Loading...
HomeMy Public PortalAbout19-9657 Agreement w/World Petroleum for Environmental Services Sponsored by: City Manager RESOLUTION NO. 19-9657 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF OPA-LOCKA, FLORIDA, WAIVING THE PROCUREMENT REQUIREMENTS ON AN EMERGENCY BASIS; AUTHORIZING THE CITY MANAGER TO ENTER INTO AN AGREEMENT WITH WORLD PETROLEUM CORPORATION IN THE AMOUNT OF ONE HUNDRED TWENTY THOUSAND FOUR HUNDRED AND TWENTY- FOUR DOLLARS ($120,424.00), FOR ENVIRONMENTAL SERVICES; PROVIDING FOR INCORPORATION OF RECITALS; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, Staff has discovered there is a tremendous amount of oil in the drainage system on Northwest 127th Street; and WHEREAS, as such, DERM has requested immediate action to clean up the system; and WHEREAS, Staff has identified World Petroleum Corporation as a reliable vendor to perform these environmental services; and WHEREAS, Staff recommends the City Commission waive the procurement requirements on an emergency basis, and authorize the City Manager to enter into an Agreement with World Petroleum in the amount of One Hundred Twenty Thousand Four Hundred and Twenty-Four Dollars ($120,424.00), for environmental services. NOW THEREFORE, BE IT RESOLVED THAT THE CITY COMMISSION OF THE CITY OF OPA LOCKA, FLORIDA: Section 1. RECITALS ADOPTED The recitals to the preamble herein are incorporated by reference. Resolution No. 19-9657 Section 2. AUTHORIZATION. The City Commission hereby waives the procurement requirements on an emergency basis, and authorizes the City Manager to enter into an Agreement with World Petroleum Corporation in the amount of One Hundred Twenty Thousand Four Hundred and Twenty-Four Dollars ($120,424.00), for environmental services. Section 3. SCRIVENER'S ERRORS. Sections of this Resolution may be renumbered or re-lettered and corrections of typographical errors which do not affect the intent may be authorized by the City Manager, or the City Manager's designee, without need of public hearing, by filing a corrected copy of same with the City Clerk. Section 4. EFFECTIVE DATE. This Resolution shall take effect immediately upon adoption, and is subject to the approval of the Governor of the State of Florida or his designee. PASSED AND ADOPTED this 8t" day of May, 2019. MATTHEW A.PIGATT MAYOR Attest to: Approved as to form and legal sufficiency: Joa l a Flores BROWN LAW GROUP, LLC City Clerk City Attorney Resolution No. 19-9657 Moved By: COMMISSIONER KELLEY Seconded by: VICE MAYOR DAVIS Commissioner Vote: 5-0 Commissioner Kelley: YES Commissioner Bass: YES Commissioner Burke: YES Vice Mayor Davis: YES Mayor Pigatt: YES C O City of Opa-Locka Agenda Cover Memo Department Airia Austin Department Director: Director Signature: • Acting City Newall Daughtrey CM Signature: Manager: %II, Commission 05/08/2019 Item Type: Resolution rdina ce • 't er Meeting Date: X (EnterX in box) Fiscal Impact: Ordinance Reading: 1st Reading 2Ra Reading (Enter X in box) yes No (Enter X in box) $120,424.00 X Public Hearing: Yes No Yes No (Enter X in box) X X Funding Source: (Enter Fund Advertising Requirement: Yes No Account# &Dept) (Enter X in box) Ex: X 81-581920 Contract/P.O. Yes No RFP/RFQ/Bid#: RFP# Required: X Waive of BID (EnterX in box) Strategic Plan Yes No Strategic Plan Priority Area: Strategic Plan Obj./Strategy: Related X Enhance Organizational - (list the specific objective/strategy this (Enter X in box) Bus.&Economic Dev D item will address) Public Safety Quality of Education Qual.of Life&City Image Communication D _ Sponsor Name City Manager Department: City Manager Mort Title: Request for waiver of bid for the emergency procurement, approving the hiring of World Petroleum Corporation at a sum of$120,424.00,and authorizing the City Manager to enter into an agreement. Staff Summary: The purpose of this request is to take emergency action to clean the storm drain system on NW 127th Street in order to prevent oil from entering into the canal system and addition this is a requirement from DERM. Proposed Action: Staff recommends approval of this proposal. Attachment: 1. Agenda 2. CBI Environmental