HomeMy Public PortalAboutTENTH ST_5 CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 02-27-2013 PERMIT#: 130125
WORK DESCRIPTION FOUNDATION REPAIR
WORK LOCATION 5 TENTH ST—PIN#4-0006-15-005
OWNER NAME BRIAN CURRAN
ADDRESS 331 PLANTATION VIEW LN
CITY,ST,ZIP MOUNT PLEASANT SC 29464-6228
PHONE NUMBER
CONTRACTOR NAME RAM JACK
ADDRESS 2075 US HWY 21 S
CITY STATE ZIP RIDGEWAY,SC 29130
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 87.00
PROPERTY IDENTIFICATION#
PROJECT VALUATION $5,040.00
TOTAL BALANCE DUE: $ 87.00
It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire,soil
and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including all
environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent: Of 4421—
P.O.Box 2749-403 Butler Avenue,Tybee Island,Georgia 31328
(912)786-4573-FAX(912)786-9539
www.cityoftybee.org
etfiNcl City _i Tybee Island • Planning & Zoning Dept.
,T-rtirkk,
=wag.
. ,\ Inspection Report Kira
r....a.
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
INTERNATIONAL
Phone 912.472.5032 • Fax 912.786.9539 CODE COUNCIL!
MEMBER
Permit No. I _,..7 - ,_,),/ 7.‹,— Date Requested q/4:)/41'' ,
Owner's Name jr„),L.--%- f,-/ Date Needed
Gen. Contractor '- ; , --,_- _,_, Subcontractor
Contact Information ,,A.),>>7 __' ..).„3- -3 23 -277
-il-- - -----=--- j.4 i ----
Project Address
Scope of Work
Inspector Date of Inspection Q ikS■Ss
----,
Inspection I -r_i'l /---- ,._4 /_ Pass El- Fai Fee
Inspection Pass El Fail 0 Fee
Inspection Pass El Fail 0 Fee
Inspection Pass 0 Fail 0 Fee
g xc N"Ea. City of Tybee Island • Planning & Zoning Dept. ��
'` ''I Inspection Report um*
, 403 Butler Ave. •• P.O. Box 2749 •• Tybee Island, GA 31328 wi °
y INTERNATIONAL
`''
— �,, Phone 912.472.5032 • Fax 912.786.9539 CODE COUNCIL'
MEMBER
Permit No. 0 - „71,?5, Date Requested :I?J�//
f
Owner's Name (.-_-__7(. 7"-/-1,,- Date Needed �/</rte
Gen. Contractor L2 / , .. Subcontractor
Contact Information ,_-, 4,i - 2Z -‘? 77`7
Project Address - y,J4/i -�
Scope of Work 1.-e. .2,-..,7,,,.)/7)----7.e. �_9 i�:7--__ 4 .
Inspector %/q Date of Inspecti. fi \- V-i 2 /i
Inspection ,//;._
Pass all El Fee
Inspection Pass ❑ Fail ❑ Fee
Inspection Pass ❑ Fail ❑ Fee
Inspection Pass 0 Fail ❑ Fee
Cc- \ffictiJ 13-0x72. 3410.col ,±9 2/20
s :.., City of Tybee Island, Georgia
9: , Kit 1) ti-c( Ave, 912-472-5033 or 912-472-5031 - Fax 912-786-9539
« `
( qfl-) fll5o3o APPLICATION FOR BUILDING PERMIT
Property Address: I D ()f- J1 I 10ft island CIA " ,32' 7-000 ~/5"-ooc
Name Mailing Address Telephone
Home:
Owner mar) Cu(rail 5col e az,p t `1 add . cell: -7 N.-971/1"
Architect or
Engineer
�ctrYl 04,-,x, b U� US. y Cell: X636-N
Contractor 'L 7�j �f yvy ��� Cell:
St. 3`7-3Zo�
(Check all that apply) �i�3 ..,
Single Family ❑ Discovery/Tearout ❑ Demolition of Structure
Duplex ❑ Footprint Changes— Other Ye/�(dLII l/
❑ Multi-Family units new square feet /
❑ Commercial units heated/cooled
Details of Project: kIWI 11+a 1LC. a, rvx0,14d-t(y I erem) d I444 5 15 ,lrylati)Yl
A it - . k 2_1__' lA.D1 k • t • a ...A. I A _.• l l • • , .2 • • i..
