HomeMy Public PortalAboutBUTLER AV_214 CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 03-25-2013 PERMIT#: 130186
WORK DESCRIPTION ADD RAMP INSIDE DUMPSTER AREA
WORK LOCATION 214 BUTLER AVENUE
OWNER NAME DESOTO BEACH CLUB ASSOC
ADDRESS PO BOX 1602
CITY,ST,ZIP TYBEE ISLAND GA 31328-1602
PHONE NUMBER
CONTRACTOR NAME CATSKILL BUILDERS,INC.
ADDRESS 210 CATALINA DR.
CITY STATE ZIP TYBEE ISLAND GA 31328
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE U
TOTAL FEES CHARGED $ 0.00
PROPERTY IDENTIFICATION# PIN#4-0004-07-004
PROJECT VALUATION $1,500.00
TOTAL BALANCE DUE: $ 0.00
It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire,soil
and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including all
environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
id
P.O.Box 2749-403 Butler Avenue,Tybee Island,Georgia 31328
(912)786-4573-FAX(912)786-9539
www.cityoftybee.org
/
<�Vtie\�� 1 , � reap icc
L�,. City"of Tybee Island • Planning & Zoning Dept. N
` ?'� sew
Inspection Report nuat
. 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 P.MER rare-i
�`
�k+hp 0[�n%' Phone 912.472.5032 • Fax 912.786.9539 COOECOUNCIL
�
MEMBER
Permit No. 13 -a/16 Date Requested Oil, /13
Owner's Name ) 3 OT Date Needed
Gen. Contractor etc4-1-3 k J c.L Subcontractor
Contact Information JO kit Al 6) .-• 7r9 . 7
Project Address 2 I 4 Bui-z .6
Scope of Work A-Thi to
Inspector 1/1 Date of Inspection %/f
Inspection I /)JAL. Pass MU F Fee
Inspection Pass ❑ Fail 0 Fee
Inspection Pass 0 Fail ❑ Fee
Inspection Pass 0 Fail 0 Fee
_ ( (�'1 el-ii L�
lit-N,� City of Tybee Island • Planning & Zoning� Dept. �-' Il
� Y Y 9 9 p l i�s� �:�`
,,,F ' Inspection Report �®I�
(\\ 403 Butler Ave. • P.O. Box 2749 • Tybee Island GA 31328 ®°`�°'
� °� INTERNATIONAL
X.n ` Phone 912.472.5032 • Fax 912.786.9539 COOECOUNC(L
/ MEMBER
Permit No. /,5-N ( '-�/
( Date Requested � /5 1/3
Owner's Name TIf c-S°TD Date Needed 04//2/`3
Gen. Contractor { Q?S1 /L L Subcontractor
Contact Information ,Ip1 Al 4 4 0- 7fg7
Project Address "I 8r,e1t6i9 s
Scope of Work PAM P
Inspector Date of Inspection
Inspection I"- ; 6. Pass D Fail 0 Fee
1s ,..\._
Inspection Pass ❑ Fail ❑ Fee
Inspection Pass ❑ Fail ❑ Fee
Inspection Pass ❑ Fail ❑ Fee
0 -01
�os'`B`I `% City of Tybee Island, Georgia
,,. ,\ 912-472-5033 or 912-472-5031 - Fax 912-786-9539
1,7)
cAPPLICATION FOR BUILDING PERMIT
'�, 4/
l
Property Address: u� 2� UP� . -bDw -' i '7- 014
Name Mailing Address Telephone
3 to,�l. CkuA, -Ass�c., , Home:
Owner b(,-SOTO Cell:
Architect or (Kt;44, 6ta:, -
Engineer
Contractor Office:
�ATSK LL 64.11t`. Cell: 912 a 3 )'
(Check all that apply)
❑ Single Family ❑ Discovery/Tearout Demolition of Structure
❑ Duplex ❑ Footprint Changes— ;U�I Other {:,Ci; )5 P
❑ Multi-Family units new square feet
❑ Commercial units heated/cooled
Details of Project: CA: !T CL)1 1 ; .TIJ `b Rne.ltd o it DorilP,STr\Z. C try I0., ff : t ctv AO
AND (24-Pail-j b4-1-14 :4 leilin p (41)P, r1 i-o Pt, x 20" Hs6iii lb ,41;) 1 tJ
6-v5 'L )Z Ct.i /:' ,�S 7b CoZB fit. Ckt; P
Estimated Cost of Construction: $ 1560 (materials + labor+ profit/overhead)
If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and/or a site plan may be required.
