Loading...
HomeMy Public PortalAbout19-9640 Agreement with Hernandez Underground for repairs of 1226 Jann Avenue Sponsored by: City Manager RESOLUTION NO. 19-9640 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF OPA-LOCKA, FLORIDA, AUTHORIZING THE CITY MANAGER TO TAKE IMMEDIATE ACTION AND ENTER INTO AN AGREEMENT WITH HERNANDEZ UNDERGROUND TO REPAIR A 12" SEWER GRAVITY MAIN IN THE AREA OF 1226 SHARAR AVENUE, IN AN AMOUNT NOT TO EXCEED $27,500.00; IN A FORM THAT IS ACCEPTABLE TO THE CITY ATTORNEY; PROVIDING FOR INCORPORATION OF RECITALS; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, A 12" gravity main in the area of 1226 Sharar Avenue is in need of immediate repair; and WHEREAS, The City Commission believes that it is in the City's best interest to authorize the City Manager to take immediate action to effectuate the said; and NOW THEREFORE, BE IT RESOLVED THAT THE CITY COMMISSION OF THE CITY OF OPA-LOCKA, FLORIDA: Section 1. The recitals to the preamble herein are incorporated by reference; Section 2. The City Manager is hereby authorized to take immediate action to repair the 12" gravity main in the area of 1226 Sharar Avenue, by entering into an agreement with Hernandez Underground, for said services, in an amount not to exceed $27,500.00, and in a form that is acceptable to the City Attorney. Section 3. Sections of this Resolution may be renumbered or re-lettered and corrections of typographical errors which do not affect the intent may be authorized by the City Manager, or the City Manager's designee, without need of public hearing, by filing a corrected copy of same with the City Clerk. Section 4. This Resolution shall take effect immediately upon adoption, and is subject to the approval of the Governor of the State of Florida or his designee. PASSED AND ADOPTED this 10th day of April, 2019. Resolution No. 19-9640 Matthew A. Pigatt Mayor Attest to: Approved as to form and legal sufficiency: rn JoarL Flores Vincent T. Brown, Esq. City Clerk The Brown Law Group, LLC City Attorney Moved by: COMMISSIONER BASS Seconded by: VICE MAYOR DAVIS Commissioner Vote: 4-0 Commissioner Kelley: NOT PRESENT Commissioner Bass: YES Commissioner Burke: YES Vice Mayor Davis: YES Mayor Pigatt: YES City of Opa-Locka Agenda Cover Memo Department Airia Austin Department Director: Director Signature: Finance Director: FD Signature: Department Acting City Newall Daughtrey CM Signature: / wf Manager: Commission 04/10/2019 Item Type: Resolution I rdina c• S the Meeting Date: X (EnterXin box) Fiscal Impact: Ordinance Reading: 1St Reading 2nd Reading (EnterXin box) Yes No (EnterXin box) X Public Hearing: Yes No Yes No (EnterXin box) X X Funding Source: (Enter Fund Advertising Requirement: Yes No Account# &Dept) (EnterXin box) X Ex: 35-535523 Contract/P.O. Yes No RFP/RFQ/Bid#: RFP# Required: X Waive of BID (EnterXin box) Strategic Plan Yes No Strategic Plan Priority Area: Strategic Plan Obj./Strategy: Related X Enhance Organizational •• (list the specific objective/strategy this (Enter X in box) Bus.&Economic Dev item will address) Public Safety Quality of Education 0 Qual.of Life&City Image Communication 0 Sponsor Name City Manager Department: City Manager Short Title: Request for waiver of bid for the emergency procurement, approving the hiring of Hernandez Underground at a sum of$27,500.00,and authorizing the City Manager to enter into an agreement. Staff Summary: The purpose of this request is to take emergency action to repair a 12"sewer gravity main,due to the potential for sanitary sewer overflow,and to protect residential health and safety immediate action is necessary Proposed Action: Staff recommends approval of this proposal. Attachment: 1. Agenda 2. Hernandez Underground Proposal 3. Memo of explanation "THE GREAT CITY" pp oCka / gloratt o 1 i MEMORANDUM TO: Newall Daughtrey, Acting