Services Proposal 3. Raider Environmental Services Proposal 4. World Petroleum Corporation Proposal 5. Memo of explanation O 9 MEMO TO: Newall J. Daughtrey, Acting City Manager FROM: Airia Austin,CIP& PWD Director DATE: May 8,2019 RE: Emergency Declaration in Compliance with Section 2-320 (i) Three weeks ago we found out that the Drainage System on NW 127th Street was full with a tremendous amount of oil, and DERM is requesting immediate action to clean up the system. If we do not correct this action it will result in daily fines of$250.00 up to$10,000.00. The reason for this long delay is because we were in the process of identifying a vendor to perform this job and selecting the best proposal. Vendor Short Description Cost CBI Environmental Services Supply all labor, materials and equipment to $163,650.00 Vac-Con clean drainage sumps and structures of all soil and debris located at NW 127th Street Raider Environmental Services Cleaning, transportation and disposal of the $129,200.00 contaminated water and sludge and grit from the storm drain system on NW 127th Street World Petroleum Corp. Labor, equipment, and transportation $120,424.00 required to clean multiple storm drains at NW 127th Street As a result of that urgent situation, and in an effort to prevent harm to the City and its residents, I declared an emergency to enable the most expeditious, effective and lawful response allowable in accordance with the relevant section of the City's Code. I hereby certify that the information provided above is true and correct to the best of my knowledge. Enclosures ***END OF MEMORANDUM*** 2?,1,, • _ r�,g • xt, , • • CBI CW Bury in( C' e'rrc irme—meal `(;r.^s„€'= April 22, 2019 Project Proposal: STORM DRAINAGE BASIN CLEANING AND JETTING CLAIRO LANE & NW 127TH STREET IMPROVEMENTS Customer: City of Opa-Locka Contact: Owen Carney Phone#: 1-305-953-2828 Address: 12950 Lejeune Ave Opa-Locka, FL 33054 Proposal Sent Via Email: ocarnevaa opalockafl.gov Dear Mr. Carney: Cliff Berry, Inc. (CBI) has been offering comprehensive Environmental Services for over six decades by combining proven technical expertise and problem solving proficiency. We have supported our customers in developing cost effective solutions for all of their environmental requirements. Cliff Berry, Inc. (CBI) is pleased to provide you with a personalized pricing proposal to execute the following Scope of Work referenced below: Scope of Work: Cliff Berry, Inc. (CBI) will supply all labor, materials and equipment to Vac-Con clean (14) — 4 x 4 x 6 drainage sumps and structures of all soil and debris located at the above-mentioned site. In addition, CBI will jet clean approximately 2000 liner feet of connecting 24-inch diameter drainage pipe to remove any soils or debris. CBI will dispose of all contaminated soil and water generated during the duration of the project. Price to include labor, material and equipment... $8,200 per day Note: This project estimated @ 14 ten-hour days Disposal of soil: Estimated Volume 220 tons in total 22 ton minimum on transportation per load Disposal of contaminated soil $85.00 per ton Transportation of contaminated soil $15.00 per ton Transportation Demerge if required $60.00 per hour Equipment operator and backhoe $2,900.00 flat rate Disposal of oily water: Estimated at 50,000 gallons Disposal of oily water $0.38 per gallon Transportation of oily water $550.00 per 6000 gallon load Total(Estimated) cost of project... C $163,650.00 Estimated Site Location: 127”'Ave and Opa-Locka Blvd. '` ox. 13 071 Port E 'urutcAks Stat1oC,, Fort L2.t��z 1=;Crf rd.<. ricL ,,_ O`° .P._ r s4 763 :1390. Fay; ti.)5,41 ,r .,h ° €" 1. Once the project has been accepted and confirmed to CBI for execution, we shall schedule this project on a mutually agreeable date with a minimum of five(5)business days'lead-time. 2. All waste is subject to Profile Approval from the certified disposal facility and will be manifested (actual quantity), transported and disposed of in accordance with all Federal, State and Local regulations. 