HomeMy Public PortalAbout100_021_B101ExhibitA-2007 - Checked Draft - 001(3) AlA Document B101TM - 2007 Exhibit A Initial Information for the following PROJECT: (Name and location or address) Tybee Island Public Safety Building ADDITIONS AND DELETIONS: The author of this document has lots 78 and 80 at Van Horne Street,Tybee Island,Georgia added information needed for its completion.The author may also THE OWNER: have revised the text of the original (Name, legal status and address) AIA standard form.An Additions and Deletions Report that notes added City of Tybee Island,Other information as well as revisions to the 403 Butler Avenue standard form text is available from the author and should be reviewed.A Tybee Island,GA 31328 vertical line in the left margin of this document indicates where the author THE ARCHITECT: has added necessary information (Name, legal status and address) and where the author has added to or deleted from the original AIA text. Greenline Architecture,Professional Corporation This document has important legal 28 E. 35th Street consequences.Consultation with an Savannah GA 31401 attorney is encouraged with respect to its completion or modification. This Agreement is based on the following information. (Note the disposition for the following items by inserting the requested information or a statement such as "not applicable," "unknown at time of execution"or "to be determined later by mutual agreement.') ARTICLE A.1 PROJECT INFORMATION § A.1.1 The Owner's program for the Project: (Identify documentation or state the manner in which the program will be developed.) The Owner desires to construct a Public Safety Building for the City of Tybee Island I pursuant to RFP#2012-633,incorporated fully herein as"Exhibit B." The anticipated site ' I improvements and building square footage for each area are as follows: (1) Administrative—10,640 square feet, (2)multi-purpose courtroom,training,and city council chambers—2,400 square feet,(3)detention area/holding cells—360 square feet,(4) sally port/garage enclosure(add alternate)—1,000 square feet,(5)fire bay(add alternate)— 420 square feet, and(6)and automated fuel reading system with 2 new fuel pumps(add alternate). The parties agree that the City may want to make changes to this written program. The parties agree that the Owner can meet its obligations under Section 5.1 of this Agreement,providing in a timely manner regarding requirements for and limitations on the Project, including a written program which shall set forth the Owner's objectives, schedule,constraints and criteria,so long as the Owner has furnished to Architect the foregoing prior to Architect's commencement of the Schematic Design Services Phase under this Agreement. ELECTRONIC COPYING of any portion § A.1.2 The Project's physical characteristics: of this AlA®Document to another (Identify or describe, if appropriate, size, location, dimensions, or other pertinent electronic file is prohibited and information,such as geotechnical reports;site, boundary and topographic surveys;traffic constitutes a violation of copyright laws and utility studies; availability of public and private utilities and services; legal as set forth in the footer of this description of the site; etc.) document. AIA Document 8101 TM-2007 Exhibit A.Copyright©1974,1978,1987,1997 and 2007 by The American Institute of Architects.All rights reserved.WARNING: This AlA® Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AlA® Document, 1 or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This draft was produced by AIA software at 10:56:18 on 04/04/2013 under Order No.8726877139_1 which expires on 01/22/2014,and is not for resale. User Notes: (1765371448) The Public Safety Building is to be located at the site at 78 and 80 Van Home Street,Tybee Island Georgia,and the surrounding area. The two buildings on the site will be demolished,at the Owner's expense,in phases as directed by the Owner. Owner will provide Architect with a written protocol for phased demolition prior to commencement of demolition. § A.1.3 The Owner's budget for the Cost of the Work,as defined in Section 6.1: (Provide total, and if known, a line item break down.) The Owner's preliminary budget for the Cost of Construction is$2.8Million. The preliminary budget is the basis for the Architect's compensation in the Agreement. Any changes to this preliminary budget for the Cost of Construction, in excess of$250,000, shall entitle Architect to a fee increase equivalent to 7%of the total budget for the cost of construction after allowing a set-off for the preliminary budget amount and the$250,000 excess to which the Architect is not entitled to any further compensation.The Architect is only entitled to this fee increase as it relates to the budget for the project and Architect shall not be entitled to any additional fee or compensation due to the fact that the actual Cost of Work may exceed the budget. § A.1.4 The Owner's other anticipated scheduling information,if any,not provided in Section ..2: § A.1.5 The Owner intends the following procurement or delivery method for