RIVERSIDE COUNTY TRANSPORTATION COMMISSION
TECHNICAL ADVISORY COMMITTEE MEETING AGENDA*
*Actions may be taken on any item listed on the agenda.
TIME: 10:00 a.m.
DATE: April 15, 2013
LOCATION: Riverside County Transportation Commission
4080 Lemon Street, Third Floor
Riverside, CA 92501
In compliance with the Americans with Disabilities Act and government Code Section 54954.2, if you need special
assistance to participate in a Committee meeting, please contact the Riverside County Transportation Commission
at (951) 787-7141. Notification of at least 48 hours prior to meeting time will assist staff in assuring that
reasonable arrangements can be made to provide accessibility at the meeting.
1. Call to Order
2. Self -Introductions
3. Approval of February 4, 2013 Minutes
4. Public Comments (This is for comments on items not listed on agenda. Comments
relating to an item on the agenda will be taken when the item is before the Committee.)
5. Draft STP Rehabilitation Call for Projects — Summary and Staff Recommendations
(Attachment)
6. Development of Multi -funding Call for Projects (Summary of Assumptions for the Call)
(Verbal Presentation)
7. Obligation Plan for the Remaining FFY 2012-13 Projects (Attachment)
8. FTIP Update (Attachment)
9. Local Assistance Update (Verbal Presentation)
10. April Commission Meeting Highlights (Verbal Presentation)
11. Other Business
SB 821 Call for Projects
12. Adjournment (The next meeting will be May 20, 2013 in Riverside.)
-• AGENCY TAC MEMBER BANNING DUANE BURK Director of Public Works BEAUMONT KISHEN PRATHIVADI Assistant Director of Public Works BLYTHE DAVID LANE City Manager CVAG 1 MIKE SHOBERG Transportation Program Manager CALIMESA MICHAEL THORNTON City Engineer CAL TRANS ~ SEAN YEUNG Acting District Local Assistance Engineer CANYON LAKE HABIB MOTLAGH City Engineer CATHEDRAL CITY BILL SIMONS Interim City Engineer COACHELLA JONATHAN HOY City Engineer CORONA KIP FIELD Acting Public Works Director DESERT HOT HAL GOLDENBERG SPRINGS Director of Public Works TECHNICAL AD.RY COMMITTEE April 15, 2013 ALTERNATE PRINT NAME Kahono Oei \<~ol-lo 0 E'"•" Kevin Hughes Allyn Waggle we,...¢\' Deputy Director /~\~v-. Bob French H,~1~ Public Works Director William Mosby Deputy Director of Planning c1¥l\J~T~ l-\N l{.,461{1. "\ ' I L2? .,4 ~1 "'(_C>~ Maritza Martinez j~£t~ ~ Interim Public Works Director Robert Morin Principal Civil Engineer -------• SIGNATURE ~ I I i /\ ~t_ c/fUI) PJJ;<~ ~~1 ... ~ J.'111~ <E:Y-l-\~ I \ I . I .. ~~ 1 -CMJJ1N{ /J u .
.... • EASTVALE HEMET GEORGE ALVAREZ City Engineer JORGE BIAGIONI TECHNICAL AD.RY COMMITTEE April 15, 2013 G~e:;~.:? ~ /\ \vare Victor Monz Engineering Director/City Engineer I Principal Engineer INDIAN WELLS IKEN BELL I Bondie Baker Interim Public Works Director Assistant Engineer II INDIO I GRANT EKLUND Tom Rafferty Public Works Director/City Engineer Principal Civil Engineer G#<,lfArr E }< L (.)Ai J;> 1JURUPA VALLEY I ROY STEPHENSON Mike Myers I Public Works Director/City Engineer Assistant City Engineer LA QUINTA !TIMOTHY JONASSON Bryan McKinney Public Works Director/City Engineer Principal Engineer LAKE ELSINORE I KEN SEUMALO City Engineer fCEJ-/ 5ei,tM Alo I I MENIFEE /JONATHAN SMITH Robert Johnson -;J::J.M17-1,1r).} 5 /VltTf/ Acting City Engineer Interim City Manager I MORENO VALLEY !AHMAD ANSARI Prem Kumar ~~~\'I\ Public Works Director/City Engineer Deputy Public Works Director/ ~l..{Nlt\(. Assistant City Engineer MURRIETA BOB MOEHLING Jim Holsten Engineering Manager Assistant City Manager s~ ~O~l.-l ~1 NORCO BILL THOMPSON Lori Askew Director of Public Works Sr. Engineer • ~ JM--~ I ){_?ff Ji __ £--
-... • PALM DESERT BO CHEN City Engineer PALM SPRINGS DAVE BARAKIAN Director of Public Works/ City Engineer PERRIS HABIB MOTLAGH City Engineer RTA GORDON ROBINSON Director of Planning RANCHO MIRAGE BRUCE HARRY Director of Public Works RIVERSIDE TOM BOYD Public Works Director RIVERSIDE COUNTY JUAN PEREZ Director of Transportation SAN JACINTO HABIB MOTLAGH City Engineer SUN LINE JOE FORGIARINI Director of Transit Planning TEMECULA GREG BUTLER Director of Public Works WILDOMAR TIM D'ZMURA Director of Public Works and City Engineer WR COG RUTHANNE TAYLOR-BERGER Deputy Executive Director TECHNICAL AD.RY COMMITTEE April 15, 2013 • Mark Diercks /l/MtL ~~" ~_Id . Transportation Engineer .... fkvl ~((104~ 9&!~-H~,'3 Lorelle Moe-Luna Senior Planner Bill Enos ~~'1 r--. 4~ )\---v-\:, City Engineer < I ~-/ j. 'I ~.JU Farshid Mohammadi / -v Engineering Manager (.fl/\ . Patty Romo _/·;~--~ Deputy Director of Transportation HA61iJ : Amer Attar ~r;5ufl___ Principal Engineer Dan York / / .! City Engineer Donna Dean ?-~ Program Manager '
...... • AGENCY __ 1?..:versid~ c.L) .,,Rf 'f /Y)o~o i/AL~e,,y TECHNICAL ADV.RY COMMITTEE April 15, 2013 NAME TELEPHONE OR E-MAIL 'Ko1.1 ;./ /,( I I Y nuJf ~ rc..+lwt~' o-ra. I 7 E-(.Ui C.. L€WI 6 £: (Z i C_) L £ (f0 ,1 VI c/I} A L , o ~G "--"-------1------------------------f----1 --1--~--=--• --~----·-
MINUTES
TECHNICAL ADVISORY COMMITTEE MEETING
MINUTES
Monday, February 4, 2013
1. CALL TO ORDER
The meeting of the Riverside County Transportation Commission (RCTC) Technical Advisory
Committee (TAC) was called to order at 10:05 a.m. at the Riverside County Transportation
Commission, 4080 Lemon Street, Riverside, CA.
2. SELF -INTRODUCTIONS
Members Present:
Others Present:
Lori Askew, City of Norco
Greg Butler, City of Temecula
Bo Chen, City of Palm Desert
Donna Dean, WRCOG
Grant Eklund, City of Indio
Bruce Harry, City of Rancho Mirage
Jonathan Hoy, City of Coachella
Prem Kumar, City of Moreno Valley
Eric Lewis, City of Moreno Valley
Bob Moehling, City of Murrieta
Farshid Mohammadi, City of Riverside
Robert Morin, City of Corona
Habib Motlagh, Cities of Canyon Lake,
Perris and San Jacinto
Kahono Oei, City of Banning
Gordon Robinson, Riverside Transit Agency
Patty Romo, County of Riverside
Ken Seumalo, City of Lake Elsinore
Bill Simons, City of Cathedral City
Michael Thornton, City of Calimesa
Sean Yeung, Caltrans District 8
Fred Alamolhoda, LAE Associates, Inc.
Grace Alvarez, RCTC
Cathy Bechtel, RCTC
Ruben Castaneda, City of Eastvale
Eric DeHate, RCTC
Jillian Edmiston, RCTC
Shirley Gooding, RCTC
Bryan McKinney, City of La Quinta
Shirley Medina, RCTC
Roy Null, County of Riverside
Jonathan Smith, City of Menifee
Technical Advisory Committee Meeting
February 4, 2013
Page 2
3. APPROVAL OF MINUTES
M/S/C (Harry/Romo) to approve the minutes as submitted.
4. PUBLIC COMMENTS
There were no public comments.
5. ELECTION OF OFFICERS
Greg Butler, City of Temecula, was unanimously nominated and elected Chair for the Western
County; and Jonathan Hoy, City of Coachella, was unanimously nominated and elected Vice Chair
for the Eastern County, both for two year terms commencing February 4, 2013.
6. SB 821 CALL FOR PROJECTS
Jillian Edmiston, RCTC, reminded the TAC that an SB 821 call for projects will be released on
March 4, 2013. There will be an optional technical workshop on March 11. Proposals will be due
Thursday, May 16, and the evaluation committee will meet Wednesday, May 29. The award will be
presented to the Commission Wednesday, July 10. She requested three TAC volunteers who are not
submitting proposals to contact her or Shirley Medina if they wish to sit on the evaluation committee.
In response to a suggestion to change the claims due date from June 30 to August 30, Ms. Edmiston
reported that administrative extensions may be granted by RCTC's executive director once the
affected agency sends a letter to her stating additional time is needed.
7. MID COUNTY PARKWAY
Cathy Bechtel, RCTC, provided a Mid County Parkway (MCP) question and answer newsletter
describing the project and addressing various questions. She provided history of the MCP as well as
future strategies for its completion, and requested specific positive or negative written comments by
March 11. There will be a public hearing on Wednesday, February 20, 5:00 p.m. to 8:00 p.m., at
Lakeside Middle School, Perris.
8. SR-79 REALIGNMENT PUBLIC MEETINGS
Ms. Bechtel reported that the environmental document for the State Route 79 realignment project
from Gilman Springs Road/SR-79, San Jacinto, to south of Domenigoni Parkway, Winchester, was
signed by Caltrans and it will be published Friday, February 8 in the Federal Register, which will
start the 45-day comment period to March 25. She further indicated that the alignment will be moved
further west, that it will be straighter, 12 miles, and two lanes in each direction. Two public hearings
are scheduled Tuesday, February 26, 3:00 p.m. to 6:00 p.m. and Wednesday, February 27, 5:00 p.m.
to 8:00 p.m. at Tahquitz High School, Hemet.
Technical Advisory Committee Meeting
February 4, 2013
Page 3
9. FEDERAL STP CALL FOR REHABILITATION/RECONSTRUCTION PROJECTS
Shirley Medina provided a Draft Surface Transportation Program (STP) Call for Rehabilitation
Projects, a table indicating draft amounts that each agency will be eligible to receive if their
nominated project fits the criteria, and pavement has a management system in place.
She stated that RCTC is setting aside 20% of fiscal year 2012/13 apportionment for STP for three
years of funding for a total of $13.8 million. She further explained the background, policy, and
procedure. She also indicated that based on questions and/or recommendations, a subcommittee
would be convened — most likely a conference call. The call for projects is expected to be released in
March. She responded to various questions.
10. FEDERAL FISCAL YEAR 2012/13 OBLIGATION PLAN REVISED
Grace Alvarez, RCTC, provided an updated FFY 2012/13 Obligation Plan spreadsheet. She reported
that as we approach the April 1 deadline for submittal of request for authorization to Caltrans Local
Assistance, for projects programmed with Surface Transportation Program (STP) and Congestion
Mitigation Air Quality (CMAQ) in FY 2012/13, RCTC continues to monitor the progress of these
projects to make sure RCTC meets its obligation authority while helping the state meet its obligation
authority and be eligible for the August Redistribution for California.
The current obligation plan reflects the latest schedule updates received from the local agencies.
Also, the funding has been revised to reflect the latest funding plans for the Proposition 1B Trade
Corridor Improvement Fund (TCIF) projects for grade separations that include a mix of federal, state,
and local funds.
The combined STP/CMAQ obligation plan is approximately $105 million this year. FY 2012/13 is a
big year for delivery of federally funded projects. There are six CVAG CMAQ funded projects from
the 2007 call for projects in the Coachella Valley; six grade separation projects from the Alameda
Corridor East; RCTC's Perris Valley Line Extension and Rideshare Program; one Transportation
Enhancement; an interchange in the Pass Area, and one pavement rehabilitation project.
