HomeMy Public PortalAbout2018 Work order related to West Mashta BridgeWORK ORDER
NOTICE TO PROCEED
November 1, 2018
TO: The Corradino Group
(CONSULTANT)
ADDRESS: 4055 NW 97t" Avenue
Miami, Florida 33178
PROJECT: West Mashta Bridge
The Village of Key Biscayne (the "Village") is in receipt of your proposal dated
October 2, 2018 to perform Structural Analysis and Design Services for the
West Mashta Bridge Remedial Repairs. The Village Council authorized the
Village Manager to issue a work order on October 30, 2018. Please accept
this letter as a Notice to Proceed with the work in accordance with the Scope
of Services (Exhibit 'A"). Terms and Conditions shall be per the Continuing
Services Agreement for Engineering Services approved May 24, 2016.
Cc: Project File
By
An a Agha, Village Manager
NIP -1
Exhlbif"A„
THE CORRADINO GROUP, INC
CORRADINO
ENGINEERS PLANNERS PROGRAM MANAGERS ENVIRONMENTAL SCIENTISTS
October 2 2018
Jake Ozyman MSCM PE ENV SP
Director of Public Works
Village of Key Biscayne
Public Works Department
88 West McIntyre Street
Key Biscayne FL 33149
Re West Mashta Drive Bridge (Bridge No 878400) Remedial Repairs
Dear Mr Ozyman
As requested The Corradino Group Inc (CORRADINO) is pleased to present this letter scope
and fee estimate to perform Structural Analysis and Design Services for the above referenced
project
BACKGROUND INFORMATION
The Village of Key Biscayne requires the following scope of services for the above mentioned
structure
• Part A Conduct a structural analysis and remedial repair plans for the above mentioned
structure based on the Ammann Whitney (Louis Berger) Inspection Report dated Nov 10
2016 our site visit and the existing bridge plans
• Part B Provide Construction Administration and Inspections Services for the
recommended repairs A separate proposal for Part B will be provided to the Village by
Corradino once the recommended repairs and plans are received
PROPOSED SCOPE OF SERVICES (Part A)
Based on the available information the existing bridge consists of one span with precast arched
units Our scope will consist of detailing the remedial repair for the existing spalls cracks and any
exposed rebars also an estimate of probable remedial repair cost will be submitted The repair
specifications will be part of the repair plans
SCHEDULE (Part A)
The scope of work is anticipated to be completed within three (3) weeks from your notice to
proceed
COMPENSATION (Part A)
CORRADINO agrees to provide the scope of services above for the lump sum compensation of
$ 14 230 00 based on a Lump Sum contract This proposal includes the services for Botas
Engineering Inc (structural analysis and design) Additional work not anticipated in this proposal
will be billed as additional services as a negotiated lump sum Written authorization will be
required prior to the commencement of additional services
Invoices will be submitted by CORRADINO upon project completion CORRADINO will provide
project management of its team resources review of available project data and provision effective
4033 NW 97tH AV! NUI SDI ri 200 MIAMI FL 3,178
FEL 800 887 3551 305 594 0735
FAX 305 594 0753
W W W CORRADINO COM
overall quality control of all deliverables A breakdown of tasks and related costs is included below
Additional services will be negotiated as required
Task
Totals
1
Structural Analysis and Plans
$ 12
374
00
2
Quality Control 15%
$ 1
856
00
Total
$ 14
230
00
CORRADINO appreciates your consideration of our firm for this project To formally authorize us
kindly indicate so by returning a signed copy of our proposal We look forward to working with you
on this project If you have any questions or if you require additional information please do not
hesitate to contact Cecilia Villona at (305) 594 0735
Presented by Accepted by
Mike Ciscar P E
VP of Engineering and Planning
The Corradino Group Inc
October 2 2018
Attachments
Exhibit A
Jake Ozyman MSCM PE ENV SP
Director of Public Works
Village of Key Biscayne
Date
1\4383 Key B yn \TWO 99 Masht B dg \TWO 9_Masht B dg d
"EXHIBIT A"
BOTAS Engineering, Inc.
STRUCTURAL ENGINEERS
September 17, 2018; rev. September 25, 2018
The CORRADINO Group
4055 NW 97th Ave.
Miami, FL 33178
Attn: Cecilia Villoria, PE
Project: West Mashta Drive Bridge (Bridge No. 878400)
Subject: Fee Proposal for the Remedial Repair Plans for Existing Cracks
along Precast Units and Spalls.
