Loading...
HomeMy Public PortalAbout11-0212 Stevens .vf , O. `. , `." m00L1t CITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 04-15-2011 PERMIT#: 110212 WORK DESCRIPTION FRAME AND INSTALL 3 WINDOWS WORK LOCATION 1014 LAUREL AVE OWNER NAME DONALD STEVENS ADDRESS 1014 LAUREL AVE CITY,ST,ZIP TYBEE ISLAND GA 31328-8813 PHONE NUMBER / /�' CONTRACTOR NAME DONALD STEVENS % /// 1430 � .s ADDRESS 1 E TVBEE IS ♦ND GA 31320 00 3 CITY STATE ZIP �L tuL��D—an o�, FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 79.00 PROPERTY IDENTIFICATION# PROJECT VALUATION $3,860.00 TOTAL BALANCE DUE: $ 79.00 It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire, soil and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including all environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent:/ ,�/� P.0.Box 2749-403 Butler Avenue,Tybee Island,Georgia 31328 (912)786-4573-FAX(912)786-9539 www.cityoftybee.org , -� City�of Tybee Island • Planning & Zonn g Dept. Ilik.� . ' '1 Inspection Report in 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 g`��, y ,</;,i I�dTERNA 0NAL °�. Phone 912.472.5032 • Fax 912.786.9539 CODE COUNCIL' MEMBER Permit No. , Z/ Date Requested -G' L/2 Owner's Name f5i;.AJi"-rl.S Date Needed Gen. Contractor aa- :t. ,// // Subcontractor Contact Information ho.i 1 - f,. , r Project Address I n / L f/-1-vT.-e.( , Scope of Work +== -=r 03 . !,`„):-.104( 1/31 .a )uAS Inspector Date of Inspection - Inspection rrfe,i--e4 rrf- Pass El Fail El Fee Inspection Pass ❑ Fail 0 Fee Inspection Pass 0 Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee ,Y�;J '\�� City o `bee Island • Community Dever lent Dept. rerk 'j t . 3 Inspection Report im 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 2 �. INTERNATIONAL ''`^-,=0„,,,,,.____,, 6 ., ,� Phone 912.786.4573 ext. 114 • Fax 912.786.9539 CODECOUNCIE" / MEMBER Permit No. r '� r.� l;! Date Requested _/4 fj iil i Owner's Name 3-7:17.--0/7.-p,_) Date Needed <-14/i/ Gen. Contractor , / I Subcontractor Contact Information A.3- Lio_ -7_.) 0 - 1 0 I-7 Project Address 1 01 (.L. L,atY�i;I Scope of Work . 1-""' I G ( r\)--SIA'/ i 3 L.+.)I IJ 0 Inspector `? I-1 Date of Inspection ,- <//If I Inspection XjA1 1 k=- r�ii- l- Pass --- ❑ Fee Z. �1/ ?---" � 1:t Lt.)>' t u U:a ) l-�tJ v*Jc� NS S1 n.,„,..,Inspection 7: 10 l iii -- Pass Fee I y Inspection i— 1‘-- Pass F Fee 3' , QSS\ Inspection I r3/f- /[-�i - Imo- Pass Fail 0 Fee 1 1 1 CE 1927 ti� GJ®b` ry • INV010E G MATERIALS ` p�f D.. HARDWARE v =� ' WIT P.O.Box 23859 PAINT V 6°. i ,`; •"•a• Savannah,Georgia 31403 �I S DOORS,WINDOWS 44th&Barnard oos MOULDINGS �� v ( 2)232-3128 Phone 91 Fax(912)232-1476 !DINGS ROOFINGS DELVE " `"ue,ttyltli#t 70 Eaad ,44ytleet9 - SOLD TO: SHIP TO:(SAME AS SOLD TO UNLESS SHOWN) . ACCOUNT NO. C TS ti$;9> L BUILDING CO 114 LAURAL AVE. I(IVOI 2813..«1 210 CATALINA DR. 001 k E ISLAND GA 31328; INVOt OUR ORDER NO. 183842«-cie Y e i ),34AM )4/2 ORDER DATE CUSTOMER ORDER NO./ORDERED BY HOW SOLD SOLD BY DATE PI SMISEI ' ppAPRli. CHARGE WADE E LEWIS ....: r. , QUANTITY `.°�-I° DESCRIPTION ITEM NO. UNITS PRICE/UNIT. AMOI) 00047562 RSVD PO FOR SO 47562 WL CK ,S02404792 M1,4 1 1114 2-6 ;5_0 C 3FM :NT LEFT 121001 I 398.74/EACH CLASSIC WHITE LOW E/SC COASTAL HDR -9/:1 6 JB DP 60 E MW 2-6 5-0 ASE" 'u:NT RIGHT tk 121002 2.0 398..74/EACH CLASSIC WHITE LOW E/SC C O AL. H R 6-9/16 6 JB D3`613 N.,,, 3 MW 2-6 5-0 CLASSIC C WHT C$MT SCRN 121004 3.0 10,,;:3 /EACH 1 OSD8X1.25 SCREWS 100 PK 6578 1.0 t .29/EACH NON-TAXABLE TAXABLE I TO PER MONTH Read terms and conditions governing this sale on reverse side. RECEIVED THE ABOVE IN GOOI ANNUAL - CON'T'INUED ON NE PAGE 'ERCENTAGE RATE)will be X ;barged on All Accounts Past Due. IN THE EVENT THIS ACCOUNT BECOMES PAST DUE AND COLLECTION IS NECESSARY,BUYER 3S a FINANCE CHARGE. AGREES TO PAY REASONABLE ATTORNEY FEES WHETHER INCURRED BY SUIT OR OTHERWISE. IMPORTANT THIS READ SALE TERMS ON AND RE?/QONDITION ERSE SIDE .--..: U��..v-n-cr-'c��--.-----. .^- ,,... r�-rr`�-v7rYt'�'ftEfi'Ti�TCLfRRED BY SUITOR OTHERWISE. —ITV] ._ _.__—._:_ � PORTANT READ TERMS AND CONDITIONS GO THIS SALE ON REVERSE SIDE ere rs; ►\\� City of 'bee Island • Community Develc sent Dept. ����tz Inspection Report I� 7' Ai! 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 1-�, INTERNATIONAL Phone 912.786.4573 ext. 114 • Fax 912.786.9539 COOECOUNCIC MEMBER / i Permit No. P I ~ raZ( Date Requested (.//? l l 1 Owner's Name ral i�- Date Needed U ? 