 Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Thursday, April 02, 2015 1:19 PM To: 'THOMAS, GEORGE' Subject: RE: Gulfstream -underground facilities. Do you have an update on your schedule for the conversion in Gulf Stream south of Golfview Road. Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 8474435 Cell: (561) 307-9454 Website: www.BnGEneineers.com 64 Danny Brannon From: GONZALEZ, CARLOS A <cg8667@att.com> Sent: Wednesday, May 06, 2015 1:49 PM To: DBrannon@BnGEngineers.com Subject: Gulfstream Danny, Thaks- Carlos 65 Danny Brannon From: BENINATE, VIC <vb2674@att.com> Sent: Friday, June 05, 2015 10:30 AM To: Danny Brannon Subject: RE: Gulf Stream Project Got it Let me work on it Sent via the Samsung Galaxy S8 5 ACTIVE"', an AT&T 4G LTE smartphone ----- Original message From: Danny Brannon <DBrannon@BnGEngineers.com> Date:06/05/2015 10:12 AM (GMT -05:00) To: "BENINATE, VIC" <vb2674@att.com> Cc: Subject: Gulf Stream Project Vic, I have been trying to get a response from George Thomas on Phase 2 with no success. What does the Town need to do to get someone to work with us on this? We have sent plans twice and requested that they be marked up to reflect the underground conduits that AT&T would need to place their facilities underground. We have had no response. Calls and emails are not returned. What do you recommend we do. I have a commission meeting next Friday and have to show some action. Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off. (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEngineers.com 66 MealThis email has been checked for viruses by Avast antivirus software. www.avast.com 67 Danny Brannon From: HOBBY, BRENDA G <bh3194@att.com> Sent: Friday, June 05, 2015 1:32 PM To: Danny Brannon Subject: RE: Pole and Gulfstream So are you saying, if we are on a pole line there it can stay? From: Danny Brannon[mailto:DBrannon@BnGEngineers.com] Sent: Friday, June 05, 2015 1:27 PM To: HOBBY, BRENDA G Subject: Pole and Gulfstream We are looking to leave you guys in the rear alley between Polo Rd and Gulfstream Rd from Golfview Rd north if that will make the cost less. Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEngineers.com This email has been checked for viruses by Avast antivirus software. www.avast.com M. Danny Brannon From: HOBBY, BRENDA G <bh3194@att.com> Sent: Friday, June 05, 2015 2:41 PM To: Danny Brannon Cc: KESSELL, GREGORY Subject: RE: Gulf Stream Phase 2 Danny, I have forwarded this project to Greg Kessell to review and coordinate with you. As Greg has questions or issues, I will have him reach out to you. Brenda Hobby Area Manager South Florida Construction & Engineering 561-988-6500 (office) 954-675-3802 (cell) "This e-mail and any files transmitted with it are AT&T property, are confidential, and are intended solely for the use of the Individual or entity to whom this email is addressed. If you are not one of the named recipient(s) or otherwise have reason to believe that you have received this message in error, please notify the sender and delete this message immediately from your computer. Any other use, retention, dissemination, forwarding, printing, or copying of this e-mail is strictly prohibited." From: Danny Brannon[mailto:DBrannon@BnGEngineers.com] Sent: Friday, June 05, 2015 1:22 PM To: HOBBY, BRENDA G Subject: Gulf Stream Phase 2 This is phase 2 WE have FPL and Comcast designs completed. We are waiting on you. Thank you for your help. Maybe George knows Polo Road and Gulfstream Rd are not in the south end. Danny P. Brannon, P.E. Brannon & Gillespie, tsc Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEngineers.com 69 This email has been checked for viruses by Avast antivirus software. www.avast.com 70 Danny Brannon From: KESSELL, GREGORY <gk9318@att.com> Sent: Friday, June 05, 2015 3.49 PM To: Danny Brannon; HOBBY, BRENDA G Subject: RE: Gulf Stream Phase 2 Danny, I'm available any time next week; give me a day, time, and place and I'll meet you. Greg Kessell Mgr Osp Ping & Engrg Design AT&T Florida 3215E 2nd St 2nd FI Delray Beach, FL 33483 561988-6535 gk9318@att.com From: Danny Brannon[mailto:DBrannon@BnGEngineers.com] Sent: Friday, June 05, 2015 3:01 PM To: HOBBY, BRENDA G Cc: KESSELL, GREGORY Subject: RE: Gulf Stream Phase 2 Is there anytime he could meet with me next week? Commission Meeting is Friday. I have a conflict also on Wednesday from loam to 1pm. Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEngineers.com From: HOBBY, BRENDA G [mallto:bh3194@att.com] Sent: Friday, June 05, 2015 2:41 PM To: Danny Brannon Cc: KESSELL, GREGORY Subject: RE: Gulf Stream Phase 2 Danny, 71 I have forwarded this project to Greg Kessell to review and coordinate with you. As Greg has questions or issues, I will have him reach out to you. Brenda Hobby Area Manager South Florida Construction & Engineering 561-988-6500(office) 954-675-3802 (cell) "This e-mail and any riles transmitted with it are AT&T property, are confidential, and are intended solely for the use of the individual or entity to whom this email is addressed. If you are not one of the named recipient(s) or otherwise have reason to believe that you have received this message in error, please notify the sender and delete this message immediately from your computer. Any other use, retention, dissemination, forwarding, printing, or copying of this e-mail is strictly prohibited." From: Danny Brannon[mailto:DBrannon(a)BnGEngineers.coml Sent: Friday, June 05, 2015 1:22 PM To: HOBBY, BRENDA G Subject: Gulf Stream Phase 2 This is phase 2 WE have FPL and Comcast designs completed. We are waiting on you. Thank you for your help. Maybe George knows Polo Road and Gulfstream Rd are not in the south end. Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEngineers.com This email has been checked for viruses by Avast antivirus software. www.avast.com This email has been checked for viruses by Avast antivirus software. www.avast.com 73 COMCAST EMAILS ON PROJECT PROCESS Danny Brannon From: Rosa, Steven <Steven-Rosa@cable.comcast.com> Sent: Wednesday, April 10, 2013 4:02 PM To: dbrannon@bngengineers.com info Steven F Rosa Tech III Construction Comcast Construction Dept. 10435 Ironwood Road Palm Beach Gardens FI, 33410 Office:561-454-5851 Mobile:561-436-9034 Fax:561-454-5899 E-mail steven—rosa@cable.comcast.com con CAST ') )Cf i n ity. Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Wednesday, April 10, 2013 4:14 PM To: 'Rosa, Steven' Cc: Mc Enroe, Jeannine; Archie Griggs (Archie Griggs@cable.comcast.com) Subject: Gulf Stream Undergrounding Phase 1 - Golfview Road south to Pelican. Yes, Steve. This project is funded and will be going out to bid in the next month. Archie indicated you wanted to review your plans. I need your revised conduit plans ASAP. In about two months, I will need your cost estimate. We will install all the conduit for all utilities. Be sure to figure the cost to run thru the attics if the current drop is not at the FPL meter location. We typically run 1" service conduits and 2-2" backbone conduits. We typically specify orange for Comcast and gray for AT&T. Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEneineers.com From: Rosa, Steven [mailto:Steven Rosa(@cable.comcast.coml Sent: Wednesday, April 10, 2013 4:02 PM To: dbrannon(la bnaenaineers.com Subject: info Steven F Rosa Tech III Construction Comcast Construction Dept. 10435 Ironwood Road Palm Beach Gardens Fl, 33410 Office:561-454-5851 Mobile:561-436-9034 Fax:561-454-5899 E-mail steven—rosa@cable.comcast.com kit COMCAST �� (P \8-v xfinity. Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Monday, April 22, 2013 8:42 PM To: 'Rosa, Steven' Cc: Archie Griggs (Archie-Griggs@cable.comcast.com); Mc Enroe, Jeannine Subject: Gulf Stream - Pelacan Lane to Golfview Undergrounding Have you started reviewing this project. We need your plan adjustments asap as we need to go out to bid. Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www,BnGEngineers.com From: Rosa, Steven [mailto:Steven Rosaecable.comcast.coml Sent: Wednesday, April 10, 2013 4:02 PM To: dbrannoriftncienaineers.com Subject: info Steven F Rosa Tech III Construction Comcast Construction Dept. 10435 Ironwood Road Palm Beach Gardens FI, 33410 Office:561-454-5851 Mobile:561-436-9034 Fax:561-454-5899 E-mail steven rosa@cable.comcast.com COMCAST 4) C�,) O ) (,fii n ity. Dannv Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Wednesday, May 15, 2013 2:02 PM To: 'Rosa, Steven' Subject: RE: George Bush Blvd to Golfview ACAD file Attachments: 09-213 DPB PROJECT PHASE 1 COMCAST - 05-01-2013 DPB CD-12.pdf, 09-213 DPB PROJECT PHASE 1 COMCAST - 05-01-2013 DPB CD-Ol.pdf, 09-213 DPB PROJECT PHASE 1 COMCAST - 05-01-2013 DPB CD-02.pdf,, 09-213 DPB PROJECT PHASE 1 COMCAST - 05-01-2013 DPB CD-03.pdf, 09-213 DPB PROJECT PHASE 1 COMCAST - 05-01-2013 DPB CD-04.pdf 09-213 DPB PROJECT PHASE 1 COMCAST - 05-01-2013 DPB CD-05.pdf; 09-213 DPB PROJECT PHASE 1 COMCAST - 05-01-2013 DPB CD-06.pdf 09-213 DPB PROJECT PHASE 1 COMCAST - 05-01-2013 DPB CD-07.pdf, 09-213 DPB PROJECT PHASE 1 COMCAST - 05-01-2013 DPB CD-08.pdf 09-213 DPB PROJECT PHASE 1 COMCAST - 05-01-2013 DPB CD-09.pdf, 09-213 DPB PROJECT PHASE 1 COMCAST - 05-01-2013 DPB CD-10.pdf 09-213 DPB PROJECT PHASE 1 COMCAST - 05-01-2013 DPB CD-ll.pdf Attached are the draft PDF files showing the Comcast conduits. Please review and comment. I changed a few routes in the south end interior area. (at tennis courts, and on Pelican (to feed off George Bush as we have to go there anyway. Exact locations of New/Existing Pedestals, Power supply, fiber node, and splice boxes to be firmed up in the field. If you have any info on the fiber node and splice vault to the south of it, that would be helpful. Pedestal locations identified as termination points In the conduit runs. Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 12798 West Forest Hill Blvd, Ste 102 Wellington, FL 33414-4704 Off: (561)795-0833 - Cell: (561) 307-9454 Website: www.BnGEngineers.com From: Rosa, Steven [mailto:Steven RosaZcable.comcast.coml Sent: Friday, May 10, 2013 11:31 AM To: Danny Brannon Subject: FW: George Bush Blvd to Golfview ACAD file Here you go Steven F Rosa Tech III Construction Comcast Construction Dept. 10435 Ironwood Road Palm Beach Gardens Fl, 33410 Office:561-454-5851 Mobile:561-436-9034 Fax:561-454-5899 E-mail steven—rosa@cable.comccist.com COMCAST ��W )(,fi n ity From: Lattin, Theresa Sent: Friday, May 10, 2013 11:13 AM To: Rosa, Steven Subject: George Bush Blvd to Golfview ACRD file Steve, I saved it as a 2004 file, but if they need it in a different year find out which one and let me know. Thanks 4k COMCAST Theresa Lattin I Planning & Design 10435 Ironwood Rd I Palm Beach Gardens, FL 33410 Desk 561.881.3240 1 Fax 561.454.5899 Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Monday, May 12, 2014 12:45 PM To: 'Rosa, Steven' Subject: FW: Comcast FYI... Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEneineers.com From: nvganger(mailto:rwaanoeoolbellsouth.netl Sent: Monday, May 12, 2014 9:05 AM To: Danny Brannon Cc: Anneli Ganger Subject: Comcast Danny, At 12:50 PM on Friday (after the Commission meeting), I observed a Comcast truck (the serious kind with a cherry picker) parked directly in front of the proposed slab for the 1443 NOB easement. Shortly thereafter, the truck had moved north and the technician appeared to be checking cable connections at planned UG sites. Around 4PM, my wife called to indicate that we had no cable signal. I immediately called Comcast and went through the normal ordeal of trying to reach a human. A recorded message indicated "system failure" --which seemed to be due to unusual call overload, and not necessarily to the local cable service. Around 6PM we did reach a human who tried to diagnose the problem remotely, but no signal was forthcoming. The best we could get was an appointment Sunday PM (Mother's Day) On Saturday, I began to think that many of my neighbors might also be out of service, and the problem might be related to the Undergrounding Project. I called once again, speculating that the serviceman might have disconnected cables in preparation for installing the slabs. The Comcast agent promised emergency service so I waited around all day to no avail. A tech arrived at 2:45 PM on Sunday. He started to perform the usual diagnostics, but I suggested he look first at the box near the new slab site. Sure enough, my cable had been disconnected --but worse, the line leading to the house had also been torn from the wall and severed.. It had to be completely replaced (with a new orange cable that presumably can be buried), a distance of almost 350 feet.) The job was completed at 5:30 PM. The new cable is lying loosely on the ground, directly in front of the area where the slab will be installed. I placed one of the cones on top of it with a CAUTION message, but it is quite possible that the next crew will tear it up again. Hopefully my experience is a random event, but I think you should alert your COMCAST contact that something screwy is going on. No one I talked to was in any position of authority, and I do want to alert Comcast management that they may have a bigger problem on their hands. Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Monday, May 12, 2014 1:02 PM To: 'Rosa, Steven' Subject: RE: Comcast Gulf Stream, (between Boynton and Delray on the barrier island) Specifically at North Road and AlA. This Town Commissioner lives on the east side of A1A at the intersection. Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEneineers.com From: Rosa, Steven [mailto:Steven Rosa(a)cable.comcast.coml Sent: Monday, May 12, 2014 12:56 PM To: Danny Brannon Subject: RE: Comcast Is this in Boynton Delray or Boca From: Danny Brannon [mailto:DBrannoneBnGEngineers.coml Sent: Monday, May 12, 2014 12:45 PM To: Rosa, Steven Subject: FW: Comcast FYI... Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEngineers.com From: rwganger [mailto:rwganger(d)bellsouth.netl Sent: Monday, May 12, 2014 9:05 AM To: Danny Brannon e Cc: Anneli Ganger Subject: Comcast Danny, At 12:50 PM on Friday (after the Commission meeting), I observed a Comcast truck (the serious kind with a cherry picker) parked directly in front of the proposed slab for the 1443 NOB easement. Shortly thereafter, the truck had moved north and the technician appeared to be checking cable connections at planned UG sites. Around 4PM, my wife called to indicate that we had no cable signal. I immediately called Comcast and went through the normal ordeal of trying to reach a human. A recorded message indicated "system failure" --which seemed to be due to unusual call overload, and not necessarily to the local cable service. Around 6PM we did reach a human who tried to diagnose the problem remotely, but no signal was forthcoming. The best we could get was an appointment Sunday PM (Mother's Day) On Saturday, I began to think that many of my neighbors might also be out of service, and the problem might be related to the Undergrounding Project. I called once again, speculating that the serviceman might have disconnected cables in preparation for installing the slabs. The Comcast agent promised emergency service so I waited around all day to no avail. A tech arrived at 2:45 PM on Sunday. He started to perform the usual diagnostics, but I suggested he look first at the box near the new slab site. Sure enough, my cable had been disconnected ---but worse, the line leading to the house had also been torn from the wall and severed.. It had to be completely replaced (with a new orange cable that presumably can be buried), a distance of almost 350 feet.) The job was completed at 5:30 PM. The new cable is lying loosely on the ground, directly in front of the area where the slab will be installed. I placed one of the cones on top of it with a CAUTION message, but it is quite possible that the next crew will tear it up again. Hopefully my experience is a random event, but I think you should alert your COMCAST contact that something screwy is going on. No one I talked to was in any position of authority, and I do want to alert Comcast management that they may have a bigger problem on their hands. :.. elCtu09' This email is free from viruses and malware because avastl Antivirus protection is active. Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Monday, May 12, 2014 1:25 PM To: 'Rosa, Steven' Subject: RE: Comcast I was thinking that Jeanine did not handle that area and that there was another manager there.... but areas change frequently.... Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEnineers.com From: Rosa, Steven [mailto:Steven Rosa(alcable.comcast.coml Sent: Monday, May 12, 2014 1:24 PM To: Danny Brannon Subject: RE: Comcast Thank Danny I will forward to Jeannine and the team From: Danny Brannon [mailto:DBrannon(la BnGEnaineers.coml Sent: Monday, May 12, 2014 1:02 PM To: Rosa, Steven Subject: RE: Comcast Gulf Stream, (between Boynton and Delray on the barrier island) Specifically at North Road and AlA. This Town Commissioner lives on the east side of AIA at the intersection. Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEngineers..com 10 From: Rosa, Steven [mailto:Steven Rosa@cable.comcast.coml Sent: Monday, May 12, 2014 12:56 PM To: Danny Brannon Subject: RE: Comcast Is this in Boynton Delray or Boca From: Danny Brannon [mailto:DBrannon(a)BnGEnaineers.coml Sent: Monday, May 12, 2014 12:45 PM To: Rosa, Steven Subject: FW: Comcast FYI... Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEneineers..com From: rwganger [mailto:rwoanoer(a)bellsouth.netl Sent: Monday, May 12, 2014 9:05 AM To: Danny Brannon Cc: Anneli Ganger Subject: Comcast Danny, At 12:50 PM on Friday (after the Commission meeting), I observed a Comcast truck (the serious kind with a cherry picker) parked directly in front of the proposed slab for the 1443 NOB easement. Shortly thereafter, the truck had moved north and the technician appeared to be checking cable connections at planned UG sites. Around 4PM, my wife called to indicate that we had no cable signal. I immediately called Comcast and went through the normal ordeal of trying to reach a human. A recorded message indicated "system failure" --which seemed to be due to unusual call overload, and not necessarily to the local cable service. Around 6PM we did reach a human who tried to diagnose the problem remotely, but no signal was forthcoming. The best we could get was an appointment Sunday PM (Mother's Day) On Saturday, I began to think that many of my neighbors might also be out of service, and the problem might be related to the Undergrounding Project. I called once again, speculating that the serviceman might have disconnected cables in preparation for installing the slabs. The Comcast agent promised emergency service so I waited around all day to no avail. A tech arrived at 2:45 PM on Sunday. He started to perform the usual diagnostics, but I suggested he look first at the box near the new slab site. Sure enough, my cable had been disconnected --but worse, the line leading to the house had also been torn from the wall and severed.. It had to be completely replaced (with a new orange cable that presumably can be buried), a distance of almost 350 feet.) The 11 job was completed at 5:30 PM. The new cable is lying loosely on the ground, directly in front of the area where the slab will be installed. I placed one of the cones on top of it with a CAUTION message, but it is quite possible that the next crew will tear it up again. Hopefully my experience is a random event, but I think you should alert your COMCAST contact that something screwy is going on. No one I talked to was in any position of authority, and I do want to alert Comcast management that they may have a bigger problem on their hands. :.. Jovckw This email is free from viruses and malware because avast! Antivirus protection is active. O&AW ' This email is free from viruses and malware because avast! Antivirus protection is active. ff raw 12 Danny Brannon From: Rosa, Steven <Steven Rosa@cable.comcast.com> Sent: Saturday, October 25, 201411:11 AM To: Danny Brannon Cc: Springsteel, Anthony Subject: RE: Gulf Stream Phase 2 Comcast drawings - Golfview to Little Club sorry we have been so busy doing a lot of thing going on I will get your invoice to you on Monday and see if I can get some prints from design From: Danny Brannon[mailto:DBrannon(@BnGEnoineers.coml Sent: Friday, October 24, 2014 2:17 PM To: Rosa, Steven Subject: Gulf Stream Phase 2 Comcast drawings - Golfview to Little Club How is it coming? Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 8474435 Cell: (561) 307-9454 Website: www.BnGEngineers.com 7�VGWk, This email is free from viruses and malware because avast! Antivirus protection is active. •r (IIp" 13 Danny Brannon From: Rosa, Steven <Steven_Rosa@cable.comcast.com> Sent: Monday, October 27, 2014 9:32 AM To: Danny Brannon Cc: Springsteel, Anthony Subject: RE: Gulf Stream Phase 2 Comcast drawings - Golfview to Little Club Attachments: invoice for the Town of Golfstream.pdf Here you invoice for part one do not mail we will pick it up thanks From: Danny Brannon rmailto:DBrannon( BnGEnaineers.com1 Sent: Friday, October 24, 2014 2:17 PM To: Rosa, Steven Subject: Gulf Stream Phase 2 Comcast drawings - Golfview to Little Club How is it coming? Danny P. Brannon, P.E. Brannon & Gillespie, ric Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEngineers.com .IMY This email is free from viruses and malware because avast! Antivirus protection is active. 14 Danny Brannon From: Sent: To: Subject: Attachments: AS Builts Phase 1 Gulf Stream Danny Brannon <DBrannon@BnGEngineers.com> Wednesday, December 10, 20141:27 PM 'Rosa, Steven' RE: COMCAST - RED UNE.PDF Danny P. Brannon, P.E. Brannon & Gillespie, LLC Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEngineers.com From: Rosa, Steven [mailto:Steven Rosa(@cable.comcast.coml Sent: Wednesday, April 10, 2013 4:02 PM To: dbrannon( bngengineers.com Subject: info Steven F Rosa Tech III Construction Comcast Construction Dept. 10435 Ironwood Road Palm Beach Gardens FI, 33410 Office:561-454-5851 Mobile:561-436-9034 Fax:561-454-5899 E-mail Steven rosa@cable.comcast.com ki COMCAST �brJ�Fl)� �fnity 15 Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Thursday, December 11, 2014 10:47 AM To: 'Rosa, Steven' Cc: Rebecca Tew (rtew@gulf-stream.org) Subject: FW: Gulf Stream Phase 2 Comcast drawings - Golfview to Little Club Attachments: invoice for the Town of Golfstream.pdf Steve, the Town is exempt from sales tax? Is this a recovery of the tax you pay to purchase the materials or a sales tax? Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEneineers.com From: Rosa, Steven (mailto:Steven Rosa(alcable.comcast.coml Sent: Monday, October 27, 2014 9:32 AM To: Danny Brannon Cc: Springsteel, Anthony Subject: RE: Gulf Stream Phase 2 Comcast drawings - Golfview to Little Club Here you invoice for part one do not mail we will pick it up thanks From: Danny Brannon rmailto:DBrannon(coBnGEnaineers.coml Sent: Friday, October 24, 2014 2:17 PM To: Rosa, Steven Subject: Gulf Stream Phase 2 Comcast drawings - Golfview to Little Club How is it coming? Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEngineers.com 16 QMU-21f This email is free from viruses and malware because avast! Antivirus protection is active. (*&" 17 Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Friday, February 27, 2015 10:49 AM To: 'Rosa, Steven' Cc: 'Springsteel, Anthony' Subject: RE: Gulf Stream Phase 2 Comcast drawings - Golfview to Little Club Please provide a status on the undergrounding of your facilities in the portion of Gulf Stream south of Golfview Road (Phase 1 of our project). The Town is very anxious as to the progress on this work. I have been requested to put a meeting together with the Town Manager, Town Attorney, and the Mayor to discuss this issue and possible actions to expedite the communications relocation work. Danny P. Brannon, P.E. Brannon & Gillespie, LT Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEngineers.com From: Rosa, Steven [mailto:Steven Rosaftable.comcast.coml Sent: Monday, October 27, 2014 9:32 AM To: Danny Brannon Cc: Springsteel, Anthony Subject: RE: Gulf Stream Phase 2 Comcast drawings - Golfview to Little Club Here you invoice for part one do not mail we will pick it up thanks From: Danny Brannon[mallto:DBrannon(d)BnGEnoineers.com1 Sent: Friday, October 24, 2014 2:17 PM To: Rosa, Steven Subject: Gulf Stream Phase 2 Comcast drawings - Golfview to Little Club How is it coming? Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEngineers.com is 1ROXM5 This email is free from viruses and malware because avast! Antivirus protection is active. 19 Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Tuesday, March 03, 2015 8:21 AM To: Steven Rosa (Steven_Rosa@cable.comcast.com) Cc: Mc Enroe, Jeannine Subject: FW: Comcast Redline As -Built Signed Attachments: COMCAST - RED LINE - Signed.pdf Resend as -constructed drawings for Gulf Stream Phase 1. Please advise as to your conversion work schedule. Danny P. Brannon, P.E. Brannon & Gillespie, tsc Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEngineers.com From: John Zoerhof rmallto:izoerhofOHYPOWERINC.COMI Sent: Friday, December 12, 2014 12:21 PM To: Danny Brannon (DBrannonCalBnGEnoineers.ccrn Subject: Comcast Redline As -Built Signed Regards, John Zoerhof Division Manager - Power Services Direct 954.917.1439 Cell 954.448.0369 .--s'�wwwinypowennc.com PILCA., �o14.1S-C-E 4D ®� tu(e 1645 NW 33b STREET, POMPANO BEACH, FC 33064 954.978.9300—Main 954 978 8666 -Fax ✓}Please consMer Bre e,Mromnent behve oHnfi g Ibis e-mail NOTICE: This email is Intended solely for the use of the individual to whom It is addressed and may contain Information that Is privileged, confidential or otherwise exempt from disclosure. If the reader of this email Is not the Intended recipient or the employee or agent responsible for delivering the message to the Intended recipient, you are hereby notified that any dissemination, distribution, or copying of this communication is strlcdy prohibited. If you have received this communication In error, please Immediately notify us by telephone and return the original message to us at the listed email address. Thank You. 20 21 Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Monday, December 28, 2015 11:58 AM To: Jeannine McEnroe(JEANNINE_MCENROE@cable.comcast.com) Subject: Status on Gulf Stream Phase 1 Any info yet? Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEngineers.com 22 Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Tuesday, February 09, 2016 7:37 AM To: Jeannine McEnroe(JEANNINE_MCENROE@cable.comcast.com) Subject: Marked up plans for FTTH for Gulf Stream phase 2. Do I need to come pick them up? I was in Sarasota yesterday Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: wwv.BnGEngineers.com 23 Danny Brannon From: Danny Brannon <DBrannon@BnGEngineers.com> Sent: Thursday, March 03, 2016 10:34 AM To: Jeannine McEnroe(1EANNINE_MCENROE@cable.comcast.com) Subject: Gulf Stream Phase one The mayor of Gulf Stream wants to know why Comcast is not off the poles in phase one. Can you find out the facts on this before our meeting tomorrow? Danny P. Brannon, P.E. Brannon & Gillespie, LLc Consulting Engineers 631 US Highway One, Suite 301 North Palm Beach, Florida 33408 Off: (561) 847-4435 Cell: (561) 307-9454 Website: www.BnGEneineers.com 24 SCOTT W. MORGAN, Mayor ROBERT W. GANGER, Vice -Mayor JOAN K. ORTHWEIN THOMAS M. STANLEY DONNA S. WHITE Dear Resident: TOWN OF GULF STREAM PALM BEACH COUNTY, FLORIDA Telephone (561)276-5116 Fax (561)737-0188 Town Manager WILLIAM H. THRASHER Town Clerk RITA L. TAYLOR The utility bills have a new look. There has also been a change in the web address that you can use for online payments. The updated web address for online utility payments is httos://¢ulfstream.secure.munibilling.com. Each resident will receive an individual code on their utility postcard statement located in the lower left side box. Please use this code to set up access to your account online as well as online payments. If you typically receive your utility statements via email, please make sure to check your email for a confirmation email to ensure you continue to receive your bills electronically. To ensure delivery of your bills, please add the email address rtew0gulf-stream.ors to your