Year Built: Listed on National Historic Register or located within a National Historic District? Y / N
*Buildings older than 50 years may be eligible to be listed on the State/National Register. With this designation,you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
*Also see the Tybee Island Land Development Code Article 14: Historic Preservation
During construction:
On-site restroom facilities will be provided through t i o r e L /f t 69,-):-kg-Construction debris will be disposed
by Co-/1 AL-jb by means of nP nt.Lt2._ . I understand that I must comply with zoning, flood
damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective action that
may be necessary to restore drainage impaired by t 's per\mmitted cs str ction.
• --2. - � �- FEES /0
Date:3 Z / 3 Signature of Applicant: ,, j_
Printed Name �'s, J-0 Permit
Inspections
Note: A permit normally takes 7 to 10 days to process Cap Cost Rec
Water Tap
Sewer Stub
Approvals: - Signature Date Eng. Fees
&Zoning Manager 3 - 2S-13 s
Aid . eeest.
Building Official
Water/Sewer
Storm/Drainage
City Manager
•
TOTAL --_-;:4 -
rZ
K�
LEAD-BASED PAINT RRP RULES
Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform
renovation, repairs, and painting jobs in pre-1978 housing and child-occupied facilities must, before beginning
work, provide owners, tenants, and child-care facilities with a copy of EPA's lead hazard information pamphlet
Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools.
Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you
to be certified and to use lead-safe work practices. Georgia Environmental Protection Division Lead-Based
Paint and Asbestos Program (404) 363-7026.
Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator
When disturbing lead-based painted or coated surfaces or components more than 6 ft2 per interior
room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size.
* * * * * * *** * * * * * * * * * * * *
Asbestos/Environmental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission
to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a
structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation
Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia
Environmental Protection Division administers the rules. In most cases, the rules require both the owner and
the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by
an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before
renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the
building. Further guidance for regulatory compliance and contact telephone numbers are provided by the
brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such
as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have
EPD regulations that could affect the project.
* * * * ** * * ** * * * * ** * * * **
BMPs
While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility.
Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 —
Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment
Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission;
http://www.gaswcc.org/docs/field_manual_4ed.pdf.
Problems with the Co is not limited to the installation, but to material. The stone will be a representation of
1.5"-3.5" stone or larger.
Type A sediment barriers have been installed where Type C is required and shown on the permit drawings.
Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall
over) without impacting the second one. The complete assembly and installation must be compliant; steel or
wood p $ts, po t s acing, Type C or A.
, I i ,,,: ................/....- 3-2.s - 3
Sigh' ture for re eipt of Lead Paint, Asbestos, and BMP notices. Date
Printed Name
HYDRO I
e L Truly Sustainable. Roofing Designed to Last. 'i/- LID ,3,,,,,A
1465 Pipefitter Street• North Charleston, SC 29405 d
f
www.hydrostop.com • p 800-739-5566 • f 843-745-9602
UM II MMEMMOM ■ ■■■■
■■ 1■I
■■ 1 - ;E■■ M ■1i�
■
■■
MWERMNIMMEMMI
■■■ UMW ■I ■ , AM ■
IIIIIIIIIIIIIIIIflIIIIII1III
■ I■■ ■■■■ ■■■ ■■■ ■ai■u■a■■
■■■I■ ■ ■ ■■Ii■■■■■
mormolumm mom ■ ■ii
■ I
!■ ! _ail
mialmmmo NE En= tint maist
m
mmim
ilimmom mum ! S■iu.'::■u■a. I�■II U■■■
■■■ - I■■■ ■ ■■'■ mIII ■■
mommummummummammommij motamm
■ ■ ■■ ■■ ■■■ , °9r
■■■ ■ ■ / il! ■
- 7 III
■a
_ ■■■■ I, il ILm■
■ I� ■ ■1i1■il,NIMINI N
, 1111 1 ■ �■ ■ 1110/1111 x.111 I,■EE
I ■■ . ■■111■ ■ �4111�!,■ _
■■■■I I■■ ► ■ ■■111■ m,��I,II � ,■
■■■■I■11■■■■ ■ ■■■ ■■111■■ MIii NI
Ell i ■■ ■11■ �' iL !. 'mix• ■ ■■■■■■■■■ ■■ MI
�_. 1
millimMESUMMEMIIMMMMEMEMEMMU MEM
MMIONMEMOMmil 111■111111111111111111110111MMIMM
mEMNEMOMMIM 110101111111110111111112CMEN
■■. ■■■■S, MM
S■ �■i ■r'1��11��i ■ �r ■
E ■■ ■■
■■ ■ ■ ■ ■ ■■■ ■ ■
HydroStop is a Quest Construction Products brand ( ) QuES r