1 I Gen. Contractor /�{- �r it Subcontractor Contact Information 1 c)N i 7 ID -I O .? Project Address 1 0 )Li -t)) �.I Scope of Work I•`i7P--//)i .. .. 1 ,' •ii -3 L 1` )(.a�+ Inspector '7 (1 Date of Inspection � �?L1 /II *Ali Inspection 1\)(4,t 4- -i Pass El Fail Fe I V Z ///� � Inspection %7//\% - Pass ® Fail El a Af< b Inspection Pass ® Fail ❑ Fee Inspection Pass 0 Fail 0 Fee J— O11 CITY OF TYBEE ISLAND, GEL .51A �L APPLICATION FOR BUILDING PERMIT kS • „�gF3 Location: ggt9 L o"Ave 4 r<_ PIN # NAME ADDRESS TELEPHONE Owner C,r,Ay S 1 'O RLA" Architect or Engineer Building Contractor C3 \ c)ts ic-74-t-vi-) (Check all that ItrRepair Residential ❑ Footprint Changes [Renovation Q-ingle Family ❑ Discovery ❑ Minor Addition ❑ Duplex N--Demolition ❑ Substantial Addition ❑ Multi-Family ❑ Other n Commercial � ,i,4) ,34" Details of Project: �r�;,n- ,, -I- r r..S� -3 OP—lo C-k v■-eA,-) ' Lk, s 0-ems., 004,3, 14 °1 e. Fr a oki-- fin Estimated Cost of Construction: $ -3 g ,� Construction Type . (Enter appropriate number) (1) Wood Frame (4) Masonry (6) Other (please specify) (2) Wood & Masonry (5) Steel &Masonry (3) Brick Veneer Proposed use: Remarks: �.erv%Ov-e_ s s 3-M1 3 tJ ;� ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following information based on the construction drawings and site plan: #Units 1 # Bedrooms of # Bathrooms Lot Area Living space (total sq. ft.) # Off-street parking spaces N '►- Trees located & listed on site plan Access: Driveway (ft.) With culvert? With swale? Setbacks: Front Rear Sides (L) (R) # Stories j Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On-site restroom facilities will be provided through C 3S-4r•-.9 On-site waste and debris containers will be provided by L04 V41 • Construction debris will be disposed by OtA.vp4,6, by means of 1 understand that I must comply with zoning, flood damage control,building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as-built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: 1-t-15-11 Signature of Applicant: Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification NFIP Flood Zone Approved rezoning/variance? Street address and number: New Existing Is it in compliance with City map? If not, has street name and/or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Signature Date FEES Zoning Administrator Permit 6S' Code Enforcement Officer Inspections 14- Water/Sewer Water Tap Storm/Drainage Sewer Stub Inspections Aid to Const. City Manager TOTAL i!q` I LEAD-BASED PAINT Adapted from http://www.epa.gov/lead/pubs/renovation.htm. Please use that site to access the following information. Information for Property Owners of Rental Housing, Child-Occupied Facilities - - Property owners who renovate, repair, or prepare surfaces for painting in pre-1978 rental housing or space rented by child-care facilities must, before beginning work, provide tenants with a copy of EPA's lead hazard . ..+• --, information pamphlet Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, IF YOU'RE NOT and Schools. Owners of these rental properties must document compliance with this requirement, EPA's sample LEAD-sarEEEenriED, pre-renovation disclosure form may be used for this purpose. 1ISTeURBIINGG After April 22, 2010, property owners who perform these projects in pre-1978 rental housing or space rented �U.7T$IX by child-care facilities must be certified and follow the lead-safe work practices required by EPA's Renovation, SQUARE FEET Repair and Remodeling rule. To become certified, property owners must submit an application for firm `COULD(OSTYOU certification and fee payment to EPA. The Agency has up to 90 days after receiving a complete request for 'BIG TIME.• • certification to approve or disapprove the application. Property owners who perform renovation, repairs, and painting jobs in rental property should also: • Take training to learn how to perform lead-safe work practices. • Learn the lead laws that apply regarding certification and lead-safe work practices beginning in April 2010. • Keep records to demonstrate that you and your workers have been trained in lead-safe work practices and that you followed leac safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA hE developed to help contractors comply with the renovation recordkeeping requirements that took effect April 2010. • Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right. • Read about how to use lead-safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting. Information