City Manager FROM: Airia Austin, Public Works Director (I-017—, • DATE: April 5, 2019 RE: Formation of Sinkhole In the latter part of the month of March, we witnessed the preliminary signs of gravity main failure adjacent to the residence located at 1226 Sharar Avenue. In this vicinity there are two gravity mains one 12" and the other 16". This request is being brought before the commission as an add-on item, at the April 10 Meeting. We are confident the problem is with the smaller main, since we are experiencing slower than normal flows between manholes The intent is to perform a point repair, in lieu of replacing the entire section of pipe between manholes, since this will be a costly venture. We have received three proposals for this repair and the intent is to go with the low bidder Hernandez Underground. Vendor Short Description Cost Hernandez Underground Excavate area to set well point system, $27,500.00 Does not install trench box, expose and repair include permit fees damaged 12"main. Restore area FD Majestic Services, Inc. Install well point system, install trench $38,500.00 Does not box and shoring as needed, excavate to include permit fees expose 12" gravity clay pipe, replace 20' section, and restore area. Metro Equipment Services, Install well point system, install trench $40,500.00 Does not Inc. box and shoring as needed, excavate to include permit fees expose 12" gravity clay pipe,replace 20' section, and restore area. 780 FISHERMAN STREET,OPA-LOCKA,FLORIDA 33054(305)953-3058 AN EQUAL OPPORTUNITY EMPLOYER AND DOES NOT DISCRIMINATE ON THE BASIS OF HANDICAP PROPOSAL It.ri It LL�L U N D E R G R O U N D 1520 SW 119 TERRACE DATE: April 3, 2019 Davie, FL 33325 Phone 786-514-1107 Fax 954-885-5554 FOR: 1226 SHARAR AVE hernandezundergroundecomcast.net AU: OWEN CARNEY To: CITY OF OPALOCKA OCARNEY @OPALOCKAFL.GOV 786-877-4015 DESCRIPTION AMOUNT MAINTENANCE OF TRAFFIC EXCAVATE AREA TO SET WELL POINT SISTEM WITH SAND BOX SET TRENCH BOX EXCAVATE AND EXPOSE BROKEN 12"CLAY REPAIR BROKEN MAIN WITH 2 IMAX COUPLING AND C-900 PVC PIPE CLEAN SEWER SISTEM MANHOLE TO MANHOLE BACK FILL AND COMPACTED RESTORE AREA $27,500.00 PERMIT FEES, BONDS AND POLICE OFFICER ARE NOT INCLUDED! THANK YOU FOR YOUR BUSINESS! PROPOSAL FD MAJESTIC SERVICES, INC. OD BS d/b/a D B S G, L L C GROUP 9950 S.W. 168 Terrace. Miami, FL 33157 TEL: (954) 642-6396 • E-MAIL:jfernandezbrun @yahoo.com Proposal Submitted To: Phone: Date: City of Opa-Locka (305)953-2828 March 27,2019 Street: Replace 20 feet section of 12"gravity line 12950 N.W. 42nd Avenue City,State and Zip Code: Job Location: Op-Locka, Florida 33054 1226 Sharad Avenue, Opa-Locka, Florida 33054 Attention: Date of Plans: E-mail address: Fax Phone: Mr Owen H. Carney E-mail : N/A We are pleased to submit for your consideration this proposal to provide "Labor, material, equipment, M.O.T, and supervision to complete the following work: 1. Set up M.OT. 2. Install complete well point dewatering system 3. Install Sheeting(trench box)and shoring as needed 4. Excavate to expose broken 12"gravity clay pipe 5. Plug in 12" line inside up-stream manhole 6. Cut 12"Clay pipe and remove a section not to exceed 20' in length 7. Prepare#57 rock bed to lay new C-900 PVC sewer pipe 8. Replace about 20' of 12" C-900 pipe using two 12" macro HP extended range coupling 2-12 manufactured by Romac Industries or equal 9. Place 6" layer of#57 rock on top of the pipe 10. Back fill and compact in 12' layers at 98%density 11. Set up vactor truck on west manhole to jet and vacuum line from the point of repair to this manhole 12. Close circuit T.V. line and provide copy of video 13. Remove plug from up-stream manhole. 