contacts. This should prevent your bills from going into your spam box. If you do not currently receive your utility bill by email but wish to do so, please contact Town Hall to set up electronic bill delivery. Also, don't forget to visit the Town's webpage at www.gulf-stream.org to complete a barrier island survey. The results of the survey are vital to planning for the future of the town. Best regards, Town of Gulf Stream Administration 100 SEA ROAD, GULF STREAM, FLORIDA 33483 Ftl Telephone (561)276-5116 Fax (561)737-0188 Town Manager WILLIAM H. THRASHER Town Clerk RITA L. TAYLOR The utility bills have a new look. There has also been a change in the web address that you can use for online payments. The updated web address for online utility payments is httos://¢ulfstream.secure.munibilling.com. Each resident will receive an individual code on their utility postcard statement located in the lower left side box. Please use this code to set up access to your account online as well as online payments. If you typically receive your utility statements via email, please make sure to check your email for a confirmation email to ensure you continue to receive your bills electronically. To ensure delivery of your bills, please add the email address rtew0gulf-stream.ors to your contacts. This should prevent your bills from going into your spam box. If you do not currently receive your utility bill by email but wish to do so, please contact Town Hall to set up electronic bill delivery. Also, don't forget to visit the Town's webpage at www.gulf-stream.org to complete a barrier island survey. The results of the survey are vital to planning for the future of the town. Best regards, Town of Gulf Stream Administration 100 SEA ROAD, GULF STREAM, FLORIDA 33483 COMMISSIONERS SCOTT W. MORGAN, Mayor ROBERT W. GANGER, Vice -Mayor JOAN k ORTHWEIN THOMAS M. STANLEY DONNA S. WHITE March 20, 2016 Dear Gulf Stream Residents, TOWN OF GULF STREAM PALM BEACH COUNTY, FLORIDA I want to update you on the status of the undergrounding project. Telephone (561)276-5116 Fax (561)737.0188 Town Manager WILLIAM 11. THRASHER Town Clerk RITA L. TAYLOR In 2010, Gulf Stream hired Willdan Financial Services to evaluate the cost of removing overhead utility lines for underground installation. By April, 2011, Willdan Financial completed its study and recommended a budget of $5,497,742.00, which amount has been fully funded for the project. Willdan noted that construction costs were low due to the economic downturn, and believed its numbers would hold for the three to four years estimated to finish the undergrounding improvement. The Town finished its advance work in mid -2011, which included public meetings, a straw poll of its residents and required court validation. The project was then divided into two phases: Phase 1 for the South end of town up to Gulfview Drive; and Phase 2 for Gulfview Dr. up to the North end of town. Phase 1 began in August 2011, but FPL, the main utility, created a significant delay in the actual undergrounding work, as it did not provide the plans needed for contractors to bid the construction work until January 30, 2013. Once started, however, the Phase 1 work proceeded well and is nearly complete. Phase 1 will also finish slightly below budget. In view of the difficulties with FPL on Phase 1, Gulf Stream's engineer filed a complaint with the Florida Public Service Commission in March 2013, voicing the Town's concern about increased construction costs should Phase 2 of its project be similarly drawn out. FPL responded by promising Phase 2 plans and a binding cost estimate within 6 months after receiving Gulf Stream's utility survey drawings. Instead, FPL took 16 months, not delivering the needed drawings until late August 2015. By this time, most contractors were already over -booked with work created during the economic recovery that Florida has experienced over the last several years. This work includes All Aboard Florida and some very large projects in Collier County, Jupiter and Hollywood. Gulf Stream's Phase 2 project is comparatively small, and we received only two bids, both of which were high. Willco Electrical was the low bidder at $2,874,569.00, which is $954,431.76 over the Phase 2 budget. 