for Homeowners Working at Home If you are a homeowner performing renovation, repair, or painting work in your own home, EPA's RRP rule does not cover your projec However, you have the ultimate responsibility for the safety of your family or children in your care. If you are living in a pre-1978 horn and planning to do painting or repairs, please read a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Chi) Care Providers, and Schools lead hazard information pamphlet. You may also want to call the National Lead Information Center at 1-80C 424-LEAD (5323) and ask for more information on how to work safely in a home with lead-based paint. Information for Tenants and Families of Children under Age 6 in Child Care Facilities and Schools As a tenant or a parent or guardian of children in a child care facility or school, you should know your rights when a renovation job performed in your home, or in the child care facility or school that your child attends. Before starting a renovation in residential buildings built before 1978, the contractor or property owner is required to have tenant sign a pre-renovation disclosure form, which indicates that the tenant received the Renovate Right lead hazard informatio pamphlet. • Beginning in December 2008, the contractor must also make renovation information available to the parents or guardians c children under age six that attend child care facilities and schools, and to provide to owners and administrators of pre-1978 chil care facilities and schools to be renovated a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Chi! Care Providers, and Schools lead hazard information pamphlet. Information for Contractors As a contractor, you play an important role in helping to prevent lead exposure. Ordinary renovation and maintenance activities can treat dust that contains lead. By following the lead-safe work practices, you can prevent lead hazards. Contractors who perform renovatior repairs, and painting jobs in pre-1978 housing and child-occupied facilities must, before beginning work, provide owners, tenants, an child-care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families Child Care Providers, and Schools. Contractors must document compliance with this requirement. EPA's pre-renovation disclosure form ma be used for this purpose. Understand that after April 22, 2010, federal law will require you to be certified and to use lead-safe wor practices. To become certified, renovation contractors must submit an application and fee payment to EPA. See: Application for firr certification. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application. Contractors who perform renovation, repairs, and painting jobs should also: • Take training to learn how to perform lead-safe work practices. • Find a training provider that has been accredited by EPA to provide training for renovators under EPA's Renovation, Repaii and Painting (RRP) Program. Please note that if you previously completed an eligible renovation training course you ma take the 4-hour refresher course instead of the 8-hour initial course from an accredited training provider to become certified renovator. Click here for a list of eligible courses. • Provide a copy of your EPA or state lead training certificate to your client. • Tell your client what lead-safe methods you will use to perform the job. • Learn the lead laws that apply to you regarding certification and lead-safe work practices beginning in April 2010. • Ask your client to share the results of any previously conducted lead tests. • Provide your client with references from at least three recent jobs involving homes built before 1978. • Keep records to demonstrate that you and your workers have been trained in lead-safe work practices and that you followed leac safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA ha developed to help contractors comply with the renovation recordkeeping requirements. • Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right. • Read about how to use lead-safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting. �� Signature Lt IS (j ate 44t,..,z- -\..--tO c -e Printed ame DEFT OF NATURAL '&14P4'. ncsamec+ GEORGIA Permit Acknowledgement of Asbestos/Environmental Notification to Georgia EPD for Projects Involving Demolition,Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. Undersi ed Date Printed Name Office Use Only: Project Address: Permit Number: