Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My Public Portal
About
Amendment No 09
AMENDMENT TO AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER PROJECT NO PROJECT NAME AND LOCATION VKB-98069000 Village Community Center (Recreation Center) Village Fire Station Police Station and Administrative Office of the Village of Key Biscayne, Florida (the "Project") AMENDMENT NUMBER #9 (Owner Requested Changes for the Village Fire Station, Police Station and Administrative Office Building ) THIS AMENDMENT made this 17th Day of June in the year Two Thousand and Three By and between the Village of Key Biscayne, Florida, a Florida municipality, (the "Owner") and James A Cummings, Inc a Florida Corporation 3 575 Northwest 53rd Street Ft Lauderdale, FL 33309 Phone (954) 733-4211, Fax (954) 485-9688, Federal Tax I D Number 59-2098732, (the "Construction Manager") WHEREAS, the Owner (as a direct signatory and through its former agent, the Department of Management Services of the State of Florida (the "DMS")) has previously entered into the Agreement between the Owner and Construction Manager, and WHEREAS, the Agreement has previously been revised by Amendment Nos 1, 2, 3, 4, 5, 6, 7, and 8 WHEREAS, it is now necessary to revise the Agreement to include additional Work resulting from Owner Requested Changes for the Village Fire Station Police Station and Administrative Office Buildings, include Owner Change Order Nos 1 and 2, for the Village Community Center, Village Fire Station, Police Station, and Administrative Office Buildings, delete references to DMS as agent for the Owner as to the Village Fire Station Police Station and Administrative Office Buildings, and Site Infrastructure (Amendment No 3) components of the Project and to reference Skyline Management Group, Inc as the Owner Agent for the Community Center component of the Project NOW THEREFORE in recognition of the good and valuable consideration provided by the covenants hereof between the parties, the Owner and the Construction Manager hereby covenant and agree to amend the Agreement to include work for the Owner Requested Changes for the Village Fire Station Police Station and Administrative Office Buildings, and to identify its funding source, to identify the drawings specifications and other documents upon which the GMP is based, and to otherwise revise the Agreement, as follows (1) Guaranteed Maximum Price — the Guaranteed Maximum Price (GMP) for construction of Project VKB-98069000, Village Community Center, Village Fire Station Village Police Station and Administrative Office of the Village as defined in Article 7 1 of said Agreement shall be $21,240,858 59 (which includes $232,893 00 for Owner Requested Changes listed below as Item Numbers (2)a through (2)z for the Village Fire Station, Police Station and Administrative Office Buildings ) (2) Drawings and Other Supporting Documents — in addition to the drawings specifications and other supporting documents identified in previous amendments (No 1 2, 3 4, 5, 6, 7 and 8) to the Agreement, the Guaranteed Maximum Price (GMP) for construction of the Project is based upon the following drawings and other supporting documents a Proposal #R -03F to the Village of Key Biscayne from James A Cummings, Inc , dated April 29, 2002, and as directed by OBM Miami Inc in accordance with RFI #0P0017, dated June 26 2001 which are attached hereto as Exhibit "A 1" b Proposal #R -11F to the Village of Key Biscayne from James A Cummings, Inc dated November 9, 2001 and as directed by Doug Fitzgerald during site visit on September 6, 2001 which are attached hereto as Exhibit "A 2" c Proposal #R -13F to the Village of Key Biscayne from James A Cummings, Inc , dated June 7, 2003, and as directed by OBM Miami, Inc in accordance with Mechanical Plans Rev 1, dated July 10, 2001 which are attached hereto as Exhibit "A 3" d Proposal #R -20F to the Village of Key Biscayne from James A Cummings Inc dated March 14 2002 and as directed by OBM Miami, Inc in accordance with Memorandum dated September 5, 2001 which are attached hereto as Exhibit "A 4" e Proposal #R -22F to the Village of Key Biscayne from James A Cummings Inc dated June 8 2002, and as directed by OBM Miami, Inc in accordance with Architect Field Directive, which are attached hereto as Exhibit "A 5" f Proposal #R -27F to the Village of Key