HomeMy Public PortalAbout10-0272 Sakas A
CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 05-25-2010 PERMIT#: 100272
WORK DESCRIPTION REPLACE 2 EXT DOORS
WORK LOCATION 1206 SECOND AVE
OWNER NAME CATHY J.SAKAS
ADDRESS PO BOX 111
CITY,ST,ZIP MELDRIM GA 31318-0111
PHONE NUMBER
CONTRACTOR NAME THD AT-HOME SERVICES INC
ADDRESS 2690 CUMBERLAND PKWY STE 300
CITY STATE ZIP ATLANTA GA 30339
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 74.00
PROPERTY IDENTIFICATION#
PROJECT VALUATION $2,700.00
TOTAL BALANCE DUE: $ 74.00
It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire,
soil and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including
all environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P.O.Box 2749-403 Butler Avenue,Tybee Island,Georgia 31328
(912)786-4573-FAX(912)786-9539
www.cityoftybee.org
MAY 24 2010 5: 06PM HP .1 RSERJET 3200 P• 2
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
( 0- 0272
/e O Se Co(i'O W l/ PIN#
Location:
NAME ADDRESS TELEPHONE
Owner CPT/WI. SIB; l 0(0 c'e.c, gi /lam
Architect
or Engineer
Building
j Contractor Ahrint
(Check all that apply)
❑ Repair ❑ Residential ❑ Footprint Changes
❑ Renovation ❑ Single Family ❑ Discovery
❑ Minor Addition ❑ Duplex ❑ Demolition'
❑ Substantial Addition 0 Multi-Family
OtherZsialakc ❑ Commercial
Details of Project: -IA kel Ariod ., d dee-
/4/97ne afert fiii4n 1\NCS44,0
Estimated Cost of Construction: $' 'cig ?Cr Cdr plans jvs/g.:�%tT+r 5
Construction Type (Enter appropriate number)
(1) Wood Frame (4) Masonry (6) Other(plea r ec'fy)
(2) Wood&Masonry (5) Steel&Masonry :_ + �
(3) Brick Veneer --�[ ' ,,,[ �,,,���,
Proposed use: To ° lQr , o � 1�f t :►I!it ' o1cv c
Remarks:
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
#Units c\ #Bedrooms #Bathrooms
Lot Area Living space(tots sg.ft.) 9140
#Of street parking spaces
Trees located&listed on site plan
Access:
Driveway (ft) With culvert? With swale?
Setbacks: Front Rear Sides(L) (R)
#Stories 01 Height 9(') Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building,exclusive of chimneys,heating
units,ventilation ducts,air conditioning units,elevators,and similar appurtances.
MAY 24 2010 5: 06PM HP I ASERJET 3200 p. 3
During construction:
On-site restroom facilities will be provided through
On-site waste and debris containers will be provided by
Construction debris will be disposed by by means of
I understand that I must comply with zoning,flood damage control,building,fire, shDre
protections and wetlands ordinances,FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as-built elevation certification is due as socltas the
habitable floor level is established.Drainage:I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: o`_l In Signature of Applicant; / t , A Xle
s
Note:A permit n ally takes 7 to 10 days to process.
The following Ls to be completed by City personnel:
Zoning certification NFIP Flood Zone
Approved rezoning/variance?
Street address and number:New Existing
Is it in compliance with City map?
If not,has street name and/or number been reported to MPC?
FEMA Certification.attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage ^_
Approvals: Signature Date FI-BS 5-q
Zoning Administrator Permit /
Code Enforcement Officer Inspections 1_ -
Water/Sewer Water Tap
Stonn/Drainage Sewer Stub
Inspections Aid to Collar.
City Manager
TOTAL -24
MAY 24 2010 5: 06PM HP IASERJET 3200 p, 4
i
ffi r :
N., i \k:'',.
!f
GEORGIA
Permit Acknowledgement of
Ashestos/Environmental Notification to Georgia EPD for
Projects Involving Demolition,Wrecking.or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with cleznoliton,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordotace with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
F Inspector for materials that contain asbestos; and the removal of the asbestos before i cnovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
i numbers are provided by the brochures entitled Asbestos & Renovation and Asi5 estos and
Demolition. Other environmental issues such as-asbestos removal techniques, lead ehatement,
ground contamination,or unusual site conditions may have END regulations that could affect the
project.
1 _____
4 ,.__ 0
�cLli ���-
Undersigned Date /
C rIT14 Y c7: S4t41 .
Printed Name
f
1
F ? , z 't g
VeR•+�'lf+�s**r19•�a+,..r , Ft f F F$ e I Fi eti ....:,y' ii L..
3 ,.
_ B ? l doe i r e:4"i
0 „u f i_
f
'771
Cy c�'y. tf.Zax,0( `Bu(t ( \dti
004 X - q70- '7V, - qa3
1- k0 CP-7-(Lf Di-ms
�
�c�s : � d'r,rs �Jf,u�nlo�r of a �
PSAtarts rvnp
�{�r0 � `k' rep(ace_
�e�- cv�,'� (0a.01_
� xis�iN I� ' dalerror`c�/�
0niy 1�a cu000 kuie-
c)Xoc)/\-)podotse0( <ccow ovvx
7/V ccrkpltovice_ p'4 ,corce_ `.
-7Y6Pe . [Cw \rw_citA90(
Lov9 e71(9 ((: k Cs (