HomeMy Public PortalAbout10-0369 Hogan / Moore I
* W
CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 07-16-2010 PERMIT#: 100369
WORK DESCRIPTION MECH-CHANGEOUT A/C SYSTEM
WORK LOCATION 1005 BAY ST
OWNER NAME ERIC&SONIA BUTL HOGAN
ADDRESS PO BOX 1550
CITY,ST,ZIP TYBEE ISLAND GA 31328-1550
PHONE NUMBER
CONTRACTOR NAME CLIMATECH AIR INC
ADDRESS 121 W DERENNE AVE
CITY STATE ZIP SAVANNAH GA 31405
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 65.00
PROPERTY IDENTIFICATION#
PROJECT VALUATION $4,000.00
TOTAL BALANCE DUE: $ 65.00
It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire,
soil and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including
all environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
C . (64
Signature of Building Inspector or Authorized Agent:
P.0.Box 2749-403 Butler Avenue,Tybee Island,Georgia 31328
(912)786-4573-FAX(912)786-9539
www.cityoftybee.org
l ' r
f? t?
c
�1��yg6
CITY OF TYBEE ISLAND
BUILDING PERMIT
REINSPECTION FEE
DATE ISSUED: 07-27-2010 PERMIT#: 100369
WORK DESCRIPTION MECH-CHANGEOUT A/C SYSTEM
WORK LOCATION 1005 BAY ST
l Moore-
OWNER NAME ERIC&SOMA L HOGAN r rut c `i
ADDRESS PO BOX
CITY,ST,ZIP TYB ISLAND GA 31328-1550
PHONE NUMBER
CONTRACTOR NAME CLIMATECH AIR INC uu;u;Qm C 17e 6 ra. ‘r:cc r1
ADDRESS 121 W DERENNE AVE •`C
CITY STATE ZIP SAVANNAH GA 31405 3 SS-04 2 3
LQrrq 429-(os�o
FLOOD ZONE ,J
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 115.00
PROPERTY IDENTIFICATION#
PROJECT VALUATION $4,000.00
REINSPECTION FEE — FINAL MECH. TOTAL BALANCE DUE: $ 50.00
It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire,soil
and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including all
environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
(Or
P.0.Box 2749-403 Butler Avenue,Ty bee Island,Georgia 31328
(912)786-4573-FAX(912)786-9539
w ww.cityoftybee.org
,
c- 4,
40
Ivor
CITY OF TYBEE ISLAND
BUILDING PERMIT
REINSPECTION FEE
DATE ISSUED: 07-27-2010 PERMIT#: 100369
WORK DESCRIPTION MECH-CHANGEOUT A/C SYSTEM
WORK LOCATION 1005 BAY ST
OWNER NAME ERIC&SOMA BUTL HOGAN
ADDRESS PO BOX 1550
CITY,ST,ZIP TYBEE ISLAND GA 31328-1550
PHONE NUMBER
CONTRACTOR NAME CLIMATECH AIR INC
ADDRESS 121 W DERENNE AVE
CITY STATE ZIP SAVANNAH GA 31405
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 115.00
PROPERTY IDENTIFICATION#
PROJECT VALUATION $4,000.00
REINSPECTION FEE - FINAL MECH. TOTAL BALANCE DUE: $ 50.00
It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire,soil
and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including all
environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
OH..4.4 0633
Signature of Building Inspector or Authorized Agent:
P.0.Box 2749-403 Butler Avenue,Tybee Island,Georgia 31328
(912)786-4573-FAX(912)786-9539
www.cityoftybee.org
gi Account Management ` ead Only) p x
File Edit Options Functions Consoles Help
Account Number 101.2030-01 ;,p Address I 1005 (BAY ST
Zone 01 4' Name IMOORE,TIMOTHY&CARLA lh
General I Metered I Non-Metered I Financial I Information' Comments' History' Consumption History I Service Orders' Devices
—Mailing Address —Account Details
Attention I Status (Active I Eb
Address PO BOX 1285 9/02/2010 STATESBORO,GA 30459 Start Date
r® Bill Thru Date 11/30/2012
Last Bill Date 1/01/2013
-Profile
Balance 0.00.
Statement Bill Pending Activity 0.00
Statement Group P "' Credit History Good i
Class 121'P RESIDENTIAL-SINGLE Deposits 200.00 bti
E-Mail carlam @alesco.us El "' Cutoff N/A ILI
Exceptions I 123 Contracts 0.00
Draft IN/A IlI
SECOND NO. I 1912-587-7899 9125363441 eQ
SOC SEC# °= Ii
..0 Clear 1
View I dotto
.-197I "--.7/ ....77-- —A::/...,IL.- .,,,_
---)/ )
tc9-4-%
City of T ae Island • Community Develop /, )nt Dept. ,...A-0/1 Itt.--
r 111"k
Inspection Report sousgh
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 imam%
\\ y INTERMNAL
Phone 912.786.4573 ext. 114 • Fax 912.786.9539 CODE COUNCIL
MEMBER
1
-,
Permit No. / I Date Requested 1/-4,7(...)
Owner's Name 1-77Aqak.) Date Needed -4/7yD
ii /
Gen., Contractor Subcontractor i ''',.7-(i,i7/4-/ite. /4
Contact Information 0,56. i 6,:r./,- ,.. - -77V/ ,i--74/4.1=a4,-(C /52:/-7 ..:-.. 7?j-k,
Project Address
/0695- L.,4-7,
Scope of Work MF. /.,/ ,L-4"..))//e..c.
2fi
Inspector -- Date of Inspection
/ /
Inspection 11115)ka//4/ /4 -/A.)41- /,__ Pass Ii Jail il El- Fee
1110" y
I (J 4176 --1-c-)
/
dir:--c--k
Inspection Pass El Fail 0 Fee
Inspection Pass 0 Fail 0 Fee
Inspection Pass 0 Fail 0 Fee
BtE City of'l, yee Island • Community Develop nt Dept. „a•
Inspection Report iaml,
! 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 ��
�m , INTERNATIONAL
Phone 912.786.4573 ext. 114 • Fax 912.786.9539 CODE COUNCIL
MEMBER
� Date Requested �, ' >
Permit No. � - . , ,��� , � �.
Owner's Name ' -► ) Date Needed -� /2 , _
7 Gen. Contractor Subcontractor C 4-1
Contact Information C%� ,a, j,. 77Y1
Project Address / cX)<. l4a- -rt-"" - i
Scope of Work . rYn:7 1 ,,"//1/;-2/;: . ,`1 - z% Jr L,.J.1. D.1 - '
j
Inspector '''2l 4'/ Date of Inspection -1C /3
Inspection ` ,2),Z,77----) 1:----/ Jai:. Pass El Fail
617-) k___C L.--
Inspection Pass 0 Fail ❑ Fee
Inspection Pass 0 Fail ❑ Fee
Inspection Pass ❑ Fail ❑ Fee
CITY OF TYBEE ISLAND
i- t COMMUNITY DEVELOPMENT DEPARTMENT
P.O. Box 2749 • 403 Butler Ave., Tybee Island, GA 31328
� , '"� Phone (912) 786-4573 • Fax (912) 786-9539
MECHANICAL PERMIT APPLICATION
Location of work (street address) \O OS 6----. - i--
C\: c Q-0.-1-, 1 , f .,c_
Address of contractor \2\ �3- (. .._,-e....-.0.,
Contact name&telephone number of contractor 3S S-" U5 Z 3
Name of property owner Imo; c '\-boy--,
Mailing address of property owner & ' C_o Qt.c.r�-,s V .e. ..i
Telephone number of property owner C --c-I`i TaU
Residential cz Commercial
New Work Replacement
Details of project C\,-.6,,0sc o.�?t- .c- c r',r&: ,-.\-.`0,,-.i_,, S 3 Sk`,.
Estimated cost of construction b
nc) ,°-=
Permit Number
Date work will be ready for inspection, if known 3 T
ATTENTION:
Inspections for Mechanical Permits are required and will be in accordance with the
International Residential Code or the International Mechanical Code and the Georgia
Amendments.
Requirements for "change-outs" will not be less than the requirements for new installations. In
addition, elevation of outside condensing units for FEMA compliance is required. Plan
accordingly. Please ask if you have any questions.
• jji ractor signature Date
0- c s--•
Owner/Contractor printed name