PLANNING BOARD REPORT
Board Members:
John B. Hawes, Jr., Chairman
Linda Tuttle -Barletta
Jeffrey W. Brown
Fergal Brennock
Neal Corbett
On April 10, 2013 with five (5) members of the Planning Board (the Board) present, case # ZBA-
2013-07 SP/SR, a Special Permit with Site Plan review to be heard by the Zoning Board of Appeals
on April 24, 2013, was considered. The Board submits the following report, as requested, to aid the
Zoning Board of Appeals in deciding the application before it.
Case #:
Subject Property:
Parcel ID #:
Zoning District:
Petitioner:
Owner:
Zoning Relief Sought:
Granting Authority:
Site Plan Review Meeting:
Planning Board Meeting:
Planning Board and Staff
Recommendation:
Date of Planning Board Report
Zoning Board of Appeals Hearing:
ZBA-2012-07 SP/SR
64 Grove Street
1613 7B 0
I-2 (Industrial) Zoning District
Tufts Associated Health Maintenance Org., Inc. 705 Mt Auburn
St, Watertown, MA 02472
Boston Biomedical Research Institute, 64 Grove St. Watertown,
MA
Special Permit with Site Plan Review-
• §5.01.3(a), Business Offices
• §6.01(g) Offsite Parking
Zoning Board of Appeals
Waived — existing space with interior renovations only
April 10, 2013
Conditional Approval SP/SR (vote: 5-0)
April 18, 2013
Scheduled: April 24, 2013
Page 1 of 8
64 Grove Street Planning Board Report
ZBA-2012-07 SP/SR 04/18/2013
I. Public Notice (M.G.L. c. 40A, 11)
A. Procedural Summary
Petition PB-2013-07 SP/SR was considered by the Planning Board April 10 2013 and is
scheduled to be heard the Zoning Board of Appeals on April 24, 2013. As required by M.G.L. c.
40A, sec.11 and the Watertown Zoning Ordinance, notice was given as follows:
• Published in the Watertown Tab, the newspaper of record, on 4/5/2013 and 4/12/2013;
• Posted at the Town Administration Building and on the Town Website on 3/27/2013; and,
• Mailed to Parties in Interest on 03/27/2013.
B. Legal Notice
"64 Grove Street - Tufts Associated Health Maintenance Organization, Inc. 705 Mt. Auburn Street, Watertown, MA
herein requests the Zoning Board of Appeals grant a Special Permit in accordance with Watertown Zoning
Ordinance §6.01(g) Off -Site Parking and §5.01.5(c)2 Conversion >4,000 Square Feet from Laboratory to Office,
Zoning Ordinance, so as to extend Tufts office operations at 64 Grove Street with additional required parking of 87
spaces located at 705 Mt. Auburn Street. 1-2 (Industrial) Zoning District. ZBA-2013-07"
Front facade of buildin from Grove St
Looking north from 64 Grove over RR bridge
Area of proposed pedestrian crossing
Entrance to Tufts parking area from Grove St
- ._ 1
Page 2 of 8
64 Grove Street Planning Board Report
ZBA-2012-07 SP/SR 04/18/2013
II. Description
A. Site Characteristics
The subject property is a 1.272 acre lot situated on Grove St and the former Boston & Maine
Railroad line with a building used for office/research & development originally built in 1920. The
site has parking in the rear with 65 spaces and two entrances (one to the rear and one on the street).
B. Surrounding Land Use
The project site is located just south of Arlington St surrounded by a mix of commercial and
industrial uses. Tufts and the Old Burying Ground are to the north, Newlyweds Bakery is directly to
the south/east, and a residential neighborhood is located to the rear of the site. A mix of industrial
uses are situated to the west of Grove St.
C. Nature of the Request
The Petitioner has requested that the Zoning Board of Appeals grant a Special Permit with Site Plan
Review in accordance with §5.01.3(a), Business Offices and §6.01(g) Off Site Parking to convert an
existing office/laboratory building into a office building with 152 parking spaces, of which 87 would be
located off -site in the Tufts main campus parking garage.
D. Relevant Permitting History
• ZBA # 98-35 SP & VAR; and, 98-37 & 98-36SPF — Special Permit, Special Permit Finding, and
Variance — to convert and existing building into a R&D facility by demolishing 30,000 s.f.,
adding 7,000 s.f. to the second floor, for a total of 51,200 s.f. and adding parking for 65 spaces
where 97 would be required.