14. Restore about 1800 square feet bahia sod 15. Restore±250 square feet of asphalt to meet existing condition 16. Remove and dispose debris and trash 17. And all other material,and tools to provide a complete working rapair 18. Final clean up INCLUSIONS Limited MOT Up to 250 Square feet of paving restoration The discharge of the groundwater will de done into the existing storm drainage system EXCLUSIONS ➢ Sod not included ➢ Permits ➢ Assestment or remediaton and all special handling,removal or ➢ Plans if required to be provided by the disposal of contaminared soil or ground water owner ➢ Any additional mobilization besides the first one.The job must be ➢ Any deviation from the outline of this allowed to continue without interruptions until completed proposal ➢ Any paving above and beyond de 250 S.F.per repair will be done as ➢ Police Protection an extra at a cost of$5.5 per square feet ➢ Payment and performance Bond ➢ Relocation of utilities ➢ Conflict encountered during construction ➢ Sewer By-pass PAYMENT TERMS: Based upon Applications for Payments to be discussed upon approval of contract. with the signing of this proposal Payments due and unpaid under the Contract Documents shall bear interest from the date payment is due at the following rate:any balance past thirty(30)days will be subject to 1-2%per month(18%per annual)finance charge with the Owner/Agent paying for all attorneys'fees should collection be necessary. This proposal may be withdrawn by FD MAJESTIC SERVICES, INC.d/b/a DBSG if not accepted within 30 days DISCLOSURES 713.015 LIEN LAW DISCLOSURE According to Florida's Construction Lien Law(Sections 713.001—713.37,Florida Statutes),those who work on your property or provide materials and who are not paid in full have a right to enforce their claim for payment against your property.This claim is known as a Construction Lien.If your Contractor or a Subcontractor fails to pay Subcontractors,sub-subcontractors,or material suppliers or neglects to make other legally required payments,the people who are owed money may look to your property for payment,even if you have paid your contractor in full.If you fail to pay your contractor,your contractor may also have a lien on your property.This means if a lien is filed your property could be sold against your will to pay for labor,materials or other services that your contractor or a subcontractor may have failed to pay. Florida's construction Lien Law is complex an it is recommended that whenever a specific problem arises,you consult an attorney We propose hereby to furnish material and labor complete in accordance with above specifications,for the sum of: Thirty Eight Thousand Five Hundred Dollars and no cents $ 38,500.00 I.'ayment to be made as follows: wiTn the oraer ana me rest upon completion OT me now test All material is guaranteed to be as specified. All work to be completed in a workmanlike Authorized Signature: manner according to standard practices. Any alteration or deviation from above specification involving extra costs will be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon strikes,accidents or delays beyond our control. Owner to carry fire,tornado and other Dagoberto Castillo necessary insurance. Our workers are fully covered by Workmen's Compensation Insurance. Note:This proposal may be withdrawn by us if not accepted within 30 days. Acceptance of Proposal The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. Signature Date of acceptance: TO: City of Opa-Locka Project: Emergency Repair of 10"Gravity Sewer main 12950 NW 42 AVE 1226 Sharar Avenue Opa-Locka,Florida 33054 Opa-Locka,FL Att.: Owen H.Carney Engineer:None SCOPE OF WORK.- Subject to a mutually acceptable agreement,Metro Equipment Service,Inc.("MES") proposes to provide,in accordance with the following qualifications and exceptions,all labor material and equipment to perform and complete the sewer repair items referenced under"Scope of Work- Price Schedule". 