HomeMy Public PortalAboutOLD HWY 80_921.pdf • •
CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 01-10-2013 PERMIT#: 130021
WORK DESCRIPTION CLEARING&GRADING
WORK LOCATION 921 OLD HWY 80—PIN#4-0026-08-006
OWNER NAME WILLIAM RUSHER
ADDRESS 4796 LAMBS RD
CITY,ST,ZIP NORTH CHARLESTON SC 29418-35
PHONE NUMBER
CONTRACTOR NAME CATSKILL BUILDERS,INC.
ADDRESS 210 CATALINA DR.
CITY STATE ZIP TYBEE ISLAND GA 31328
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 162.50
PROPERTY IDENTIFICATION#
PROJECT VALUATION $1,500.00
TOTAL BALANCE DUE: $ 162.50
It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire,soil
and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including all
environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent: 51/_44,�y �'
44--
P.O.Box 2749-403 Butler Avenue,Tybee Island,Georgia 31328
(912)786-4573-FAX(912)786-9539
www.cityoftybee.org
;I I Y Ur I YI3tt ISLAND PL " 'CHASE ORDEF
403 Butler Ave
PO Box 2749
Tybee Island,GA 31328-2749 PO Number: 13-21665
Ph(912)786-4573 FAX(912)786-5832 This number must appear on all related
correspondence, shipping papers and invoices.
Vendor# 0 1 - 0 02 0 5 5 Date: 0 1 / 1 0 / 2 0 1 3 Requisition # 1 3 - 2 1 6 6
Issued to: DAVIS ENGINEERING , INC Ship to: CITY HALL
P 0 BOX 1663 403 BUTLER AVENUE
TYBEE ISLAND , GA 31328 TYBEE ISLAND , GA 31328
F.O.B. Point - Tybee Island, GA Terms - Net 30 day
LINE UNITS DESCRIPTION PRICE AMOUNT
1 0.00 Engineering - 921 Old Hw 100-7220-52-1203 0 .00 87 . 50
Davis Engineering, Inc. - Inv. #21203601 dated
12/19/2012 for $87 . 50 - drainage review for 921
Old Hwy 80
Purchase Order void after 90 days .
Special Instructions: TOTAL, 87 .50
Authorized by Date
For the City of Tybee Island
I agree to provide the items/services listed on this
purchase order and accept the Purchase Order
Terms and Conditions that accompany this form.
Supplier Acknowledgement Date
RECEREET
DAVIS ENGINEERING, INC.
P.O. Box 1663 Tybee Island, GA 31328
Tel. (912) 695-7262 dkdbus(a�gmail.com
INVOICE
December 19, 2012 Invoice #21203601
Diane Otto City of Tybee Island P.O. Box 2749 Tybee Island, GA 31328
Phone (912) 786-4573 Fax: (912) 786-9539
RE: 921 Oid'i,. Highway 80
12-19-12 0.50 Review with Engineer at City Hall and subsequent review and
concurrence of revisions. Previous dranage calcs remained valid.
0.50 hours @ $175 = $87.50
DI - 10 - 13
-L 13 - 00;2/
P. O. /3-..24,6
,, \ /3 "00,2__/ City of Tybee Island, Georgia
ik 912-472-5033 or 912-472-5031 - Fax 912-786-9539
■ R ,it ) APPLICATION FOR BUILDING PERMIT
Property Address: q 21 0 ( J, \ y , 0 00 .6 - 08_Dab
1
Name Mailing Address Telephone
Home:
Owner �JY"∎ nSl .�sl �� ���1anLFS�a,.>) C , � , Cell:
Architect or
Engineer ESw L �,.
Office:.? 10 -leer 160
Contractor 064S(.4: Ll. i2S 7 2 L. ( L � Cell:°i )(b-DZ)
(Check all that apply) I IY-Single Family ❑ Discovery/Tearout ❑ Demolition of Structure
El Duplex El Footprint Changes— ❑ Other
❑ Multi-Family units new square feet
❑ Commercial units heated/cooled ,r
Details of Project:
, 11 b>L/, „ 1.. 1 t .∎1 e T_A-)Ss a�1. r�Q 1�S,t� r'c
- aLp fkof)) ., k .5iac; t� G' (1d,/t6 .4: MIL ' ,.,/Cw ' zoa/JUN/�-
�J �--b (materials + labor + profit/overhead)
Estimated Cost of Construction: $ P�, v —
If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and/or a site plan may be required.