• ZBA # 96-17 SP/SPF and #97-23 SPA (amendment) — to renovate and restructure an existing
AT&T assembly and office facility on 11.26 acres and build a 4 level 928 space parking garage
which was amended to be 5 -level and an additional 260 spaces and shifted on the site so the total
parking was for 1736 vehicles with employee flex time
III. PUBLIC COMMENT
No written comments were received at the time this report was written. Angie Kounelis, Town
Councilor, commented that Tufts has been a good neighbor and is delighted with the responsiveness
of Tufts to issues that have arisen in the pass. She had questions about the number of potential
employees (200 was the response) and to whether the space would be subleased (no was the answer).
She also wanted to ensure that the neighborhood traffic was considered when traffic was leaving the
site during the time that the police detail was in place.
IV. FINDINGS
Within the I-2 Zoning District, the Zoning Board of Appeals is the Special Permit Granting
Authority.
Page 3 of 8
64 Grove Street Planning Board Report
ZBA-2012-07 SP/SR 04/18/2013
A. Plan Consistency
Met: The proposed development is in keeping with the goals and implementation strategies of relevant
plans.
1. Watertown Growth Management Plan, 12/01/1988
• Maintain an industrial and commercial base for employment and fiscal purposes
2. Strategic Framework for Economic Development, 08/02/2011
• Overarching goals to capitalize on key industry clusters and promote investment
• Goal 4 — Shape the character of new development: set expectations for high quality, attractive
architecture and site design that minimizes impacts on the environment.
These plans lay a framework for development. The proposed conversion in use will continue to support
the commercial and built environment in the neighborhood and will expand a crucial component of the
business mix within this area of Watertown. The expansion of the Tufts headquarters will continue the
redevelopment of this industrial area into a viable business mix.
B. Special Permit — Site Plan Review &5.01.3(a), Business Offices:
The request must meet the four conditions of approval for a Special Permit as set forth in WZO
§9.05(b) as well as consider the 10 criteria for Site Plan Review as set forth in §9.03(c) all within the
parameters of § 1.00, Purpose.
1. The specific site is an appropriate location for such a use, structure, or condition.
Met: The conversion of the existing mixed office and research space into a commercial office
building as part of the Tuft's headquarters is appropriate and is allowed within the district. The two
sites have ample parking and can accommodate the interior conversion of laboratory space to office
space without impact to traffic or parking. The original approvals to convert 64 Grove St into a
biomedical R&D facility allowed for a reduced parking of 65 spaces. The proposed acquisition and
use by Tufts would remove this non -conforming aspect of the site by providing adequate parking
within the main campus parking garage which currently has excess parking.
2. The use as developed will not adversely affect the neighborhood.
Met: There are no external changes being proposed to the site so there will be little change to the
current operations. There will be an increase in pedestrian use of the sidewalk on Grove St. which
would add additional 'eyes on the street' that may increase the vibrancy and safety of pedestrians
using this area. The proposed Watertown Greenway divides the two sites and Tuft's has offered to
keep the route clear year round when if the community path is built. They have also proposed a
pedestrian access with approval by DCR when the rail corridor is converted. This maintenance and
use would improve the multi -use path and would improve the neighborhood.
3. There will be no nuisance or serious hazard to vehicles and pedestrians.
Met: The sites were designed with appropriate safety and access for vehicles and pedestrians. The
current sidewalk and exits from the garage are adequate for pedestrian access between the two sites
and if access is developed across the rail corridor, even more options will be available. The 64
Page 4 of 8
64 Grove Street Planning Board Report
ZBA-2012-07 SP/SR 04/18/2013
Grove St site has a front entrance that will provide direct access for employees and the existing lot
located at the rear of the building will provide all handicap and visitor parking required for the
building. A traffic study was completed which shows negligible impacts to the surrounding streets.
The current mitigations have been successful in maintaining the transportation network in the
vicinity.
4. Adequate and appropriate facilities will be provided for the proper operation of the
proposed use.
Met: Parking requirements are met with a total of 260 excess parking spaces remaining on the main
campus. Existing facilities have been identified as being adequate for the commercial office use.
A. &9.03 (c), Site Plan Review
As this project is making no external modifications to the sites, the preliminary site plan committee
meeting was waived. The following provides findings for the ten Site Plan Review Criteria,
§9.03(c), of the WZO:
1. Preservation of Landscape:
Met: No changes are proposed to the exterior of the site that would affect this criterion.
2. Relation of Buildings to Environment:
Met: No changes are proposed to the exterior of the site that would affect this criterion.
3. Open Space:
Met: No changes are proposed to the exterior of the site that would affect this criterion.
4. Circulation:
Met: Current Transportation Demand Management (public transportation and carpool incentives,
flexible schedules) has reduced vehicle trips and parking demand on the Tufts site. Tufts Health Plan
does not plan on expanding the number of employees at this time. Despite this, the study looked at a
possible increase of 100 additional vehicle trips per day compared to the existing BBRI use. The
study concluded that the traffic generated would be minimal and can be reasonably accommodated
with the current street system without any project specific mitigation.
