HomeMy Public PortalAbout19-9639 Agreement w/Diamanti Construction for Roof Repair Sponsored by: City Manager
RESOLUTION NO. 19-9639
A RESOLUTION OF THE CITY COMMISSION OF THE CITY
OF OPA-LOCKA, FLORIDA, AUTHORIZING THE CITY
MANAGER TO TAKE IMMEDIATE ACTION AND ENTER
INTO AN AGREEMENT WITH DIAMANTI CONSTRUCTION
& DEVELOPMENT, INC., TO REPAIR THE ROOF AND
EXTERMINATE FOR TERMITES AT HISTORIC CITY HALL,
IN AN AMOUNT NOT TO EXCEED $32,000.00; IN A FORM
THAT IS ACCEPTABLE TO THE CITY ATTORNEY;
PROVIDING FOR INCORPORATION OF RECITALS;
PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, The historic City Hall is in need of immediate roof repair and
extermination for termites; and
WHEREAS, The City Commission believes that it is in the City's best interest to
authorize the City Manager to take immediate action to repair the roof and exterminate for
termites at historic City Hall.
NOW THEREFORE, BE IT RESOLVED THAT THE CITY COMMISSION
OF THE CITY OF OPA-LOCKA, FLORIDA:
Section 1. The recitals to the preamble herein are incorporated by reference;
Section 2. The City Manager is hereby authorized to take immediate action to repair
the roof and exterminate for termites at historic City Hall, by entering into an
agreement with Diamanti Construction and Development, Inc., for said services, in
an amount not to exceed $32,000.00, and in a form that is acceptable to the City
Attorney.
Section 3.
Sections of this Resolution may be renumbered or re-lettered and corrections of
typographical errors which do not affect the intent may be authorized by the City
Manager, or the City Manager's designee, without need of public hearing, by filing a
corrected copy of same with the City Clerk.
Section 4. This Resolution shall take effect immediately upon adoption, and is subject
to the approval of the Governor of the State of Florida or his designee.
PASSED AND ADOPTED this 10th day of April, 2019.
Resolution No. 19-9639
Matthew A. Pigatt
Mayor
Attest to: Approved as to form and legal sufficiency:
Jo.11 a Flores Vincent T. Brown, Esq.
Cit Clerk The Brown Law Group, LLC
City Attorney
Moved by: COMMISSIONER BURKE
Seconded by: VICE MAYOR DAVIS
Commissioner Vote: 4-0
Commissioner Kelley: NOT PRESENT
Commissioner Bass: YES
Commissioner Burke: YES
Vice Mayor Davis: YES
Mayor Pigatt: YES
�rea
City of Opa-Locka
Agenda Cover Memo
Department Airia Austin Department
Director: Director Signature: •
Finance Director: FD Signature:
Department
Acting City Newall Daughtrey CM Signature: i,
Manager:
Commission 04/10/2019 Item Type: Resolution ■din. /ce , O r
Meeting Date: X
(EnterXin box)
Fiscal Impact: Ordinance Reading: 1St Reading 2nd Reading
(Enter X in box) Yes No (Enter X in box)
X Public Hearing: Yes No Yes No
(EnterXin box) X X
Funding Source: (Enter Fund Advertising Requirement: Yes No
Account# &Dept) (EnterXin box) X
Ex:
44-541823
Contract/P.O. Yes No RFP/RFQ/Bid#: RFP#
Required: X Waive of BID
(EnterXin box)
Strategic Plan Yes No Strategic Plan Priority Area: Strategic Plan Obj./Strategy:
Related X Enhance Organizational EN (list the specific objective/strategy this
(EnterXin box) Bus.&Economic Dev El item will address)
Public Safety
Quality of Education 0
Qual.of Life&City Image
Communication 0
Sponsor Name City Manager Department: City Manager
Short Title:
Temporary Roof Leak Repair and Termite Treatment Proposal for Historic City Hall.
Staff Summary:
The purpose of this request is to take immediate action to perform temporary roof leak repairs and termite
treatment to the Historic city Hall facility to keep the building safe until additional funds are available to
continue with the Rehab-construction work.This project will have a fiscal impact of$31,405.00; however, it will
prevent termites and more water damages to the building.
Proposed Action:
Staff recommends approval of this proposal.