Dear Cecilia:
As requested, we are submitting our proposal to develop the remedial repair plans for
the above -mentioned structure.
Our repair plans will be based on the Ammann Whitney (Louis Berger) Inspection Report
dated Nov. 10, 2016, our site visit and the existing bridge plans.
Based on the available information, the existing bridge consists of one span with precast
arched units. Our scope will consist of detailing the remedial repair for the existing
spalls, cracks and any exposed rebars; also, an estimate of probable remedial repair cost
will be submitted. The repair specifications will be part of the repair plans.
We estimate for the repair time to be approximately 6 months; this includes product
shop drawings submittals and approvals, however it does not include any permitting
that may be required.
Our fee for the above -mentioned scope will be a lump sum of $12,374.
We estimate the work effort to develop the repair plans and the repair cost will take
approximately 2.5 weeks.
Please, let us know if you have any question(s) or need any additional information.
Thank you for considering us for this project.
Regards,
BOTAS Engineering, Inc.
Accepted
10/2/2018
Patricia M. Botas, P.E. Date
President
7875 NW 12th Street, Suite #120 • Dora), FL 33126 • Tel: 305-418-9111 • Fax: 305-418-9112
Project Activity 9: Structures Summary and Miscellaneous Tasks and Drawings
Estimator:
Mashta Bridge Remedial Repair
Task
No.
Task
Units
Design and Production
Staffhours
Comments
No. of
Units
Hours
per
Unit
No. of
Sheets
Total
General Drawings
9.1
Index of Drawings
sheet
1
0
0
0
9.2
Project Layout
sheet
0
0
0
0
9.3
General Notes and Bid Item Notes
sheet
1
12
1
12
9.4
Incorporate FDOT Standards
sheet
1
0
0
0
9.5
Incorporate Report of Core Borings
sheet
0
0
0
0
9.6
Existing Bridge Plans
LS
1
0
0
9.7
Computation Book and Quantities
LS
1
0
0
9.8
Cost Estimate
LS
1
12
12
9.9
Technical Special Provisions
LS
1
0
0
Structures - Miscellaneous Tasks & Drawings
Subtotal
1
24
Task
No.
Task
Total
Task
10
Task
11
Task
12
Task
13
Task
14
Task
15
Task
16
Task
17
Task
18
10-16
Bridge 1
70
0
0
0
70
0
0
0
10-16
Bridge 2
0
10-16
Bridge 3
0
17
Retaining Walls
0
0
18
Miscellaneous Structures
0
0
Structures Technical Subtotals
70
0
0
0
70
0
0
0
0
0
Nok
Task
Units
of
Units
Hours
per
Unit
Total
Comments
9.10
Field Reviews
LS
1
8
8
1 Inspection
9.11
Technical Meetings
LS
1
0
0
9.12
Quality Assurance 1 Quality Control
LS
%
10%
9
9.13
Independent Peer Review
LS
%
0%
0
9.14
Supervison
LS
%
0%
0
Structures Non -Technical Subtotal
17
9.15 Coordination LS
%
0%
0
9. Structures - Miscellaneous Tasks & Drawings,
Non -Technical, & Coordination Total
41
Staffhour-MashtaBridgeRepairs-loadedrates.xls
9. Structure Summary
Page 1 of 1 9/25/2018
Project Activity 13: Structures- Medium Span Concrete
Estimator:
Bridge Identfier (Number or Name):
Mashta Bridge Remedial Repair
Task
No.
Task
Units
No. of
Units
Hours /
Unit
No. of
Sheets
Total Hours
Comments
General Layout Design and Plans
13.1
Overall Bridge Final Geometry
LS
0
0
C
0
13.2
Expansion/Contraction Analysis
EA Unit
0
0
0
13.3
General Plan and Elevation
Sheet
1
18
1
18
13.4
Construction Staging
Sheet
0
0
'.
0
13.5
Approach Slab Plan and Details
Sheet
1
0
1
0
13.6
Miscellaneous Details
Sheet
1
40
i
40
Spalls. Crack Injection. Strands Repair, sheet pile repair
End Bent Design and Plans
13.7
End Bent Geometry
EA
0
0
0
0
13.8
Wingwall Design and Geometry
EA Bent
i
0'.
