Loading...
HomeMy Public PortalAboutEIGHTEENTH ST_14 ' ti y i Y Fk?'`j\'2j\ ®a� o\ City or Tybee Island • Planning & Zoniny Dept. SPX \i; _ i Inspection Report ort mas ® � :`�i 403 Butler Ave. • P.O. Box 2749 • Tybee Island i GA 31328 INTERNI0NA L v`:,rn��f Phone 912.472.5032 • Fax 912.786.9539 CODE COUNCIL MEMBER � / , Permit No. J_J -U'7?"I Date Requested (%it'/`,__, Owner's Name 1./1s//4JJ, Date Needed Gen. Contractor /±.. Subcontractor Contact Information Project Address /` /� / -1z ,r Scope of Work F----/---- -ii'4 ,' -, ,- 'c Inspector Date of Inspection Inspection Y /= J4-f - Pass 'p lap® Fee r Inspection Pass 0 Fail 0 Fee Inspection Pass 0 Fail ❑ Fee Inspection Pass 0 Fail 0 Fee 2013-02-05 08:49 ACE ROOFING 9127283945» 912 786 9539 P 1/1 / 3-0077 a49-(,5- 0 °� ". City of Tybee Island, Georgia ',f'\ 912-472-5033 or 912-472-5031 -Fax 912-786-9539 APPLICATION FOR BUILDING PERMIT Property Address: 1 -1 1A\ � 77Jbee 15164Aci • Name Mailing Address Tele•hone 1�t l 'ci4f1 s4 Home: ) - '74/14-1 Owner, . . . , ; CP 1 \S Cell: 3 3-S '5 ri Architect or Engineer C�- lam..A v.9 ..TT(751 iLa ii.q t7 Office: 5 Lt'3 1 Contractor 7Ct Cell: • • 7-c/(o (Check all that apply) Single Family Discovery/Tearout ❑ Demolition of Structure • Duplex ❑ Footprint Changes- El Other ❑ Multi-Family units new_square feet ❑ Commercial units) /�c heated/cooled Details of Project: -C• let_S 90-----1--Cc'). • • Estimated Cost of Construction:$ "f b • (materials+labor+profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work,two sets of construction drawings and/or a site plan may be required. Year Built: Listed on National Historic Register or located within a National Historic District? Y I N "Buildings older than 50 years may be eligible to be listed on the State/National Register. With this designation,you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. Also see the Tybee Island Land Development Code Article 14: Historic Preservation On- eere, troom fac Mies will be provided through . Construction debris will be disposed by t.. Y by means of ((1 LALUO l.rtL L, I understand that I must comply with zonino,flood dame•a control buildi r= sh• = •r. ten'. -n. a 4.- • •r.'1 • .: ,,,;, r=,• _ ;-n- and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this rmitted --- • it Date: (W5/13 Signature of Appf nt: FEES Tt Permit Printed Name ..ra'7R#�.. �srt._ Inspections Note; A Permit normally takes 7 to 10 days to Process Cap Cost Rec Water Tap Approvals: Signsere�� Eng. Fees , _ Date Sewer Stub Q Planning&Zoning Manager Building Official Aid to Const Water/Sewer , Storm/Drainage - City Manager TOTAL 2013-02-05 08:47 ACE ROOFING 9127283945» 912 786 9539 P 1/1 LEAD-BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre-1978 housing and child-occupied facilities must, before beginning work, provide owners, tenants, and child-care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right:important Lead Hazard information for Families, Child Care Providers, and Sci~tool . Contractors must document compliance with this requirement. After April 22, 2010,federal law will require you to be certified and to use lead-safe work practices. Georgia Environmental Protection Division Lead-Based Paint and Asbestos Program (404) 363-7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead-based painted or coated surfaces or components more than 8 ft2 per interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. ****************** **• Asbestos/Environmental Notification to Georgia EPD for Projects Involving Dgrnolillgn. Wrecking. or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Protect Notification for Asbestos Renovation Encapsulation or Demolition" fon in accordance with the Georgia Asbestos Rules. The. Georgia Environmental Protection Division adtninisters the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are previdud by the brochures entitled Asbestos&Renovation and Asbestos and Demolldoit Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. ******* **** ***** ***** BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http://www.gaswcc.org/does/field_rnanual_4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5"-3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or wood sts, post spacing, ype C or A. Signs re for receipt of Le Paint, Asbestos, and BMP notices. Date f , Y OW •. Printed Name