Attachment:
1. Agenda
2. Diamanti Construction & Development Inc Proposal for the Roof Leak Repair and Termite Treatment
"THE GREAT CITY"
oPp.IOC,, /J./
,a ar aebAQaa
MEMORANDUM
TO: Newall J. Daughtrey, Acting City Manager
FROM: Airia Austin, Public Works Director otv)40 .
DATE: April 3, 2019
RE: Historic City Hall Building Preservation
The intent of this resolution is for a waiver of bid, to have Diamanti Construction& Development, Inc. perform
termite treatment, and seal the building envelope.
Upon recent inspection of the facility interior it was discovered to have active termites in multiple locations. In
an effort to preserve historical aspects as well as newly constructed work, immediate action is required.
First steps will require repair of the leaky roof and the sealing of the open tower. After which the facility will be
tented to allow for the proper fumigation of the termite infestation.
Diamanti Construction was chosen for their work knowledge on historical facilities, and the thoroughness of
their work product.
780 FISHERMAN STREET,OPA-LOCKA,FLORIDA 33054(305)953-3058
AN EQUAL OPPORTUNITY EMPLOYER AND DOES NOT DISCRIMINATE ON THE BASIS OF HANDICAP
DLAMAWf1 CONST';UOTION & DEVELOPMENT, INC
STATE LICENSE# CGC 1524241
February 20,2019
Carlos Gonzalez,
CIP-Project Manager
City of Opa-Locka
Subject: Temporary Roof Leak Repair&Termite Treatment Proposal for Historic City Hall
Dear Mr. Gonzalez,
Diamanti Construction &Development, Inc pleased to submit the following proposal for temporary roof
leak repair and termite treatment for the historic city hall (main building including front two towers).
ROOF LEAK REPAIR:
Scope of work on different parts of entire flat roof of the main building & two front towers:
1. Clean flat roof on the leak areas to prepare for the repairs
2. Remove damaged roofing material on the areas of the repairs, if needed
3. Install new modified torch down roofing material, as needed
4. Install roofing cement in all required areas, as needed
5. Install roofing membrane for reinforcement of the seams, as needed
6. Install granules of the fresh roofing cement to add strength to the roof repair, as needed
7. Water proof the repaired areas
8. Cover observatory tower to prevent water intrusion
9. Dispose appropriately of all roofing debris
Note: This proposal is for water leak roof repairs on the flat roof only, does not include removal of the
existing damaged wood decking. The removal and replacement of damaged wood decking will be done
at the time of the replacement and installation of a new flat roof installation on the building, under a
separate contract.
Further,this proposal is presented for the repairs of all of the flat roof areas that has existing water leaks
only, and our work consist on stopping the intrusion of all rain water into the building from the roof,to
prevent further damages to the roof decking and the structure and interior of the building as well.
In Addition,the Contractor will furnish all material, labor, equipment,tools,transportation and services
necessary for the proper completion of the Roof repair, and remove the surplus materials,tools, and
equipment as soon as possible out of the property. rl
a,
ao
fa
a
EMAIL: 1IIAMANT1CONSTRUCT1ON Q MAILCOM;CELL:561-301-7191
DligiMANTI CONSTRUCTION 6. DEVELOPMENT, INC
STATE LICENSE#CGC 1524241
HIDDEN SITE CONDITIONS: The Contractor is NOT RESPONSIBLE for preexisting conditions.
We hereby propose to furnish labors and materials to complete in accordance with the above
specifications for the sum of$12,500.00(twelve thousand five hundred dollars)
DRY WOOD TERMITE FUMIGATION TREATMENT:
A licensed Pest Control Company will Tent the main building and two front towers to fumigate for dry
wood termite treatment(treatment does not cover subterranean or Formosan termites).
Proposed cost for the termite treatment is estimated: $18,905(eighteen thousand nine hundred five
dollars).
Cost for Temporary Roof Leak Repair & Termite Treatment:
1. Roof Leak Repair $12,500.00
2. Dry Wood Termite Treatment $18,905.00
Total $31,405.00(Thirty-One Thousand Four
Hundred Five Dollars and 00 Cents)
Respectfully,
Mohammed S Islam
Diamanti Construction &Development, Inc
President
taa
(N
CO
0_
EMAIL: DIAMAN'TICONSTRUCTIONFL®GMAILCOM; CEL L:561-301-7191