HomeMy Public PortalAboutVETERANS DR_21CITY OF TYBEE ISLAND
BUILDING PERMIT
ADDED SCOPE & VALUE
DATE ISSUED: 02 -11 -2013
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
REPAIR BACK ROOM
21 VETERANS DR
TYBEE ISLAND POST NO 154, INC
PO BOX 1225
TYBEE ISLAND GA 31328 -1225
912 - 786 -5356
CATSKILL BUILDERS, INC.
210 CATALINA DR.
TYBEE ISLAND GA 31328
U
$ 234.00
PIN #4- 0002 -05 -008
PROJECT VALUATION $12,860.00
$2,860 for spray foam
PERMIT #: 130090
TOTAL BALANCE DUE: $ 32.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
pi
Property Address: /\---c-
City of Tybee Island, Georgia
912 - 472 -5033 or 912 - 472 -5031 - Fax 912 - 786 -9539
APPLICATION FOR BUILDING PERMIT
fl Single Family
❑ Duplex
❑ Multi - Family units
❑ Commercial units
Details of Project:
(Check all that apply)
n Discovery/Tearout
❑ Footprint Changes —
new _ square feet
heated /cooled
❑ Demolition of Structure
❑ Other
K_:■ 4 c-et --,
Estimated Cost of Construction: $ 60 s (materials + labor + profit/overhead)
If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and /or a site plan may be required.
Year Built: Listed on National Historic Register or located within a National Historic District? Y / N
* Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
*Also see the Tybee Island Land Development Code Article 14: Historic Preservation
During construction:
On -site restroom facilities will be provided through e -N ',,. . Construction debris will be disposed
by Cw?-xt-■v\ by means of D,.-,,,p -1...,,t_ . I understand that I must comply with zoning, flood
damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective action that
may be necessary to restore drainage impaired by this permitted construction.
Date: bt l \ 3 Signature of Applicant:
Printed Name A } kr,
Note: A permit normally takes 7 to 10 days to process
Approvals: Signature
Planning & Zoning Manager
Building Official
Water /Sewer
Storm /Drainage
City Manager
Date
FEES
Permit
Inspections
Cap Cost Rec
Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
TOTAL 32, °°
Name
Mailing Address
Telephone
Owner
Av.&-C C^
5
I
Home:
Cell:
Architect or
Engineer
_—
Contractor
���\
Officeqb 1 brad
Cell: 4v • )it -loin
fl Single Family
❑ Duplex
❑ Multi - Family units
❑ Commercial units
Details of Project:
(Check all that apply)
n Discovery/Tearout
❑ Footprint Changes —
new _ square feet
heated /cooled
❑ Demolition of Structure
❑ Other
K_:■ 4 c-et --,
Estimated Cost of Construction: $ 60 s (materials + labor + profit/overhead)
If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and /or a site plan may be required.
Year Built: Listed on National Historic Register or located within a National Historic District? Y / N
* Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
*Also see the Tybee Island Land Development Code Article 14: Historic Preservation
During construction:
On -site restroom facilities will be provided through e -N ',,. . Construction debris will be disposed
by Cw?-xt-■v\ by means of D,.-,,,p -1...,,t_ . I understand that I must comply with zoning, flood
damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective action that
may be necessary to restore drainage impaired by this permitted construction.
Date: bt l \ 3 Signature of Applicant:
Printed Name A } kr,
Note: A permit normally takes 7 to 10 days to process
Approvals: Signature
Planning & Zoning Manager
Building Official
Water /Sewer
Storm /Drainage
City Manager
Date
FEES
Permit
Inspections
Cap Cost Rec
Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
TOTAL 32, °°
LEAD -BASED PAINT RRP RULES
Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform
renovation, repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning
work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information pamphlet
Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools.
Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you
to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based
Paint and Asbestos Program (404) 363 -7026.
Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator
When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior
room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size.
* * * * * * * * * * * * * * * * * * * **
Asbestos /Environmental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission
to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a
structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation
Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia
Environmental Protection Division administers the rules. In most cases, the rules require both the owner and
the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by
an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before
renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the
building. Further guidance for regulatory compliance and contact telephone numbers are provided by the
brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such
as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have
EPD regulations that could affect the project.
* * * * * * * * * * * * * * * * * * * **
BMPs
While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility.
Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 —
Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment
Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission;
http:// www. gaswcc .org /docs /field_manual_4ed.pdf.
Problems with the Co is not limited to the installation, but to material. The stone will be a representation of
1.5 " -3.5" stone or larger.
Type A sediment barriers have been installed where Type C is required and shown on the permit drawings.
Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall
over) without impacting the second one. The complete assembly and installation must be compliant; steel or
wood posts, post spacing, Type C or A.
Signature for recei of `L Asbestos, and BMP notices. Date
9 ,
A
Printed Name
i
y
`° y
c v '
4111 iv-)
CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 02-11-2013 PERMIT#: 130090
WORK DESCRIPTION REPAIR BACK ROOM
WORK LOCATION 21 VETERANS DR—PIN#4-0002-05-008
OWNER NAME TYBEE ISLAND POST NO 154, INC
ADDRESS P.O.BOX 1225
CITY,ST,ZIP TYBEE ISLAND GA 31328
PHONE NUMBER 912-786-5356
CONTRACTOR NAME CATSKILL BUILDERS,INC.
ADDRESS 210 CATALINA DR.
CITY STATE ZIP TYBEE ISLAND GA 31328
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE U
TOTAL FEES CHARGED $202.00
PROPERTY IDENTIFICATION#
PROJECT VALUATION $10,000.00
TOTAL BALANCE DUE: $202.00
It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire,soil
and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including all
environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
0
Signature of Building Inspector or Authorized Agent: i
P.0.Box 2749-403 Butler Avenue,Tybee Island,Georgia 31328
(912)786-4573-FAX(912)786-9539
■ww.cityoftybee.org
tlk,
City of Tybee Island • Planning & Zoning Dept.
Inspection Report inaltik
'-*I ' elliiima
..',/, 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 INTERZTONAL
Phone 912.472.5032 • Fax 912.786.9539 CODE COUNCIL
MEMBER
Permit No. , , , Date Requested /
) , /
Owner's Name -,-. //,- , , . " `.. _ ,,,/,,,,,,i Date Needed /.7 ,
-'t 2. / -;
Gem Contractor /:.:47-7/74-..:4,/i Subcontractor
Contact Information
- , _ ) _
Project Address ,
/
Scope of Work 1
' - ,-, , , , F-_,j,, ,( (,„) 1
Inspector Date of Inspection
, - ■
Inspection / ,1-- /- ./
Pass 0 Fi'l Fee
YAis,
Inspection i211 - Pass ErvF—:7-- Fee
j(227,-x,
Inspection t_. /-- Pass Fee
- J4--;iii-) )
Inspection Pass 0 Fail 0 Fee
-Lf r, 0 -
��, City of Tybee Island • Planning & Zoning Dept. iri�7► ,
9 Inspection Report :in
',7s i 1- i
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 IN7[RNMNAL
°�F Phone 912.472.5032 • Fax 912.786.9539 CODE COUNCIL
/ MEMBER
Permit No. ;' �; ._, . ��.��,�'- Date Requested 0-549%013
Owner's Name , , ,(A," :--f:'; Date Needed -3,/,917//5
Gen. Contractor -�
Subcontractor ,F=i?��-�
Contact Information
Project Address c2 i ),. .e /1,. ,Q-
Scope of Work /.7A/--(4-6(.:41
p
Inspector it ■ Date of Inspection 7. 7/(... su_
Inspection I F Pass 0 Fail Ell Fee t. Jl
M
--, rJ CE:55
I
1
Inspection Pass ❑ Fail ❑ Fee
Inspection Pass 0 Fail ❑ Fee
Inspection Pass 0 Fail ❑ Fee
/ _ 011 City of Tybee Island • Planning & Zonm6 Jept. hl
.""%t.
I Inspection Report ®��`
\ , 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 INTERNATIONAL
j
`a = Phone 912.472.5032 • Fax 912.786.9539 CODE COUNCIL
MEMBER
Permit No. ) `" 7u Date Requested 00/�I) J
Owner's Name / ('/d/V Date Needed &3//3//3
Gen. Contractor Subcontractor
Contact Information
f'
Project Address ) //7&e ^J-6 1),'a
Scope of Work dec4/2 /, 3g LA fir'd6IA-
.PsV
Inspector /7 t)1 Date of Inspection _44 b '4
Inspection ' Pass 13--- Fail El Fee
/ was ._
Inspection ( e fg-in//VC, Pass m° a ,l� Fee
i �.
-
l / G -
Y ,. ',�>/ /VA,: ;v�
Inspection' Pass 0 Fail El Fee
Inspection Pass ❑ Fail 0 Fee
�y wL, j3 -0 0 q 0 City of Tybee Island, Georgia
cif ,
h � 912-472-5033 or 912-472-5031 - Fax 912-786-9539
ill
APPLICATION FOR BUILDING PERMIT
Property Address: � `7 urE -0�� ' OS�. 011.
Name Mailing Address Telephone _
Home:
Owner frNl %Low L-Setffolj �u V>i )s Cell:
Arc ' ect or 1,0 3 NHS v Oet t,/E.
gineer MA 42-1C ,af c.c� SAWR-N)J R-4 c-tA • $`i"I - (pst 3 Z
Office:
Contractor 51 ju - Cell: Zto - i 01-1
(Check all that apply) Job/ bb0-1I37�°'
❑ Single Family El Discovery/Tearout El Demolition of Structure
❑ Duplex ❑ Footprint Changes- ❑ Other
❑ Multi-Family units new square feet
[Commercial units heated/cooled
"
O
Details of Project: R& 0€)--- I S'- 3 K 19.,1-D (Z,00...,. - j at)%sq./5 t
Estimated Cost of Construction: $ LO DO° • Oo (materials + labor + profit/overhead)
If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and/or a site plan may be required.
