Loading...
HomeMy Public PortalAboutSTRAND AV_1510 F. , 11 7.1 ii CITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 03-20-2013 PERMIT#: 130173 WORK DESCRIPTION SHED ROOF BEHIND MA SC CNTR WORK LOCATION 1510 STRAND OWNER NAME CITY OF TYBEE ADDRESS PO BOX 2749 CITY,ST,ZIP TYBEE ISLAND GA 31328-2749 PHONE NUMBER CONTRACTOR NAME CITY OF TYBEE ADDRESS PO BOX 2749 CITY STATE ZIP TYBEE ISLAND GA 31328-2749 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE U TOTAL FEES CHARGED $ 0.00 PROPERTY IDENTIFICATION# PIN#4-0008-03-001 PROJECT VALUATION $600.00 TOTAL BALANCE DUE: $ 0.00 It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire,soil and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including all environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P.0.Box 2749-403 Butler Avenue,Tybee Island,Georgia 31328 (912)786-4573-FAX(912)786-9539 www.cityoftybee.org ' ) �� ICS p6l\. City of Tybee Island • Planning & Zoning Dept. =;\I Inspection Report ana 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 / y INTERNATIONAL _--- Phone 912.472.5032 • Fax 912.786.9539 CODECOUNCIL MEMBER Permit No. J3- .0/ 73 Date Requested 0 /XX//3 Owner's Name r�.P A.Zrcc 6Date Needed 0 3.Ja 7//s Gen. Contractor Subcontractor Contact Information Ir' 2R`J Project Address /5/c .,aT%lAlD Scope of Work rt-1 b Inspector Date of Inspection Inspection fi' / ,./ , ..... Pass ;.tai! Fee i Inspection Pass ❑ Fail 0 Fee Inspection Pass ❑ Fail 0 Fee Inspection Pass ❑ Fail ❑ Fee �otE � �� City o Tybee Island • Planning & Zoning Dept. Inspection Report ERW 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 =I INTERNATIONAL Phone 912.472.5032 • Fax 912.786.9539 COOECOUNC!L MEMBER Permit No. !. Date Requested Owner's Name Date Needed Gen. Contractor Subcontractor Contact Information . r Project Address Scope of Work Inspector Date of Inspection -)/ Inspection Pass II , it Fee Inspection Pass ❑ Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee eF� I ,, City of Tybee Island, Georgia 'ks , 3�� 912-472-5033 or 912-472-5031 - Fax 912-786-9539 1l1 -4/75 APPLICATION FOR BUILDING PERMIT DaoS-o3 -OD/ Property Address: I 'D � V lj rQ►--> (i Name Mailing Address Telephone k(-.;no... Sc:enc Home: Owner - Ce.-,Lcx Cell: Architect or Engineer _ -Cy b e€ -C, w Office: Contractor Rjosr e (c We- UU Cell: ra 44(2-q/(op (Check all that apply) ❑ Single Family ❑ Discovery/Tearout ❑ Demolition of Structure ❑ Duplex ❑ Footprint Changes– ❑ Other ❑ Multi-Family units new square feet ❑ Commercial _ units heated/cooled Details of Project: el r O D-c {-k r~ CI o.J-i/l c., e.►-.cP_., Estimated Cost of Construction: $ ( ) 0 3 (materials + labor+ profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and/or a site plan may be required. Year Built: Listed on National Historic Register or located within a National Historic District? Y / N * Buildings older than 50 years may be eligible to be listed on the State/National Register. With this designation,you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. *Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On-site restroom facilities will be provided through . Construction debris will be disposed by_ by means of . I understand that I must comply with zoning,flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: 3-)S-13 Signature of Applicant: d k 0 FEES),ocs" Printed Name Permit Inspections Note: A permit normally takes 7 to 10 days to process Cap Cost Rec Water Tap _ ' r .J� Sewer Stub 1 Approvals: Sign-r- Date En Fees Planning &Zoning Manager A��0 3. 3 g Building Official - �3 Aid to Const. Water/Sewer Storm/Drainage City Manager TOTAL , 4L,i'el ikliccY/c1 41 tA 1 40fAi (---- ' (AI- \ if 441% P f 1 , , I 1 ft IS 1 1 1 1 vylovv\ , I , ,ff ek. ce_ IllhihNk- 1 c-C/37- t3 1 i 1 s C r V) \ 1 I O' hillhho. 1 I 1 N\ MA I 1 1 1 ... 2?1 Cia 1 1 1 1 1 , , , 1 1 , 1 1 1 Dianne Otto ' From: Greg Mafcher[gregm @tybrisa.com] Sent: Thursday, March 07, 2013 11:17 AM To: Maria Procopio; mariatprocopio @gmail.com; Joe Wilson Cc: Dianne Otto; Diane Schleicher; Cody Shelley; Daniel Carpenter Subject: Re: Request from Tybrisa Resorts Joe, Sounds good. Please keep me in the loop on the final design. We are going to be adding 6-8ft wood fence adjacent to the alleyway(per the fence permit we have). Joe- can we schedule a time to meet before we install this, I'd like to get your feedback. Please let me know if you'll be around say 10am tomorrow AM. Thanks, ---via blackberry--- Gregory J. Mafcher Resort General Manager Tybrisa Beach Resort Condominium Association Inc. One 15th Street, P.O. Box 2966 Tybee Island, GA, 31328 ph: (912) 447-5080 ext 405 fax: (912) 790-5012 www.tybrisa.com Please consider the environment before printing this e-mail. From: Maria Procopio <maria @tybeemarinescience.org> Sender: mariatprocopio @gmail.com Date: Thu, 7 Mar 2013 10:37:00 -0500 To: Joe Wilson<jwilson @cityoftybee.org> Cc: gregm @tybrisa.com<gregm @tybrisa.com>; Dianne Otto<Dotto @cityoftybee.org>; Diane Schleicher<dschleicher @cityoftybee.org>; Cody Shelley<cody @tybeemarinescience.org>; Daniel Carpenter<DCarpenter @cityoftybee.org> Subject: Re: Request from Tybrisa Resorts Cool. On Thu, Mar 7, 2013 at 10:33 AM, Joe Wilson<jwilson @cityoftybee.org>wrote: I would prefer a framed structure with shingles to match the roof line. Barry is going to pull a permit with design and costs. From: mariatprocopio©gmail.com [mailto:mariatprocopio(agmail.com] On