the Project: (Identify method such as competitive bid, negotiated contract, or construction management.) Owner has not determined whether project will be procured by competitive bid or negotiated proposal. § A.1.6 Other Project information: (Identify special characteristics or needs of the Project not provided elsewhere, such as environmentall responsible design or historic preservation requirements.) ARTICLE A.2 PROJECT TEAM § A.2.1 The Owner identifies the following representative in accordance with Section 5.3: (List name, address and other information.) Diane Schliecher,City Manager for the City of Tybee Island 403 Butler Avenue Tybee Island,GA 31328 § A.2.2 The persons or entities,in addition to the Owner's representative,who are required to review the Architect's submittals to the Owner are as follows: (List name, address and other information.) § A.2.3 The Owner will retain the following consultants and contractors: (List discipline and, if known, ident them by name and address.) § A.2.4 The Architect identifies the following representative in accordance with Section 2.3 (List name, address and other information.) Robert J. Poticny,AIA Greenline Architecture P.C.28 E. 35th StreetSavannah GA 31401Email Address: rpoticny @greenlinearch.com § A.2.5 The Architect will retain the consultants identified in Sections A.2.5.1 and A.2.5.2. (List discipline and, if known, identify them by name, legal status, address and other information.) AIA Document 8101 TM-2007 Exhibit A.Copyright©1974,1978,1987,1997 and 2007 by The American Institute of Architects.All rights reserved.WARNING: This AlA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AlA®Document, 2 or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This draft was produced by AIA software at 10:56:18 on 04/04/2013 under Order No.8726877139_1 which expires on 01/22/2014,and is not for resale. User Notes: (1765371448) § A.2.5.1 Consultants retained under Basic Services: .1 Structural Engineer Michael Sikes,P.C. 54 Ramsgate Road — Savannah GA 31419 9121-660-1296 Contact:Hunter Saussy III .2 Mechanical/Electrical Engineer Dulohery Weeks 333 Commercial Drive Savannah GA 31406 — 912-355-0235 — Contact:Jimmy Swails — .3 Geotechnical Engineer Whitaker Labs 2500 Tremont Road Savannah GA 31418 912-234-0696 .4 Civil Engineer Thomas&Hutton 25 Park of Commerce Way Savannah GA 31405 912-234-5300 § A.2.5.2 Consultants retained under Additional Services: § A.2.6 Other Initial Information on which the Agreement is based: ((Provide other Initial Information.) The Architect has been selected to provide the following services: Design of building and site plan excluding landscape design,provide construction and site plan drawings, soil borings(as required),bidding services including public advertising and plan distribution,oversight of construction and review of change orders and provide oversight for the demolition of two existing buildings in accordance with EPA regulations. The design and construction of the building is to be architecturally compatible with the neighborhood, energy efficient,meet state police certification, ADA,and FEMA requirements. The project shall also include a telephone and interne wiring design per the Owner's requirements. The Owner if responsible for having completed a Phase 1 Limited Site Investigation Report and for having a survey completed. L_ - AIA Document B101 TM-2007 Exhibit A.Copyright©1974,1978,1987,1997 and 2007 by The American Institute of Architects.All rights reserved.WARNING: This AlA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AlA®Document, 3 or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This draft was produced by AIA software at 10:56:18 on 04/04/2013 under Order No.8726877139_1 which expires on 01/22/2014,and is not for resale. User Notes: (1765371448) Additions and Deletions Report for AIA Document B101 TM — 2007 Exhibit A This Additions and Deletions Report,as defined on page 1 of the associated document, reproduces below all text the author has added to the standard form AIA document in order to complete it,as well as any text the author may have added to or deleted from the original AIA text.Added text is shown underlined. Deleted text is indicated with a horizontal line through the original AIA text. I Note: This Additions and Deletions Report is provided for information purposes only and is not incorporated into or constitute any part of the associated AIA document.This Additions and Deletions Report and its associated document were generated simultaneously by AIA software at 10:56:18 on 04/04/2013. PAGE1 Tybee Island Public Safety Building lots 78 and 80 at Van Horne Street,Tybee Island,Georgia City of Tybee Island,Other 403 Butler Avenue Tybee Island,GA 31328 qii Greenline Architecture,Professional Corporation 28 E. 35th Street Savannah GA 31401 The Owner desires to construct a Public Safety Building for the City of Tybee Island pursuant to RFP#2012-633, _ incorporated fully herein as"Exhibit B." The anticipated site improvements and building square footage for each area. are as follows: (1)Administrative— 10,640 square