Year Built: Listed on National Historic Register or located within a National Historic District? Y / N
*Buildings older than 50 years may be eligible to be listed on the State/National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
*Also see the Tybee Island Land Development Code Article 14: Historic Preservation
During construction: /
On-site restroom facilities will be provided through-- 0- -o( . Construction debris will be disposed
by ±r a . \- x by means of L o•14-ra ctrl understand that I must comply with zoning, flood
damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective action that
may be necessary to restore drainage impaired by this_pltted construc .
I '
Date: -�-(3 Signature of Applicant: \�Jiy� ' /V' 2) FEES
Printed Name Permit 7 5'
Inspections
Note: A permit normally takes 7 to 10 days to process Cap Cost Rec
Water Tap
Sewer Stub
Approvals: c) drzt)u re �DDate t 3 Eng. Fees �7•S�
Planning &Zoning Manager Aid . Fees
Building Official
Water/Sewer
Storm/Drainage
City Manager
TOTAL
No2 . SO
LEAD-BASED PAINT RRP RULES
Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform
renovation, repairs, and painting jobs in pre-1978 housing and child-occupied facilities must, before beginning
work, provide owners, tenants, and child-care facilities with a copy of EPA's lead hazard information pamphlet
Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools.
Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you
to be certified and to use lead-safe work practices. Georgia Environmental Protection Division Lead-Based
Paint and Asbestos Program (404) 363-7026.
Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator
When disturbing lead-based painted or coated surfaces or components more than 6 ft2 per interior
room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size.
* ** * ** * *** * * * * * * * * * * *
Asbestos/Environmental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission
to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a
structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation
Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia
Environmental Protection Division administers the rules. In most cases, the rules require both the owner and
the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by
an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before
renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the
building. Further guidance for regulatory compliance and contact telephone numbers are provided by the
brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such
as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have
EPD regulations that could affect the project.
* * * * ** *** * * * * * * * * * * **
BMPs
While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility.
Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 —
Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment
Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission;
http://www.gaswcc.org/docs/field_manual_4ed.pdf.
Problems with the Co is not limited to the installation, but to material. The stone will be a representation of
1.5"-3.5" stone or larger.
Type A sediment barriers have been installed where Type C is required and shown on the permit drawings.
Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall
over) without impacting the second one. The complete assembly and installation must be compliant; steel or
wood p4_ .ost spacing, Type A.
0'7A- ,1 f • 3
Signat e fo receipt of Lead Paint, Asbestos, and BMP notices. 7 Date
I d nqt/ 2--
Printed Name
SWALE "A" et; '-'�I9 '
LOT 3 50 LF SWALE °y `
AT 2% a�',\
1FG 6.4 FG 6.2 DNF FLAG#1
FG 6.5 FG 6.3 '
DRIVE TO BE CONSTRUCTED OF PERMEABLE FG 6.7 \\\,\\\\ \\; . \\ \
MATERIALS AND BE 25' WIDE (TOTAL MAX AT FG 6.8 0 \ \ \
RIGHT OF WAY LINE ) OR AS PER CITY OF ® FG 6.9 \\ \ \%\\\ \�\
TYBEE ISLAND ORDINANCES REFER TO TYBEE � \
PLANNING AND ZONNING DEPARTMENT FOR DRIVEWAY ® !�"" '� \ - DNF FLAG#2
TP 7.3 \
OPTIONS ,\,1 \.��t, r, \ , .
. al -- • EGG ,0 l \c\\\\\\\\\\\\\
FG .0 - Y:z - ,,;. \ \ \
t
....+rte
ir'
r \
EXT G `s,` \
MATCH
.::r=. DNR
\ \ 'G
1.
PAVING
\
II`♦ f III
r
I
ELEVATION . . •. �►♦`►`r'��� ,,,,,,,,�, ,, , ,*,,,,' � `:'��` .,:..'�"�.-:;.::. : `:=::."..: :: :�;;:.;:_: :::.. .. .. . . ��,:tir ' 0.75% , 1 'r:-' .:":`'. ;.,.. ,' ...:.v,,, \\ \ \\ \ -*f----- ---►-
, .,k,, r*,,,,,,,, { .5%a WSS - -I . :# ### * 4*,, I IIII� j '��*,,*, **1111 ��t.� Al 2 ; -'�/-���,� sx i i \\\\\\1\\\\\I\\. DNR FLAG#4
. ........ �� I : \ r\\\ \\\\\\,` \
d �, - -- - - 7a m- \\\\\\\\\\\\\\\ ROOF PLAN
8-Z}
Cs)-i x r +� ---- 7 ` 70 =i r�i. : ::" _ ` \\ \�\ \\, \\
\ '\
EXISTING
-FINISHED
rn z i r ;.rn r- ,,
GRADE GRADE
;:r:'- .T.'. :;::,:.-.,:-=::;i::.'.=•.:.,,, ,-,::,. ; '':` :;- .f.':;', :: ;.''.;' \ ,\. \ DNR F VARIES 2.
'� • p t �� \\\\ \\\\\\ \\ LAG#5 .1 - T...,;, VARIES o.
CO \,\> \\\ \\\\\\
TP 3 \ 1r, ...--
',:r.1,.,,,c,:.',:,,,1::;-'t::": '..'.•:. :.: \\\\\\ _\V-\\\\\‘\\\ l/ .(rte
MATCH EXTG ,::_r .;< \
\ \
II �
f
o \
f t
PAVING - � � �/ :::''''' :::';'''`'':"1':';;'''''''''-:':ti ..: :="��= ; ':' ` ;;�'`�. ` : ='::;:a:° " , .\ \ \ �if
ELEVATION ∎41/4 41,I,I,I,I,I. ,���>I �a IIt4�+�! MII11pa,, 0.7\ >I ,' o \\t �. \\. \\ :.,, �,.:.I,, ,I;,v. 4sis y#####��#,# , - - •• .v>#� .;� '::`::::.:.': ::.: :.-. ': :: :': _ ' \ \ \ 4g.\\\ ELEVATIONS SHOWN
Si******** , /444****A04 4**** **V,SS� : : ' : : ., :-.: :.: ' ' • _ -, .-_.'jj- --- :i.,.:,•,•.:: ::, \\"4. \\\\\\\' \\\ �I ISIS•
►I►r��ilL►.i 41,46 SWALE DETAIL 44 1 };:,,,,,,:'' : ' NEW 8' WIDE DEGK _.' \\\\ • ,\\\\\\ \\\ DNR FLAG#6
i 1 . ,,„ ., ,.„, , , . . .- ._, ;:. . . ,.:,.. ,„. : .,.2 7 \\\\ \ \\ \ not to scale
*-"-8'....� 7P 7.35 _ \� \\\\\\\\\\\\\\\\
BEN I . - - , ttELEC.HfJY �� ,,.,
NAIL IN P/P ' o�� {;. \\ • \ p-____
-�-- -----
ELEV 8.45 I v� - 4 I 0' 55L k' ' -\ \ , \_ . \ \\ \'N\\DNR FLAG#'7
NAVD 1988 '
,' q'> O +�• 6� + \
�\ +�. \\\\ \\\\\ \ ,\ 22
2 6 \\\-\-`4441 `_ - \ \ 7.5' DRAINAGE a UTILITY • `+_4 1 q
+� + - + --- - 6 \\ '
+ +
r
--)II FG 1G 5.5 ,
FG 5.9 FG 5.4 FG 5.61 FG 5.4 FG 5.3
SWALE "A"
53 LF SWALE
AT 1 . 13%
PROPOSED SITE PLAN Special Pre-Construction Note
I" = I O' Contractor to verify all existing and proposed
structure locations (drainage, sanitary, etc.), NOTES:
tops and depths prior to ordering materials or
SPECIAL AVERAGE GRADE NOTES beginning construction.
1 . THE AVERAGE GRADE TO BE USED AS A BASE ELEVATION TO SET THE
I . CONTRACTOR IS TO COORDINATE ALL GAS, LIGHTING, ELECTRICAL,
BUILDING HEIGHT IS TO BE OBTAINED FROM THE TYBEE ISLAND PLANNING PHONE, CABLE AND ANY OTHER REQUIRED UTILITIES WITH THE
APPROPRIATE UTILITY AGENCIES.
AND ZONING DEPARTMENT. GENERAL DRAINAGE NOTES: FEMA MAP NOTES :
/
2. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL EXISTING
I . THIS DEVELOPMENT IS WITHIN MINIMAL ZONING AREA "AE-1 I" ACCORDING TO F.I.R.M. UTILITIES PRIOR TO COMMENCING OF CONSTRUCTION ACTIVITIES
1 . THE SITE WILL NEED TO BE GRADED AS SHOWN AND AS DICTATED BY EXISTING COMMUNITY PANEL NUMBER 1305 IC 0213 F, MAP REVISED SEPTEMBER 26, 2008 (88 LEGEND AND FOR AVOIDING CONFLICT WITH SAME. ANY DAMAGE TO
CONDITIONS WHICH CAN NOT BE FORSEEN TO ALLOW FOR PROPER DRAINAGE. DATUM), EXISTING UTILITIES SHALL BE REPAIRED AT THE EXPENSE OF THE
