HomeMy Public PortalAbout19-9599 Execute Change Order 1 & 2 for Diamanti Construction for Bahman Avenue Sponsored by: City Manager
RESOLUTION NO. 19-9599
A RESOLUTION OF THE CITY COMMISSION OF THE CITY
OF OPA-LOCKA, FLORIDA, AUTHORIZING THE CITY
MANAGER TO EXECUTE CHANGE ORDERS 1 AND 2 TO
THE AGREEMENT WITH DIAMANTI CONSTRUCTION AND
DEVELOPMENT, INC, FOR BAHMAN AVENUE PHASE I
SANITARY SEWER CONSTRUCTION IN AN AMOUNT NOT
TO EXCEED FORTY-SIX THOUSAND NINE HUNDRED
FIFTY-SIX DOLLARS AND TWENTY-EIGHT CENTS
($46,956.28); PROVIDING FOR INCORPORATION OF
RECITALS; PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the City of Opa-locka ("City") entered into an agreement with
Diamanti Construction and Development, Inc for sanitary sewer construction on Bahman
Avenue; and
WHEREAS, Diamanti Construction and Development, Inc discovered additional
conditions that need to be addressed and that were not contemplated by the original
agreement; and
WHEREAS, Change Order 1 addresses pump monitoring in the northern burst for
$16,014.28; and
WHEREAS, Change Order 2 addresses milling and resurfacing for $30,942.00;
and
WHEREAS, the City Commission fords that it is in the best interest of the City to
authorize the City Manager to execute Change Orders 1 and 2.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF
THE CITY OF OPA-LOCKA, FLORIDA:
Section 1. RECITALS ADOPTED.
The recitals to the preamble herein are incorporated by reference.
Section 2. AUTHORIZATION
The City Commission hereby authorizes the City Manager to execute Change Orders
1 and 2 to the agreement with Diamanti Construction and Development, Inc., for Bateman
Avenue Phase I sanitary sewer construction, in an amount not to exceed forty-six
thousand nine hundred fifty-six dollars and twenty-eight cents ($46,956.28).
Resolution No. 19-9599
Section 3. SCRIVENER'S ERRORS.
Sections of this Resolution may be renumbered or re-lettered and corrections of
typographical errors which do not affect the intent may be authorized by the City
Manager, or the City Manager's designee, without need of public hearing, by filing a
corrected or re-codified copy of same with the City Clerk.
Section 4. EFFECTIVE DATE.
This Resolution shall take effect immediately upon adoption and is subject to the
approval of the Governor or his designee.
PASSED AND ADOPTED this 16th day of January, 2019.
/1A1
Mayor Matthew Pigatt
A st to: Approved as to form and legal sufficiency:
A
a Flores THE BROWN LAW GROUP, LLC
Ci '' Clerk City Attorney
Moved by: COMMISSIONER BURKE
Seconded by: COMMISSIONER KELLEY
Commissioner Vote: 5-0
Commissioner Burke: YES
Commissioner Kelley: YES
Commissioner Bass: YES
Vice-Mayor Davis: YES
Mayor Pigatt: YES
ovn.weka
o o
City of Opa-Locka
Agenda Cover Memo
Department Airia Austin Department
Director: _ _ Director Si: ature: •' • IA/
Finance Director: Bryan Hamilton FD Signature:
Department
Acting City Newall Daughtrey CM Signature:
Manager: '
Commission 01/23/2019 Item Type: Resolution Ordinance Oth4
Meeting Date: X
(EnterX in box)
Fiscal Impact: Ordinance Reading: 1 Reading 2nd Reading
(Enter X in box) Yes No (Enter X in box)
X Public Hearing: Yes No Yes No
(Enter X in box) X X
Funding Source: (Enter Fund Advertising Requirement: Yes No
Account#: &Dept) (Enter X in box) X
Ex:
35-535340
Contract/P.O. Yes No RFP/RFQ/Bid#:
Required: X
(Enter X in box)
Strategic Plan Yes No Strategic Plan Priority Area: Strategic Plan Obj./Strategy:
Related X Enhance Organizational - (list the specific objective/strategy this
(Enter X in box) Bus.&Economic Dev ll item will address)
Public Safety
Quality of Education El
Qual.of Life&City Image 0
Communication 0
Sponsor Name City Manager Department: City Manager
Short Title:
A resolution authorizing the City Manager to execute Change Orders 1 & 2 in connection with
Bahman Avenue Project Phase I with Diamanti Construction&Development,Inc
Staff Summary:
City Staff, engineers, and contractor uncovered conditions on the project that were not contemplated by the BID
for Bahman Avenue Phase I project:
Change Order 1: Pump Monitoring—North Burst for$16,014.28
Change Order 2: Milling& Resurfacing for$30,942.00
Total change order cost for Bahman Avenue Project Phase I will be$46,956.28.