Behalf Of Maria Procopio Sent: Thursday, March 07, 2013 9:21 AM To: gregm@tybrisa.com Cc: Joe Wilson; Diane Schleicher; Cody Shelley; Daniel Carpenter Subject: Re: Request from Tybrisa Resorts Greg, 1 I spoke with Dan Carpenter this mon ; and he had a great idea concerning tl iaterial used to cover the backside of the building. He's suggested the opaque wavy plastic panels. I think they would look nice and provide solid coverage of the areas. What do you think? Maria On Thu, Mar 7, 2013 at 8:04 AM, Greg Mafcher<gregm @tybrisa.com> wrote: Joe, Thank you for the information. Please let me know if there is anything I can do help. Regards, --- via blackberry--- Gregory J. Mafcher Resort General Manager Tybrisa Beach Resort Condominium Association Inc. One 15th Street, P.O. Box 2966 Tybee Island, GA, 31328 ph: (912) 447-5080 ext 405 fax: (912) 790-5012 www.tybrisa.com Please consider the environment before printing this e-mail. From: Joe Wilson<jwilson@cityoftybee.org> Date: Thu, 7 Mar 2013 07:42:36 -0500 To: 'Gregory J. Mafcher'<gregm @tybrisa.cor>; 'Maria Procopio'<maria @tybeemarinescience.org>; Diane Schleicher<dschleicher @cityoftybee.org> Cc: 'Cody Shelley'<cody @tybeemarinescience.org>; Daniel Carpenter<DCarpenter @cityoftybee.org> Subject: RE: Request from Tybrisa Resorts We will be installing the parking stops this week. From: Gregory J. Mafcher [mailto:gregm @tybrisa.com] Sent: Wednesday, March 06, 2013 12:41 PM To: 'Maria Procopio'; Diane Schleicher Cc: 'Cody Shelley'; Joe Wilson; Daniel Carpenter Subject: RE: Request from Tybrisa Resorts 2 Hello Maria, Thanks for the email. Thank you for the kind words regarding the renovations. I appreciate your efforts to clean up the area. I think a lattice (painted white) overhang to cover the back area will be cost efficient and will look great. Thanks again, Gregory J. Mafcher Resort General Manager Tybrisa Beach Resort Condominium Association Inc. One 15th Street, P.O. Box 2966 Tybee Island, GA, 31328 phone: (912)447-5080 ext 405 fax: (912) 790-5012 www.tybrisa.com Please consider the environment before printing this e-mail. From: mariaturocopio@agmail.com [mailto:mariatprocopio©gmail.com] On Behalf Of Maria Procopio Sent: Monday, March 04, 2013 6:19 PM To: Diane Schleicher Cc: Cody Shelley (cody(citybeemarinescience.orq); Joe Wilson; Daniel Carpenter; gregm@ tybrisa.com Subject: Re: Request from Tybrisa Resorts Hello to everyone, We have cleaned out the back and sides of the science center. As soon as it warms up a bit, we will be staining the pavers on the south side of the building to make the walkway look nice. Tybrisa's buildings look so beautiful, the new faces really freshen up the area and the center's staff members are delighted with the improvements. Please have the manager take a look and let me know if we've missed anything and to feel free to contact me directly if we start recreating the problem. Lastly, I'll go ahead and contact Danny so we can discuss options for covering the backside areas. 3 Thanks, Maria On Thu, Feb 14, 2013 at 11:44 AM, Maria Procopio <maria@tybeemarinescience.org>wrote: Got it. Hopefully, they are only s0000 bad during our off season project time. We'll get right on it. Thanks, Maria On Thu, Feb 14, 2013 at 10:48 AM, Diane Schleicher<dschleicher@cityoftybee.org>wrote: Maria, Attached are two photos emailed to me from the general manager of Tybrisa Resorts. The manager has been working on improving the property and requested that I request the TIMSC clean up the two areas in the photos attached. One suggestion by the manager was the installation of some lattice over the rear area, so the property owners do not have a view of the garbage cans and boxes. Please work with the DPW to create a screen for the rear area and to keep the two areas in good shape. Thanks in advance for your cooperation. Thanks, Diane This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed.If you are not the named addressee you should not disseminate,distribute or copy this e-mail.Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system.Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of The City of Tybee Island.The recipient should check this email and any attachments for the presence of viruses.The City of Tybee Island accepts no liability for any damage caused by any virus transmitted by this email.City of Tybee Island P.O.Box 2749 Tybee Island,GA 31328 4 LEAD-BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre-1978 housing and child-occupied facilities must, before beginning work, provide owners, tenants, and child-care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead-safe work practices. Georgia Environmental Protection Division Lead-Based Paint and Asbestos Program (404) 363-7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead-based painted or coated surfaces or components more than 6 ft2 per interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. * * * * ** * *** * * * * ** ** * ** Asbestos/Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. * * * * ** * * ** * ** * ** * ** * * BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http://www.gaswcc.org/docs/field_manual_4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5"-3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or wood posts, post spacing, Type C or A. Signature for receipt of Lead Paint, Asbestos, and BMP notices. Date Printed Name