5. Surface Water Drainage:
Met: No changes are proposed to the exterior
6. Utility Service:
Met: No changes are proposed to the exterior
7. Environmental Sustainabilitv:
Met: No changes are proposed to the exterior
8. Screening:
Met: No changes are proposed to the exterior
of the site that would affect this criterion.
of the site that would affect this criterion.
of the site that would affect this criterion.
of the site that would affect this criterion.
Page 5 of 8
64 Grove Street Planning Board Report
ZBA-2012-07 SP/SR 04/18/2013
9. Safety:
Met: No changes are proposed to the exterior of the site that would affect this criterion.
10. Design:
Met: No changes are proposed to the exterior of the site that would affect this criterion.
V. PLANNING BOARD AND STAFF RECOMMENDATIONS:
Linda Tuttle -Barletta motioned to accept the Staff Report findings that the petition for a Special
Permit with Site Plan Review will meet the criteria set forth in §9.05 (b); adequately addresses the
Site Plan Review criteria as set forth in §9.03 (c); and meets with the general purpose of the
Ordinance outlined in § 1.00 of the WZO and recommends granting conditional approval to allow
the conversion of a office/lab into a commercial office use with offsite parking. Jeff Brown seconded
the motion and the Board voted 5-0 to recommend approval to the Zoning Board of Appeals.
VI. CONDITIONS:
#
Condition
Timeframe
for
Compliance
To be
Verified
by
1
These approvals are based upon the control plans submitted by the
Petitioner and/or the contractor and control plans as referenced
and approved through previous approvals:
The Plan dated 3/20/2013 by Bruce Truong, Tufts Health Plan, titled
C-1 Tufts Health Plan 705 Mount Auburn Street & 64 Grove Street
Combined Site Plan
Perpetual
ZEO/
ISD
2.
Previous Approvals. Conditions as approved in Decisions ZBA # 98-
35 SP & VAR; and, 98-37 & 98-36 SPF, as well as Decisions ZBA #
96-17 SP/SPF and #97-23 SPA shall remain in effect unless
specifically modified by this decision
Perpetual
ZEO
3.
Plan Modifications. Neither the Petitioner nor any present or future
owner of any interest in the project shall change or modify either the
control plans referenced in this decision, or the project itself, without
first filing a formal request with the DCD&P, Zoning Enforcement
Officer, and Building Inspector, for an opinion as to whether or not
such change or modification requires further review from the Granting
Authority. Minor modifications may be considered and approved by
DCD&P Director which are found to be consistent with the project
approval granted by the Granting Authority.
CO'
Perpetual
ZEO/ISD
4.
Recordation. Upon application for a Building Permit, the Petitioner
shall provide evidence to the Zoning Enforcement Officer that this
entire decision has been filed with the Registry of Deeds.
BP
ZEO
5.
Codes/Regulations Compliance. The Petitioner shall comply with all
other applicable local, state, and federal requirements, ordinances, and
statutes.
Perpetual
ZEO/ISD
Page 6 of 8
64 Grove Street
ZBA-2012-07 SP/SR
Planning Board Report
04/18/2013
#
Condition
Timeframe
for
Compliance
To be
Verified
by
6'
Certificate of Occupancy/Final Inspection. A copy of the Building
Permit with final approval signatures from all relevant inspectors must
be submitted to the Zoning Enforcement Officer upon completion of
the project.
CO
ZEO
7
Signage. No signs are approved as part of this permit; all signs shall
be reviewed and approved under separate building permit.
perpetual
ZEO
8.
Pedestrian Access. If an easement is obtained for a pedestrian
crossing between the two sites, final design and placement shall be
reviewed and approved administratively by planning staff.
Perpetual
DCDP
Page 7 of 8
sii
aRk.. 831-71'!241/(4 7 14444_1 0r
1-11
�A 7lf x�
The data shown on this site are
provided for informational and -'
planning purpo ses only. The
• Town and its consultants are not rt-
6 responsible for the misuse or • •, .,
misrepre sentation of the data.
pg n rraarn
MErirtrE3,4 .„
RR1F'I.ELD. AVE —1
11_11111111MINIOCa! 11...4
! ftr-
630
1260 tt Printed on 04/02/2013 at 04.04 PM
Abutting Towns
Town Boundary
nu
MA Highways
Interstate
/^`- US Highway
/r' State Highway
Parcels with Orthos
Hooks vviOrthos
Buildings
ce Rinks
Community Health Centers
Hospitals
1;1
Public Libraries
�I
Schools
II111
Police Stations
1�
Fire Stations
I
64 Grove St Locator
laa .l]s a 4o.ID f9