3. Any waste accepted that is not in compliance with approved profile will be communicated with the customer within 72 hours of receipt. Pricing adjustments will be applied where applicable. 4. Our rates are based on a Monday thru Friday 0800 — 1700 workweek. If weekend work and/or second/third shift work is required and authorized, overtime rates will be charged at one and a half straight time rates and double on observed government holidays. 5. It is the customer's responsibility for payment of any tariffs, fees, taxes, and administrative costs which CBI may incur in the execution of this project.Any additional fee(s)shall be indicated as a separate line item on the final invoice. 6. A fuel surcharge shall be added to all invoices in accordance with the"National Average Diesel Fuel Index". 7. A signed Purchase Order, Job Authorization Form or this Proposal is acknowledging agreement with the terms and conditions of this document and is required prior to job commencement. 8. Any demurrage charges that are NOT caused by CBI's field personnel shall be billed to the customer. 9. This estimate applies only to the job described above. This pricing does not include additional materials or labor that may be required due to any unforeseen problems that may arise once the project has begun. If additional labor and equipment is required, it will be invoiced at"Time&Material"rates. 10. This proposal is an estimate based on limited known conditions. If the scope of work changes CBI reserves the right to adjust its fee schedule as required. 11. Payment is CASH IN ADVANCE unless otherwise approved in advance by CBI's credit department. 12. The above rates are based on a(4)hour minimum. 13. Transportation charges are portal to portal. 14. Pricing is valid for(30)days from the date of this proposal. Supplemental Conditions: 1. Pricing is based on estimated days and availability of equipment at the time of scheduling. 2. Any damage to rental equipment left on site overnight will be invoiced to the customer. 3. It is the responsibility of client to have all manways and access ports open that are need to make entry or access to the above quoted system for cleaning, prior to start of work. 4. CBI's liability to protect existing structures and utilities from damage is limited to the extent of CBI's direct negligence. Due to the inherent risk associated with the methodology of the job, CBI is not liable for structures with existing damage during the course of decontamination. 5. CBI will require unimpeded access to the work site area. Cliff Berry, Inc. would like to thank you for the opportunity to submit pricing for this project. If you require additional details on this scope of work, please do not hesitate to contact the undersigned. CBI is committed to preserving our environment and combined with decades of documented work experience. It is our personal commitment to you that we shall execute this work with the highest degree of professionalism and environmental stewardship. All CBI field personnel are certified with 40-Hour OSHA training and are Confined Space Entry certified. Best Regards, Patrick Petrillo Account Manager Fort Lauderdale, FL 33316 Cell: 954-594-3872 Office: 954-763-3390; Ext. 1502 Fax: 954-763-8375 Company Representative (signature) Title Company Representative (print) Date PS: Please sign and return this project proposal at your earliest convenience so that we may verify our master schedule and confirm to you the exact time and date of the work to be performed. P.O. Box 1307 9 Port E.v&rgladr:s Station, Fort Lauderdale, Florid 13316 Office:, (95$) '63,3390 Fax 19.54E 763.8375 vivoh,cliffberryinc,core isgtiostiear ENVIRONMENTAL SERVICES April 30`h 2019 Airia Austin City of Opa Locka 780 Fisherman Street Opa Locka, FL 33054 Dear Mr. Austin In response to your request, Raider Environmental Services of Florida, Inc. is pleased to submit a proposal for the Cleaning, Transportation and Disposal of the contaminated water and sludge and grit from the storm drain system on NW 127th street, from NW 32nd Ave to Cairo Lane. Scope of Work Raider will provide a vactor truck and operator to vacuum out all of the soil and any sludge and water jet all 15 and 24 inch lines totaling approximately 2000 linear feet. . This could take up to three full weeks due to the limited quantification of solids that have entered the system and the amount of petroleum product that will have to be removed. Raider is proposing to separate the job into three sections. 