11. 2013 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM UPDATE
Eric DeHate, RCTC, said on December 13, 2012, SCAG, FHWA, and Caltrans approved the 2013
FTIP. The additional amendments that were submitted are attached to the staff report.
In response to a suggestion, Mr. DeHate agreed to include estimated date of approval on his FTIP
amendment log.
12. LOCAL ASSISTANCE UPDATE
Sean Yeung, Caltrans Local Assistance, stated that FHWA sent Caltrans congratulations on taking the
balance of unexpended funds down for the quarterly review of inactive projects. Since last year, the
Technical Advisory Committee Meeting
February 4, 2013
Page 4
number has been reduced from the $60+ million range to under $2 million, which also reduces the
scrutiny FHWA would be under by other federal agencies.
At present, there is another quarterly review of inactive projects. He encouraged agencies that are on
the three-month look ahead to submit an invoice before the end of this quarter so it won't be inactive
next quarter. The quarterly review goes out to the six-month look ahead, meaning that it will be six
months before it becomes inactive. If an invoice cannot be submitted, agencies should submit a
justification form that is due on February 22.
Mr. Yeung also announced that a flyer was sent out to all agencies that Caltrans is holding its RE
Academy that is being offered throughout the state. The first one will begin in Sacramento on
February 11. A series of training will be offered February 11 until the end of June. The training
being offered at District 8 will be April 15 through April 18 at the Hilton Garden in San Bernardino
off Waterman. The teachers of the classes are from Cal State Sacramento and it costs $360; if not a
local agency, the cost will be $560.
He stated that he had been contacted by his counterparts in Sacramento that there are a couple of
agencies in which a project program supplemental agreement was sent, which is a contract that is sent
within 10 to 12 working days after an E-76 is issued meaning that it was more than 30 days since
Caltrans has received a signature from the agency. The purpose of the agreement is that upon signing
it, Caltrans would be allowed to pay for the invoice submitted by the city.
13. JANUARY COMMISSION MEETING HIGHLIGHTS
Cathy Bechtel reported that this year's Commission Workshop was January 31 and February 1.
RCTC's federal lobbyist attended from Washington DC as well as the state lobbyist from
Sacramento. They talked about the reauthorization, what the funding picture looks like, and the new
transportation secretary who has not been named yet. The Commission outlined the Measure A
Expenditure Plan that was approved by the public. She further reported that The Commission's
Chair, Karen Spiegel, is setting up a subcommittee of Commissioners to review where the
Commission can get more funding for such things as the San Jacinto Valley's desire to have the
Perris Valley Line continue to Hemet and San Jacinto.
She also reported that RCTC's Michael Blomquist talked about the I-15 toll roads and the State Route
91 CIP and that RCTC received a $445 million TIFIA loan. A subcommittee of Commissioners has
been discussing the I-15 route, how much money there is for the project, and if a toll road and general
purpose lanes should be added. A recommendation was made to move forward with the
environmental document on the I-15 toll road from 60 to Cajalco on the I-15 with a toll road in the
median and no additional general purpose lane.
The Commission approved authorizing its executive director to award the contract at the appropriate
time. That is a $250 million project with $137.7 M of federal funds.
Technical Advisory Committee Meeting
February 4, 2013
Page 5
Ms. Medina reported that proposals for transportation funding, including user fees, vehicle miles
travelled fees, vehicle registration fees, and diesel fuel tax increases are being discussed at state and
federal levels, and the Commission will continue to be briefed on these issues.
14. OTHER BUSINESS
Grace Alvarez asked Sean Yeung about the recently released Caltrans Office Bulletin regarding
changes to the finance letter that allows the local agencies to determine a lump sum reimbursement or
a Pro Rata reimbursement. The proposed change will impact several projects planned for obligation
in FY 2012-2013. Sean Yeung responded that the difference is trying to guess the future cost of the
project for that phase of work. When the bids go up, one option is more beneficial; when the bids go
down, the other option is more beneficial. In the finance letter, the local agency can determine which
method could be the most beneficial. At present, there is talk of modifying the finance letter along
with other streamlining processes relating to future RFA packages to federal highways.
Patty Romo, County of Riverside, announced that the county has been working on an ADA transition
plan for the past couple of years and it is being released for public review February 5, with adoption
expected in March. It is on the county's transportation web page.
15. ADJOURNMENT
There being no further business for consideration by the Technical Advisory Committee, the meeting
adjourned at approximately 11:12 a.m.
Respectfully submitted,
Shirley Medina
Programming and Planning Manager
AGENDA ITEM 5
DRAFT
RIVERSIDE COUNTY TRANSPORTATION COMMISSION
DATE:
April 22, 2013
TO:
Budget and Implementation Committee
FROM:
Shirley Medina, Programming and Planning Manager
THROUGH:
Cathy Bechtel, Project Development Director
SUBJECT:
Federal Surface Transportation Rehabilitation Call for Projects —
Programming Recommendations
STAFF RECOMMENDATION:
This item is for the Committee to:
1) Approve programming federal Surface Transportation Program (STP) funds for
rehabilitation projects in the amount of $ million as presented in Attachment A;
and
2) Forward to the Commission for final action.
BACKGROUND INFORMATION:
At its March 2013 meeting, the Commission approved a Call for Rehabilitation Projects
funded with federal STP funds in the amount of $13.8 million. The amount available is a
set aside of 20% of Riverside County's Fiscal Year 2013/13 STP apportionment
estimate provided by Caltrans. Staff received number of projects by the April 1,
2013 deadline for the May Commission approval action, and anticipates additional
projects to be submitted for approval at the June Commission meeting.
Upon approval, staff will program the projects in the Federal Transportation
Improvement Program (FTIP). Once the projects are in an approved FTIP project
sponsors will work with Caltrans to complete the federal requirements for obligating the
funds.
Federal STP funds are administered through Caltrans; therefore there is no impact to
the Commission's budget.
AGENDA ITEM 6
A presentation will be made but
there is no attachment to the
agenda for item 6.
AGENDA ITEM 7
RIVERSIDE COUNTY TRANSPORTATION COMMISSION
DATE:
April 15, 2013
TO:
Technical Advisory Committee
FROM:
Grace Alvarez, Senior Staff Analyst
Eric DeHate, Staff Analyst
SUBJECT:
Federal Fiscal Year 2012/13 Obligation Plan Revised
STAFF RECOMMENDATION:
Receive and file.
BACKGROUND INFORMATION:
As presented to you during our previous TAC meetings, RCTC prepared the federal
obligation plan for FFY 2012/13 and submitted it to Caltrans Local Assistance. The revised
attached FFY 2012/13 Obligation Plan includes Riverside County's Congestion Mitigation Air
Quality (CMAQ) and Surface Transportation Program Local (STPL) funded projects, and
reflects the latest updates received from the local agencies. It also reflects the successful
obligation of RCTC's Rideshare Program, Riverside County's Clay Street Grade Separation
right-of-way, and Desert Hot Springs Essential Road Improvements Phase III.
Another change worth reporting is that the Riverside Avenue Grade Separation will not need
post award right-of-way STPL obligation, as the right-of-way process has been completed
and the previously obligated STPL funds are sufficient to cover the right-of-way costs.
As we can see, the obligation plan is an important tool in managing federal funds and
provides critical information to RCTC on the need to develop contingency plans, such as
loans between regions or project substitution, based on the target amount of federal funds
that needs to be obligated during the fiscal year. Likewise, the plan allows Caltrans to
monitor the rate of obligations, determine staffing needs, and develop contingency plans for
use of any funds that may not be obligated at a statewide level.
It is important to emphasize that agencies that submit their request for authorizations (RFA)
by the established deadline of April 1st have better chances of obligating the programmed
federal funds in the current fiscal year because usually there is enough Obligation Authority
(OA) to approve federal obligations. Additionally, early obligation of the federal funds in the
fiscal year helps our region to meet the OA target and prevents it from becoming available to
other regions within the state; it may even help secure additional OA for Riverside County
through the "August Redistribution."
If the state as a whole does not use all of the OA, then the unobligated balance will return to
the Federal Highway Administration (FHWA) for redistribution to other states that have
obligated 100% of the OA. This is referred to as "August Redistribution." This opportunity
allows states to obligate more federal funding than initially anticipated.
RCTC understands that some projects simply can not obligate earlier than the schedule
allows due to environmental or right of way certification issues, however, RCTC staff
encourages agencies to obligate as early as possible in the federal fiscal year.
Therefore, RCTC continues to request your active participation in keeping the FFY 2012/13
Obligation Plan updated throughout the end of the fiscal year. Please feel free to contact
RCTC Programming Staff if you need assistance with your obligation package.
Attachment: FFY 2012/13 Obligation Plan
FFY 2012/2013 OBLIGATION PLAN RCTC
NOM
Rivuddc Calmly Trunsponafmn Commhva-
RFA Subm. To
Funding
Current Project
IN FY12/13 FTIP
Agency
FTIP ID
Project Location
Project Scope/Description
Caltrans D-8
CMAQ
STP-L
Phase
Phase
Beaumont
RIV050535
SR60/Potrero Blvd. Interchange Ph. 1
IC Project
4/1/2013
$2,406,000
Con
ROW
Y
Coachella
RIV071246
Ave. 52GS
Grade Separation
4/1/2013
$7,818,000
Con
ROW
Y
Corona
RIV041047
Magnolia & El Camino Ave
TE project
11/15/2012
$943,000
Con
ROW
Y
Indio
RIV091208
Jackson St signal synch
Signal synchronization
8/1/2012
$332,000
Con
CON
Y
Palm Desert
RIV031208
1-10 at -Monterey Ave IC
New Westbound Ramps
3/25/2013
$1,771,000
Con
CON
Y
Palm Desert
RIV071243
Free rt- Fred Waring/111
Reconfigure Right Turn
4/15/2013
$531,000
Con
ROW
Y
Palm Springs
RIV071258
Traffic Management Ctr
TMC
4/15/2013
$1,644,000
Con
PA&ED
Included in 2013 FTIP
A6
Palm Springs
RIV091205
Farrell Dr RT Ln @ Vista Chino
Intersection Improvements
3/1/2013
$369,000
Con
PA&ED
Y
RCTC
RIV520109
Perris Valley Line
Perris Valley Rail Line
9/15/2012
$32,091,000
Con
PS&E
Y
Riverside
RIV110116
Quiet Zone X-ing Imp
Crossing improvements
TBD by Agency
$7,000,000
Con
PA&ED
Y
Riverside
RIV070703
Iowa Ave
Grade Separation
3/1/2013
$2,626,968
Row
ROW
Y
Riverside County
RIV060123
Clay St GS
Grade Separation
6/30/2013
$6,829,000
Con
ROW
Y
Riverside County
RIV071278
Magnolia Ave. GS
Grade Separation
6/30/2013
$16,400,000
$4,350,000
Con
PA&ED
Y
Riverside County
RIV060124
Sunset Avenue
Grade Separation
4/1/2013
$10,000,000
$1,482,000
Con
CON
Included in 2013 FTIP
A6
$77,785,000
$18,807,968
TOTAL
Pending Obligation
Need Additional Information
Planned for update in 2013 FTIP Amendment #6
RFA to be submitted to Caltrans
As of March 7, 2013
1
AGENDA ITEM 8
RIVERSIDE COUNTY TRANSPORTATION COMMISSION
DATE:
April 15, 2013
TO:
Technical Advisory Committee
FROM:
Grace Alvarez, Senior Staff Analyst
Eric DeHate, Staff Analyst
SUBJECT:
2013 Federal Transportation Improvement Program (FTIP)
STAFF RECOMMENDATION:
Receive and file.
BACKGROUND INFORMATION:
2013 FTIP
On February 4, 2013 RCTC staff presented updates to the 2013 FTIP and reported the
approval of the 2013 FTIP federal conformity, as well as approvals for Formal Amendment
No. 1 and Administrative Modification No. 2.
Since the approval of the 2013 FTIP, SCAG has processed four Formal Amendments, three
Administrative Modifications and one RTP Consistency Amendment. Currently, RCTC has
participated in seven out of the eight amendments encompassing changes to 131 projects
including Administrative Modification No. 8 submitted to SCAG on April 9, 2013.