feet, (2)multi-purpose courtroom,training,and city council chambers—2,400 square feet, (3)detention area/holding cells—360 square feet, (4)sally port/garage enclosure(add alternate)—1,000 square feet,(5)fire bay(add alternate)—420 square feet,and(6)and automated fuel reading system with 2 new fuel pumps(add alternate). The parties agree that the City may want to make changes to this written program. The parties agree that the Owner can meet its obligations under Section 5.1 of this Agreement,providing in a timely manner regarding requirements for and limitations on the Project,including a written program which shall set forth the Owner's objectives, schedule, constraints and criteria, so long as the Owner has furnished to Architect the foregoing prior to Architect's commencement of the Schematic Design Services Phase under this Agreement. PAGE 2 The Public Safety Building is to be located at the site at 78 and 80 Van Home Street,Tybee Island Georgia,and the surrounding area. The two buildings on the site will be demolished,at the Owner's expense,in phases as directed by the Owner. Owner will provide Architect with a written protocol for phased demolition prior to commencement of demolition. ... IT The Owner's preliminary budget for the Cost of Construction is$2.8Million. The preliminary budget is the basis for the Architect's compensation in the Agreement. Any changes to this preliminary budget for the Cost of Construction, in excess of$250,000,shall entitle Architect to a fee increase equivalent to 7%of the total budget for the cost of construction after allowing a set-off for the preliminary budget amount and the$250,000 excess to which the Additions and Deletions Report for AIA Document B101 TM-2007 Exhibit A.Copyright©1974,1978,1987,1997 and 2007 by The American Institute of Architects.All rights reserved.WARNING:This AlA® Document is protected by U.S.Copyright Law and International Treaties.Unauthorized 1 reproduction or distribution of this AlA® Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This draft was produced by AIA software at 10:56:18 on 04/04/2013 under Order No.8726877139_1 which expires on 01/22/2014,and is not for resale. User Notes: (1765371448) Architect is not entitled to any further compensation.The Architect is only entitled to this fee increase as it relates to the budget for the project and Architect shall not be entitled to any additional fee or compensation due to the fact that the actual Cost of Work may exceed the budget. Owner has not determined whether project will be procured by competitive bid or negotiated proposal. Diane Schliecher,City Manager for the City of Tybee Island 403 Butler Avenue Tybee Island,GA 31328 Robert J. Poticny,AIA Greenline Architecture P.C.28 E. 35th StreetSavannah GA 31401Email Address:rpoticny @greenlinearch.com PAGE 3 Michael Sikes, P.C. 54 Ramsgate Road Savannah GA 31419 9121-660-1296 Contact: Hunter Saussy III .2 Mechanical Mechanical/Electrical Engineer Dulohery Weeks 333 Commercial Drive Savannah GA 31406 912-355-0235 Contact: Jimmy Swails .3 Electrical Geotechnical Engineer Whitaker Labs 2500 Tremont Road Savannah GA 31418 912-234-0696 .4 Civil Engineer Thomas&Hutton 25 Park of Commerce Way Savannah GA 31405 912-234-5300 The Architect has been selected to provide the following services: Design of building and site plan excluding landscape design,provide construction and site plan drawings, soil borings(as required),bidding services including public advertising and plan distribution, oversight of construction and review of change orders and provide oversight for the demolition of two existing buildings in accordance with EPA regulations. The design and construction of the building is to be architecturally compatible with the neighborhood, energy efficient,meet state police certification Additions and Deletions Report for AIA Document 8101 TM-2007 Exhibit A.Copyright©1974,1978,1987,1997 and 2007 by The American Institute of Architects.All rights reserved.WARNING:This AlA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized 2 reproduction or distribution of this AIA° Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This draft was produced by AIA software at 10:56:18 on 04/04/2013 under Order No.8726877139_1 which expires on 01/22/2014,and is not for resale. User Notes: (1765371448) ADA,and FEMA requirements. The project shall also include a telephone and internet wiring design per the Owner's requirements. The Owner if responsible for having completed a Phase 1 Limited Site Investigation Report and for having a survey completed. Additions and Deletions Report for AIA Document B101 TM-2007 Exhibit A.Copyright©1974,1978,1987,1997 and 2007 by The American Institute of Architects.All rights reserved.WARNING:This AlA® Document is protected by U.S.Copyright Law and International Treaties.Unauthorized 3 reproduction or distribution of this AlA® Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This draft was produced by AIA software at 10:56:18 on 04/04/2013 under Order No.8726877139_1 which expires on 01/22/2014,and is not for resale. User Notes: (1765371448)