1- structure S 21 to S 23 and then S-24 2- structure S 24 to S25, S 26 S 27 and S 28 and S 29 3- structure S 29 to S 31, S 30 s 32 and S33 Each section will be isolated and pumped down into a supplied frac tank to gravity separate any possible petroleum contact water. The oil water portion of the frac tank will then be transported off site to Raider facility for disposal. The remaining petroleum free water will be decanted back to the system after the system has been cleaned. Raider will provide all pumps and necessary plugs to isolate the drainage system as needed for the cleaning process. Vacuum extracted materials will be staged onsite at a pre determined location area just west of 32nd ave until enough material that has been stockpiled can be transported and disposed of, once approval has been accepted at our disposal facility. This proposal is based on the information provided via a site visit. We will be responsible for profiling, vacuuming, cleaning, transporting and manifesting the soil and any sludge all in compliance with US DOT regulations. Transportation of all waste will be in accordance with all transportation regulations including those described in 49 CFR 170-179, 40 CFR 61,40 CFR 263, 40 CFR 112.7, and 40 CFR 761. The following will be the specific responsibilities: 1. Vacuum and pressure clean out all of the soil and any sludge from the storm drains. 2. Complete all applicable paperwork required for disposal and shipment for the sludge. 3. Remove, transport and dispose of the oily sludge. 4. Coordinate acceptance and transportation to the disposal facility. The following quote includes all labor, material and disposal for oily water. Raider can not quantify the amount of soil that is contained within the existing piping, we can only ascertain by what is visible to us at time of inspection which was all catch basin were completely full of sand and debris which leads us to the worst case scenario that the pipes are also completely full although unlikely it is the worst case scenario. Taking that scenario into play, one would estimate the entire volume 45, 316 gallons as per City of Opa Locka personnel is dirt and a conversion factor 200 gallons per cubic yard is used. There could potentially be over 225 cubic yards of debris in the system. Soil disposal rates will be billed on actual scaled tonnage from Waste Management with a total not to exceed number of 35,000.00 The actual cleaning process, mobilization of equipment, oily water disposal, materials and labor cost are not to exceed 104,200.00 We appreciate the opportunity to service your environmental needs and look forward to working with you in the future. Please do not hesitate to contact me at(305)994-9949 if you need further assistance. Sincerely, Orlando Solis Director of Compliance& Environmental Operations Raider Environmental Services of Florida,Inc. RAIDER ENVIRONMENTAL SERVICES OF FLORIDA, INC. COST PROPOSAL CUSTOMER: City of Opa Locka SCOPE OF WORK: Vacuum, Pressure Wash, Transport and Dispose of Soil and Sludge Description Quantity Unit Price Extended Price Vactor Truck and Operator 10 hours x $280.00/hour $42,000.00 15days Service Truck 10 hours x 15 $100.00/hour $15,000.00 days Field Tech 10hours x 15 $50.00/hour $7,500.00 days Field Tech 10 hours x 15 $50.00/hour $7,500.00 days Frac tank rental 3 weeks plus 5 5 mob x 30 $500.00 per $4,000.00 mobilizations days mob, 50 a day _ Disposal of contaminated soil 60.00 per ton Not to exceed _ 25,000.00 _ Miami Dade Water Meter+usage _ $ 5,000.00 _ Confined Space 1 flat rate $1750.00 $ 1,750.00 _ Pump+pipe plug rental 30days $550.00/day $16,500.00 Loader+ operator 3 days _ $1500.00 day _ $ 4,500.00 _ Estimated Total 129,200.00 Terms and Conditions 1. Charges will be based on actual tons removed for disposal. 2. Work to commence at the direction of the customer. 