Year Built: Listed on National Historic Register or located within a National Historic District? Y / N
*Buildings older than 50 years may be eligible to be listed on the State/National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
*Also see the Tybee Island Land Development Code Article 14: Historic Preservation
During construction: / 8vlLb144c'
On-site restroom facilities will be provided through ON 'Si-re-- Ii- . Construction debris will be disposed
by CA'1XY.-"`-L- by means of Du S-C€ /. I understand that I must comply with zoning, flood
damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective action that
may be necessary to restore drainage impaired by this permitted construction.
Date: 1-25- 1$ Signature of Applicant: lA...9- .a--J2-12-- e°22 SEES
Printed Name MRri2-1L Qs-ostA9 Permit
Inspections
Note: A permit normally takes 7 to 10 days to process Cap Cost Rec
Water Tap
Approvals: Signat re Date Sewer Stub
Planning &Zoning Manager 1111_.,�,�_ �.0 a - 11- 13 Eng. Fees
Building Official s-/it4e' Aid to Const.
Water/Sewer A� -
Storm/Drainage
City Manager
TOTAL
LEAD-BASED PAINT RRP RULES
Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform
renovation, repairs, and painting jobs in pre-1978 housing and child-occupied facilities must, before beginning
work, provide owners, tenants, and child-care facilities with a copy of EPA's lead hazard information pamphlet
Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools.
Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you
to be certified and to use lead-safe work practices. Georgia Environmental Protection Division Lead-Based
Paint and Asbestos Program (404) 363-7026.
Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator
When disturbing lead-based painted or coated surfaces or components more than 6 ft2 per interior
room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size.
* * * * * ***** * ** * * * * * * **
Asbestos/Environmental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission
to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a
structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation
Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia
Environmental Protection Division administers the rules. In most cases, the rules require both the owner and
the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by
an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before
renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the
building. Further guidance for regulatory compliance and contact telephone numbers are provided by the
brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such
as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have
EPD regulations that could affect the project.
* * * * * * * *** * ** * * * * * * * *
BMPs
While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility.
Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 —
Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment
Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission;
http://www.gaswcc.org/docs/field_manual_4ed.pdf.
Problems with the Co is not limited to the installation, but to material. The stone will be a representation of
1.5"-3.5" stone or larger.
Type A sediment barriers have been installed where Type C is required and shown on the permit drawings.
Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall
over) without impacting the second one. The complete assembly and installation must be compliant; steel or
wood posts, post spacing, Type C or A.
Signature for receipt of Lead Paint, Asbestos, and BMP notices. Date
Printed Name
BLOCKING AT t LU(:(JNC-,Al v..wr.n v.-..
1/3 SPAN I/3 ,' N I/3 SPAN
rill __ G- - `--
—v 5.+-,.---1,
11} ___,_
_,...‘ . ....-_________
REPAIR HEADER 1--� \,
T ' } I + 9 ■ 1110, p11��I r� rl ff1 �i ���•
------.- ----------- - -- -= -----------+-
oomphl with Th . etlonel El , to
STORAGE I - ---- I ..,. .,.•„'t, Ion and -
------------ ------- ------------' et(Willi Ant 1 month .
ROOM !
� I N
I
o
DOUBLE JOISTS AT --- -=---- ---- ,-------- -- ----------I- to
STRONGBACK 1
,
� `� � � '�>_____ ----- - -------1- BLOCKING
1
cPe sots`° CLOSET ALL WIRIP _ • --_=
1
- -- ---- PRIVATE — -------------4 SERVICE I LUDm
---------- - DI NG MUST @E 7 ) PER t
''`, -- --- --- I------- -�-�_ it
Rp ALU M ALLOWE'I? A
-- _-- WIT ' ;CEILI ' _--- Section 9
\ H ,,,k.,; �';i► eat3on B-SI-A
--`� lybee Land De • :IopmsM tide
rig r�
O STORAGE -- --------- --------- -------------t MEETING
ar` �� i ROOM
a'` �� ROOM 1------- --=---- ------- , -----------1
I .,g . 1
7'.c . 3ci 3_
R CODE COOLI 1--------------------1 BAR AND
------------------; GRILL AMERICA
is been made to identify L ----- ROOM ROOM FRA
no oversight by the
be construed a• authority 15'-3"
noel, alter or .et aside "..■ BOSWEI., ., DESK
codes or ordinances. The
*4+ chnimld not •e construed FRAMING PLAN 103 NAS
SAVANNAH.C