1 Set up M.OT. 2 Install complete well point dewatering system 3 Install trench shoring(trench box)as needed 4 Excavate to expose broken 12"gravity clay pipe 5 Plug in 12"line inside up-stream manhole 6 Cut 12"Clay pipe and remove a section not to exceed 20'in length 7 Prepare#57 rock bed to lay new C-900 PVC sewer pipe 8 Replace about 20'of 12"C-900 pipe using two 12"macro HP extended range coupling 2-12 manufactured by Romac Industries or equal 9 Place 6°layer of#57 rock on top of the pipe 10 Back fill and compact in 12'layers at 98%density 11 Set up Vactor truck on west manhole to jet and vacuum line from the point of repair to this manhole 12 Close circuit T.V.line and provide copy of video 13 Remove plug from up-stream manhole. 14 Restore about 1800 square feet Bahia sod 15 Restore±250 square feet of asphalt to meet existing condition 16 Remove and dispose debris and trash 17 And all other material,and tools to provide a complete working repair 18 Final clean up QUALIFICATIONS AND EXCEPTIONS: 1 Price is based on Contractor being able to discharge the groundwater dewatering into the existing drainage system or sewer system. 2 Contamination assessment or remediation work for contaminated soil,sediments and/or groundwater is not included.Removal and replacement of unsuitable and/or 3 MOT is included.Off-duty police is not included.MOT plans signed and sealed by PE is not included. 4 Cleaning and TV inspection of the sewer line associated with the repair is included.Video will be performed from MH to MH 5 This proposal is predicated on the assumption that MES will perform all the work included in this scope of services. 6 City,county,state or federal special prevailing wages are not included in our price. 7 Costs of payment and performance bond premiums are excluded. Bonds can be provided upon request.Cost of the bonds shall be reimbursed to Metro. 8 All permit fees are excluded.All permits procurement to be by others.All impact and utility connection fees are excluded. 9 All construction staking and layout is excluded. MES to provide redline as-builts at the completion of MES's scope. 10 All work to be performed in one mobilization.Additional mob/demob are not included. 11 Relocations of existing utilities are excluded.Conflicts encountered during construction will be negotiated prior to the work being performed. 12 Sewer By-Pass is Excluded 13 Sheeting is excluded 14 Items included in this Exception list are meant to represent examples of general items excluded from the proposal,absence of an item from this list should not be 15 Progress payments to MES will be made by the City within 30 days of the completion of the work as per submitted Monthly Payment Request. 16 Final payment to MES will be made by the City within 30 days of completion of MES scope of work. 17 Price is valid for 30 calendar days from the date of this proposal. 18 The work will be performed to meet OSHA regulation and the State of Florida Trench Saftey Act. SCOPE OF WORK- PRICE SCHEDULE(LUMP SUM PROPOSALI Description Ill WErelagaMI AMOUNT 1 Emergency Sewer Line Repair I LS 1 $ 40,500.00 TOTAL THIS PROPOSAL : $ 40,500.00 Ovp-LOCk4 0S 0 9 ii I O. ` D t\ 1� V? Y APRIL 2019 Project Description: Sinkhole Created by Collapsed Sewer Pipe • A sink hole was created when the existing 12" sewer pipe collapsed -:. a I ttiv - between Ahmad St. and Kalandar St. I 0,4` • 20ft. of C-900 pipe will replace the clay pipe at the section that collapsed. `"" '" .•.•• -�..•. sn~••N z_52..E IN) ,.: . . :. Stlarar Ave. -,,.> �s cr x 12^a.r rw x x t4 � �•: snf Q M .� ,,.MH 11A-16 ti MH 11A-17 I >,•1 - ;17- ' z- ...':- 226 Sharar Av- PLAN VIEW rRestore Pavements Grass Area Ira 16.1 Install+/-20ft. 12"C-900 Install Sewer r Lateral I 1 ' 1 I I MH-11A-17 I MH-11A-16 RIM Elev.=8.88' RIM Elev.=8.47' E inv.elev.=0.64'(12"Clay) E inv.elev.=0.59'(12"Clay) W inv.elev.=0.53'(12"Clay) LONGITUDINAL VIEW