4
.W e■ 3 e cL.'u el I l ift l etrh Oa c IL '.I\.P 5 -1vnl ba bea r f rub&- i stab! I?Ze Se-1J-1e n ct--0 .(;A scope o,FLo�1[. I`s a�-l-achcc()Estimated Cost of Construction: $ yv , U0 (materials + labor+ profit/overhead)
If a pp licable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and/or a site plan may be required.
Year Built: Listed on National Historic Register or located within a National Historic District? Y / N
*Buildings older than 50 years may be eligible to be listed on the State/National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
*Also see the Tybee Island Land Development Code Article 14: Historic Preservation
During construction:
On-site restroom facilities will be provided through . Construction debris will be disposed
by by means of . I understand that I must comply with zoning, flood
damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective action that
may be necessary to restore drainage impaired by this permitted construction.
Date: ZJ Zol/3 Signature of Applicant: el i 0 ALA. FEES
Printed Name ( ry5 Gt I 1 4-e�' Permit
Inspections
Note: A permit normally takes 7 to 10 days to process Cap Cost Rec
Water Tap
Approvals: Signatu a Date Sewer Stub
Planning &Zoning Manager Z -21-L3 Aid to Const.
Fees
Building Official Aid to
Water/Sewer
Storm/Drainage
City Manager
TOTAL
LEAD-BASED PAINT RRP RULES
Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform
renovation, repairs, and painting jobs in pre-1978 housing and child-occupied facilities must, before beginning
work, provide owners, tenants, and child-care facilities with a copy of EPA's lead hazard information pamphlet
Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools.
Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you
to be certified and to use lead-safe work practices. Georgia Environmental Protection Division Lead-Based
Paint and Asbestos Program (404) 363-7026.
Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator
When disturbing lead-based painted or coated surfaces or components more than 6 ft2 per interior
room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size.
* ** * * * * * * * * * * * * * * * * * *
Asbestos/Environmental Notification to Georgia EPD for
Proiects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission
to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a
structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation
Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia
Environmental Protection Division administers the rules. In most cases, the rules require both the owner and
the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by
an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before
renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the
building. Further guidance for regulatory compliance and contact telephone numbers are provided by the
brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such
as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have
EPD regulations that could affect the project.
* * * * * * * * ** * * * * * * * * * * *
BMPs
While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility.
Two areas of deficiencies are in the most basic and common BMPs; Co - Construction Exit and Sd1 -
Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment
Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission;
http://www.gaswcc.orgiclocs/field_manual_4ed.pdf.
Problems with the Co is not limited to the installation, but to material. The stone will be a representation of
1.5"-3.5" stone or larger.
Type A sediment barriers have been installed where Type C is required and shown on the permit drawings.
Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall
over) without impacting the second one. The complete assembly and installation must be compliant; steel or
wood posts, post spacing, Type C or A.
CA Aigt-CC-0- iak-tf"),K. A 7//i/t)//
Signature for receipt of Lead Paint, Asbestos, and BMP notices. Date
Cr M-612U.0 lL
Printed Name
Scope of Work
Brian Curran
5 10th St
Tybee Island GA 31328
Work should take approximately 1 Crew Day, we are only doing
foundation repair; no changes are being made to original design or
construction of the building. Again this is for a residential building that
has settlement issues and we are installing Ram Jack piles to stabilize
Foundation.
® Installing 5 Ram Jack Pilings to load bearing soil.
` 1/A7.42 /0 d I t' e-kA
Sr 'W.u,u-42 4/' ) Ram Jack of South Carolina, Inc.
GA GCLT-C0000133 2075 US Hwy 21 S
NC 66113 Ridgeway,SC 29130
FL CGC 1518926 - - .) 735-3085
cos oil .iC ji
1 Confidential Information P m Jack use only
.t Name Is % h `--(�
- ic�c -4 Driven Pile dept .. ft. II•_ . . .{: / -Ulla&
Rome Number 3-44 p..L tgaiIINork e 7 2'Helical Pile depth exceed! . ) •=c arged eXlrc S. /foot
a Site Address t 0�!" �1 -1 Q� 5'Hellcal Pile depth exceedln _#t.will be charged extra$j of
• City /State I l 1 l S Zip �`a[.3 vel
Gi 'Cl)
The following items are recommended to enhance the future performance of your foundation.
