Loading...
HomeMy Public PortalAbout11-0667 Powers 0-c.. r u A CITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 12-8-2011 PERMIT#: 110667 WORK DESCRIPTION REMOVE 2ND KITCHEN/ELECTRICAL WORK LOCATION 16 TWELFTH ST OWNER NAME JAMES H.POWERS ADDRESS PO BOX 349 CITY,ST,ZIP TYBEE ISLAND GA 31328-0349 PHONE NUMBER I CONTRACTOR NAME 5 STAR ELECTRICAL CONTRACTORS T P i, (,) n~b ,n3 ADDRESS PO BOX 15722 CITY STATE ZIP SAVANNAH GA 31416 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 68.00 PROPERTY IDENTIFICATION# PROJECT VALUATION $1,500.00 TOTAL BALANCE DUE: $ 68.00 It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire,soil and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including all environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: , e OF P.O.Box 2749-403 Butler Avenue,Tybee Island,Georgia 31328 (912)786-4573-FAX(912)786-9539 www.cityoftybee.org account Management. 'Read Only) x File Edit Options Functions Consoles Help 105-1030-00 1 f Account Number �' Address 1 16 !TWELFTH ST APTS 1 110 Zone 01 a�xx Notes xx Name 'POWERS.JAMES H. (I General Metered 1 Non-Metered I Financial I Information 1 Comments' History' Consumption History' Service Orders I Devices ServITbl 010IRES 5D RESIDENTIAL Sequence 73.00 Expected Consumption 1 14 Status Ion ME 1 Location 1 40 n0 Units 2.00 Meter U 164706117 0 Instruction n p Scale 1.000 Dials 11:41 Serial U 1 Last Read 111/30- 1081 r Apply to Address 'Sere -Tbl Description Status , Units .Meter U Scale Dials Sequence Location A. 010 RES RESIDENTIAL On 2.00 64706117 i_000 6 73.00 __.l 1 ±ri • Clear JI 1 1 View I dotto , I ie_ �- .� I D C0 (o1 („) aS (SS ()ad+ 12 -t - i � •i2 -5- IL ! k-Lo-- p °._\e -'t" VJc•s ',0 ;i T0. 0•0 rd jn5 r?L d 4° dal ''i -( - 13 'P e�' V `` l 1 0 m fr. 1 L�� :S i Q d V .-C; "e 5 0►� y a s:n L. wQS .-L S r-e- S ; 2 , 't n 5-4-u It.era • Q,nd ,`_- 1s YZ ot,) a 5/(15[2-_Ca✓ ,.(y we_tl. � l Cy„..„..).- Of - City of Tyoee Island • Community Development Dept. 1.....11.k- Inspection Report mants, 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 3132.8 '- tip!`•z% iuMNAL •:2.,,,,„,_,„,,,.--- Phone 912.786.4573 ext. 114 - Fax 912.786,9539 CODE COUNCIL' MEMBER Permit No. I I - 066/ Date Requested i 2/4/1 Owner's Name /.-- -)<,.-7::: ‹, Date Needed / Gen, Contractor Subcontractor / -7.-. P/Ji-kyA„)4, Contact Information \)01C. 2-/(-) - --t.L 1 i Project Address - i te2 ---..t)p:_iy.)- 1 --54-. Scope of Work Inspector Date of Inspection / GInspection ri .JJ,- ;.._. i---, ra3 i - , Pass Fail D Fee k /7 inspection 1-Kj--<) -,--- , ,),_A I _ Pass Er Fail [] Fee I:Ispection Pass 0 Fail 0 Fee Inspection Pass 0 Fail 0 Fee �. "`�� City of Tyuee Island . Community Development Dept. 4; Sri`\ ��r►- I s .i I Inspection Report ies.m ,r / i 403 Butler Ave. • P.O. Box 2749 . Tybee Island GA 31328 ,_—..a 4 r INTERNATIONAL 'Y•.,,,._,2e% Phone 912.786A573 ext. 114 . Fax 912.786 9539 CODE COUNCIL MEMBER Permit No. •/l -/}6/4 Date Requested / 1i//Z ."1, owner's Name )`-LJ >, Date Neecied f z.4 A I Gen, Contractor Subcontractor � . 147 i5/ /� Cctrirart 5nforrnation ect it -JU I Project Address -6/ L —FA)T_1 F-75-) Scope of Work 1 rat1 VU/<, Gh Ie.-r 1,7e� mix-// 4G IG t Inspector 2 /') Date of Inspection //Z//3/i Inspection i /� . }-1,J4 / - Pass Fail D Fee Q i Inspection Pass 0 FaR D Fee Inspection Pass ❑ Fail Fee Inspection Pass Li Fail 0 Fee Pit CITY OF TYBEE ISLAND ictti /?° fi '"��� BUILDING&ZONING DEPARTMENT �fi / P.O.Box 2749,Tybee Island,GA 31328 l . Phone(912) 786-4573 • Fax (912) 786-9539 hUan+�� ELECTRICAL PERMIT APPLICATION & TEMPORARY SERVICE AFFIDAVIT Date i/p2 —f — _0/J New Work _ Replacement Location of work(street address) -`/(. ITLde 7// 7 i.. 577 Contractor ,j -S 7 v /=/e c Y-v t Co—( ,� Telephone 9/A 36 31 3 Address of Contractor //0 �//I//7 y �"�,,i)/00-( l;.ir,e..-)1,0-t-- /3 lt/ 3/ 0S— •e ?o(.0.trS Property Owner Pc)W.•e V 5, GPO vq J .e Telephone Ce// 313 70(36 -210 -1z19 Date work will be ready for inspection, if known /,t !//1 L6/1 (0€C c,b' ) Permit Number Estimated cost of construction /().(20 1 h 2 5- 5- A/C Unit and Heat Pump Range Hood—commercial Attic Ventilation Fan Service: amps ALL WIRING, Bell Transmitter—low voltage Sign Circuit-wattage Border/Outline Lighting Smoke Detector—low voltage SERVICE Building Saw Spa or Tub—grounding INCLUDED, Exit Lights—life safety Special Outlet Heat Pump Swimming Pool—grounding MUST BE Meter Box CRe_6'/1 Uue. On e) Water Heater Motor(s): hp Welder—220 volts circuit COPPER. NO Outlets— 110 volts circuit Well Pump—grounding ALUMINUM Parking Lot Lights X-ray Pool Lights—grounding Other ALLOWED. Range—comniercial Ce;r,,17, rN y S ovutc-e, r° ON/_ APPLICATION FOR TEMPORARY SERVICE REQUEST In requesting temporary electrical service,the undersigned understands and agrees: ' CTING 1. Connection of temporary electrical service does not remove the requiremen " t. ' .' "'►. .1 rtiP1 Georgia minimum construction codes. Provided.to disconnect all 2. Temporary electrical power is intended for completion of the construction ep)o etors li est na.en �structure installed within the structure. con a service-entrance conductors. 3. Issuing approval for temporary power connection does not constitute appr a o occupy the structure. A Certificate of Occupancy must be issued by the City of Tybee Island prior to any occupancy. 4. The owner and contractor are hereby held responsible for any violations of this policy. A violation of this policy may resin in disconnection of the electrical service until all violations and deficiencies are corrected. Owner/ , tractor Signature Date , ,�es�e� a_La - : 3 2- �n: -� aP 4.. �-o f Se55o%'ii 5 Sir,g1e'rraw.:1y Owner/Contractor Printed Name �1 I. • APPROVAL Fee Building Official Date CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT I ( ■ (0 lob Location:'b 1, ' PIN# 61-000i 0 a-— °(.95- NAME ADDRESS TELEPHONE Owner dew. /14 . Pvo,/e4/5 /6 / 473 9 0 2-1 J- 11" Architect or Engineer Building Contractor (Check all that apply) _ n Repair ❑ Residential _ Footprint Changes E Renovation n Single Family n Discovery n Minor Addition ri Duplex ❑ Demolition _ Substantial Addition f l Multi-Family f 1 Other ❑ Commercial Details of Project: R vt` / S ma c( javil^-s+ a't f S 14‘.fzL€ 111 Q..d'0. (e Estimated Cost of Construction: $ std Construction Type (Enter appropriate number) (1) Wood Frame (4) Masonry (6) Other(please specify) (2) Wood&Masonry (5) Steel &Masonry (3) Brick Veneer Proposed use: Remarks: ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following information based on the construction drawings and site plan: # Units # Bedrooms 5— it Bathrooms c Lot Area Living space(total sq. ft.) 9-1 O 0 # Off-street parking spaces 3 Trees located &listed on site plan Access: Driveway (ft.) With culvert? With swale? Setbacks: Front Rear Sides (L) (R) # Stories p. Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys,heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On-site restroom facilities will be provided through }�(...it■15 On-site waste and debris containers will be provided by f o worn Construction debris will be disposed by ?c. c _/S by means of ±r►� I understand that I must comply with zoning,flood damage control, building, fire, shore protections and wetlands ordinances,FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as-built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: I Z/FI/) Signature of Applicant: i �'�---- Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification NFIP Flood Zone Approved rezoning/variance? Street address and number:New Existing Is it in compliance with City map? If not,has street name and/or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Signature Date FEES Zoning Administrator Permit Code Enforcement Officer Inspections Water/Sewer Water Tap Storm/Drainage Sewer Stub Inspections Aid to Const. City Manager TOTAL LEAD-BASED PAINT Adapted from htt21/www.epa.00wleackpubslrenovation.htm.Please use that site to access the following information, Information for Property Owners of Rental Housing, Child-Occupied Facilities Property owners who renovate, repair, or prepare surfaces for painting in pre-1978 rental housing or space rented by child-care facilities must, before beginning work, provide tenants with a copy of EPA's lead hazard information pamphlet Renovate Riont: Irndortai)t Lead Hazai-d t;, r - o �;�:.�, Chp a x,= Providers, FYOUTI'OT „p, , Owners of these rental properties must document compliance with this requirement. EPA's sample f D-saFfc rcim, Dreiiriendvolion cliecksare _:_o may be used for this purpose. 'ISTUR NGG After April 22, 2010, property owners who perform these projects in pre-1978 rental housing or space rented - UST IX by child-care facilities must be certified and follow the lead-safe work practices required by EPA's Renovation, SQUARE ET Repair and Remodeling rule. To become certified, property owners must submit an ,; firm >4UtDCO.. t} = U _ ,:;;., and fee payment to EPA. The Agency has up to 90 days after receiving a complete request for •l3 1 T certification to approve or disapprove the application. Property owners who perform renovation, repairs,and painting jobs in rental property should also: • Take:,;r-=innrl to learn how to perform lead-safe work practices. • Learn the lead laws that apply regarding certification and lead-safe work practices beginning in April 2010. • Keep records to demonstrate that you and your workers have been trained in lead-safe work practices and that you followed lead- safe work practices on the job. To make recordkeeping easier, you may use the a_ c_==: c t4 __ , ?c :h=c r that EPA has developed to help contractors comply with the renovation recordkeeping requirements that took effect April 2010. • Read about how to comply with EPA's rule in the EPA Small Entity Co,muiiance Guide to Renovate Right. • Read about how to use lead-safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting.. Information for Homeowners Working at Home If you are a homeowner performing renovation, repair, or painting work in your own home, EPA's RRP rule does not cover your project. However, you have the ultimate responsibility for the safety of your family or children in your care. If you are living in a pre-1978 home and planning to do painting or repairs, please read a copy of EPA's rn 'a,.