2. OUTFALL FOR THE PROJECT WILL BE DICTATED BY EXISTING CONDITIONS WITHIN THE ITEM EXISTING PROPOSED CONTRACTOR.
SPECIAL BUILDING GUI 1�ER NOTES : CITY OF TYBEE EXISTING DRAINAGE SYSTEM AND EASEMENTS. 2. CONTRACTOR IS TO VERIFY FEMA ELEVATIONS PRIOR TO
ANY CONSTRUCTION ACTIVITIES. 3. CONTRACTOR IS TO COORDINATE ALL DEMOLITION WORK WITH
1 . A BUILDING GU FI ER SYSTEM AS SHOWN ON THE PLANS SHALL BE UTILIZED TO
ENSURE THAT ALL ROOF RUN-OFF IS DIRECTED TO THE TYBEE ISLAND RIGHT TOPO ,`, FG THE OWNER. ALL ITEMS NOT TO BE RELOCATED OR GIVEN TO THE
OWNER WILL BECOME THE PROPERTY OF THE CONTRACTOR.
OF WAY. CONTOURS -12- 4. REMOVE ALL UNDERGROUND UTILITIES NOT TO BE UTILIZED.
2. BUILDING DESIGNER SHALL SIZE GUTTER SYSTEM TO CONVEY A 25 YEAR (MIN) GENERAL BUILDING INFORMATION NOTES: SPECIAL BUILDING SET BACK LINE DO NOT ABANDON UTILITIES IN PLACE.
NOTES . FLOW -..It- - - - -.- .....,,,,i____................
STORM EVENT (8" PER HOUR). I . THE BUILDING OUTLINE SHOWN ON THE PLANS IS ASSUMING THE MOST 5. REMOVE ALL TREES AS NECESSARY FOR PROPOSED
I . PROPOSED BUILDING FINISHED FLOOR ELEVATIONS ARE TO BE 5ET AS PER FEMA OUTSIDE PART OF THE BUILDING. ARROWS CONSTRUCTION.
3. INCREASED STORM WATER RUN-OFF DUE TO NEW IMPERVIOUS AREAS WILL FLOOD STUDY MAPS AND AS PER THE CITY OF TYBEE ISLAND, GEORGIA ORDINANCES.
NOT BE ALLOWED TO IMPACT ADJACENT PROPERTIES. TOP OF G. PREVENT DAMAGE TO EXISTING TREES WHERE POSSIBLE.
2. PROPOSED BUILDINGS ARE TO BE SUPPORTED ON PIERS OK FOUNDATIONS 2. THE MOST OUTSIDE PART OF THE BUILDING INCLUDES ALL SIDING, PARKING TPS
WHICH WILL SATISFY FEMA ELEVATION AND FEMA ZONE REQUIREMENTS AS WELL AS SHUTTERS, GU TIERS, DOWNSPOUTS, DOWNSPUT BOOTS, TRIM WORK OF SLAB 12.30 X TREES TO BE REMOVED.
4. CONSULT TYBEE ISLAND PLANNING AND ZONING DEPARTMENT REGARDING TYBEE ISLAND REQUIREMENTS. ANY KIND OR TYPE OF COVERING OR AESTETIC PART OF THE BUILDING.
REQUIREMENTS OF GUT I ERS, DOWNSPOUTS AND DOWNSPOUT BOOTS AND
HOW BUILDING SET BACK LINES ARE IMPACTED BY THE GU TIER AND 3. CONTRACTOR IS TO COORDINATE BUILDING WITH THE OWNER AND EASEMENT NOTES:
DOWNSPOUT SYSTEM PRIOR TO CONSTRUCTION. ARCHITECT TO MAKE SURE THAT NO PART OF THE BUILDING, WITH THE 1. THE OWNER, ENGINEER AND SURVEYOR ARE TO COORDINATE TRAFFIC AND RIGHT-OF-WAY NOTES:
EXCEPTION OF THE OVERHANG, PROTRUDES OUTSIDE OF THE BUILDING ALL EASEMENTS PRIOR TO FINAL PLAT APPROVAL AND
\
RECORDING.
I . ALL ROAD CLOSINGS, DETOURS AND ETC. ARE TO BE
SET BACK LINE VERTICALLY FROM THE GROUND LINE TO THE BO(IOM OF 2. ALL DRAINAGE EASEMENTS TO BE PRIVATELY MAINTAINED. COORDINATED WITH THE CITY OF TYBEE ISLAND, GEORGIA
SPECIAL AE AND Ve ZONE NOTES : THE ROOF OVERHANG. GUTTER SYSTEM IS TO BE INCLUDED AS PART OF PERSONNEL.
I. BUILDINGS IN 'AE ZONES ARE TO HAVE THE FINISHED FLOOR SETA THE ALLOWED OVERHANG.
STREAM BUFFER ENCROACHMENT NOTES : MINIMUM OF I'ABOVE FLOOD.
2. ANY AND ALL NECESSARY PERMITS MUST BE OBTAINED
4. CONSULT THE TYBEE PLANNING AND ZONING DEPARTMENT FOR BUILDING FROM THE CITY OF TYBEE ISLAND PRIOR TO COMMENCEMENT
2. BUILDINGS IN"VE"ZONES ARE TO HAVE THE LOWEST HORIZONTAL OF ANY WORK WITHIN RIGHT-Of-WAY.
1 . NEW STRUCTURES ON THIS PROJECT DO NOT STRUCTURAL MEMBER SETA MINIMUM OF I'ABOVE FLOOD. SET BACK LINE REQUIREMENTS IF A GUTTER SYSTEM IS UTILIZED AND FOR ,
ENCROACH IN THE 25 OR 50 FOOT STREAM 3. BUILDINGS IN AE AND VE ZONES ARE TO HAVE ALL ELECTRICAL, PLUMBING, DOWNSPOUTS, DOWNSPOUT BOOTS, FIREPLACES, ELEVATOR SHAI-I S,
BUFFER. HVAC, DUCTWORK AND OTHER EQUIPMENT TO BE A MINIMUM OF I'ABOVE ROOF DECKS, STAIRS AND AC COMPRESSORS.
Survey Information
2. NON-EXEMPT ACTIVITIES SHALL NOT BE 4. FLOOD VENTS ARE REQUIRED IN"AE"ZONES AND ARE TO HAVE I SQUARE 5. CONSULT THE TYBEE PLANNING AND ZONING DEPARTMENT FOR BUILDING
INCH/SQUARE FOOT OF FLOOR PLAN AREA WITH A MINIMUM ROUND SET BACK LINE REQUIREMENTS IF A SPREAD FOOTING !S USED. Survey : Reynolds Surveying
CONDUCTED WITHIN THE 25 OR 50 FOOT OPENING OF 3",A MINIMUM OF 2 OPENINGS WITH ALL OPENINGS EVENLY
SPACED AROUND PERIMETER. BOTTOM OF OPENING SHALL BE 12"OR.LESS Date of Survey : Dec. 20 12
STREAM BUFFER AS MEASURED FROM THE ABOVE ADJACENT GRADE. G. CERTIFICATE OF OCCUPANCY WILL NOT BE GRANTED IF ANY PART OF THE SPECIAL CONSTRUCTION NOTE:
POINT OF WRESTED VEGETATION WITHOUT 5. BREAK AWAY WALLS ARE REQUIRED IN "VE"ZONES. BUILDING (INCLUDING SIDING, SHUTTERS, GUTTERS, DOWNSPOUTS, Datum : NAVD 1988
FIRST OBTAINING THE NECESSARY VARIANCES
G.COORDINATE 5ITE WORK AND FINISHED FLOOR ELEVATIONS WITH DOWNSPOUT BOOTS, TRIM, WATER TABLE OR ANY AESTECTIC WORK, IF THE CONTRACTOR KNOWS OR CAN REASONABLY BE EXPECTED TO HAVE KNOWN
AND PERMITS. ARCHITECTURAL PLANS TO MAKE SURE BUILDING ELEVATIONS ARE SET AS PER
CODE ETC.) EXTENDS OVER THE BUILDING SET BACK LINE WITHOUT A VARIANCE. Of AN ERROR, DISCREPANCY OR CONFLICT IN THE PLANS, SPECIFICATIONS OR SCALE: I" = 10'
CONSTRUCTION STAKING AND FAILS TO REPORT THE PROBLEM PRIOR TO
CONSTRUCTION, HE SHALL NOT BE ENTITLED TO COMPENSATION FOR ANY WORK OR _--------"-°-- ---"-
EXPENSE INCURRED BY HIM FOR WORK REQUIRED TO BE RE-CONSTRUCTED BECAUSE OF 0 1 0' 20' 25
SAID ERROR, DISCREPANCY OR CONFLICT.