Loading...
HomeMy Public PortalAboutElectrical Fees (Updated 2018)TOWN OF BREWSTER ELECTRICAL FEES Effective July 1, 2018 Residential Uses (1 & 2 Family, Multi-Family, Condominiums) First Dwelling Unit Up to 4000 sq ft habitable space* $200.00 Over 4000 sq ft habitable space* $300.00 *includes trench, service, rough and final inspections; also includes security and/or fire alarm system if completed by the same Installer and ready for the inspection at the same time_____________________ Each Additional Dwelling Unit (within the same exterior shell) $200.00 Additions and Renovations/Alterations (per unit) $150.00 Alarm and Security Systems, Smoke Detectors, Audio & Telecommunications ______ $100.00 Solar Panels, Generator, Wind Turbines ______ $100.00 Temporary Service $125.00 Pools (above or below ground), Spas, Hot Tubs $150.00 Shed/Barn Up to 120 sq ft $ 75.00 Over 120 sq ft $100.00 Primary and Secondary Handholds $25 per 150’ conduit in Trench / $75 Minimum Commercial (Other than Residential Uses Noted Above) New Construction including Additions* (Fees are cumulative applicable) First 1000 sq ft $200.00 Each additional 100 sq ft $ 5.00 Each 100 amps (or fraction thereof) $ 25.00 Each additional meter (beyond the first meter) $ 30.00 Renovations/Alterations (per unit) Up to 4000 sq ft $250.00 Each Additional 1000 sq ft $ 50.00 Alarm & Security Systems, Smoke Detectors, Audio & Telecommunications (per unit) Up to 4000 sq ft $150.00 Over 4000 sq ft $150.00 Solar Panels, Generator, Wind Turbine $150.00 Other Change of Service per Meter Up to 200 Amps $100.00 Over 200 Amps $150.00 Signs / Oil Burners / Air Conditioning / Appliances / CO Detector $ 75.00 Emergency/After Normal Work Hours Inspection $150.00 Septic Inspection $100.00 New Subdivisions / Primaries and Secondary Handholds $25 / 150 Lineal Foot of Conduit in Trench $75 Minimum_______________________ First Reinspection Fee $ 75.00 Second and Subsquent Reinspection Fee $125.00 Electrical permit fees for unusual or special conditions not itemized herein will be determined by the Building Commissioner.