__Rr r :_ Zotormaidoiiii _r%,Fin Care Providers. a d r,e lead hazard information pamphlet. You may also want to call the National Lead Information Center at 1-800- 424-LEAD (5323) and ask for more information on how to work safely in a home with lead-based paint. Information for Tenants and Families of Children under Age 6 in Child Care Facilities and Schools As a tenant or a parent or guardian of children in a child care facility or school, you should know your rights when a renovation job is performed in your home, or in the child care facility or school that your child attends. • Before starting a renovation in residential buildings built before 1978, the contractor or property owner is required to have tenants sign a la;_e-renovaton disclosure form, which indicates that the tenant received the Renovate Right lead hazard information pamphlet. • Beginning in December 2008, the contractor must also make renovation information available to the parents or guardians of children under age six that attend child care facilities and schools, and to provide to owners and administrators of pre-1978 child care facilities and schools to be renovated a copy of EPA's Renovate important t Lead ? a r Infounadon Ciaria_Pro er _:d Sciiioois lead hazard information pamphlet. Information for Contractors As a contractor, you play an important role in helping to prevent lead exposure. Ordinary renovation and maintenance activities can create dust that contains lead. By following the lead-safe work practices, you can prevent lead hazards. Contractors who perform renovation, repairs, and painting jobs in pre-1978 housing and child-occupied facilities must, before beginning work, provide owners, tenants, and child-care facilities with a copy of EPA's lead hazard information pamphlet;it:',r,h'art ?'Ght, I,mportant_Liaad Hazard Information Families, c __ Chi/CI iiii7eioa Pro viderd, and s. Contractors must document compliance with this requirement. EPA's , c_ o,i 4 disc for forM may be used for this purpose. Understand that after April 22, 2010, federal law will require you to be certified and to use lead-safe work practices. To become certified, renovation contractors must submit an application and fee payment to EPA. See: ':onicatc_ f for firm i:t fiLec ti The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application. Contractors who perform renovation, repairs, and painting jobs should also: • Take training to learn how to perform lead-safe work practices. • F !, i a r:(iin ILLru:icie that has been accredited by EPA to provide training for renovators under EPA's Renovation, Repair, and Painting (RRP) Program. Please note that if you previously completed an eligible renovation training course you may take the 4-hour refresher course instead of the 8-hour initial course from an accredited training provider to become a certified renovator.Ciici< here for ; ii:st. Ji ei G`'12 courses • Provide a copy of your EPA or state lead training certificate to your client. • Tell your client what lead-safe methods you will use to perform the job. • Learn the lead laws that apply to you regarding certification and lead-safe work practices beginning in April 2010. • Ask your client to share the results of any previously conducted lead tests. • Provide your client with references from at least three recent jobs involving homes built before 1978. • Keep records to demonstrate that you and your workers have been trained in lead-safe work practices and that you followed lead- safe work practices on the job. To make recordkeeping easier, you may use the s _ le r corclkeep no cihe,cidist that EPA has developed to help contractors comply with the renovation recordkeeping requirements. • Read about how to comply with EPA's rule in the EPA `><`_'=ri;Emit{coug in cwudeto Renovate Ri;ht. • Read about how t• use lead-safe work practices in EPA's 5-teas to Lead Safe. Renovation,Repair and fainting. • .tura /Date Printed Name IA A. .\•COIFSI 1J /i RESOURCES .;40. GEORGIA ^' Permit Acknowledgement of Asbestos/Environmental Notification to Georgia EPD for Projects Involving Demolition,Wrecking,or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. --t---r...—jAAA._..------- o ersigned Date /2-d cri ( t j v,5 p le■ 6 TZ(,)e/ s Printed Name Office Use Only: Project Address: Permit Number: