Renourishment Project
Informational Me eting
for Hotels, Condo
Mana gers, and the Public
October 12, 2021
BAL
HARBOUR
- VILL AGE -
US Army Corp s
of Engineers
Jacksonville District
MIAMI•DADE
COUNTY
Purpose
• Federally funded and managed by the U.S. Army Corps
of Engineers
• This project provides:
• Beach erosion control
• Hurricane surge protection
• Protect infrastructure
• Preserve the environment for wildlife
• Support the economy (tourism)
• Builds coastal resiliency
• 200,000 cubic yards
• ~90,000 cubic ya rds from Flood Shoal (Dredging)
• —110,000 cubic yards from Upland Source (Truck Haul)
About the Sa nd
• Haulover Inlet Flood Sho al (sandbar)
• Tested a nd a pproved by USACE
• Approximately 90,000 cubic y ards
• Garcia Mine
• He ndry County, Florida
• Teste d and approved by USACE
• Approximately 110,000 cubic yards
Project Schedule*
(*Schedule is tent ative and s ubj ect to change)
• Nov ember 2021 — April 2022
• Hydra ulic Placeme nt (North Construction)
• Pipe flo ated/submerged across Haulover Inlet and over
south je tty
• Equipment to access through 96th Street
• About 4-6 weeks (Nov ember, December)
• 96t" Stree t (South Construction Access)
• About 8-12 weeks (Ja nuary, Fe bruary, March, April)
Project Sch edule*
(*Schedu le is tentativ e and s ubject to change)
• Dredging
• Monday — Sunday
• 24 hours/day (two shifts)
• Truck Haul
• Monda y — Sunday
• —7:OOa m-7:OOpm (daylight hours only)
• Work on the bea ch will progress from north to south
Boating Safety
• While dredging acti vity is in
progre ss:
• Public access to sandbar will be
limited; de pending on dredge plant
location.
• Cava che will be using staging area
at Haulov er Marina, fenced and
monitored by security at all times.
Pedestrian/Traffic Safety
• While construction activity is in
progress:
• Access point at 96th Stre et will be
monitored by flaggers to direct
pe destria n traffic and any emergency
vehicle s.
• Ca va che will se cure the construction
a ccess area using a temporary
construction fence a round the dumping
a rea.
• No e quipment will be left at the beach
during period of no construction activity.
Pedestrian/Tr affic Saf ety
• While construction acti vity is in
progress:
• ADA ramp will be placed over
pipe line at the jetty. On th e beach,
pipeline will have sa nd ramps.
Pedestrian/Traffic Safety
• Each workday shall b egin once
clearance prov ided by turtle monitors
• Ha ul roa d traffic control shall be
inspe cted e ach morning before hauling
operations begin
• Truck hauls shall be escorted by
properly trained escort
• Tra ffic control dev ices will be re moved
each day at the completion of da y's
sa nd fill
. !f•L 1111 M
100'
I:ALL f.v AD I():
WIC 4(Alt Cff
{ C .^.vA CIN ur
�kLANDfBID .r^"� wrtlrrf X"'
(NOT TO BE OISTURBE )' "
f
ANGER)
CONSTRUCTION
ZONE _)
TYPICAL WARNING SIGN
SCALE: N.T.S
WAR NIN G
VEHICI F
L ANE
DO N OT
BLOCK
OSHA M'PROV CO CAP SHALL BE
INSTALLED ON CONDUIT (TYP)
PEDESTRIA N WARNING
SIG NS ARE TO BE
AFFlLED TO BOTH SIDES
Cr STAKE
-,JETAL CONDUIT S HALL
BE SPACED AT '00'
INTERVALS AS NOTE
PA(12
Slid e 10
PA(12 Update with signage proposed for this project (USACE/Contractor)
Pisani, Alberto (RER), 9/28/2021
Contractor Parking
• At the Haulover Marina Staging Area
• ATVs will be used to tr ansfer p ersonnel to/from b each.
How It Affects You
• MOST of the beach will remain open MOST of the time.
• Business as usual
• During construction, access to certain parts of the beach will be restricted
and/or closed, for safety purposes.
• During co nstruction, parts of the beach will need to be cleared of all
chairs, umbrellas, huts, etc.
• The contractor will be co mpleting the beach north to south at the rate of
several hundred feet per day.
• You will see them co ming.
• The contractor will coordinate directly with the vendors (e .g ., chair
vendo rs) on the beach as best as possible.
• The contracto r will also reach out to management (that they know about)
with information.
• If yo u'd like, please feel free to reach out the below email to ask specific
questions.
• PublicMail. CESAJ-CC@ usace.army.mil
Q&A
• U.S. Army Corps of Engin eers
• Miami -Dade County
• Village of Ba l Harbour
• Ca va che, Inc.
EA
8
m tiJ
4
------„THANK YOU
CONTACT INFORMATION:
U .S . Army Corps of Engin eers
M aya Jordan
Email: m ay a.a .j ordanusace .army .mil
Proj ect M an ag er: Luis R. P erez
Email: luis .r.pere z(usace. army.mil
Project Spons or: Mi ami -D ade County, Alberto Pisani
Ema il: Alberto.Pis ani(miamidade .go v
Village of Ba l Harbour
Dire cto r of Pa rks and Public Spaces - John Oldenburg
Email: jolde nburg@balharbourfl.go v
Website: https://www. sa j. usace. army.mil/Ba lHarbour/
BAL
HARBOUR
- VILL AGE -
US Army Corp
of E ngi neers
Jacksonville District
MIAMI=
COUNTY
Slid e 14
PA(16 Update background mage (Bal Harbour)
Pisani, Albert o (RER), 9/28/2021