0
0
13.9
End Bent Structural Design
EA
0
0
0
0
13.10
End Bent Plan and Elevation
Sheet
0
0
0
0
13.11
End Bent Details
Sheet
0
0
0
0
Intermediate Bent Design and Plans
13.12
Bent Geometry
EA bent
0
0
0
0
13.13
Bent Stability Analysis
EA Design
0
0
0
0
13.14
Bent Structural Analysis
EA Design
0
0
0
0
13.15
Bent Plan and Elevation
Sheet
0
0
0
0
13.16
Bent Details
Sheet
0
0
0
0
Staffhour-MashtaBridgeRepairs-loaded rates.xls
13. Medium Span Concrete
Page 1 of 4
9/25/2018
Project Activity 13: Structures- Medium Span Concrete
Task
No.
Task
Units
No. of
Units
Hours /
Unit
No. of
Sheets
Total Hours
Comments
Pier Design and Plans
13.17
Pier Geometry
EA Pier
0
0
0
0
13.18
Pier Stability Analysis
EA Design
0
0
0
0
13.19
Pier Structural Analysis
EA Design
0
0
0
0
13.20
Pier Plan and Elevation
Sheet
0
0
0
0
13.21
Pier Details 1
Sheet
0
0
0
0
Misc. Substructure Design and Plans
13.22
Foundation Layout
Sheet
0
0
..
0
13.23
Fender System
LS
0
0
u
0
Superstructure Deck Design and Plans
13.24
Finish Grade Elevation (FGE)
Calculation
LS
0
0
0
0
13.25
Finish Grade Elevations
Sheet
0
0
C'
0
13.26
Existing Bridge Deck Analysis
EA Section
1
0
C'
0
13.27
Superstructure Analysis
EA Unit
1
0
0
13.28
Diaphragm design/ jacking loads
EA Section
0
0
u
0
13.29
Superstructure Plan
Sheet
0
0
0
13.30
Superstructure Section
Sheet
1
12
1
12
Plan with precast segments
13.31
Miscellaneous Superstructure
Details for Alternatives
Sheet
0
0
0
Reinforcing Bar Lists
13.32
Reinforcing Bar List
Sheet
1
0
i
0
Staffhour-MashtaBridgeRepairs-loadedrates.xls
13. Medium Span Concrete
Page 2 of 4
9/25/2018
Project Activity 13: Structures- Medium Span Concrete
Task
No.
Task
Units
No, of
Units
Hours /
Unit
No. of
Sheets
Total Hours
Comments
Continuous Concrete Girder Design
Longitudinal Analysis
13.33
Section Properties
LS
0
0
0
13.34
Material Properties
LS
0
0
0
13.35
Construction Sequence
EA Unit
0
0
0
13.36
Tendon Layouts
EA Unit
0
0
0
13.37
Live Load Analysis
EA Unit
0
0
0
13.38
Temperature Gradient
EA Unit
0
0
0
13.39
Time Dependent Analysis
EA Unit
0
0
0
13.4
Stress Summary
EA Unit
0
_
0
13.41
Ultimate Moments
EA Unit
0
0
0
13.42
Ultimate Shear
EA Unit
0
0
0
13.43
Construction Loading
EA Unit
0
0
0
13.44
Framing Plan
Sheet
0
0
0
0
13.45
Girder Elevation
Sheet
0
0
0
0
13.46
Girder Details
Sheet
0
0
0
0
13.47
Structural Steel Details
Sheet
0
0
0
0
13.48
Splice Details
Sheet
0
0
0
0
13.49
Girder Deflections and Camber
Sheet
0
0
0
0
Staffhour-MashtaBridgeRepairs-loadedrates.xls
13. Medium Span Concrete
Page 3 of 4
9/25/2018
Project Activity 13: Structures- Medium Span Concrete
Task
No.
Task
Units
No. of
Units
Hours /
Unit
No. of
Sheets
Total Hours
Comments
Simple Span Concrete Design
13.50
Prestressed Beam
EA Beam
u
0
0
13.51
Prestressed Beam Schedules
Sheet
C
0
0
0
13.52
Framing Plan
Sheet
r
0
0
0
Load Rating
13.53
Load Rating
EA Unit
i
0
0
13. Structures -Medium Span Concrete Total
6
70
Staffhour-MashtaBridgeRepairs-loadedrates.xls