As noted on the 2013 FTIP Amendment Log Approval (attached), Formal Amendment No's 1
and 3 and Administrative Modification No's 2 and 5 have been approved.. Pending approval
is 2012 RTP Consistency Amendment No. 4, Formal Amendment 6 and the most recently
submitted Administrative Modification No. 8. Formal Amendment No. 7 is SCAG's lump sum
listing for Job Access Reverse Commute (JARC) and New Freedom (NF) transit grant
projects that include some of our non-profit Riverside County transit providers, currently
undergoing Ca!trans and FHWA review. Anticipation of approval of Consistency Amendment
No. 4 is end of June 2013. Formal Amendments No. 6 and 7 as well as Administrative
Modification No. 8 are anticipated to be approved the end of April 2013.
Attachment: 2013 FTIP Amendment Log
2013 Federal Transportation Improvement Program - Amendment Submittals and Approval Dates
2013 FTIP
Purpose
No. of Projects
Due to RCTC
Due to SCAG
Anticipated Approval
Final Approval
Final
12/13/2012
Amendment 1
Formal Amendment
53
10/8/2012
10/22/2012
1/31/2013
1/24/2013
Amendment 2
Administrative Modification
23
11/19/2012
11/27/2012
12/15/2013
12/19/2012
Amendment 3
Formal Amendment
14
12/17/2012
1/8/2013
3/15/2013
3/13/2013
RTP Consistency
Amendment/Amendment 4
Formal Amendment
1
1/9/2013
1/14/2013
6/30/2013
Amendment 5
Administrative Modification
15
1/24/2013
2/5/2013
2/28/2013
2/21/2013
Amendment 6
Formal Amendment
8
2/25/2013
3/5/2013
4/30/2013
Amendment 7'
Formal Amendment
2/27/2013
4/30/2013
Amendment 8
Administrative Modification
17
4/1/2013
4/9/2013
4/30/2013
Total Number of Projects_
131
'RCTC did not participate in this Amendment
2013 FTIP Amendment log.xlsx
As of April 8, 2013
4/8/2013 - 4:26 PM Page 1 of 18
RCTC
2013 FTIP - Formal Amendment No. 1 m
October 2012 Akerside(ounryUmnWllotia C0.010r
FHWA approval: Jan. 24, 2013
Agency
Project ID
Title
Update Reason
CALTRANS
RIVLS01
GROUPED PROJECTS FOR SAFETY IMPROVEMENTS - SHOPP COLLISION REDUCTION
PROGRAM: PROJECTS ARE CONSISTENT W/ 40 CFR PART 93.126 EXEMPT TABLES 2&3 -
RR/HWY CROSSING, SAFER NON -FED -AID SYSTEM RDS, SHOULDR IMPRVMNTS, TRAFFIC
CNTRL DEVICES/OPERATING ASSIST OTHER THAN SIGNALS, INTERSCTN SIGNAL PRJCTS
AT INDVL INTERSCTNS, PVMNT MARKING DEMO, TCL OUTSIDE THE UA, LIGHTING
IMPRVMNTS, EMERGENCY TRUCK PULLOVERS
Cost Increase (EA: 0M420 added to FY 2012/2013, OP280 added
to FY 2013/2014, OR740 added to FY 2014/2015).
CALTRANS
RIVLS09
GROUPED PROJECTS FOR SAFETY IMPROVEMENTS - SHOPP MANDATES PROGRAM:
PROJECTS ARE CONSISTENT W/ 40 CFR PART 93.126 EXEMPT TABLES 283 - RR/HWY
CROSSING, SAFER NON -FED -AID SYSTEM RDS, SHOULDR IMPRVMNTS, TRAFFIC CNTRL
DEVICES/OPERATING ASSIST OTHER THAN SIGNALS, INTERSCTN SIGNAL PRJCTS AT
INDVL INTERSCTNS, PVMNT MARKING DEMO, TCL OUTSIDE THE UA, LIGHTING
IMPRVMNTS, EMERGENCY TRUCK PULLOVERS
New Project - EA: 0M310
City of Riverside
RIV120801
IN RIVERSIDE FOR RIVERSIDE SPECIAL SERVICES - CAPITALIZED PREVENTATIVE
MAINTENANCE (FY 12 - 5307) (UZA: RIV-SB).
New project from the 2012/2013 SRTP for the City of Riverside
City of Riverside
RIV120802
IN WESTERN RIVERSIDE COUNTY FOR RIVERSIDE SPECIAL SERVICES - LEASE OF XEROX
MACHINE TO SUPPORT TRANSIT DIVISION NEEDS, PER APPROVED 2012/2013 SRTP -
TABLE 4, PROJECT NO. FY 134 (FY 13 - 5307) (UZA: RIV-SAN).
New project from the 2012/2013 SRTP for the City of Riverside
COACHELLA
RIV061159
AT SR86/Avenue 50: Widen and construct new 6 through lane IC from E/O Coachella Stormwater
Channel Bridge to E/O Tyler St. Improvements include: extended ramp acceleration/deceleration
lanes, relocate/realign Ave 50 and Tyler St, bike lanes, sidewalks, and reconstruct traffic signals
(SAFETEA-LU 1702, CA 583, #2543) (EA: 0C970).
Cost decrease based on revised engineer's estimate and schedule
delay, per current PA&ED start phase.
COACHELLA
RIV071246
In the City of Coachella - Construct new (Non -capacity) Ave 52 Grade Separation overhead
structure spanning over UPRR mainline tracks and Grapefruit Blvd/Hwy 111, from Shady Ln to
approx 600' E/O Industrial Way/Tyler St. Improvements incl: Reconfig connection from Ave 52 to
Grapefruit Blvd/Hwy 111, bike Ins, sidewalks, retaining walls, reconst traffic sigs/driveways, remove
existing at -grade crossing.
Reprogramming of funding mainly needed to utilize CITY funding
for RAN and increase CMAQ in construction.
Minor project description made to correct the problem in the
database with ft (" instead of') - abbreviation to the crossing at the
end of the project description was needed to stay within the
character limitation.
Additionally, Sec 125 Surface Transportation Priorities funding was
deleted and FFY 2009 Appropriation Earmark added to clarify the
earmark appropriation in 2009 (Public Law 111-8).
Corona
RIV010209
In the City of Corona - Construct Foothill Parkway Westerly Extension 4 lane road from Lincoln Ave
to Paseo Grande (Approx 2.5 miles)
Cost decrease based on current engineer's estimate and minor
schedule delay that does not impact the model (2014).
2013 FTIP Amendment log.xlsx
4/8/2013 - 4:26 PM
Page 2 of 18
RCTC
2013 FTIP - Formal Amendment No. 1 ma
Dant* (wmyImmoimlkn Coma*.
October 2012
FHWA approval: Jan. 24, 2013
Agency
Project ID
Title
Update Reason
Corona
RIV011240
In Corona on existing McKinley St - Construct grade separation at BNSF Railroad crossing (project
study report & preliminary environmental analysis report activities).
New Project in the 2013 FTIP Quadrennial Years
CVAG
RIV090102
In the Coachella Valley PM-10 Progra - Clean Vehicle Acquisition Program: Fleet acquisition of
alternative fuel sweepers for regional street sweeping program of major arterials, for the reduction of
PM10 fugitive dust throughout the Coachella Valley ($229 toll credits used to match CMAQ in const).
Reprogram funding from FY 2013/2014 to FY 2014/2015
Desert Hot Springs
RIV061161
Essential road improvements - Phase III: City Section 31 including pavement rehab, sidewalks,
curb/gutters, cross gutters, ADA ramps & drainage improvements on Ramona Dr., Cactus Dr., El
Cajon Dr., La Mesa Dr., Caliente Dr. (Bunch Palms Tr to Hacienda Ave); and Hacienda Ave &
Ironwood Dr (Palm Dr to Ramona Dr).
New Project in the 2013 FTIP Quadrennial Years
Indio
RIV121102
In Eastern Riverside County in the City of Indio - Monroe Street Widening: Widening of Monroe St
between Ave. 49 and Ave. 52 (Approx. 7,800 L.F.), from 2 through lanes to 4 through lanes (2 lanes
in ea dir), including bike lane, sidewalk, traffic signal install at Ave. 49 and relocation of signal poles
and appurtenances at Ave. 50.
NEW SLPP Formula Funds project
Indio
RIV110831
In the City of Indio - Widen Jefferson St. from Varner Rd to Sun City Blvd from 4 to 6 lanes and
widen Varner Rd from 2 to 4 lanes from Jefferson St to approx. 500' East of Jefferson St and then
tapering back to 2 lanes. Inc! medians, traffic signals, channelization, left -turn pockets, ded rt turn
lanes on SB Jefferson and EB Varner, drainage improvemetns, sidewalks, and bike lanes.
Cost Change &Schedule Delay
SLPP formula funds project
La Quinta
RIV121101
In Eastern Riverside County in the City of La Quinta - Intersection Improvements: Modify the
intersection at Hwy 111 and Washington St by adding left turn lanes, right turn lanes, median
modifications, res-striping, reconstruction of curb and gutter, signal and signal pole modifications,
and replacement of bus turnout.
NEW SLPP Formula Funds project
MURRIETA
RIV100106
In SW Riverside County - I-15/Los Alamos Rd. Bridge Replacement & Widening: Replacement of
existing two lane overcrossing at Los Alamos Rd. and Interstate 15 with a four lane overcrossing
(gap closure), bringing the bridge vertical clearance to Caltrans Standards.
Cost Change and Schedule Delay
SLPP formula funded project
Palm Desert
RIV071243
In the City of Palm Desert - Free right turn lane-WB Fred Waring Dr to NB Hwy 111: Reconfiguration
of a free right turn lane at the intersection from West Bound Fred Waring Dr to north bound Hwy 111
($61 toll credits used to match CMAQ in construction).
New Project in the 2013 FTIP Quadrennial Years
Palm Desert
RIV071255
In the City of Palm Desert - Mid Valley Bike Path: Construct a 6.5 mile class 1 Bike Path along the
northern city limits between S/O Washington St. and N/O Monterey Ave.
Schedule Delay
Palm Desert
RIV031208
At I-10/Monterey Ave IC - Reconfigure IC: Construct new WB entry ramp and realign/relocate WB
exit ramp (EA: OF050),
New project in the 2013 FTIP quadrennial years & Reprogramming
of funds
Palo Verde Valley
Transit Agency
RIV120803
IN EASTERN RIVERSIDE COUNTY FOR PALO VERDE TRANSIT AGENCY - OPERATING
ASSISTANCE: FIXED ROUTE AND DIAL -A -RIDE OPERATING ASSISTANCE FOR FISCAL YEAR
2012/2013 (UZA: PALO VERDE).
New project from the 2012/2013 SRTP for Palo Verde Valley
Transit Agency
RCTC
RIV120201
On SR-60 near Beaumont: Construct new eastbound and westbound truck lanes from Gilman
Springs Rd to 1.6 miles west of Jack Rabbit Trail (EA: ON690) ($746 toll credits used to match
CMAQ in PA&ED).
Description change to combine RCTC's truck climbing lane with
Caltrans SHOPP Safety Improvements per agreement between
RCTC and Caltrans
2013 FTIP Amendment log.xlsx
Page 3 of 18
4/8/2013 - 4:26 PM
RCTC
2013 FTIP - Formal Amendment No. 1 r'
8trers16 (wmylrompormlbn (mnmeJor
October 2012
FHWA approval: Jan. 24, 2013
Agency
Project ID
Title
Update Reason
RCTC
RIV520109
Reconstruct & Upgrade San Jacinto Branch Line for rail passenger service (Riverside to Perris)
(Perris Valley Line) (FY 07 5307) (UZA: RIV-SAN).
Cost increase and adjustment to toll credit utilization in project
description.
PTA -RIP funding replaced with Surface Transportation Program -
RIP (federal), per CTC.
Riverside
RIV110116
In Riverside - Quiet Zone X-ing Improvements: Upgrade of 14 at -grade Hwy rail X-ing & one
pedestrian only at -grade X-ing along the BNSF San Bernardino Subd. & one at -grade Hwy -rail X-ing
along the UPRR Los Angeles Subd w/in the city of Riverside. The improvements are needed to
optimize safety at the X-ings and allow for quiet zone to mitigate existing and projected train horn
noise impacts.
Description change -grade crossings reduced from 14 to 11 based
on current conditions
Riverside County
RIV060123
In Northwest Riverside County on Clay St from approx. 100' SW of General Dr. to approx. 500' N/O
Linares Ave: Replace existing 4-lane (2 Ins in each direction) at grade R/R X-ing with a 4-Ln (2 Lns
in each direction -non-capacity) undercrossing (UPRR).
Cost decrease based on current engineer's estimate and minor
schedule delay.
CMAQ funds will be obligated in FY 2012/2013, utililzing the EPSP.
Riverside County
RIV031202
1-10 Bypass South: Construct two lanes of roadway to provide a by-pass/network facility for the 1-10,
approx. 1/2 mile S/O I-10 between the eastern end of the City of Banning and Apache Trail in
Cabazon. Other improvements include the construction of several low-water crossings at Smith
Creek and San Gorgonio River (PA&ED).
Cost Increase based on the latest engineer's estimate & Schedule
Advance
Riverside County
RIV060124
In Banning on Sunset Ave at 1-10 from s/o Ramsey St to s/o Lincoln St: Lower Sunset Ave to
construct new 4-lane UC at UPRR crossing (non -capacity) and reconstruct the 1-10 IC ramps to
meet the new street grade (SAFETEA CA438, #1261+ HR4818+HR3058) (EA:33471)
Cost Increase per latest TCIF baseline agreement &minor
schedule advance.
Riverside County
RIV011233
At I-15/Limonite Ave IC - Widen IC 4 to 6 Lns, widen NB and SB exit ramps 1 to 2 Ins, add 2 lane
loop ramps in the NB and SB directions & widen Limonite Ave from Hamner to Wineville 4 to 6 Lns
(approx 1 mi) (EA: 0E1050K).
New project in the 2013 FTIP quadrennial years &Reprogramming
of funds
Riverside Transit
Agency
RIV091211
IN WESTERN RIVERSIDE COUNTY FOR RTA - VEHICLE REPLACEMENT: PURCHASE FIFTY
(50) REPLACEMENT HEAVY DUTY CNG REVENUE VEHICLE ROLLING STOCK (FEDERAL
APPROPRIATION THROUGH HR 3288, FFY 2009/2010 - FTA 5309).
Description Change -FTIP project converted to Lump Sum Listing
per 2011 FTIP Guidelines, Grouped Project Listing Category 58
Riverside Transit
Agency
RIV120819
IN WESTERN RIVERSIDE FOR RTA- REVENUE VEHICLES FOR CONTRACTED OPERATIONS:
PURCHASE OF SEVEN (7) MID -SIZE VEHICLES, REPLACING TYPE II VEHICLES THAT HAVE
REACHED THEIR SERVICE LIFE PER FTA GUIDELINES. REPLACEMENT VEHICLES WILL BE
USED FOR CONTRACT OPERATED FIXED ROUTE SERVICE (FTA 5307 - FY 13) (UZA: RIV-
SB).
New project from the 2012/2013 SRTP for Riverside Transit
Agency -Project No. FY13-2
Riverside Transit
Agency
RIV120822
IN WESTERN RIVERSIDE FOR RTA - CAPITALIZED COST OF TIRE LEASE (FTA 5307 - FY 13)
(UZA:RIV-SB).
New project from the 2012/2013 SRTP for Riverside Transit
Agency- Project No. FY13-5
Riverside Transit
Agency
RIV120825
IN WESTERN RIVERSIDE FOR RTA - INFORMATION SYSTEMS: PURCHASE OF COMPUTERS
AND SOFTWARE SYSTEM FOR FIXED ROUTE VEHICLES, HEMET TRAINING ROOM
EQUIPMENT, AND RIVERSIDE CONFERENCE ROOM MONITORS - NON ITS COMPONENTS
(FTA 5307 - FY13) (UZA: RIV-SB).
New project from the 2012/2013 SRTP for Riverside Transit
Agency - Project No. FY13-8
2013 FTIP Amendment log.xlsx
4/8/2013 - 4:26 PM
Page 4 of 18
RCTC
2013 FTIP - Formal Amendment No. 1 am NE.
Rimpde (aonN Irowlorblkn CammeYor
October 2012
FHWA approval: Jan. 24, 2013
Agency
Project ID
Title
Update Reason
Riverside Transit
Agency
RIV120826
IN WESTERN RIVERSIDE FOR RTA - OPERATING ASSISTANCE: FIXED ROUTE AND DIAL -A-
RIDE OPERATING ASSISTANCE FOR FISCAL YEAR 2012/2013 (FTA 5307 - FY 13) (UZA:
HEMET).
New project from the 2012/2013 SRTP for Riverside Transit
Agency -Project No. FY13-8.
Project funding includes prior years carry overs.
Riverside Transit
Agency
RIV120827
IN WESTERN RIVERSIDE FOR RTA - CAPITALIZED PREVENTATIVE MAINTENANCE FOR FY
12-13 (FTA 5307 - FY 13) (UZA: RIV-SB, TEM/MURR/MEN).
New project from the 2012/2013 SRTP for Riverside Transit
Agency
Riverside Transit
Agency
RIV120828
IN WESTERN RIVERSIDE FOR RTA - CAPITAL COST OF CONTRACTING FOR FY 12-13 (FTA
5307 - FY 13) (UZA: RIV-SB).
New project from the 2012/2013 SRTP for Riverside Transit
Agency
Riverside Transit
Agency
RIV120820
IN WESTERN RIVERSIDE FOR RTA - SUPPORT VEHICLE: PURCHASE OF ONE (1) VEHICLE
TO REPLACE A VEHICLE THAT HAS MET ITS USEFUL LIFE REQUIREMENT (FTA 5307 - FY 13)
(UZA: RIV-SB).
New project from the 2012/2013 SRTP for Riverside Transit
Agency - Project No. FY13-3
Riverside Transit
Agency
RIV120821
IN WESTERN RIVERSIDE FOR RTA - CAPITAL MAINTENANCE SPARES: PURCHASE OF
SPARE PARTS FOR ROLLING STOCK UNDER THE BUS MAINTENANCE PROGRAM (FTA 5307
- FY 13) (UZA: RIV-SB).
New project from the 2012/2013 SRTP for Riverside Transit
Agency - Project No. FY13-4
Riverside Transit
Agency
RIV120823
IN WESTERN RIVERSIDE FOR RTA - TRANSIT ENHANCEMENTS: PURCHASE AND
INSTALLATION OF TRANSIT ENHANCEMENTS FOR BUS STOP SYSTEM SUCH AS
INSTALLATION OF BUS SHELTERS AND BENCHES, KIOSKS, SIGNAGE, AND LIGHTING TO
ENHANCE SECURITY AND SAFETY OF THE RIDING PUBLIC (FTA 5307 - FY 13) (UZA: RIV-SB).
New project from the 2012/2013 SRTP for Riverside Transit
Agency - Project No. FY13-6
Riverside Transit
Agency
RIV120824
IN WESTERN RIVERSIDE FOR RTA - SUPPORT EQUIPMENT: PURCHASE OF
MISCELLANEOUS MAINTENANCE AND SUPPORT EQUIPMENT FOR ROUTINE MAINTENANCE
(E.G., VEHICLE JACKS, WHEELCHAIRS FOR OPERATOR TRAINING, POINJAR, AIR
COMPRESSORS/GENERATORS, AND FLOOR SCRUBBERS) (FTA 5307 - FY 13) (UZA: RIV-SB).
New project from the 2012/2013 SRTP for Riverside Transit
Agency - Project No. FY13-7
SAN JACINTO
RIV111129
In San Jacinto — Ramona Exp Widening PH 1: Ramona Exp. Widening of 2 and 4 lanes to 6 lanes
regional arterial (3 in each direction) between Sanderson & Eagle Rd., including left -turn or
landscape median, drainage improvement, relocation of traffic signal poles and installation of curb
and gutter. Exist configuration varies from 2 and 4 lanes - widening will be from 2 to 6 and 4 to 6
Lanes.
Cost Increase based on the latest engineer's estimate &minor
schedule advance
SunLine Transit
Agency
RIV110407
In the Coachella Valley for SunLine Transit Agency - Job Access & Reverse Commute and New
Freedom Project: Express Service to the Pass area with service to Banning and Beaumont,
connecting Coachella Valley commuters to Western Riverside County (FTA 5316 and FTA 5317,
FYs 09 and 10).
project description change to include additional stops in Cabazon,
Moreno Valley, and Riverside; Conformity Category changed from
Exempt-93.126 to .
SunLine Transit
Agency
RIV120804
IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - FIXED ROUTE AND DIAL -A -RIDE
OPERATING ASSISTANCE FOR FISCAL YEAR 2012/2013 (FTA 5307 - FY 13) (UZA: INCCPS).
New project from the 2012/2013 SRTP for SunLine Transit Agency
SunLine Transit
Agency
RIV120805
IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - CAPITALIZED PREVENTATIVE
MAINTENANCE FOR FISCAL YEAR 2012/2013 (FTA 5307 - FY 13) (UZA: INCCPS).
New project from the 2012/2013 SRTP for SunLine Transit Agency
2013 FTIP Amendment log.xlsx
4/8/2013 - 4:26 PM
Page 5 of 18
RCTC
2013 FTIP - Formal Amendment No. 1 me
Rlrmide (oeely IromponoXen Cometior
October 2012
FHWA approval: Jan. 24, 2013
Agency
Project ID
Title
Update Reason
SunLine Transit
Agency
RIV120806
IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY: REHABILITATION OF SUNLINE'S
FLEET OF OLDER BUSES, INCLUDING RESTORATION OF COLORS ON BOTH THE INTERIOR
AND EXTERIOR, AND PURCHASE OF EQUIPMENT NEEDED TO REPAIR/REHAB BUSES (FY
13 - 5307) (UZA: INCCPS).
New project from the 2012/2013 SRTP for SunLine Transit Agency
- Project No. SL 13-01.
SunLine Transit
Agency
RIV120807
IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - PURCHASE TWO REPLACEMENT
SERVICE TRUCKS AND FOUR REPLACEMENT CNG RELIEF CARS (FTA 5307 - FY 13) (UZA:
INCCPS).
New project from the 2012/2013 SRTP for SunLine Transit Agency
_project No. SL 13-02.
SunLine Transit
Agency
RIV120808
IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - FACILITY IMPROVEMENTS:
REPAVE THE EXISTING BUS YARD AND STAFF PARKING AREA AT THE THOUSAND PALMS
OPERATING FACILITY (FTA 5307 - FY 13) (UZA: INCCPS).
New project from the 2012/2013 SRTP for SunLine Transit Agency
_project No. SL 13-03.
SunLine Transit
Agency
RIV120809
IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - PURCHASE TRANSIT STOP
ENHANCEMENTS FOR CONTINUED IMPROVEMENTS TO BUS STOPS FOR THE SAFETY AND
COMFORT OF PASSENGERS, PER COMPREHENSIVE OPERATIONAL ANALYSIS
RECOMMENDATION (CA PROP 1 B SECURITY FUNDED PROJECT).
New project from the 2012/2013 SRTP for SunLine Transit Agency
- Project No. SL 13-04.
SunLine Transit
Agency
RIV120810
IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - FACILITY IMPROVEMENTS:
IMPROVE THE THOUSAND PALMS AND INDIO FACILITIES, INCLUDING ROOF REPAIR AND
REPLACEMENT, NEW CARPETING AND BLINDS, AND REPAIR OF PARKING FACILITIES FOR
STAFF USE (FTA 5307 - FY 13) (UZA: INCCPS).
New project from the 2012/2013 SRTP for SunLine Transit Agency
- Project No. SL 13-05.
SunLine Transit
Agency
RIV120811
IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - FURNITURE REPLACEMENT:
PURCHASE OF OFFICE FURNITURE TO REPLACE AND ADD FURNITURE REACHES THE
END OF ITS CYCLE LIFE (FTA 5307 - FY 13) (UZA: INCCPS).
New project from the 2012/2013 SRTP for SunLine Transit Agency
_project No. SL 13-06.
SunLine Transit
Agency
RIV120812
IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - PURCHASE OF VARIOUS IT
EQUIPMENT, SOFTWARE AND HARDWARE FOR EXISTING AGENCY SYSTEM NEEDS AND
TO STREAMLINE OPERATIONS AND PRODUCE REPORTS FOR SUNLINE SERVICES (FTA
5307 - FY 13) (UZA: INCCPS).
New project from the 2012/2013 SRTP for SunLine Transit Agency
- Project No. SL 13-07.
SunLine Transit
Agency
RIV120813
IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY -PURCHASE NEW MODERN,
STATE OF THE ART TELEPHONE SYSTEM, IMPROVING THE COMMUNICATION SYSTEM FOR
SUNLINE TRANSIT AGENCY (FTA 5307 - FY 13) (UZA: INCCPS).
New project from the 2012/2013 SRTP for SunLine Transit Agency
Project No. SL 13-08.
SunLine Transit
Agency
RIV120814
IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - PURCHASE FIVE (5) NEW SPARE
FAREBOXES TO ALLOW EXISTING UNITS TO BE REPAIRED WITHOUT BUS SERVICE
INTERRUPTION (FTA 5307 - FY 13) (UZA: INCCPS).
New project from the 2012/2013 SRTP for SunLine Transit Agency
project No. SL 13-09.
SunLine Transit
Agency
RIV120815
IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - CONDUCT A SAMPLE SURVEY
OF SUNLINE TRANSIT AGENCY RIDERS, PROVIDING USEFUL INFORMATION TO SUPPORT
SUNLINE PLANNING AND MARKETING EFFORTS. SURVEY WILL ALSO INCLUDE NTD
SECTION 15 RIDECHECKS (FTA 5307 - FY 13) (UZA: INCCPS).
New project from the 2012/2013 SRTP for SunLine Transit Agency
- Project No. SL 13-10.
SunLine Transit
Agency
RIV120816
IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - PURCHASE MAJOR
REPLACEMENT MAINTENANCE TOOLS AND EQUIPMENT FOR ROUTINE VEHICLE
MAINTENANCE (FTA 5307 - FY 13) (UZA: INCCPS).
New project from the 2012/2013 SRTP for SunLine Transit Agency
_project No. SL 13-11.
SunLine Transit
Agency
RIV120817
IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - SPECIAL FUEL PROVISION
ALLOWING A PORTION OF AGENCY FUEL COSTS TO BE TREATED AS A CAPITAL
MAINTENANCE (FTA 5307 - FY 13) (UZA: INCCPS).
New project from the 2012/2013 SRTP for SunLine Transit Agency
_project No. SL 13-12.
2013 FTIP Amendment log.xlsx
4/8/2013 - 4:26 PM
Page 6 of 18
RCTC
2013 FTIP - Formal Amendment No. 1 i ....
October 2012 Rim* (awe Trmswenlen(emmeiler
FHWA approval: Jan. 24, 2013
Agency
Project ID
Title
Update Reason
SunLine Transit
Agency
RIV120829
IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - SOLAR PANEL REPLACEMENT:
REPLACEMENT OF EXISTING SOLAR PANELS, PROVING 33 PERCENT OF SUNLINE ENERGY
NEEDS FOR OPERATING OFFICES AND FACILITIES (PROJECT FUNDED BY FY 12 STATE OF
GOOD REPAIR, BUS LIVABILITY AND TRANSIT ASSET MANAGEMENT).
New project from the 2012/2013 SRTP for SunLine Transit
Agency.
Number of Projects
53
2013 FTIP Amendment log.xlsx
As of April 8, 2013
4/8/2013 - 4:26 PM Page 7 of 18
RCTC
2013 FTIP - Administrative Modification No. 2 ma 1...... "
Rir MAICounty BOMOVIO WCOM Nor
November 2012
SCAG approval: Dec. 19, 2012
Agency
Project ID
Title
Update Reason
Beaumont
RIV100102
In Western Riverside Co in Beaumont: SR79 Bypass Ext No. Ph II - Instal of a 3-Ln pre-fab bridges
on the eastside of the Ph I Potrero Bridge SR79 Bypass Ext. No., extending the Potrero Blvd 0.675
mi. No. from the future SR60/Potrero Fwy IC (RIV050535), to connect to the Oak Valley Pkwy in
Beaumont, including the instal of a Class !multi -purpose trail, flared intersection and turning pockets.
Technical Change to Correct RTP ID, per approved 2012 RTP
Cathedral City
RIV070302
In Eastern Riverside County in the Coachella Valley - Date Palm Dr Bridge Replacement/Widening:
Replacement of a two lane (1 In in ea dir) low water crossing bridge over Long Canyon Creek (Bridge
No. 00L0043) with a six lane (3 Ins in ea dir), for approximately 350 ft. (from Varner Rd. to 350' S/O
Varner Rd).
Reprogrammingof fundin
9 Years per HBP update of 10/29/2012.
Cathedral City
RIV091011
In Eastern Riverside County in the Coachella Valley - Date Palm Dr over the Whitewater River:
Widening of Date Palm Dr from 4 to 6 Ins (3 Ins in ea dir), from approx. 350 Ft S/O the bridge to 250
Ft N/O the bridge (Via Estrada to the north and Perez Rd. to the south), including the construction of
a raised median and sidewalk along the east side of the project (Bridge No. 56C0189).
Cost increase per HBP funding update of 10/29/2012.
Indio
RIV111202
In the City of Indio - Ave 44 Bridge Replacement: Replace existing Avenue 44 two lane low water
crossing over the Coachella Valley Stormwater Channel with a four lane bridge (Bridge No. 00L0056),
including 6 ft sidewalk on each side of the bridge.
Reprogramming of Engineering funding years per HBP funding
update of 10/29/2012.
Lake Elsinore
RIV111203
In Lake Elsinore - Temescal Canyon Rd. Bridge ReplacemenUWidening: Replace Temescal Canyon
Rd. 2 lane bridge with a 4-lane bridge over Temescal Wash, 0.22 mi. W/O Lake Street (Bridge No.
56C0050).
Reprogramming of HBP per 10/29/2012 update.
Lake Elsinore
RIV091007
In mid -Western Riverside County in the City of Lake Elsinore: Widening of SR-74 from 2 to 4 through
lanes (2 lanes in each direction), west of 1-15 to the Ortega Mountains. Other improvements include
turn pockets and one traffic signal.
Technical Change to Correct RTP ID, per approved 2012 RTP
Moreno Valley
RIV091003
In Western Riverside County in the City of Moreno Valley - Eucalyptus Ave. Widening/Extension:
Construction of a 4th through lane in the eastern direction from Redlands Blvd. to Theodore St &
Extension of Eucalyptus Ave. to Redlands Blvd., with a signalized intersection.
Technical Change to Correct RTP ID, per approved 2012 RTP
Moreno Valley
RIV091004
In Western Riverside Co. in the City of Moreno Valley - Cactus Ave Widening: Widen Cactus Ave
from 2 to 4 through lanes (2 in ea dir), from Lasselle St to Nason St. Other improvements include the
installation of a dedicated right turn lane, a 2-way left turn lane, bus turn -outs, landscaping &
sidewalks.
Technical Change to Correct RTP ID, per approved 2012 RTP
Palm Springs
RIV110124
In the Coachella Valley in the city of Palm Springs - Ramon Rd. Widening between San Luis Rey Dr &
Landau Blvd: Widening of Ramon Rd. from a 4-Ln arterial to a 6-Ln arterial (3-Lns in ea dir) between
San Luis Rey Dr & Landau Blvd., including the widening/replacement of the Whitewater River Bridge
(Bridge No. 56CO287), including seismic retrofit and scour countermeasures as necessary.
Reprogramming of HBP per 10/29/2012 update.
Palm Springs
RIV990727
In Palm Springs: Widen Indian Canyon Dr from 2 to 6 lanes (3 in each direction), from UPRR
overcrossing to Garnet Ave (HBRR#:5600025).
Cost decrease per HBP funding update of 10/29/2012
Palm Springs
RIV090405
In the Cityof Palm Springs: Re lace existing 4-lane low water crossing on Vista Chino at Whitewater
p g g
River with a new 4-lane bridge - bridge No. 00L0052.
Reprogrammingof HBP er 10/29/2012 update & Technical
p p
change, correcting RTP ID to be consistent with the 2012 RTP.
2013 FTIP Amendment log.xlsx
4/8/2013 - 4:26 PM
Page 8 of 18
RCTC
2013 FTIP - Administrative Modification No. 2 ism
- irirs a CONY Gp16,onoRon(omm for
November 2012
SCAG approval: Dec. 19, 2012
Agency
Project ID
Title
Update Reason
Palm Springs
RIV031206
On S. Palm Canyon Dr. over Arenas Canyon South Drainage Channel: Replace existing 4 lane low-
water crossing with a new 4-lane bridge, including drainage improvements consisting of levee
channelization (HBRR #: OOL0027).
Cost increase per HBP funding update of 10/29/2012.
Rancho Mirage
RIV110130
In Coachella Valley in Rancho Mirage - Widening of south bound Monterey Ave. from 2 to 3 lanes
from Dinah Shore Dr to Gerald Ford Dr. (Approx. 3,480 L.F.). Other improvements include
installation of curb and gutter, drainage improvements (retention basins), signing and striping, and
traffic signal modification at Ginger Rogers Rd.
Schedule Delay per latest project milestone report from the City of
Rancho Mirage
RCTC
RIV041047
Throughout Riverside County - Grouped Projects for Transportation Enhancement Activities -
Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 and 3 categories - Transportation
Enhancement Activities (Except Rehabilitation and Operation of Historic Transportation Buildings,
structures, or facilities). $398 in toll credits will be utilized for STPL match for cons in FY 2012/2013.
Reprogramming of funds to re-establish the STIP STP-ENHANCE-
RIP TEA funds, per RCTC discretion for utilization of TE reserve
funds prior to June 30, 2013.
TC utilization per Abijit Badge memo dated 12/12/2011.
RCTC
RIV050517
On SR74 in/near Hemet from Calvert Ave to California Ave: curve, median, & pavement widening
(non -capacity) (EA ON3600).
Cost increase and schedule delay per latest cost estimate
RCTC
RIV070308
At SR91/71 Jct: Replace EB 91 to NB 71 connector w/direct fly -over connector, and reconstruct the
Green River Rd EB on -ramp (EA: OF541) ($1,501/$639/$200 toll credits will be used in PS&E to
match DEMO-SAFETEALU/DEMO-TEA21/STP, respectively. $159 toll credits will be used in R/W to
match DEMO-SAFETEALU.)
Cost increase to include Surface Transportation Program - HR
4818 (idle earmark) for the r/w phase.
RCTC
RIV071250
On SR91/1-15: SR91 - Cons 1 MF Ln (SR71-115)/1 Aux Ln var locs (SR241-Pierce) (OC PM 14.43-
1891), CD System (2/3/4 Lns main-115), 1 toll Expr Ln (tel) & convert HOV to Tel ea dir (0C-115); 1-15-
const tel med dir connct NB15 to WB91 and EB91 to SB15, 1 tel ea dir SR91 dir connct-Ontario IC
(115 PM 37.56-42.94).
Cost increase /addition of Prop 1 B SLPP Formula Funds per CTC
meeting of Dec. 5-6, 2012.
RCTC
RIV110122
On 1-215 in SW Riverside County from Murrieta Hot Springs Rd to 1-215/1-15 Junction, construct a
third mixed flow lane southbound (widens 1-215/1-15 connector from 2 to 3 lanes).
Technical Change to correctly include the PM miles before and
after construction for signage and restriping through consultation
with Caltrans.
New PM pos miles are based on the agreed project construction
foot print with Caltrans.
RCTC
RIV090902
On Interstate 215, from Blaine St SB off -ramp to 0.3 miles south of Martin Luther King Blvd
Undercrossing(PM 40.2 to PM 42.5), extend the existing SB lane # 4 (lane drop) to 0.3 miles south of
Martin Luther King Blvd undercrossing (EA ON890) ($230 toll credits used to match STPL in cons)
Schedule Advance per current bid advertisement
Riverside County
RIV071259
In Eastern Coachella Valley - Mecca Community Roundabout: Construct a roundabout entry to the
unincorporated Mecca Comm. On Hammond Rd & 4th St btwn 5th & 3rd Streets, consisting of a
single In. traffic circle w/one bypass RT Ln for the SE traffic; mountable median aprons; landscaped
center; S/W & Ped. X-ing; landscape buffer; realignment of Hammond Rd.; and an entry monument.
Technical Change to Correct RTP ID, per approved 2012 RTP
Riverside County
RIV071285
In the Southeast Coachella Valley in Eastern Riverside County, just south of the City of Coachella on
Ave. 56 (Airport Blvd) - from Polk St to the west to Orange St. to the east of the R/R X-ing: Replace
existing 2 Ln (1 Ln in ea dir) at grade R/R X-ing with a 2 Ln OC (1 Ln in ea dir - non -capacity) across
the UPRR tracks.
Cost increase and schedule delay
2013 FTIP Amendment log.xlsx
4/8/2013 - 4:26 PM
Page 9 of 18
RCTC
2013 FTIP - Administrative Modification No. 2 um
November 2012 111.4144 (ounryTru npo boon (amuaskr
SCAG approval: Dec. 19, 2012
Agency
Project ID
Title
Update Reason
Riverside County
RIV111003
In Western Riverside County in the city of Jurupa Valley - Market Street Bridge Replacement:
Replace the existing two lane (one lane in each direction) Market Street Bridge over the Santa Ana
River, 0.4 miles northwest of SR60 with a four lane (two lanes in each direction) bridge, Bridge No.
56C0024.
Reprogramming of HBP per 10/29/2012 update.
Riverside County
RIV100105
In Western Riverside County - 1-15 at Indian Truck Trail IC: Widen Indian Truck Trail from 2 to 4
lanes, including dedicated left -turn lanes to NB and SB on ramp; widening of the SB exit ramp from 1
to 3 lanes; and widening of the NB exit ramp and entry ramp from 1 to 3 lanes plus intersection
improvements at Temescal Cyn Rd.
Technical Change to Correct RTP ID, per approved 2012 RTP
Number of Projects
23
2013 FTIP Amendment log.xlsx
As of April 8, 2013
4/8/2013 - 4:26 PM Page 10 of 18
RCTC
2013 FTIP - Formal Amendment No. 3 mom
Rnmida County Tramportman (amm<dor
January 2013
FHWA approval: Mar. 13, 2013
Agency
Project ID
Title
Update Reason
CALTRANS
RIVLS12
Grouped projects for emergency repair - SHOPP Emergency Response Program: Projects are
consistent w/40 CFR Part 93.126 Exempt Table 2 - Repair damage caused by natural disasters, civil
unrest, or terrorist acts. Applies to damages that do not qualify for fed emergency relief funds or to
damages that qualify for fed emergency relief funds but extend beyond the federally declared disaster
period.
New Project in the 2013 FTIP Quadrennial Years -Addition of EA
1 C780 to FY 2012/2013
Federal Lands
Highway Divison
RIV130101
REHABILITATE APPROXIMATELY 0.5 MILES OF THE PACIFIC COAST TRAIL - FULLERS RIDGE
TRAIL BETWEEN SEVEN PINES TRAIL AND DEER SPRINGS TRAIL IN MOUNT SAN JACINTO
STATE PARK. CONSTRUCTION ACTIVITES INCLUDE BRUSHING AND CLEARING,
SWITCHBACKS, ARMORING, ROCK RETAINING WALLS, DRAINAGE LENSES, AND TRAIL
CONSTRUCTION AND REHABILITATION (PART OF MAP-21 BILL).
New Project programmed at the request of State of California -
Natural Resources Agency -Dept of Parks and Recreation
Indio
RIV091208
IN COACHELLA VALLEY IN THE CITY OF INDIO - JACKSON ST TRAFFIC SIGNAL
INTERCONNECT AND TRAFFIC SIGNAL INSTALL: INSTALL A NEW TS AT JACKSON ST &
MARKET ST/DILLON AVE., & INSTALL. OF A WIRELESS INTERCONNECT SYSTEM ON
JACKSON ST BTWN AVE. 44 TO THE NO. & AVE. 45 TO THE SO., A DISTANCE OF APROX. 1
MILE. INTERCONNECT SYSTEM INCLUDES 2 EXIST. TS & 1 NEW TS ($38 TOLL CREDITS
USED FOR CMAQ MATCH IN CONS).
New Project in the 2013 FTIP Quadrennial Years
La Quinta
RIV121202
IN EASTERN RIVERSIDE COUNTY IN THE CITY OF LA QUINTA - ON DUNE PALMS RD:
REPLACE 3-LANE LOW WATER CROSSING WITH 4 LANE BRIDGE OVER THE COACHELLA
VALLEY STORMWATER CHANNEL ( WHITEWATER RIVER - BRIDGE NO.00L0070)
New Project in the 2013 FTIP Quadrennial Years -per 10/29/2012
HBP update
RCTC
RIV071250
On SR91/I-15: SR91 - Cons 1 MF Ln (SR71-115)/1 Aux Ln var Iocs (SR241-Pierce) (OC PM 14.43-
18.91), CD System (2/3/4 Lns main-115), 1 toll Expr Ln (tel) & convert HOV to Tel ea dir (0C-115); I-
15-const tel med dir connct NB15 to WB91 and EB91 to SB15, 1 tel ea dir SR91 dir connct-Ontario
IC (115 PM 37.56-42.94).
Cost increase to include latest cost estimate.
RCTC
RIV090601
REHABILITATION/RENOVATION OF METROLINK TRACK, SIGNALS, COMMUNICATIONS,
STRUCTURES, FACILITIES, SYSTEMS, & ROLLING STOCK. UTILIZATION OF TOLL
DEVELOPMENT CREDITS TO MATCH FTA 5307 & FTA5309(A) IN CONSTRUCTION IS AS
FOLLOWS: $245 IN FY 11 FOR FTA 5307 AND 5309(A); $251 IN FY 12 FOR FTA 5307; $502 IN
FY 13 FOR FTA 5309(A); AND $522 IN FY 14 FOR FTA 5309A.
Description change to clarify that rolling stock
rehabilitation/renovation includes replacement of locomotives with
Tier-4 technology and deprogramming of FTA 5309a FY's 13 and
14.
Original
Page 11 of 18
4/8/2013 - 4:26 PM
RCTC
2013 FTIP - Formal Amendment No. 3 rim ... —
Intrude (wry Uamponeeoe Commeslor
January 2013
FHWA approval: Mar. 13, 2013
Agency
Project ID
Title
Update Reason
Riverside
RIV071271
IN RIVERSIDE ON STREETER AVENUE: REPLACE EXISTING 4 LANE (2 LNS IN EA DIR) R/R X-
ING WITH A 4 LN (2 LNS IN EA DIR - NON -CAPACITY) U.C. GRADE SEPARATION ON
STREETER AVE BETWEEN LANTANA ST AND BEATTY DR., AND INSTALL APPROX. 1,000 FT
OF PCC S/W ON EACH SIDE OF STREETER AVENUE WITHIN THE PROJECT LIMITS.
Cost decrease per latest engineer's estimate.
Riverside
RIV071272
IN RIVERSIDE ON RIVERSIDE AVE: REPLACE EXISTING 4-LANE (2 LNS IN EA DIR) R/R/ X-ING
WITH A 4 LN (2 LNS IN EA DIR - NON -CAPACITY) U.C. G. S. ALONG RIVERSIDE AVE BTWN
MERRILL AVE AND 400FT N/O ELIZABETH ST. ADD IMP INCLUDE INSTALLATION OF APPROX
1,100 FT OF PCC S/W ON EACH SIDE OF RIVERSIDE AVE WITHIN THE PROJECT LIMITS ($791
TC IN FY09/10 & $151 TC IN FY12/13 USED TO MATCH STPL IN R/W)
Cost increase per latest engineer's estimate
Riverside County
RIV121203
IN EASTERN RIVERSIDE COUNTY IN THE COACHELLA VALLEY - ON AVE 56/AIRPORT DR,
REPLACE 2 LANE BRIDGE WITH A 4 LANE BRIDGE OVER WHITEWATER RIVER .21 MILES E/O
HWY 111 (BRIDGE N0.56C0020).
New Project in the 2013 FTIP Quadrennial Years -per 10/29/2012
HBP update
Riverside County
RIV121204
IN WESTERN RIVERSIDE COUNTY IN THE NEWLY INCORPORATED CITY OF EASTVALE - ON
HAMNER AVE OVER SANTA ANA RIVER .5 MILES N/O OF SIXTH STREET, REPLACE 2 LANE
BRIDGE WITH A 6 LANE BRIDGE (BRIDGE N0.56C0446).
New Project in the 2013 FTIP Quadrennial Years -per 10/29/2012
HBP update
Temecula
991206
BUTTERFIELD STAGE RD EXTENSIONS: EXTEND MURRIETA HOT SPRINGS RD (4 LNS)
FROM BUTTERFIELD STAGE RD TO SERAPHINA RD; BUTTERFIELD STAGE RD (4 LNS) FROM
RANCHO CALIFORNIA RD TO MURRIETA HOT SPRINGS RD; & NICHOLAS RD (4 LNS) FROM
BUTTERFIELD STAGE RD. TO CALLE GIRASOL
New Project in the 2013 FTIP Quadrennial Years -Cost increase
Temecula
RIV031215
Frech Valley Pkwy IC/Arterial Phases: Construct 6 Ln IC (Jefferson to Ynez) & ramps, NB/SB aux In,
CD Lns (3 Ins NB&SB) & modify Winchester Rd IC (I-215 PM: 8.43-9.75) (EA:43270).
Cost increase per latest engineer's estimate
Temecula
991202
French Valley Pkwy (FVP) Phase!: Design & Construct FVP 2 through lanes arterial westbound from
1-15 to Jefferson Ave, construct FVP SB exit ramp (1 lane), SB aux lane (from FVP IC to Winchester
Rd IC) & widen Winchester Rd IC SB exit ramp (1 to 3 Ins) (EA: 43270).
New Project in the 2013 FTIP Quadrennial Years and cost
decrease based on latest estimate
Various Agencies
RIV050201
IN RIVERSIDE COUNTY GROUPED PROJECTS FOR BRIDGE REHABILITATION AND
RECONSTRUCTION - HBP PROGRAM; PROJECTS ARE CONSISTENT WITH 40 CFR PART
93.126 EXEMPT TABLE 2 CATEGORIES - WIDENING NARROW PAVEMENTS OR
RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES). TC UTILIZATION: $649 IN
11/12 FOR CONS; $190 IN 12/13 FOR PE; $18 IN 15/16 FOR R/W; $2 IN 16/17 FOR R/W; $871 IN
16/17 FOR CONS; & $192 IN 17/18
Cost increase per 10/29/2012 HBP funding update.
Number of Projects
Original
14
4/8/2013 - 4:26 PM
As of April 8, 2013
Page 12 of 18
2013 FTIP - RTP Consistency Amendment No. 1/Amendment No. 4
January 2013
RCM
M. Mom
pnpmdp Cwmv Yampmatian famn+cYar
Agency
Project ID
Title
Update Reason
Riverside County
RIV110302
ON I-10 IN THE CITY OF BLYTHE - PROVIDE NEW W/B ON AND W/B OFF RAMPS TO HOBSON
WAY APPROX 1,800' W/O EXISTING RAMPS TO RIVIERA DR/INSPECTION STATION. THE
NEW RAMPS WILL REPLACE EXISTING CONNECTION TO RIVIERA DR.
Description change, Beginning PM Limits change, modeling
changes and reprogramming of funds.
Number of Projects
1
As of April 8, 2013
Original 4/8/2013 - 4:26 PM Page 13 of 18
RCTC
2013 FTIP -Administrative Modification No. 5 `n .--
lomide County fampmmnon Cemmi,tlor
February 2013
SCAG approval: Feb. 21, 2013
Agency
Project ID
Title
Update Reason
Beaumont
RIV050535
ON SR60 BETWEEN JACK RABBIT TR & SR60/1-10 JCT: PH1-CONSTRUCT NEW POTRERO 6
LN OC (3 LNS EACH DIR) W/TEMP CONNECT TO WESTERN KNOLLS (EA34141). PH2: NEW IC
ON/OFF RAMPS. CONSTRUCT WB/EB EXIT & ENTRY RAMPS (2 LNS) & WB/EB LOOP ENTRY
RAMPS (2 LNS) (ENTRY RAMPS INCL HOV LANE), INCL EB/WB AUX LNS AT EXIT RAMPS,
REALIGN WESTERN KNOLLS AVE, AND REMOVE WESTERN KNOLLS AVE CONNECTION TO
SR60 (EA34142).