3. Payment for this project must be made within 30 days of completion. 4. Any and all taxes will apply. The undersigned agrees to and accepts the terms shown in this Cost Proposal. This proposal shall be in effect for 60 days from this date. Airia Austin, as Authorized Agent Date For City of Opa Locka •� WORLD PETROLEUM CORP PO BOX 291197 DAVIE FL 33329 VVorldPetroleu P: 954-327-0724 F: 954-327-0755 CORPORATION Proposal Submitted To: City of Opa Locka Phone: 786-877-4015 Date: 04/24/2019 Fax: Street: Job Name: Storm Drain Cleaning City,State,and Zip Code: Job Location: NW 127th St Attention: Mr.Owen Carney Email:ocarney @opalockafl.gov WORLD PETROLEUM CORP IS PLEASED TO SUBMIT OUR PROPOSAL FOR THE LABOR,EQUIPMENT,AND TRANSPORTATION REQUIRED TO CLEAN MULTIPLE STORM DRAINS AT TILE ABOVE REFERENCED SITE. THIS WORK AS ITEMIZED BELOW: UNIT TOTAL ITEM#1: VACTOR TRUCK#1 WITH OPERATOR:@$180.00/HR 60 HR $10,800.00 (4 HR MINIMUM)PORTAL TO PORTAL ITEM#2: VACTOR TRUCK#2 WITH OPERATOR:@$180.00/HR 60 HR $10,800.00 (4 HR MINIMUM)PORTAL TO PORTAL ITEM#3: TRACTOR TRAILER#1 WITH OPERATOR:@$105.00/HR 60 HR $6,300.00 (4 HR MINIMUM)PORTAL TO PORTAL ITEM#4: TRACTOR TRAILER#2 WITH OPERATOR: @$105.00/HR 60 HR $6,300.00 (4 HR MINIMUM)PORTAL TO PORTAL ITEM#5: CERTIFIED FIELD TECHNICIAN:@$65.00/HR 60 HR $3,900.00 ITEM#6: DISPOSAL OF NON-HAZARDOUS WASTEWATER AT @$0.36 PER GALLON: (WORSE CASE SCENARIO 20,000 GL) $7,200.00 ITEM#7: DISPOSAL OF NON-HAZARDOUS SLUDGE/SOLIDS AT @$1.50 PER GALLON: (WORSE CASE SCENARIO 54,316 GL) $81,474.00 ESTIMATED TOT $120,424.J Business hours are Monday through Friday 7:OOam-5:OOpm.World Petroleum will not be responsible for removing diffusers if they apply. The customer will be responsible for locating the drains before the start of the project.The customer will be responsible for moving any vehicles that obstruct the drains.If there is a large quantity of water in the drain system,the customer will be responsible for directing World Petroleum where to dispose of the water.If personnel or equipment is no longer necessary onsite,the customer will not be billed.If the scope of work exceeds or undermines the estimated total,the bill will be adjusted and verified by the customer.World Petroleum will provide the customer with proper disposal documents upon completion. PLEASE NOTE: IF CIRCUMSTANCES BEYOND THE CONTROL OF WORLD PETROLEUM CORP REQUIRE DIFFERENT AND ADDITIONAL LABOR NOT INCLUDED ABOVE,THE CLIENT WILL BE CHARGED AT THE QUOTED HOURLY RATE. A SIGNED PROPOSAL(HARD COPY)AND PURCHASE ORDER(HARD COPY)ARE REQUIRED PRIOR TO INITIATING THE WORK. IF MATERIALS ARE CHARACTERIZED TO BE"HAZARDOUS,"AMOUNT DUE WILL BE ADJUSTED ACCORDINGLY. IF PAYMENT IS ENFORCED VIA A LIEN,ALL ASSOCIATED COST WILL BE THE RESPONSIBILITY OF CITY OF OPA LOCKA. We Propose hereby to furnish material.labor and complete project in accordance with above specifications. PAYMENT DUE NET 30 DAYS FROM RECEIVING INVOICE All material is guaranteed to be as specified.All work to be completed in a workmanlike manner according to standard practices. "A service charge equal to the maximum legal interest allowed by law will be charged on all accounts with balances that are past due,in the event World Petroleum Corporation has to retain an attorney to recover any sum that may be due under this agreement or order,then in such event,the customer shall reimburse World Petroleum Corporation,for all fees incurred together with all costs of litigation and other expenses incurred in connection with said collection."Please be advised that World Petroleum Corporation invoicing will only reflect actual quantities removed and the work performed. All agreements contingent upon strikes,accidents or delays beyond our controL Owner shall carry fire,tornado and other necessary insurance. Our workers are fully covered by Workmen's Compensation. NOTE: This proposal may be withdrawn by us if not accepted within 30 days. Acceptance of Proposal,The above prices,specifications and conditions are satisfactory and are hereby accepted.You are authorized to do the work as specified. SIGNATURE AUTHORIZATION: Date WORLD PETROLEUM Date CITY OF OPA LOCKA