3 We feel an obligation to inform you of potential problems if these items are not corrected:
l.
.? Services Services Services
.1 Recommended Adjustments Total Declined Accepted
- (initial)
Driven Piles/Area A:(Proposed_ pile) $ ' $ $ $
q Driven Piles/Area B:(Proposed_ pile) $ $ $_ $
Driven Piles/Area C:(Proposed pile) $ $ $ $
Helical Piles/Area D:(Proposed 5" pile) $ 61C-Cr $"'"p,t9tne3-"" $ 4-7c--(:) $ ._
Helical Piles/Area E:(Proposed pile) $C34/‹.0 $ —0. o`. $ 6 4 t ?'' 1*._ $
Piles/Area (Proposed pile) $ $ $ $
Concrete Removal&Replace: $ $ $ $
Fortress Straps: $ $_ $ $
Beam: $ $ $ $
Angle Iron: // $ $, $ _ $
Engineering:Pe-46
t7..i-FA-0cl $ S$ $ gir $
Permit $ $ $ $_
Other Services $ $ $ $
TOTAL: $ $5-0410'' $
Total Due Ram Jack Services: $_
Total Due Engineering/Permit: $
`TOTAL DUE UPON COMPLETION: $
*PAYMENT DUE UPON COMPLETION OF EACH SERVICE
T :ir': . fo Se ices•;cribed above is part of the contract which also includes the Service Plan,Terms and Conditions,and
ifetirne I. il-s arranty
` Z.--t8-vs ,9' /12 4 (2'/lam /-Z
Cus" w ignature Date Ram Jack Representative Date
Ram Jack of South-Carolina, Inc.
SC G107042
GA GCLT-C0000133 R
)) IRIVIJK ACHeadquarters
2075 US Hwy 21S
NC 66113
FL CGC1518926 Ridgeway,SC 29130
Elevation Profile and Service Plan (866) 735-3085
. -
conwential Inforrnetlell for Rarniaok use only
Notes:
36 32 28 24 20 ., 16 12 . 8 4 , . 0 z . 1 , 8 , 12 16 20 24 28 32, 36
44$" * . : ., , . z , ....., , :.,„.. ,
.-- -- ; : I: 1 r; 1.: : :: '' • :' * 44
.., 4..,-'•:..._5 -.!:,.„„,: ?, .4....„-••-:•,.. ,.1 ..j.: -1„„?, ..- .., „...., ,;. . ,• ,:l. , • ., . „g,.-if-5 -.4„„1„,„ -
5 5 ;.• :-: >: . : ... 1 . 1." :2, i 1 1 .. • 1 : ...i '2' ; ; "" i
i , :. . ; ' 1 5. • •§
40 ii is •4-- •-:•• • .-- g. -:54- -5 '
:• - g 5. :-. 5 •,. •-• I S:: r -I •1 ,..:A -I*' I .•. -•:. ; .i: i
: ...;-- 1 ::
„ .! , i 1 -, , • i .:: s.:..
36•.-- ;: ' ;:: -1' -4-- .?- • 4--':' 4 - ii-i, '' i - - i.• '
: I - I 1 t t . .. t si i • ; i ii i :, . t i s • !.. - i ii t t
-, , •, -i- ••ii• ii -.. .."-- . •iii • • i ii,• -1 •i - i i• ii .. i'• • . 1 -. -- i l. . -5 '-i-'-- -,
5: .,- 1.1 • ; , I 'I: '. . ''• : l; . r r 'r t • ; . .
321- .(--, :. : - .4.,--' ',.....L,..‘,.... - , . „'. .., ,-,'. ,.., ,,,-„i,.,..4 ..-,:,..,,,,,,, :11,......„„...., t....„ , ,...... '• :5.. t ,..„ - -.... ,....,.. .. ...,,,.02
• ,, ,-- ; ; • : a t . a : a .
. - . . ; • - •• , . , :. t
. . . , r ; .i , , i , . . t
..- 5-".' " s.r-'`.'''' t• i' ' . t '''''' • ..-- , - ......,, „.„,,•........,..rk•• ••:-. 2- , ' ,....i..... •3.. •,,
• 5 i ....•• , ,. ," ..
• ',,
' 1 ' 52 • •• ,..
,fl.,i 1 . •i. 2 ,••,. : :2 1 ! 5 11 r 1 ; i ,2 2: 5 , 5. 5; • , 22 ''"1; 1 '''). C- !•2 ' 08
&II> ' ; ,,
,
; s :
• - • 1 ; i'. , '' ' , ; , : :
is••••-r--•-;•: :: •:•5g • .5 - - • : -•-• ••• •5 -" ,,, , •-: i '--`' -----1-"."-,-"'-' '- ' '''-"-..' 'l. ' . '--il' - '1 t ".t 5
..., „ . 5;, -' •4's.- '' ,, H,, ••••••••''' ••”' '' 4
24::--t ';i:. ::: --': '.";.: ' '-.1 • •...; --- - '. w ... -:•••• ••• . .
. :
"i ;.' :- k - . ,
, ,, 4 , ;i :;i . • % I I:
:..r„.' ", ";• ., 3...er....;„..,....t,....i......}•........ .. %.•
r ,;•,., ,,%g. 'i.:;i: l;•.i::5:;:•;. .":!.. ;i"..i,•:- :•: .i:. *%,g;i, %i:: . • t1 4 1
1;;
14t':'.re
20 " i; -rre+.+i;t:;A.v...e:!i'......r.r.1"•.•;.......,...f;,i'':..•r e;;'„;..,,e i.,'; • 1i;',.. ....i% ,1“•..•,•.'••••••:1;.$...•...,"..i::;...:.•.--• *.1'.:,;:..,. ':%;.!% i;.,",:.; "'":i: •'"•;; "7 5..r--r.. 5',5.,i ",1- "-5 2i•
0
16 . 6a % i 16
• '
; t : : . ; * : 1 ::
,t 5 , ? i i;i i: .ii i.t i: iit t5- , 5%:: i;:?. i i'; -. a k ..i t :• :i::i i_ii,_......,ii.i, ..i., i t 1 iii i- ii'it,: - 1 t i7 f t;. -i 5;;.,- 2•,•;i:I, ,,1
12 - - . _ i;; :.••• 5i i:i", Ii It:i. ;. . ;,i:i
. ...1t 5
1
2
- e =-5
,, t t i ii II ti t t ; . t i; t t i i t ii ii ii - t i t ii ii,i, , ti
8....-...,:-.•:- ,;.....i.....;.........„............„.... ,...;..... .t -. . .,,. . ..'...„-.i. ,.. ..t.,-..!..„, -.;..,
1 :; •.', :: : :: ; •
; : ; : * ',: : , '-, •* :: • i'. :: ' ''. . li '.: I: : ; i :..-:".
;" - • ';.---- =;---•-•.•-•• ::-•-; ---'- 1. 4-- 4, , -• :. ,.- :. -i-, :1: -i...' -1.---y :.: ":::,... ":- : , :
.),,
: , :, :. , •.
4-...•-•iii4i- -ii i.,,,,ii-i-••iiii -•*if: : i iiist.^ ii -. - It :: : : - ' 1.-.-- .- - -::- 4--s - .: ' 4):- % :..A--- 't .-. " .--... -, ' • --A
, , , ::: :: , , , 5 ., 5- , t , i: . . : . 5 - , : t • . t t :: 5: .!: '5 : ':- .t. t
: - ;• . - '',-: -`--ll-'''''I''''' ",'''. ,- - '',
41,..-.
l - 5: ,-• t ; , 'i . 5 t + . a ; : ,' : . : .: ;.: .:: t t , : , r .
Ot ''.• -, .: . : "''' 4-•.• 1:11=1/Ci '. . •:: . .i".. • •••5 .J.: - ''. .-'', 5 ; . '.; 4 -;; -.5. .5.;. . -5 t - -,' ,
, , , . . • :. : , : : :: : ,,:. • . : , , :: :, : : z
r"-i..-±.---i--....--,1-----, , ;.., i 7 • :' 3 1 i 5: . '1„• . : . g g . •' ; 1 : 5 i I 0:: 5. e-' 7 5 : 4! 1 1
•
s ii i ii
ii t i st ti i iii 3 t \mi f..._
............. ..:-. .. . ,
8":-. ' ). ! •
•.••• .....: ,...,•• •:. ..., ...,...•7.- ii i. :,.•i . -
12. t'i . ..; :. itiiiti. • :,... .-D,,i , ,i i: 1
, :.: 4 :• - • .•
, e .., .- „ ......4.,,. ; '. •„' + , , .,' • „ n-....1. +.,+ .,..?e......4,•• . ',....: 4 : . ' . ' '
. ■,. . Z. .