Cost Increase per latest cost estimate and incorporation of 2011
FTIP A-30 changes (2006 AAA Idle Earmark replaced with STPL)
and transfer of STPL (Formerly TE) from San Timoteo Canyon Bike
and Pedestrian Facilities to SR60/Potrero IC per TAC approval of
Dec 10, 2012
Caltrans
RIV120201
ON SR-60 NEAR BEAUMONT: CONSTRUCT NEW EASTBOUND AND WESTBOUND TRUCK
LANES FROM GILMAN SPRINGS RD TO 1.6 MILES WEST OF JACK RABBIT TRAIL (EA:
ON690)AND UPGRADE EXISTING INSIDE AND OUTSIDE SHOULDER IN THE WB DIRECTION
TO STANDARD WIDTHS (5-FT INSIDE SHOULDER AND 10-FT OUTSIDE SHOULDER) (EA:
OQ 180).
Cost decrease to deprogram CMAQ PE funds -CMAQ PE funds
replaced (obligated) with idle earmarks on 12/10/2012.
Cost decrease needed to match Coop -Agreement.
Caltrans
RIVLS01
GROUPED PROJECTS FOR SAFETY IMPROVEMENTS - SHOPP COLLISION REDUCTION
PROGRAM: PROJECTS ARE CONSISTENT W/ 40 CFR PART 93.126 EXEMPT TABLES 2&3 -
W
RR/HY CROSSING, SAFER NON -FED -AID SYSTEM RDS, SHOULDR IMPRVMNTS, TRAFFIC
CNTRL DEVICES/OPERATING ASSIST OTHER THAN SIGNALS, INTERSCTN SIGNAL PRJCTS
AT INDVL INTERSCTNS, PVMNT MARKING DEMO, TCL OUTSIDE THE UA, LIGHTING
IMPRVMNTS, EMERGENCY TRUCK PULLOVERS
Cost Increase - EA ON510 increased and addition of new EA's
OR750 and OR950.
PERRIS
RIV011205
IN PERRIS - WIDEN PERRIS BLVD 2 TO 6 LANES FROM RAMONA EXPRESSWAY TO PERRIS
VALLEY STORM DRAIN - LATERAL'B'(APPROX. 1 MILE), INCLUDING CURB, GUTTER,
SIDEWALK, RAISED MEDIAN, SIGNAL WORK, UTILITY RELOCATIONS, AND MINOR DRAINAGE
IMPROVEMENTS.
Cost Decrease per latest engineer's estimate and notificaton from
city of Perris regarding defederalizing the project.
RCTC
RIV041047
THROUGHOUT RIVERSIDE COUNTY - GROUPED PROJECTS FOR TRANSPORTATION
ENHANCEMENT ACTIVITIES - PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126
EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - TRANSPORTATION ENHANCEMENT
ACTIVITIES (EXCEPT REHABILITATION AND OPERATION OF HISTORIC TRANSPORTATION
BUILDINGS, STRUCTURES, OR FACILITIES). $236 IN TOLL CREDITS WILL BE UTILIZED TO
MATCH STPL/STP ENHANCE -RIP TEA CONS I
Cost Decrease to reflect the transfer from the San Timoteo Canyon
Bike and Pedestrian facilities to the SR60/Potrero IC per TAC
approval of Dec. 10, 2012.
RCTC
RIV520109
Reconstruct & Upgrade San Jacinto Branch Line for rail passenger service (Riverside to Perris)
(Perris Valley Line) (FY 07 5307) (UZA: RIV-SAN) ($330 Toll Credits to match CMAQ in Cons FY
12/13: $865 toll credits to partially match CMAQ ($7,543) in cons FY 13/14; and $6,076 toll credits to
match STP-RIP in Cons FY 12/13).
Project not to utilize toll credits
RIVERSIDE COUNTY
RIV031202
1-10 BYPASS SOUTH: CONSTRUCT TWO LANES OF ROADWAY TO PROVIDE A BY-
PASS/NETWORK FACILITY FOR THE 1-10, APPROX. 1/2 MILE S/O 1-10 BETWEEN THE
EASTERN END OF THE CITY OF BANNING AND APACHE TRAIL IN CABAZON. OTHER
IMPROVEMENTS INCLUDE THE CONSTRUCTION OF SEVERAL LOW-WATER CROSSINGS AT
SMITH CREEK AND SAN GORGONIO RIVER (PA&ED).
Description change to refer to the federal earmark for the Ramsey
St. Extension to meet the intent of the legislation for the project
funding.
RIVERSIDE COUNTY
RIV060123
IN NORTHWEST RIVERSIDE COUNTY ON CLAY ST FROM APPROX 100"SW OF GENERAL DR
TO APPROX 500" N/O LINARES AVE: REPLACE EXISTING 4-LANE (2 LNS IN EACH DIRECTION)
AT GRADE R/R X-ING WITH A 4-LN (2 LNS IN EACH DIRECTION - NON -CAPACITY)
UNDERCROSSING (UPRR).
Cost Decrease per latest engineer's estimate.
2013 FTIP Amendment log.xlsx
4/8/2013 - 4:26 PM
Page 14 of 18
RCTC
2013 FTIP - Administrative Modification No. 5 iE R: —=
RneaMe Couch irum,orlf m Comeaelor
February 2013
SCAG approval: Feb. 21, 2013
Agency
Project ID
Title
Update Reason
RIVERSIDE COUNTY
RIV071278
IN NORTHWEST RIVERSIDE COUNTY ON MAGNOLIA AVE: REPLACE EXISTING 4 LANE (2 LNS
IN EA. DIR) R/R X-ING WITH A 4-LN (2 LNS IN EA DIR - NON -CAPACITY) O.C. GRADE
SEPARATION ON MAGNOLIA AVE BTWN BUCHANAN AVE. (ON THE EAST) AND LINCOLN
STREET (ON THE WEST).
Cost Decrease per latest engineer's estimate. Due to Programming
Capacity issues, STPL will be obligated through the EPSP process.
RIVERSIDE COUNTY
RIV071285
IN THE SOUTHEAST COACHELLA VALLEY IN EASTERN RIVERSIDE COUNTY, JUST SOUTH OF
THE CITY OF COACHELLA ON AVE. 56 (AIRPORT BLVD) - FROM POLK ST TO THE WEST TO
ORANGE ST. TO THE EAST OF THE R/R X-ING: REPLACE EXISTING 2 LN (1 LN IN EA DIR) AT
GRADE R/R X-ING WITH A 2 LN OC (1 LN IN EA DIR - NON -CAPACITY) ACROSS THE UPRR
TRACKS.
Cost Increase per latest engineer's estimate.
RIVERSIDE COUNTY
RIV060124
IN BANNING ON SUNSET AVE AT I-10 FROM S/O RAMSEY ST TO S/O LINCOLN ST: LOWER
SUNSET AVE TO CONSTRUCT NEW 4-LANE UC AT UPRR CROSSING (NON -CAPACITY) AND
RECONSTRUCT THE 1-10 IC RAMPS TO MEET THE NEW STREET GRADE (SAFETEA-LU
CA438, #1261) (EA:33471)
Cost decrease and reprogramming of funds to reflect the latest
TCIF cost estimate and approved funding. Due to CMAQ capacity
issues, RCTC Programmed CMAQ AC in FY 14/15 utilizing LOCAL
AC
Riverside Transit
Agency
RIV091211
GROUPED PROJECTS FOR PURCHASE OF NEW BUSES AND RAIL CARS TO REPLACE
EXISTING VEHICLES OF THE FLEET: PROJECTS ARE CONSISTENT WITH 40 CFR PART
93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - PURCHASE OF NEW BUSES AND
RAIL CARS TO REPLACE EXISTING VEHICLES OR FOR MINOR EXPANSIONS OF THE FLEET.
Cost Increase per approved 2012/2013 SRTP A-1, and inclusion of
new FTA 5308 grant funds.
TEMECULA
991203
EXTEND OVERLAND DRIVE (4 LANES) FROM COMMERCE CENTER DRIVE TO AVENIDA
ALVARADO/DIAZ ROAD INTERSECTION INCLUDING CONSTRUCTION OF 4 LANE BRIDGE
OVER MURRIETA CREEK
Description Change to include "To Be Implemented in Phases"
Reprogramming of design and construction from FY 2013/2014 to
FY 2014/2015. Add funds in FY 2012/2013 per City of Temecula's
request of 12/20/2012
TEMECULA
RIV060113
CONSTRUCT NEW 4 LANE BRIDGE OVER MURRIETA CREEK (PART OF WESTERN BYPASS
CORRIDOR) INCLUDING APPROACHES, CURB & GUTTER, SIDEWALKS, & STORM DRAIN
FACILITIES
Cost Decrease per latest engineer's estimate.
TEMECULA
RIV62029
AT HWY 79 SO AND LA PAZ ST: ACQUIRE LAND, DESIGN AND CONSTRUCT PARK -AND -RIDE
LOT - 157 SPACES.
Cost Decrease per latest engineer's estimate.
Number of Projects
15
As of April 8, 2013
2013 FTIP Amendment log.xlsx 4/8/2013 - 4:26 PM
Page 15 of 18
RCTC
2013 FTIP - Formal Amendment No. 6 ice'` -
Nlvws4 Cowry irvmaorlonan(omega-
March 2013
Agency
Project ID
Title
Update Reason
Beaumont
RIV060115
AT I-10/OAK VALLEY PKWY IC: RECONSTRUCT/WIDEN IC FROM 2 TO 6 THROUGH LANES
FROM APPROX 500' W/O DESERT LAWN DR TO GOLF CLUB DR, WIDEN RAMPS - EB ENTRY 1
TO 2 LANES, EB & WB EXIT 1 TO 4 LANES, WB ENTRY 1 TO 3 LANES, , ADD NEW EB/WB
ENTRY LOOP RAMPS (2 LANES) , ENTRY RAMPS INCLUDE HOV PREFERENTIAL LANE, AND
RAMPS INCLUDE EXTENDED ACCELERATION/DECELERATION LANE (EA: OG280).
Reprogramming of design, R/W and construction, per City of
Beaumont's request of 12/17/2012.
Completion year (model year) remains 2018.
Murrieta
RIV071277
ON 1-215 AT LOS ALAMOS RD IC - INSTALL LANDSCAPING AND IRRIGATION IMPROVEMENTS
TO THE 1-215/LOS ALAMOS ROAD INTERCHANGE (SAFETEA-LU 2005 SEC. 1702. HPP #3140).
New Project in the 2013 FTIP Quadrennial Years.
PALM SPRINGS
RIV071258
IN THE CITY OF PALM SPRINGS — TRAFFIC MANAGEMENT CENTER: ADVANCE THE
INTERCONNECTED SIGNAL TIMING TO BE UNIFIED CITYWIDE, COORDINATE THE COMM.
EQUIP., BRINGING THEM ALL ONTO THE SAME COMM. PLATFORM FOR THE TRANSMISSION
OF COMPLETE DATA & DISSEMINATION OF INFO. TO THE PUBLIC.
Reprogramming of CMAQ construction funds to FY 2014/2015
(programming capacity issues); CMAQ funding will be obligated in
FY 2012/2013 utilizing the EPSP in place.
Toll Credits will be utilized to satisfy the CMAQ match in
construction.
Perris
RIV091012
IN MID -WESTERN RIVERSIDE COUNTY IN THE CITY OF PERRIS - CASE ROAD/MATTHEWS
RD. (SR-74) AT I-215 INTERCHANGE: RECONFIGURATION OF THE EXISTING CASE
RD/MATTHEWS RD. (SR-74) AT I-215 IC, IMPROVING THE INTERSECTION OPERATIONS AND
ELIMINATING CROSS TRAFFIC CONFLICTS ON THE SB RAMPS, WIDEN MATTHEWS RD
FROM 2/3 LANES TO 4 LANES FROM CASE RD TO TRUMBLE RD (EA: OP420).
Reprogramming of R/W and Construction, per current schedule.
Completion date changes from 2016 to 2018 but model year
remains 2018.
RCTC
RIV520109
RECONSTRUCT & UPGRADE SAN JACINTO BRANCH LINE FOR RAIL PASSENGER SERVICE
(RIVERSIDE TO PERRIS) (PERRIS VALLEY LINE) (FY 07 5307) (UZA: RIV-SAN).
