HomeMy Public PortalAboutEIGHTEENTH ST_14 ' ti y
i
Y Fk?'`j\'2j\ ®a�
o\ City or Tybee Island • Planning & Zoniny Dept. SPX
\i; _
i Inspection Report ort
mas
® �
:`�i 403 Butler Ave. • P.O. Box 2749 • Tybee Island i GA 31328 INTERNI0NA
L
v`:,rn��f
Phone 912.472.5032 • Fax 912.786.9539 CODE COUNCIL
MEMBER
� / ,
Permit No. J_J -U'7?"I Date Requested (%it'/`,__,
Owner's Name 1./1s//4JJ, Date Needed
Gen. Contractor /±.. Subcontractor
Contact Information
Project Address /` /� / -1z ,r
Scope of Work F----/---- -ii'4 ,' -, ,- 'c
Inspector Date of Inspection
Inspection Y /= J4-f - Pass 'p lap® Fee
r
Inspection Pass 0 Fail 0 Fee
Inspection Pass 0 Fail ❑ Fee
Inspection Pass 0 Fail 0 Fee
2013-02-05 08:49 ACE ROOFING 9127283945» 912 786 9539 P 1/1
/ 3-0077 a49-(,5- 0
°� ". City of Tybee Island, Georgia
',f'\ 912-472-5033 or 912-472-5031 -Fax 912-786-9539
APPLICATION FOR BUILDING PERMIT
Property Address: 1 -1 1A\ � 77Jbee 15164Aci •
Name Mailing Address Tele•hone
1�t
l 'ci4f1 s4 Home: ) - '74/14-1
Owner, . . . , ; CP 1 \S Cell: 3 3-S '5 ri
Architect or
Engineer
C�- lam..A v.9 ..TT(751 iLa ii.q t7 Office: 5 Lt'3 1
Contractor 7Ct Cell: • • 7-c/(o
(Check all that apply)
Single Family Discovery/Tearout ❑ Demolition of Structure
• Duplex ❑ Footprint Changes- El Other
❑ Multi-Family units new_square feet
❑ Commercial units) /�c heated/cooled
Details of Project: -C• let_S 90-----1--Cc'). •
•
Estimated Cost of Construction:$ "f b • (materials+labor+profit/overhead)
If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon
the scope of the work,two sets of construction drawings and/or a site plan may be required.
Year Built: Listed on National Historic Register or located within a National Historic District? Y I N
"Buildings older than 50 years may be eligible to be listed on the State/National Register. With this designation,you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
Also see the Tybee Island Land Development Code Article 14: Historic Preservation
On- eere, troom fac Mies will be provided through . Construction debris will be disposed
by t.. Y by means of ((1 LALUO l.rtL L, I understand that I must comply with zonino,flood
dame•a control buildi r= sh• = •r. ten'. -n. a 4.- • •r.'1 • .: ,,,;, r=,• _ ;-n- and all applicable codes and
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective action that
may be necessary to restore drainage impaired by this rmitted --- •
it
Date: (W5/13 Signature of Appf nt:
FEES
Tt Permit
Printed Name ..ra'7R#�.. �srt._ Inspections
Note; A Permit normally takes 7 to 10 days to Process Cap Cost Rec
Water Tap
Approvals: Signsere�� Eng. Fees
, _ Date Sewer Stub
Q
Planning&Zoning Manager
Building Official Aid to Const
Water/Sewer ,
Storm/Drainage -
City Manager
TOTAL
2013-02-05 08:47 ACE ROOFING 9127283945» 912 786 9539 P 1/1
LEAD-BASED PAINT RRP RULES
Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform
renovation, repairs, and painting jobs in pre-1978 housing and child-occupied facilities must, before beginning
work, provide owners, tenants, and child-care facilities with a copy of EPA's lead hazard information pamphlet
Renovate Right:important Lead Hazard information for Families, Child Care Providers, and Sci~tool .
Contractors must document compliance with this requirement. After April 22, 2010,federal law will require you
to be certified and to use lead-safe work practices. Georgia Environmental Protection Division Lead-Based
Paint and Asbestos Program (404) 363-7026.
Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator
When disturbing lead-based painted or coated surfaces or components more than 8 ft2 per interior
room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size.
****************** **•
Asbestos/Environmental Notification to Georgia EPD for
Projects Involving Dgrnolillgn. Wrecking. or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission
to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a
structure prior to the filing of any required ten (10) day "Protect Notification for Asbestos Renovation
Encapsulation or Demolition" fon in accordance with the Georgia Asbestos Rules. The. Georgia
Environmental Protection Division adtninisters the rules. In most cases, the rules require both the owner and
the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by
an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before
renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the
building. Further guidance for regulatory compliance and contact telephone numbers are previdud by the
brochures entitled Asbestos&Renovation and Asbestos and Demolldoit Other environmental issues such
as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have
EPD regulations that could affect the project.
******* **** ***** *****
BMPs
While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility.
Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 —
Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment
Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission;
http://www.gaswcc.org/does/field_rnanual_4ed.pdf.
Problems with the Co is not limited to the installation, but to material. The stone will be a representation of
1.5"-3.5" stone or larger.
Type A sediment barriers have been installed where Type C is required and shown on the permit drawings.
Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall
over) without impacting the second one. The complete assembly and installation must be compliant; steel or
wood sts, post spacing, ype C or A.
Signs re for receipt of Le Paint, Asbestos, and BMP notices. Date
f ,
Y OW •.
Printed Name