• 5 ? 5. :': .i b.i.'..).: :i ; 110 1
16.- 1 ... -.. .,, r••••'" ' " ' ' ."•'' 5". ; ; , .,2 ' 2+"""t5'•'2' '''''"•;' ; g; ••• ;' '.• r ' ; '''• ''2 ••r '; 55'52 •..!•2 ;: ".•-16
• * :, 1„" .:: :: : •::. I: ; . : ' ;.. .! i.: . .; :... I: ; ';! t e".> 1 ',1 ' 1 ,_ t i .z.,
; i - 1.. :' ' il 5.1 j :: ,' ' ; !:. : ; ; ; • . ; * : ; :. : • -- ; ;
' „. 5 2 ••• 2: 5 ' 2; . ; .; 2 '
2r.r..r.-.,.:. -2-•-r...,•••., •.1.,....•, ,• ,••••..-i., ........•r„b.::'..,1,, ,...........:" , ,
, , I
.4"--"•"-}.'41/k-'"÷ ',• • •t.. ; ; f• :, •..; 1 1 ; ; • ': Z 'i
e ;: ;• :. 1 ; :I . . , • . . ,
; I: • ": % 3 : ; • s ; , , , , . .. , . . • ;
2C.'.- r ••:'•• -:: ;'7 r.-- • . .:4. -i .. % ,
;.... ` 4......
:
: ; ; : ; ; •.; ; . :: ; ; r ;
.i.-'r"-1"-"?. :•-"1--.•.-t" i I'- -. ...*::• i -,•/..'''''t ..:'
. , i. . , • .• 3 •■••• 2; • '' .
:: "; • 1 ,. ,
•5 •5 '2 ;• ; h & 1 wio)...„2_, ... .„ :. „.; .J.,. L. .1 ., i. '.'.:.:,.„1 ...„„„. , 7 , I .;,' i C%
7....--7,,,.......'"7".,.-:'''''T-: .4-'2', 5-1'"•"":••• -'2" ••;'- •"" )24•;i :;: ! i `. :4
., T.: :1 : • : : 1 ,' , r.IU f,s4 , , , : ; ..1 . . i : :
32:;-
.......1.-,...t''''3-......„..:...,. :.,-.5 . • ......1„..i.,....! -C .......;.,.........„,...-.....1 ' ' '
f---1
....=,.. ... ..„ , .., •...-.. •• :,.. - ..:
• . , : - „
. . .•
:::. - :, ::. ‘.-: , • . .. __...,,. ..::. iLl ilkott......h : .. .. = , : . :. ,. - ,
36„ , .,. „. :, , a_4244 •
; -- ; -e.--.Y.----T-.-..- ,. , , ,:-----,.., , ,v;s46-: ''''''-'j ';:' rs ,4--.•.4.,, ';,' ' r .1- , ;
40.: -, ::: „. : i: , -• :: , ::
': • g ::.: 5 5 : ; g : : 5: f i ::.
40
44 i: ii t .;: t :, i - i 5 5 -i : 5 5 5 i ii !' g g ;'• 5 g -. 5: sr.. : .:: g 5 5 1 5 5.
5..„ s;„ ;,„.;•; ...... ,..!., - . ,,,,,..„,5, ,, i , : - y '' ::: -. ;--:... • :, -- -••••-g:- %.i,•• .: •5. 5 g•-• ":: • :••..1.--- ,5.- •-:: •„5.-• .5.••-4••:•••- •••.:-••••i•-•,..--'''''''1
. ; : . •-: .: 5 i ,.:: i; • g ‘ 5 : g ,' : : 5 :. 5 g g • 5 g
36 32 28 24 20 16 12 8 4 0 4 8 12 16 20 24 28 32 36
Scale 3/16"=2 •Pile Placement A/C Air Conditioner
Al Utility Rol Pile in Concrete °Tree 01-felical Pile w/Slab Bracket tgliefical Pile w/Beam Bracket
Name 1 ? ir-21. ),,...) Site Address ,5- H"‘:11.
Number:Honelik2 11'
' t°_.-) 1(::v worfT0-7336- ---745-
t City/Stia'ite //Sin& i -,e..-_-** Zip
Date2d23.1Ram Jack Representative \X C.,-- Estimated Job Cost $