Reprogramming CMAQ Funds and Measure A Match from
FY 2011/2012 to FY 2014/2015.
EPSP will be utilized for obligation in FY 2012/2013.
Riverside County
RIV060124
IN BANNING ON SUNSET AVE AT I-10 FROM S/O RAMSEY ST TO S/O LINCOLN ST: LOWER
SUNSET AVE TO CONSTRUCT NEW 4-LANE UC AT UPRR CROSSING (NON -CAPACITY) AND
RECONSTRUCT THE I-10 IC RAMPS TO MEET THE NEW STREET GRADE (SAFETEA-LU
CA438, #1261) (EA:33471)
Reprogramming to eliminate the AC and to allow CMAQ obligation
for construction in FY 12/13, utilizing the Expedited Project
Selection Process.
Riverside Transit
Agency
RIV050553
IN TEMECULA FOR RIVERSIDE TRANSIT AGENCY - CONSTRUCT NEW TEMECULA/MURRIETA
TRANSIT CENTER - LOCATION UNDER STUDY (04, 05, 06, 07, E-2006-091, E-2007-0131, & 2008-
BUSP-0131, SAFETEA-LU).
New Project in the 2013 FTIP Quadrennial Years.
Description modified to include correct earmark.
Riverside Transit
Agency
RIV130201
IN WESTERN RIVERSIDE COUNTY FOR RTA WITHIN THE CITY LIMITS OF RIVERSIDE -
REGIONAL TRANSIT CENTER FOR MASS TRANSIT SERVICE IN WESTERN RIVERSIDE
COUNTY. LOCATION TO BE DETERMINED (PA&ED ONLY)
New PA&ED Project in the 2013 FTIP Quadrennial Years.
Number of Projects
8
2013 FTIP Amendment log.xlsx
4/8/2013 - 4:26 PM
As of April 8, 2013
Page 16 of 18
RCTC
2013 FTIP - Administrative Modification No. 8 `Nom—
li imde (way %nomm . Comaa for
April 2013
Agency
Project ID
Title
Update Reason
BEAUMONT
RIV050535
ON SR60 BTWN JACK RABBIT TR & SR60/1-10 JCT: PH1-CONST. NEW POTRERO 6 LN OC (3
LNS EACH DIR) W/TEMP CONNECT TO WESTERN KNOLLS (EA34141/34143). PH2: NEW IC
ON/OFF RAMPS. CONST. WB/EB EXIT & ENTRY RAMPS (2 LNS) & WB/EB LOOP ENTRY
RAMPS (2 LNS) (ENTRY RAMPS INCL HOV LANE), INCL EB/WB AUX LNS AT EXIT RAMPS,
REALIGN WESTERN KNOLLS AVE, AND REMOVE WESTERN KNOLLS AVE CONNECTION TO
SR60 (EA34142/34143).
Minor Change to the project description to add the new EA of
34143 for both Ph. I and Ph II.
CALTRANS
RIV120201
ON SR-60 NEAR BEAUMONT: CONSTRUCT NEW EASTBOUND AND WESTBOUND TRUCK
LANES FROM GILMAN SPRINGS RD TO 1.6 MILES WEST OF JACK RABBIT TRAIL AND
UPGRADE EXISTING INSIDE AND OUTSIDE SHOULDER IN THE WB DIRECTION TO
STANDARD WIDTHS (10-FT INSIDE SHOULDER AND 10-FT OUTSIDE SHOULDER) (EA:
ON69U).
New combined project - Caltrans SHOPP EA 00180 AND RCTC'S
EA ON690 combined into a new EA:ON69U.
Description change per Caltrans request to reflect the standard
shoulder width of 10 ft.
Coachella
RIV071246
IN CITY OF COACHELLA — CONSTRUCT NEW (NON -CAPACITY) AVE 52 GRADE SEPARATION
OVERHEAD STRUCTURE SPANNING OVER UPRR MAINLINE TRACKS AND GRAPEFRUIT
BLVD/HWY 111, FROM SHADY LN TO APPROX 600 FT. E/O INDUSTRIAL WAY/TYLER ST.
IMPROVEMENTS INCL: RECONFIG CONNECTION FROM AVE 52 TO GRAPEFRUIT BLVD/HWY
111, BIKE LNS, SIDEWALKS, RETAINING WALLS, RECONST TRAFFIC SIGS/DRIVEWAYS,
REMOVE EXISTING AT -GRADE CR
Technical Change, reclassified from State Route to Local HWY
from relinquishment that took place April 2002.
Corona
RIV011240
IN CORONA ON EXISTING MCKINLEY ST - CONSTRUCT GRADE SEPARATION AT BNSF
RAILROAD CROSSING (PROJECT STUDY REPORT & PRELIMINARY ENVIRONMENTAL
ANALYSIS REPORT ACTIVITIES)
Cost increase per latest engineer's estimate.
Lake Elsinore
RIV111203
IN LAKE ELSINORE - TEMESCAL CANYON RD BRIDGE REPLACEMENTNVIDENING: REPLACE
TEMESCAL CANYON RD. 2 LANE BRIDGE WITH A 4 LANE BRIDGE OVER TEMESCAL WASH,
0.22 MI. W/O LAKE STREET (BRIDGE NO.56C0050).
Reprogramming of funds per 3/26/2013 HBP update.
Moreno Valley
RIV090117
IN MORENO VALLEY AT SR60/NASON ST IC: WIDEN NASON ST OC FROM 2 TO 4 THROUGH
LANES FROM ELDER AVE TO FIR AVE (EA: 32302)
AC Conversion and incorporation of actual allocation/obligation
funding in FY 11/12.
STPL funding adjustments are needed to open up capacity for
RCTC in FY 13/14.
Palm Springs
RIV031206
ON S. PALM CANYON DR OVER ARENAS CANYON SOUTH DRAINAGE CHANNEL: REPLACE
EXISTING 4 LANE LOW-WATER CROSSING WITH A NEW 4-LANE BRIDGE, INCLUDING
DRAINAGE IMPROVEMENTS CONSISTING OF LEVEE CHANNELIZATION (HBRR #: OOL0027).
Cost decrease per 3/26/2013 HBP update.
RCTC
RIV070309
ON 1-215 IN SOUTHWEST RIVERSIDE COUNTY FROM SCOTT RD TO NUEVO RD IC:
CONSTRUCT A MIXED FLOW LANE IN EACH DIRECTION AND RECONSTRUT AUX LANES
BETWEEN D ST IC AND NUEVO RD IC (EA: OF162)
Funding changes per CTC financial allocation amendment for Prop
1 B CMIA and STIP-RIP
Riverside
RIV071272
IN RIVERSIDE ON RIVERSIDE AVE: REPLACE EXISTING 4-LANE (2 LNS IN EA DIR) R/R/ X-ING
WITH A 4 LN (2 LNS IN EA DIR - NON -CAPACITY) U.C. G. S. ALONG RIVERSIDE AVE BTWN
MERRILL AVE AND 400FT N/O ELIZABETH ST. ADD IMP INCLUDE INSTALLATION OF APPROX
1,100 FT OF PCC S/W ON EACH SIDE OF RIVERSIDE AVE WITHIN THE PROJECT LIMITS ($791
TC IN FY09/10 TO MATCH STPL IN RNV)
Cost increase and schedule delay per latest engineer's estimate.
Toll credit reference in the project description removed the use of
$151 TC in FY 12/13 (funding not needed - deprogrammed).
2013 FTIP Amendment log.xlsx
4/8/2013 - 4:26 PM
Page 17 of 18
RCTC
2013 FTIP - Administrative Modification No. 8 `Mos—
Ilrirme County %ma'am (amnsuor
April 2013
Agency
Project ID
Title
Update Reason
Riverside County
RIV031202
1-10 BYPASS SOUTH (FORMERLY RAMSEY ST. EXT.): CONSTRUCT TWO LANES OF
ROADWAY TO PROVIDE A BY-PASS/NETWORK FACILITY FOR THE 1-10, APPROX. 1/2 MILE
S/O 1-10 BETWEEN THE EASTERN END OF THE CITY OF BANNING AND APACHE TRAIL IN
CABAZON. OTHER IMPROVEMENTS INCLUDE THE CONSTRUCTION OF BRIDGE CROSSINGS
AT SMITH CREEK AND SAN GORGONIO RIVER.
Description change to remove SEVERAL LOW WATER and
(PA&ED) language.
Schedule delay per latest project update.
Riverside County
RIV060123
IN NORTHWEST RIVERSIDE COUNTY ON CLAY ST FROM APPROX 100"SW OF GENERAL DR
TO APPROX 500" N/O LINARES AVE: REPLACE EXISTING 4-LANE (2 LNS IN EACH DIRECTION)
AT GRADE R/R X-ING WITH A 4-LN (2 LNS IN EACH DIRECTION - NON -CAPACITY)
UNDERCROSSING (UPRR).
Cost increase and schedule delay per latest engineer's estimate.
Riverside County
RIV071288
IN EASTERN RIVERSIDE CO. IN THE COACHELLA VALLEY — 66TH AVE GRADE SEPARATION:
CONSTRUCT A TWO-LN (1-LN IN EA DIR) 66TH AVE ELEVATED STRUCTURE OVER THE
UPRR, HAMMOND RD., AND SH-111., FROM WESTERLY OF LINCOLN ST TO JOHNSON ST ON
THE EAST IN THE COMMUNITY OF MECCA. ADD. IMPROVEMENTS WILL BE CONSTRUCTED
TO TIE BACK INTO THE EXISTING ALIGNMENT.
Reprogram funding years to reflect current project schedule
Riverside Transit
Agency
RIV120826
IN WESTERN RIVERSIDE COUNTY FOR RTA - OPERATING ASSISTANCE: FIXED ROUTE AND
DIAL -A -RIDE OPERATING ASSISTANCE FOR FISCAL YEAR 2012/2013 (FTA 5307 - FY 13) (UZA:
HEMET)
Cost decrease per latest revisions to FTA 5311 Regional
Apportionments for Operating Assistance and removing incorrect
funds from SRTP table 4 programmed on this project.
Sunline Transit
Agency
RIV120804
IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY — FIXED ROUTE AND DIAL -A -RIDE
OPERATING ASSISTANCE FOR FISCAL YEAR 2012/2013 (FTA 5307 — FY 13) (UZA: INCCPS).
Cost increase per latest revisions to FTA 5311 Regional
Apportionments for Operating Assistance.
Temecula
RIV62031
I-15/SR79 SO. IC: REMOVE SB EXIT RAMP, ADD NEW SB EXIT LOOP RAMP, REALIGN SB EXIT
RAMP (2 LNS) W/AUX LN. WIDEN SB ENTRY 1 TO 3, NB EXIT 1 TO 4, NB ENTRY 1 TO 3 &
RECON SR79S.
Schedule delay is due to scope in R/W acquisition.
Temecula
RIV031215
FRENCH VALLEY PKWY IC/ARTERIAL PHASES: CONSTRUCT 6 LN IC (JEFFERSON TO YNEZ)
& RAMPS, NB/SB AUX LN, CD LNS (3 LNS NB&SB) & MODIFY WINCHESTER RD IC (1-215 PM:
8.43-9.75) (EA:43270)
Fund Source Change per Abhijit Badge direction to SCAG on
2/20/2013
Various Agencies
RIV050201
IN RIVERSIDE COUNTY GROUPED PROJECTS FOR BRIDGE REHABILITATION AND
RECONSTRUCTION - HBP PROGRAM; PROJECTS ARE CONSISTENT WITH 40 CFR PART
93.126 EXEMPT TABLE 2 CATEGORIES - WIDENING NARROW PAVEMENTS OR
RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES). TC UTILIZATION:$190 IN
12/13 FOR PE; $18 IN 15/16 FOR RM/; $2 IN 16/17 FOR R/W; $871 IN 16/17 FOR CONS; & $192
IN 17/18
Cost Decrease per 3/26/2013 HBP Lump Sum Update.
Description change to adjust TC utilization, per HBP funding
changes in FY 11/12.
Number of Projects 17
2013 FTIP Amendment log.xlsx
4/8/2013 - 4:26 PM
As of April 8, 2013
Page 18 of 18
AGENDA ITEM 9
A presentation will be made but
there is no attachment to the
agenda for item 9.
AGENDA ITEM 10
A presentation will be made but
there is no attachment to the
agenda for item 10.