Proposed Action:
Staff recommends approval.
Attachment:
1. Agenda
2. Change Order 1: Pump Monitoring—North Burst Proposal
3. Change Order 2: Milling& Resurfacing Proposal & Map
ocp.Locra
a °<
MEMO
u is
iC
TO: Newall J. Daughtrev, Acting City Manager
FROM: Airia Austin, CIP& PWD Director
DATE: January 15, 2019
RE: Bahman Avenue Projects- Change Orders for Phase I & Phase II
Change Order#1-North Burst:
During the sewer pipe installation north of Pump Station 11A, the by-pass pump failed several
times during the night hours. It caused sewage to overflow into the excavated work area. The
contractor had to clean it up each time, which resulted in job delay
Change Order#2-South Burst:
During the sewer pipe installation south of Pump Station 11A, the by-pass pump failed several
times during the night hours. It caused sewage to overflow into the excavated work area. The
contractor had to clean it up each time, which resulted in job delay. The City directed the
contractor to monitor the bypass pump after hours to assure no more sewage overflow.
Change Order#3-Pipe and Valve Repair:
4" water main in the inter section of Sharazad Blvd and Bahman Ave needed repair due to
construction activity and age of the pipe caused crack on the line. The contractor provided the
pipe and materials needed to fix it.
Change Order#4-Milling& Resurfacing:
The contractor recommended milling and resurfacing the entire Bahman Avenue section
between Sharazad Blvd and Dunad Ave. The initial work was estimated only for the disturbed
area (5000sf out of 24,100sf). Milling and resurfacing the whole street was agreed upon by the
City and contractor. The road was resurfaced and brick pavers and sidewalks were installed.
***END OF MEMORANDUM***
t x i,� ,, 5
t
D
Document G701 - 2017
o Y
th
ange Order
p..,�Id�. s ad ) r ORIL TIO p:�,� TN:
Relso: l�P.e Phase
Caauart For.Emei ac "'ii•s Qi�V1dC!1�1101�IEf:001
x " 11� 0;�-,;, L1eb:06J23/7A1$
§ Date 11/15/2018
11RCNIIECT:(Nave and address) OOIIIRACTOIB(Nas.e and addwi)
v feie ,� �
° Diamao2i Con�ucticn At Dev.Inc
t
. x ..4.!.14,,,.., :r
atti • a
:*01E: X p
2 "' a
ol.a({japyrftaab/t,attack or rigferena aalrlbtd..!!so a.clwds a�gsad upon ar�irnsa.er.ts
° ... pp..y����I�B�f CIS Db iwr)
ie'i C T i, '7.7.1 P"
6 W"44't"C-,v
K 'S' , fi '
'"/°r1 K $ 349,000.00• amuse
g, y °pie Order: $
0.00
>bar7`c Order was i 349.000.00
by this Chan8e Oedein the asp of 16.01428
' ° , �� dal ChgOrder w01 be
a, 365,01428
�� ° ° TjI ..W ed by 60(0)days.
will be 11/34W2018
� ` Th�fli it it erdoes nef> e i adjustments Change to the Contract Sum or Guaranteed Maximum Prig,or the Cary
. bsve been audnorrzaf ab�r action Directive until the cost and time have been agreed upon by both the
`O a C a I n whidt stile ti Change Order is executed to supersede• the C.oeslnretion Change
airwave.
C }�
r,T i r t+ nl ,CONTI/W I OR AND OWIER,
5
1;411' mgt D►arnauh construction Deveiopmeay C Of locks
5 zd be "7
W h,v• i
a'R (Firs*nacre) OWNER(Finn nose)
s
r' "• a JYP't
'^ ?, 1,
SINTtJlfE ' TITRE !II#NATLBiE
is
mi•k R® � Mohammed S Islam
PRiNT�NAME AND TITLE
PRINTED NAT!AND TI TIE' OJ1TE 11/15/2018
DATE DATE
z Ta s '
AlA 0aaawaer tirasw-aarT.Cc yliph!01Q7a,10M,3°°°,7001 and 2017 by s Anlnlorl Mlraha.d ArdliMera All ryhe.Iaa.lrad WAtiMMtk TI*
AIA taoelraaat is paa.aa.d br tli tbpyriita Lear cad YM.ii l Tnntl.s, l/Io. sd r.producdon or al.�tllluoa of this Nowt alaa.11t,or 1
0« d Ir,Ina'r alik to aarala clvi and e.Ylllara Ymeti.s.aed Iris be p.0aa01ll.d te the ra.odlalra..a.at peaaMsl.ands Yla This
document
330.a�mewed ty AIA aoawan at 23 20."!0 ti-
NW on 11I14f201$under
tads No TSWp2ai3.drdl sleptra.an t in 0/2018.and s<nct for raaata
X73
Diamanti Construction&Development,Inc
Project Name: Stwpr Repair at Bahman Avp PhaAe IiPump 11-A)
Change Order name: Bypass pump monitoring-North burst -Phase I
Date Submitted: 11/15/2018
Change Order number: Phase I-01
Days Requested
Equipment
Description QTY Unit Day Rate Total
225 Excavator 15 Day $1,073.00 $ 1,609.50
Loader 1.5 Day $799.00 $ 1,198.50
Skid Steer Day $260.00 $
Mini-Excavator/wheel 1.5 Day $425.00 $ 637.50
Foreman Truck 1.5 Day $60.00 $ 90.00
Dump Truck 1.5 Day $360.00 $ 540.00
Tool Truck 1.5 Day $70.00 $ 105.00
Construction Broom Day $147.00 $ -
Well Point System 4j "119 IIW :WM:7n
6"Hoses,Header Pipe and Accessories 1.5 Day $67.00 $ 100.50
Sediment Tank Day $250.00 $
6"Suction Pump 1.5 Day $268.00 $ 402.00
Two 4x20 hoses(Suction) 1.5 Day $20.00 $ 30.00
One 4x50 lay flat(Discharge) Day $10.00 $
4"Strainer Day $5.00 $ -
Small Tools 1.5 Day $15.00 $ 22.50
Trench Box 1.5 Day $145.00 $ 217.50
L: LYI
$ 6,138.00
Labor Days Day Rate
Superintendent 0.50 Day $464.00 $232.00
Foreman 1.50 Day $363.00 $544.50
Pipelayer(2) 3.00 Day $210.00 $630.00
Operator 1.50 Day $714.00 $1,071.00
Laborer(3) 4.50 Day $345.00 $1,552.50
Project Manager 0.25 Day $519.00 $129.75
$4,159.75
Subcontractor
Security 1.5 Days $ 195.00
$292.50
$ 292.50
Materials
Additional fill 9loads $450.00 $4,050.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$4,050.00
Construction Cost: $14,640.25
Admin Fees-10%: $1464.03
Total $16104.28
DIAMANTI CONSTRUCTION at DEVELOPMENT, INC
STATE LICEINISE#CGC 1524241
November 19, 2018
Additional Milling& Resurfacing for Bahman Ave(From Dunad Ave to Sharazad
Blvd)
Item Quantity Unit Unit Price Total Cost
Additional 19,100 SF of Milling& Resurfacing 1" 19,100 SF $ 1.62 30,942.00
TOTAL $ 30,942.00
Sincerely,
M Saif Islam
v
ao
CO
a
EMAIL: DIAMANTICONSTRUCTIONFLOGMAIL,CO ; CFI J.:561-301-7191
/2 133HS SIH1 3N/7 H,�1 b'!N i i U
2
oI ' ov
■
1 II
C
w Q
i
' J \
0 g
2
t.-
'' . U
ag
4 le. I`:� � � F
e„..„ - t
I i 0 ° ti
�' f 4 O O S I .i t
T' li ,
A : 1),' 1,)
-- '— If f lit. 6 "- ir
, 6 A 4. t _
tot ,
t ti
'/sir
e. �U
,,,[1,4, * ": r
1 i AO ii
.41 E I 4 It4Ii :. : . :11
0
cn
gs
_ it 1 6 ti: u
CI
wt M.
_I
LL ,,,
a El> O J :�
401 i
IZ w al
y W in /tt 0 41C4 15 ti) CD tE 12
O W : ....
`�I+i
w
I
J
ii I'2
6 IN
t
.... . ::::, it I , ...t4
1111111iti
f ;,+
0.
{/ 173I/.S S/Hl 3NI7 H31 dW