100 SEA ROAD, GULF STREAM, FLORIDA 33483 The Town engineer believes options exist to reduce the cost of Phase 2, but due to Florida's "Cone of Silence" laws, he cannot negotiate with the bidders until the Commission awards the project, albeit while withholding authority to proceed pending price adjustments. Therefore, the Town has scheduled a Special Meeting for Tuesday, March 22, 2016, at 3:30 pm to review the bids and decide whether to make an award. Let me assure you that the Commission will thoroughly evaluate the Phase 2 costs and timeline of events, and we will make a decision that reflects the best interests of the residents. Also, and perhaps most importantly, please know that the Town has funds available to cover the Phase 2 cost increase so there is no need for a change in taxes or for an assessment. Thank you for your patience and understanding as we move to complete this undergrounding project. Very truly yours, Scott W. Morgan Town of Gulf Stream 100 Sea Road Gulf Stream, FL 33483 WILLIAM BOARDMAN 3251 POLO DR GULF STREAM, FL 33483 Gulf Stream Bimonthly Bill PREVIOUS BALANCE $0.00 PAYMENTS $0.00 CURRENT CHARGES 5315.48 TOTAL DUE BY 02/29/2016 $315.48 ACCOUNT NUMBER 1273 Meter # Start Read End Read Consumption CUSTOMER WILLIAM BOARDMAN $315.48 3251 POLO DR SERVICE ADDRESS NAME WILLIAM BOARDMZ GULF STREAM FL 33483 BILL DATE 01/31/2016 SERVICE START END USAGE AMOUNT Garbage 02/01/2016 03/31/2016 $59.32 Water Usage 12/03/2015 - 2367000 01/31/2016 - 2414000 47000 $155.80 Admin Fee 12/04/2015 01/31/2016 $8.63 Reserve Fee 12/04/2015 01/31/2016 $31.20 Base Service 12/04/2015 01/31/2016 $60.53 TOTAL CURRENT CHARGES $315.48 Please detach below perforation and return with payment -------------------------------------------------------------------------------------------------------------------------------- ACCOUNT NUMBER 1273 SERVICE ADDRESS 3251 POLO DR AMOUNTDUE $315.48 DUE DATE 02/29/2016 NAME WILLIAM BOARDMZ Town of Gulf Stream 100 Sea Road Gulf Stream, FL 33483 Town of Gulf Stream 100 Sea Road Gulf Stream, FL 33483 WILLIAM BOARDMAN 3251 POLO DR GULF STREAM, FL 33483 Gulf Stream Bimonthly Bill PREVIOUS BALANCE $0.00 PAYMENTS $0.00 CURRENT CHARGES $240.00 TOTAL DUE BY 04/30/2016 $240.00 ACCOUNT NUMBER 1273 Meter# Start Read End Read Consumption CUSTOMER WILLIAM BOARDMAN $240.00 3251 POLO DR SERVICE ADDRESS NAME WILLIAM BOARDMAN GULF STREAM FL 33483 BILL DATE 03/31/2016 SERVICE START END USAGE AMOUNT Garbage 04/01/2016 05/31/2016 $59.32 Water Usage 01/31/2016 - 2414000 03/30/2016 - 2430000 16000 $51.52 Admin Fee 02/01/2016 03/30/2016 $8.63 Reserve Fee 02/01/2016 03/30/2016 $60.00 Base Service 02/01/2016 03/30/2016 $60.53 TOTAL CURRENT CHARGES $240.00 Please detach below perforation and return with payment -------------------------------------------------------------------------------------------------------------------------------- ACCOUNT NUMBER 1273 SERVICE ADDRESS 3251 POLO DR AMOUNT DUE $240.00 DUE DATE 04/30/2016 NAME WILLIAM BOARDMAN Town of Gulf Stream 100 Sea Road Gulf Stream, FL 33483 PALM BEACH COUNTY, FLORIDA Delivered via e-mail April 29, 2016 Chris O'Hare [mail to: chrisoharegulfstream@gmail.com] Re: GS # 2169 (small group - boardman) (1) During the Town Commission meeting held on March 11, 2016 under agenda item VIII the minutes reflect that the mayor suggested that the information that has been presented be made available to a small group of residents that are knowledgeable in this type of situation for their input and that this matter be further considered at the next meeting on April 8, 2016 Their were no objections to this suggestion. I request you provide for my inspection the public record which is any record of who the members of this small group are; what documents were considered by them; what there input was; and any records of communication in the Town's custody with any members of this group during the time period from Jan 1, 2016 to the present. (2) I assume Mr. Boardman was a member of this group but if he wasn't then please produce for my inspection any all records of communication and attachments and/or documents referenced in those communications, on any matter, between Mr. Boardman and any member of the Town of Gulf Stream * during this same time period. Dear Chris O'Hare [mail to: chrisoharegulfstream(7a,gmail.coml, The Town of Gulf Stream has received your original record requests dated April 27, 2016. Your original public records request can be found at the following link: http://www2.gulf- stream.ore/weblink/0/doc/90007/Pagel.asyx. Please refer to the referenced number above with any future correspondence. In response to part 1 of your request, there are no records regarding who was involved in said "group", the documents that were created for this item can be found at the same above link as well as the following link: http://www2.gulf-stream.ore/weblink/0/doc/90012/Pagel.asvx, there are no records of "input", and there are no records of communication. In response to part 2 of your request, the only records of communication can also be found at the following link: htto://www2.gulf-stream.org/weblink/0/doc/90012/Pagel.aspx. We consider this closed. Respectfully, Town Clerk, Custodian of the Records