Loading...
HomeMy Public PortalAbout10.18.2022 Work Session Packet Posted 5/29/2009 Page 1 of 1 WORK SESSION AGENDA MEDINA CITY COUNCIL Tuesday, October 18, 2022 6:30 P.M. Medina City Hall 2052 County Road 24 I. Call to Order II. Hackamore Road Improvement Project Update III. Adjourn Posted 10.14.2022 MEMORANDUM TO: City Council, through City Administrator Scott Johnson FROM: Jim Stremel, City Engineer DATE: October 13, 2022 MEETING: October 18, 2022 City Council SUBJECT: Hackamore Rd Improvement Project – 90% Design Update Background The Hackamore Road Improvement Project was initiated back in early 2020 with the intention of addressing increased traffic volume, deteriorating pavement conditions, and pedestrian connectivity along this corridor. The preliminary design efforts allowed both the cities of Medina and Corcoran to coordinate and partner with multiple development projects to inform critical infrastructure connections, access to Hackamore Road, securing of right-of-way, and accommodating of the required stormwater management outside of the roadway corridor. These coordination efforts have contributed to a less costly project than would have otherwise been possible. In June of 2022, both cities authorized final design in anticipation of bidding and construction in 2023. Since that time, the project has progressed to a 90% completion level; the work session is intended to refresh the City Council on the proposed improvements, design changes, and related cost updates. Project Location & Design Updates The proposed project extends from roughly 1,900 feet west of County Road 116 up to the intersection with County Road 101. Here are a few highlights of changes to the project since 75% design completion. • The City of Plymouth, as a part of the CR 47 improvements, included the intersection improvements of CR 101 with their project constructed in 2022. • The cities have achieved the goal of utilizing adjacent development areas to fully provide stormwater treatment meeting the prevailing regulations. • The cities have successfully utilized the preliminary plans to inform the final design of adjacent development access points in all locations. • The City is currently working through right of way acquisition (both temporary and permanent easements) along a number of the existing single family residences impacted by the proposed improvements. • The project has been extended west roughly 400 additional feet. • For the City of Corcoran, a future watermain corridor is being planned along portions of the northerly side of the roadway. • The project team is working on facilitating the undergrounding of private utilities within the corridor. 2 Estimated Project Costs & Funding Sources The current estimated project costs are detailed in the table below and incorporate anticipated 2023 construction costs, a 10% construction contingency factor, and 25% indirect costs which include engineering, legal, financing, right-of-way acquisition, and administrative costs. Description Estimated Project Cost Street Improvements $ 5,211,000 Trail Improvements $ 587,000 Wetland Mitigation $ 30,000 Storm Sewer Improvements $ 828,000 CR 116 Intersection Costs $ 738,000 Grand Total for Project $ 7,394,000 Funding for the project is anticipated to come from a combination of several sources, including cost sharing agreements with adjacent development projects, awarded LRIP funds up to $750,000, a cost sharing opportunity with Hennepin County (CIP funding split for CR 116 signal), with the remaining share split between each City. The City of Medina may consider utilizing State Aid funding for a portion of their cost split. Recommended Actions No formal action is requested, but staff are asking for input on the final design to inform any potential changes as the project progresses into 100% plans and specifications.