Biscayne from James A Cummings Inc dated April 5, 2002 and as directed by OBM Miami Inc in accordance with Drawing #10, Rev 1 dated January 3 2002 which are attached hereto as Exhibit "A 6" g Proposal #R -30F to the Village of Key Biscayne from James A Cummings Inc dated June 7 2003 and as directed by OBM Miami, Inc in accordance with Proposal Request #5, dated May 7 2002 which are attached hereto as Exhibit "A 7" h Proposal #R -31F to the Village of Key Biscayne from James A Cummings Inc , dated June 7, 2003, and as directed by OBM Miami, Inc in accordance with Proposal Request #1, dated March 8, 2002 which are attached hereto as Exhibit "A 8" 1 Proposal #R -32F to the Village of Key Biscayne from James A Cummings, Inc , dated April 16, 2002, and as directed by OBM Miami, Inc in accordance with Proposal Request #2, dated March 8, 2002 which are attached hereto as Exhibit "A 9" J Proposal #R -33F to the Village of Key Biscayne from James A Cummings, Inc dated May 10, 2002, and as directed by OBM Miami Inc in accordance with Transmittal Sketch dated February 11, 2002 which are attached hereto as Exhibit "A 10" k Proposal #R -64F to the Village of Key Biscayne from James A Cummings Inc dated June 8, 2002, and as directed by Village of Key Biscayne which are attached hereto as Exhibit "A 11" 1 Proposal #R -66F to the Village of Key Biscayne from James A Cummings Inc , dated June 7 2003 and as directed by Village of Key Biscayne which are attached hereto as Exhibit "A 12" m Proposal #R -79F to the Village of Key Biscayne from James A Cummings Inc , dated July 15, 2002 and as directed by OBM Miami Inc in accordance with Drawing #22, Rev 1, dated July 1, 2002 which are attached hereto as Exhibit "A 13" n Proposal #R -108F to the Village of Key Biscayne from James A Cummings Inc dated June 7, 2003, and as directed by Village of Key Biscayne which are attached hereto as Exhibit "A 14" o Proposal #R -10P to the Village of Key Biscayne from James A Cummings, Inc dated December 3 2001 and as directed by Spillis Candela DMJM in accordance with RFI #PC0050, dated September 5, 2001 which are attached hereto as Exhibit "A 15" p Proposal #R -14P to the Village of Key Biscayne from James A Cummings, Inc dated December 3, 2001 and as directed by Spillis Candela DMJM in accordance with revised shop drawings which are attached hereto as Exhibit "A 16" q Proposal #R -16P to the Village of Key Biscayne from James A Cummings Inc dated June 7, 2003 and as directed by Spill's Candela DMJM in accordance with ITC Nos 10 16 and 17 and Memorandum, dated January 3, 2002 which are attached hereto as Exhibit "A 17" r Proposal #R -20P to the Village of Key Biscayne from James A Cummings Inc dated March 19 2002 and as directed by Spillis Candela DMJM in accordance with Revised Drawing E2 3 31 dated September 10 2001 which are attached hereto as Exhibit "A 18" s Proposal #R -30P to the Village of Key Biscayne from James A Cummings, Inc dated July 12, 2002, and as directed by Spillis Candela DMJM in accordance with RFI #PC0135, dated May 17 2002 which are attached hereto as Exhibit "A 19" t Proposal #R -34P to the Village of Key Biscayne from James A Cummings, Inc , dated June 10 2002, and as directed by Spillis Candela DMJM in accordance with RFI #PC0071, dated November 29 2001 which are attached hereto as Exhibit "A 20" u Proposal #R -45P to the Village of Key Biscayne from James A Cummings, Inc dated August 20, 2002, and as directed by Spillis Candela DMJM in accordance with RFI #PC0094, dated January 28, 2002 and Correspondence dated April 22, 2002 which are attached hereto as Exhibit "A 21" v Proposal #R -100P to the Village of Key Biscayne from James A Cummings, Inc , dated January 6 2003 and as directed by Spillis Candela DMJM in accordance with RFI #PC0030, dated September 28 2001 which are attached hereto as Exhibit "A 22" w Proposal #R -101P to the Village of Key Biscayne from James A Cummings, Inc dated January 6 2003, and as directed by Spillis Candela DMJM in accordance with RFI #PCO200, dated November 13 2002 which are attached hereto as Exhibit "A 23" x Proposal #R -117P to the Village of Key Biscayne from James A Cummings Inc , dated March 26 2003 and as directed by Spillis Candela DMJM in accordance with Architectural Drawings, Rev 1 dated March 8 2001 which are attached hereto as Exhibit "A 24" y Request for Change Order to the Village of Key Biscayne from James A Cummings, Inc , dated July 16 2002, and as directed by Spillis Candela DMJM in accordance with RFI #PC0150, dated September 5, 2001 which are attached hereto as Exhibit "A 25" z Request for Change Order to the Village of Key Biscayne from James A Cummings Inc , dated June 7, 2003 and as directed by Spillis Candela DMJM in accordance with ITC Nos 11, 12 and 22, dated January 18, 2002, February 28 2002 and May 6 2002 respectively which are attached hereto as Exhibit "A 26" as Owner Change Order No 1 from the Department of Management Services dated January 28, 2002, in the amount of ($1,140,899 62) which are attached hereto as Exhibit A 27 bb Owner Change Order No 2 from the Department of Management Services dated May 15 2003, in the amount of ($1 118 301 79) which are attached hereto as Exhibit A 28 cc The revised Project Budget which is attached hereto as Exhibit "B " (3) Elimination of Agent — DMS is hereby eliminated as the agent of the Owner concerning the construction of the Village Fire Station, Police Station and Administrative Office Buildings, and Site Infrastructure (Amendment No 3) components of the Project (4) Introduction of Agent — Skyline Management Group, Inc is hereby designated as the agent of the Owner concerning the construction of the Village Community Center (5) Changes in Agreement — various changes are required to the exhibits and articles of the Agreement to reflect the amendments described herein It is agreed that the articles and exhibits of the Agreement shall be deemed to be amended, to provide the following a Elimination of the services of DMS as agent for the Owner as to the Village Fire Station Police Station and Administrative Office Buildings, and Site Infrastructure (Amendment No 3) components of the Project b Introduction of the services of Skyline Management Group, Inc for the Village Community Center component of the Project c Establishment of the GMP for the Owner Requested Changes at the Village Fire Station, Police Station and Administrative Office Buildings in the amount of $232,893 00, and establishment of the GMP for the Project of $21,240,858 59 (6) Effect On Agreement - except as provided above, the articles and exhibits of the Agreement which are not affected by the amendments provided for herein shall remain in full force and effect IN WITNESS WHEREOF the parties have executed this Amendment the day and year first written above JAMES A CUMMINGS, INC Attest By / / kjL /( Lc-, Corporate Secretary Witnessed By By (print name Lisa /416Goff/ cch;e5 (print name) By JVTlliam R Derrer Corporate President James A Cummings, Inc VILLAGE OF KEY BISCAYNE Approved as to form and ::al sufficiency By 1 age Attor ey 103001\agreements\amendment to agr. -m nt between owner and construction manager (Corporate Seal) EXHIBIT B OWNER S CONSTRUCTION BUDGET ITEM DESCRIPTION CONSTRUCTION BUDGET CONSTRUCTION MANAGER S PRECONSTRUCTION PHASE FEE $113 190 00 SUBTOTAL OWNER S TOTAL PRECONSTRUCTION PHASE FEE $113 190 00 VILLAGE FIRE RESCUE DEPARTMENT & ADMINISTRATION AND POLICE FACILITY CONSTRUCTION MANAGER S CONSTRUCTION PHASE FEE $527 392 00 CONSTRUCTION MANAGER S OV ERHEAD & PROFIT $457 223 00 CONSTRUCTION BUDGET BALANCE $9 862 250 00 AMENDMENT NO 09 - OWNER REQUESTED CHANGES $232 893 00 SUBTOTAL CONSTRUCTION COSTS $11 079 758 00 ANTICIPATED OWNER SALES TAX SAVINGS ($159 266 00) SUBTOTAL $10 920 492 00 OWNER S CONTINGENCY $256 924 00 OWNER S GMP BUDGET FIRE RESCUE & ADMINISTRATION/POLICE $1 1 177 416 00 OWNER S CONSTRUCTION BUDGET FIRE RESCUE & ADMINISTRATION/POLICE WITH PRECONSTRUCTION FEE $11,290,606 00 VILLAGE CIVIC CENTER SITE & SITE INFRASTRUCTURE WORK ELECTRICAL DUCT BANK AND WATER MAIN CONSTRUCTION MAN&GER S CONSTRUCTION PHASE FEE $119 226 00 CONSTRUCTION MANAGERS OVERHEAD & PROFIT $34 521 00 CONSTRUCTION BUDGET BALANCE $647 913 00 OWNER S CONSTRUCTION BUDGET VILLAGE CIVIC CENTER SITE & SITE INFRASTRUCTURE WORK ELECTRICAL DUCT BANK AND WATER MAIN $801,660 00 VILLAGE CIVIC CENTER SITE & SITE INFRASTRUCTURE WORK PHASES 1, 2, 3 & 5 (INCLUDING STATE SCHOOL FF SANITARY SEWER FORCE MAIN) CONSTRUCTION MANAGER S CONSTRUCTION PHASE FEE $62 630 00 CONSTRUCTION MANAGER S OVERHEAD & PROFIT $67 483 00 CONSTRUCTION BUDGET BALANCE $1 459 011 00 OWNER S CONSTRUCTION BUDGET VILLAGE CIVIC CENTER SITE & SITE INFRASTRUCTURE WORK $1,589,124 00 VILLAGE COMMUNITY CENTER (RECREATION CENTER) CONSTRUCTION MANAGER S CONSTRUCTION PHASE FEE $564 455 00 CONSTRUCTION MANAGER S OVERHEAD & PROFIT $422 814 00 CONSTRUCTION BUDGET BALANCE $8 831 401 00 OWNER S CONSTRUCTION BUDGET VILLAGE COMMUNITY CENTER (RECREATION CENTER) $9 818 670 00 EXHIBIT B (cont d ) OWNER S CONSTRUCTION BUDGET OWNER CHANGE ORDERS OWNER CHANGE ORDER NO 1 ($1 140 899 62) OWNER CHANGE ORDER NO 2 ($1 118 301 79) SUBTOTAL OWNER S CHANGE ORDERS ($2,259,201 41) OWNER S TOTAL CONSTRUCTION BUDGET (ALL PHASES) $21 240 858 59 James A Cummings, Inc 3575 Northwest 53rd Street Fort. Lauderdale FL 33309 urramins -'^e al C,,rrrcc, crs Department of Management Services State of Flonda-Facilities Development Attn Mr Rafael Martinez Sr Project Director Park Trammel Building 1313 North Tampa Street Suite 106 Tampa, Fl 33602 RE Key Biscayne Civic Center State Project # VKB 9806900 JAC Project # 99-1-38 Dear Mr Martinez, We are herewith submitting Revision # OC-3F X54 733 4211 485 5688 April 29 2002 > :17,bi 2 ^ ebac..r-rrirgs corn Adding 9 type X and I type XX lighting fixtures to the Fire / Civic Building In accordance with response to RFI # OP0017 and Fisk Electric RFI # 11 Rough in conduit only light fixtures to be determined at a later date Please see the attached back up and summary for the work in the amount of $ 888 00 This cost will be applied against the Owners Contingency We respectfully reserve our rights to request additional time should it become apparent this work will delay the completion of project Sincerely, Frank Sedmak Project Manager Cc William R Derrer Rob Maphis Jud Kurlancheek OBM Gus Escobar James A. Cummings, Inc ROC # 3 - F Summary Key Biscayne Civic Center Date 11-9-01 Fire / Civic Center Cost Code Descnption Matenal Labor Subcontract Add9 type X and 1 Type XX light fixtures to the Fire/Civic Budding Rough in only Fisk Electric $707 00 James A Cummings $110 00 r SUBTOTALS SALES TAXES @ 6 5% P,T,&I TAXED SUBTOTALS $110 00 $707 00 7100 181 00 707 00 MATERIAL TOTAL LABOR TOTAL $181 00 SUBCONTRACT $707 00 SUBTOTAL OF COSTS $888 00 1 1 TOTAL 1 $888 00 I cifFISK J electrtc 04/29/02 James A Cummins 3575 NW 53rd St Ft Lauderdale Flonda 33309 Attn Robert Maphis II Project Key Biscayne Civic Center Subject Fisk Proposal 601061-02 revised Other Ref Additional Type X &XX- Conduit & Wire Only as per 04/25/02 Meeting with Robert Maphis Dear Sir We hereby propose to increase our contract in the amount of $ 707 00 furmshmg and installing all matenals and labor as required for the abo` e referenced work In order to substantiate our proposal we are enclosing one set of our pncing and recapitulation sheets as well as our descnption of scope This proposal is based solely on the usual cost elements such as labor matenal and normal markups and does not included any amount for additional changes m the sequence of work delays disruptions rescheduling, extended overhead associated with the unforeseen delay s or disruptions overtime acceleration and/or impact costs The nght is expressly reserved to make claim for any and all of the above items pnor to final settlement of our subcontract agreement This proposal must be accepted within 30 days or before the buildings footings are installed whicheier comes first after which time it will be subjected to escalation. We are currently requestmg a time extension/consideration 2 days in conjunction with this change proposal if accepted with the Proposed Overtime Factors and Rate We will proceed with this work if directed and upon receipt of y our change order m the above amount We are proceeding with this work as directed we need your change order m the above amount ---X Smce the work has already lien completed we are in need of your change order m the above amount Respec lv Submi d Fl§$ E nc Com v Cc Jack Maxlie11 Sr Vice President r project Manager James D Kmser Construction Manager 10125 N W 116th Way #14 • Miami Florida 33178 ph 305 884 5311 fx 305 884 2192 • CC97 E00001 3 EC0000908 CHANGE NOTICE CCN# 2- revised Date Apr 30 2002 Job name Key Biscayne Civic Center Job number 601061 Page number 1 of 2 Client address JAMES A CUMMINS Attn FRANK SEDMAK 3575 NW 53RD ST FT LAUDERDALE FL 33309 USA Work Description This proposal covers conduit & wiring installed for the additional exterior fixtures type X & XX fixtures As per meeting on 04/25/02 with Robert Maphis we are awating direction from the AE on exact quantity of additional fixtures needed However as previously stated all conduit and wiring had been installed to avoid a costly change in case all the additional fixtures were needed We reserve the right to correct this quote for errors and omissions This quote covers direct costs only and we reserve the right to claim for impact and consequential costs This price is good for acceptance within 10 days from the date of receipt We request a time extension of 3 days We will supply and install all materials labor and equipment as per your instructions on CCN #<ccn> Item Description Qty Price U Hrs U Mat $ Tot Hrs 1/2 EMT 110 1355 C 295 C 1491 325 1/2 EMT STL COMP CONN 20 26 56 C 5 50 C 5 31 1 10 1/2 EMT STL COMP CPLG 11 31 98 C 5 00 C 3 52 0 55 1/2 EMT STRAP 1 H 14 4 00 C 12 00 C 0 56 1 68 #12 THHN 363 38 70 M 6 60 M 14 05 2 40 4 SQ BLANK COVER 10 33 78 C 9 00 C 3 38 0 90 1G MAS BOX 2 1/2 DEEP 10 252 75 C 35 00 C 25 28 3 50 Totals $67 01 13 38 Summary General Materials Material Tax Material Total JOURNEYMAN FOREMAN Subtotal Markup (@ 6 500 %) (13 38 Hrs @ $36 28) (1 34 Hrs @ $43 53) (@ 15 000 %) Total ($) 67 01 4 36 71 37 485 43 58 33 615 13 9227 Final Amount $707 40 CCN# 2- revised Date Apr 30 2002 Job name Key Biscayne Civic Center Job number 601061 Page number 2 of 2 Name Date Signature Change Order # 1 hereby accept this quotation and authorize the contractor to complete the above described work Jam es A C umn►ings, Inc friY /L:c_E G / V/L 'i.f7Dk . Summa ry of TAKE OFF _?J CKD 0 IXTtNOQ 0 CKD r .... ..... 99-1--18 A D (z 3-r 1 Df CRtPTior� Q UA NTITY •i .A ►-tATL RIAI i UP CoNTRAC I AT TOTAL TOT L AT II TOT AL i TOTAL A- TOTAL 11-1)1). q 1Y10 2( 4rp 1 pip �C 2$ I I I I I I I I I� I I I I I I II H i l l .�� I I I 1► 1 j I 11 1 I I I I I I, I i GiiOr%l11JROJ T 11?[lirr7 c,iic I i i 1 1 I 1 r i 1 iI i I i i i I iI llIi1ii j p�� hi &- I Ili I I i I i II iiII 111111 , 'I 1 i I iI I 1 1 111 I 1 1 11 1 i 11 1 I, 1 1 I 11 I -AY ie' A C4 Wilt Jilt 7,,_t/ 11 1 Yon 1 I ( 21 1 1 I I I t I I I II I I I ill ,S11 j I pl on I l I I ( 1 fr I 1 1 1 f I ,i I } 11 1 j II I I I I► I I I 1 111111T,i �.., I ill— 1 1 1 11 I 1 I i 1 1 1 1 I I I i III i ► i—'—'I 11iI I iii111 ii! .. ,I ►_ HtiIHWHL!HI iI i i I 1 .. 1,_ .. i I I I I i i 11 1 11 1 1 1 I 11 I I III r, _ ►1 1 1 it iilII 'I IiHil ! 1 1 1 I 1i 1 1 1 1 1 1 1 1 1 1 i 1 1 IH l i! I1 I l l l l 1 , 11 I III ► 1 1 111 I i' it I 111111_ -in i iI ill i I �I 1I !it i1 , 11 11111 ' - 1 � � i r I . - . . . , i i 1 i 1 1 I ;1 1 1 1 1 Ir it 1Eiii l it 1►rr _ I Ii 1 11111 Iii ► iil I i r lili li (1 illi II I 1 p III I 1 ! I i 111 I II 1 1 1 1 1 1, 1 1 1 11111 I I b 1 I I. I l l l l i 1 1 1 11 I i I ►► l l i i 1 ��� ��� 1 ■ 1 11 1 1 1 1 11 1 11 it 1 1 1 1 1 1 i 1 1 1 1 11 I ■ 1 11 1 1 1 1 ii III 1!1 �. 1 1 1 1 i l ill l 1 11 Iil ti I __ "11 i1i1i �i1i i� T- i i► I 1 i'' it 1 i 1 iI 11 i w it i i i '► I 11 iiI i 1111111" I 1 1 I 1 „i i t 1 1 1, I i 1' 1 1 1 I 1 1' 1 1 1 1 1 i li I i I_ilil ►111 l�ill ,1 11 „Wit JU TOT: l ._,_.._t - TOTAL i 11 1 1 1 I~�1 II' i 11 '----1-7 I I I ,i l i l l i Request for Information Detailed (without Collaboration) grouped by Number Village of Key Biscayne Fire Rescue Building ProProject # 99-1-38 les A. Cummings Inc General Contractors Tel (303) 365-8955 Fax (305) 365-8987 RFI #: OP0017 Date Created: 6/26/01 ksr OBM Miami Inc Gus Escobar James A Cummings Inc General Bill Hilton Contractors 3575 NW 53rd St Ft Lauderdale FL 33309 More ELectrical RFI s Locations / Drawing Discrepancies etc Not as of yet �p�f Name Z ry . Discipline Electrical *tont Schad Impact 0 Critical point now If We dont answer these RFI s soon there could be delays with Masonry Walls and coordination with electrician Days Oft 60144 _Ctiiii tact Name Copies Hotel', 0 Electrical Engineer has stated in Previous RFI s that he will issue new Drawings 7-batikevikvid -*ism Fisk RFI # 2 The drawings do not indicate the location of Panel C & MC Fisk RFI # 8 The electrical room lay out as shown in Drawing E 2 differs from the Architectural Drawing A-102 The double door appears to be at the location where panel MP is to be mounted Please Clarify Immediately This issue is critical to the installation of the underground feeder conduit since the relocation of Panel MP may be required Fisk RFI #9 The following feeder / branch circuit size must be reviewed confirmed and or changed by the Electncal Engineer 1) Feed to Panel A is shown as 1/2 inch with 3 # 10 + Ground 2) Feed to Panel R is shown as 1 1/2 inch with 4 #3 Fisk RFI # 10 There has not been any location given in the drawings for the FPL transformer We had anticipated a 10 foot 0 inch stub South of the Electrical room to minimize the cost to the owner (See attached location) But we need confirmation from the Engineer since it is NOW critical to get the exact location before we can proceed with the installation of our underground conduit Fisk RFI #11 The lighting count provided by the Engineer in his RFI response (see attached) does not coincide with what is shown on the drawings Mr Gus Escobar has provided a total count of (20) exterior lights which have been included in our bid However going over the drawings I have found (27) type X/XX in the main building plus an additional (3) at the Generator building Since the engineer has reduced the quantity of exterior lights from (30) to (20) we need a revised set of drawings showing which lights have been deleted and which ones to remain We look forward to your guidance on these issue Sincerely Bill Hilton Otailitkoit I ve attached the Electricians RFI s also for ease of answering FYI Fisk RFI # 2 8 9 10 11 are with my RFI # OP0017 VtlitAingt CainPanY Answered By Co -Respondent OBM Miami Inc Gus Escobar Michael Guerrero er Date Answered SE F -C S-3 3 1' -;CM --:8M + d44DS�' -- 3"/ Request for Inforrnaiton DataJed Nitti,b,ut Cc aeoratronl grouped by Number Village of Key g►avayne Fire Rescue Rurtdrng P oProleac3 # 99-1-38 . es A. Cuirsm;ngie Inc. Oensrat Conttectiore To (30e) 3e5.8956 Faun (305) e65-82.7 OBM M,ratrir, Me - is Escctiatr tarns* A. Cumrnrtrga In* Gsnerai DOI Hilton Contractors 3576 NW bard. t Ft IraudeAtle FL 332oo • —!' • .=Y+=c .,4,f***.. yA"._'* f .114. .. rJr ^ rY. .�,,,_�.��''�!-•ii'fjY�71•,_'-1r �.h-']rc �•-. v. t• 1 • . .- . rre•fir-w�ai:a.�.Y+ :r�;rr,..•:i' 7.�C6'C-s ti 7..4.4.:=1_L:r.c��,:'•5 Mora ELaarrcgt RFrs. Locations ! Drawing Discrepancies etc Nvca4OTyet Etactri at Q Camel point now IT We gont answer these RF1 s soon there echoes be delays with Masonry Ways and eoorvinatron with eioctneion Fisk RF i 4F 2 ,The drawings do Mat indiic a the, location of Brat C R. MC Fisk RFI 18 erne aiectrtcai fawn lay out as shown in Drawing E-2 cotters from the ArcnRec tural Drawing A-102 The c0auDfe tract appears to tie at the fair where penei MP Is TO !fir mounted Pimps Clayey immeamaely This issue is critic) to the rrtsL3ikatiorl or tits Linciergnmirto feeQer canOWt etnce u . MOM= or Panel MP may De required sk RFI #9 Ttte ?olio/ow reecler I Drayton GWG dt DZ. Must De reineweil aanttrmela an or ft by the Electrical Et n r 1 j Fcua to Panel A la sbcrwri es 1(2 inch with 3 +i 10 r Ground 2j Paco to Nino' tt rs Shawn as ? 112 inch wmtm 4 it 3 a$jc4.4d q ,se.. 6 a _.al FIBRFII i 10 _There magic not mean any To ton Eimer in TI1s arawugs tor ttt+ FPL transformer We had anticrpatesi ;s 10 foot 0 inch stub Scutrn of the Electric= room to minimise the cost to the censer (See attocrrect racism) But we need confirmation from the Enamour since it is KOW crfical to get me e locaron_psfore we ceirt procaeo wart me intsteiaaton of our ► nderground conduit evict. 61i 7 tAr MOW M. ear 7 r " Fisk RFI i11 The iightirtg*auni pravidsci by ttre Engineer in his RFI response tsee act'larctred3 floes not a4ntCiile ye= r.trat rs shown on tic dr-ow:not Mr Gtta Escapist has provided ar tow oosrrrt of (20) comet bets which rave bwan Included In vur tud Howw•r going ovor tttic ersewinet I hoes fou# (27) type XIXX In the raisin PtRi4tt' g, piles an adcatonlal (a) at the Generator ouiglIrI . Some tn* engineer eras reauced tna quantity or aactertor lights from (X) 10 C20) we nevQ s revrse+d set of arawusgs stlowltig whlah ligrau rive peen deietosi ono vouch ones Z roman.. We loais h:weir0 to your guidance on mesa Issue Sinner$ty Bltl hittnn a Maurice( Enginver gas S3 asa in Previous RFrs mat he will issue now Drawings !NM dttactiea the Eiectrtpans RFl s also Tar ease OT answering FYt F15K RFt w 2 a 9 10 1 t are w th rrzy RFt OPQ01 oaM Warn) Inc till 6,1 O'\{\ P Z d3� 411. Gus ascot:gar Michael Querror° ON 4� 49,4 Subiect More ELectrical RR s etc Cost impact Not as of yet Cc' Company Name Attention Gus Escobar Locations / Drawing Discrepancies James A Cummings Inc 3575 Northwest 53rd Street Request for Information Fort Lauderdale FL 33309 Detailed (without Collaboration) group d by Numb r Phone 954 733 4211 8 Author Company Authored BltNebsite James A Cummings Irc General Billk�I mesacummings com Contractors 3575 NW 53rd St Ft Lauderdale FL 33309 Discipline Electrical Amount Sched impact 0 Cntical point now $f We dont answer these RFI s soon there could be delays with Masonry Walls and coordination with electrician Contact Name Days Dwg Impact 0 Electrical Engineer has stated in Previous RFI s that he will issue new Drawings Question - Date Required 612810'1 Fisk RFI # 2 The drawings do not indicate the location of Panel C & MC Fisk RFI # 8 The electrical room lay out as shown in Drawing E-2 differs from the Architectural Drawing A-102 The double door appears to be at the location where panel MP is to be mounted Please Clarify Immediately This issue is critical to the installation of the underground feeder conduit since the relocation of Panel MP may be required Fisk RFI #9 The following feeder / branch circuit size must be reviewed confirmed and or changed by the Electrical Engineer 1) Feed to Panel A is shown as 112 inch with 3 # 10 + Ground 2) Feed to Panel R is shown as 1 1/2 inch with 4 #3 Fisk RFI # 10 There has not been any location given in the drawings for the FPL transformer We had anticipated a 10 foot 0 inch stub South of the Electrical room to minimize the cost to the owner (See attached location) But we need confirmation from the Engineer since it is NOW critical to get the exact location before we can proceed with the installation of our underground conduit Fisk RFI #11 The lighting count provided by the Engineer in his RFI response (see attached) does not coincide with what is shown on the drawings Mr Gus Escobar has provided a total count of (20) exterior lights which have been included in our bid However going over the drawings I have found (27) type X/XX in the main building plus an additional (3) at the Generator building Since the engineer has reduced the quantity of exterior lights from (30) to (20) we need a revised set of drawings showing which lights have been deleted and which ones to remain We look forward to your guidance on these issue Sincerely Bill Hilton Suggestion I ve attached the Electricians RFI s also for ease of answering FYI Fisk RFI # 2 8 9 10 11 are with my RFI # OP0017 Answer Company OBM Miami Inc Answered By Co -Respondent Gus Escobar Michael Guerrero Anewer Date Answered 713101 Answer for RFI # 8 Need to resolve We have now dimensions of El MP is 68 H x 42 W x 9 5 D M is 89 H X 42 W X 9 5 D 7 5 is + or 48 W RFI # 002 008 009 010 011 Prolog Manager Panted on 8/27'01 f \ \kbfireop pmd Page 2 or 2 c I urriniuncIs Gereral Contractors Department of Management Services State of Florida -Facilities Development Attn Mr Rafael Martinez Sr , Project Director 4508 Oak Fair Blvd , Suite # 200 Tampa, F1 33610 RE Key Biscayne Civic Center State Project # VKB 9806900 JAC Project # 99-1-38 James A Cummings Inc 3575 Northwest 53rd Street Fort Lauderdale FL 33309 Phone 954 733 4211 Fax 954 485 9688 Website w vwjamesacummings com NoN, ember 9,2001 Dear Mr Martinez, We are herewith submitting Revision # OC — 11-F To add floor outlets in the council chamber per direction from Doug Fitzgerald on September 8, 2001 after his discussion with Jud Kurlancheek Please see the attached back up and summary for the work in the amount of $2,423 00 This cost will be applied against the Owner's Contingency We respectfully reserve our rights to request additional time should it become apparent this work will delay the completion of project Sincerely, r 1.4--/± 6 wx.- i Frank Sedmak Project Manager Cc William R Derrer Rob Maphis Jud Kurlancheek OBM Gus Escobar James A Cummings, Inc ROC # 11 F Summary Key Biscayne Civic Center Fire/Civic Building Date 11-9-01 Cost Code Description Add floor outlets in the Council r Chamber Material Labor Subcontract Fisk Electric $2,024 00 James A Cummings w $199 00 1 1 NI VI SUBTOTALS SALES TAXES a@ 6 5% P,T,&I TAXED SUBTOTALS MATERIAL TOTAL LABOR TOTAL SUBCONTRACT SUBTOTAL OF COSTS 15% Markup on M&L Insurance SUBTOTAL TOTAL $327 00 $2,024 00 $2,351 00 $49 00 $23 00 $2,423 00 $2,423 00 $199 00 $2,024 00 327 00 2,024 00 Sep 10 01 03 27p Fisk Electric 305 884 2192 p ¶J! FISK 10.125 N' 1161 Wav Suite 14 IsiledleN FL 33178 305-884-5u l l (Rice 305-884-2192 Fax To JAMES A CLTheIMINS Attn FRANK SEDNVfAK Ref Fisk C O# 600161-10 September 10 2001 FIRE STATION- ADD FLOOR OUTLETS IN COUNCIL CHAMBERS Please find attached our lump sum cost submission to provide and install (3) additional floor boxes in the Council chambers, <<s requested by HDR Consulting Inc and directed by JAC representative a) This proposal includes, empty conduit with pull string with homerun back to the telephone closet This proposal reflects our costs with nark -ups Total Lump Sum of $ 2,024 03 (TWO 'THOUSAND TWENTY FO ER &03/100 DOLLARS) This pnce does not include any amounts for changes in the sequence of work, time extensions, delays, disruptions, rescheduling, extended overhead acceleration, finance charge and/or impact fees The right', expressly res.erved to make claim for ,my and all cost prior to settlement of this contra( t This proposal is firm foi 15 days After 15 days we reserve the right to reconfirm, modify and/or cancel this submission Please provide formal Change Ordor Documentation. FiS Electric. pany e Edd Perra t Jr Project Manager cc Jack Maxwell Pat Clyne C VAN, Docuinents\KEY BiSCAYNE CIVIC CENTERIKEY BISCAYNE FIRE STATION401O61-1Q T rv'1D (; r-rl 1~'rC TV rem A1rli ry A T. it T. p C ,an.- Sep 10 01 03 27p Fisk Electric 305 884 2192 p 7 FISK ELF CTR1C CO BY EDGY SAVE AS PROJECT KEY B SCA YNE FIRE STA MM DATE RCO# 010 09/10/01 ADO (3) WANG FLOOR 01111E? S IN COUNCIL CLAMBERS SPECIAL QUOTES MATERIAL LABOR 916 82 LABOR /SEW LU #349 +EELE 3826 le i l FOREMAN 43..63 !4 g( 100 , 4i" (sUPE11`V1SION 4353 4f 1 400 17 E,LEC (01) 54.42 g 800 435 FOREMAN $OT) 65.30 * - Q 13:1-1 SUPERVISION (01) X65 30 g 2.00 (TOTAL � 784 JOB EXPENSES STORAGE/ON SITE OFF( TEL • 1 5% of labor CLEANUP 61% of labor /ENGINEERING fp 3% of labor SMALL TOOLS § 2% of labor 1 ON SITE VEHICLES 01 5% of labor 'MAMMAL HANDLING a 2% of lobar TOTAL 0 30 SPLCIAL QUOTES SUBTOTALS 916 62 000 MISC MATERIALI LABOR FACTOR SALES TAX 8 $% 59 593 TOTAL 976 413 000 MATERIAL 976 41 9 5% 1 yr LABOR 783 61 JOB EXPENSE PERMITe12% 0 00 000 SUBTOTAL 1760 02 FINANCING 120 PAYS 0 00 SUBTOTAL 1760 02 15961 OVHEADIPROFII 264 00 SUBTOT 41. 2024 03 BONDING ft 1% 000 TOTAL $ 2,024 03 DM NOTES JIE AS % OF LABOR 0 0% Sep 10 01 03 27p Fisk Electric 305 884 2192 P 8 Chart address JAMES A CUMMINS Attn FRANK SEDMAK 3575 NW 53RD ST FT LAUDERDALE FL USA 33309 Work Description CHANGE NOTICE CCN#k Date Job name Job number Page number 10 Sep 10 2001 Key 8cscayrrre Gown Cdiv,ter 801061 1 of 1 We reserve the nght to correct this quote for errors and omissions This quote covers direct casts array and we reserve the right to claim for?mpact and consequential costs This price is good for acceptance within 10 days from the date of receipt We request a time extension of 2 days We will supply and install all materials labor and equ;pmcnt as per your instructions on CCU( WIG Material Description 314 PVC 314 PVCTA 3/4 PVC COUPLING 314" PVC 90 ELBOW 2GANG FLOOR BOXES 2GANG FLOOR BOX TRIM QT- PVC GLUE DUCT TAPE Materials Summary General Materials Material Tax OD6500%) Material Total Markup (cg 15 000'6) Qty Price U Hrs U Mat $ Tot Hrs 251) 48 47 C 10 78 33 C 21 41 03 C 1) 144 00 C 3 175 00 E 3 7500 E 1 8 00 E 1 5 00 E 0 00 C 000 G 000 C 000 C 000 E 000 E 0 00 E coo F 11618 11 75 1149 14 40 525 00 225 00 8 00 500 w 000 0 00 000 0 00 000 000 000 0 00 $916 82 0 00 Total ($) Final Amount Name Date Signature Change Order # 91682 59 59 976 41 14648 $1,122.137 i Mrabr accept Uu , avotnetan and aufaarra tha contractor 10 comp(a a the above osacttted worst. CIC1' A w .. ..„eiectKrIc CC r7EC1•a0013 Krsk £lecl(rc Company 10125 N W 116th Way Sur1e14 Midml FL 33178 Tel WSJ 884 5311 • fax (305) 684 2192 MATERIALS C1MNTITY DESCRIPTION Villr PAW( .,._i__IL»fL_..kti'r _ 2 ✓, ltA Awl 1"L iii'-- ,L'y "Ay y f', k G. c d-,_, l0_ i'/, 1, k, 1a d. t� I !/it41At�1� 1f� .�- PfR 1WOW{T r l rrommLlye imiliw N .... tfE Lot cmft SWNE0 acRtE9 rN AT or, WORK OfASOV E MrISAVTMCM jtOSY Via OR H IS •QEN t /NO 1 H gam EFick LA11Dh AND01. IEq IITUS A R[ AllAC:oi 1IQ n IS U16°061 0434) THAT f U LJ. ►h yN rNT WAL L. •E MAO E *MN h ip oILY! AF1 E/1 I4YC,1C E IS AEWars ED i11LIN GS CUE AfTFR ]9 pA YS MIJI, •FA A IN THtE5t AT CIIUl1EN 1 LWM.11ATE 1* O CUSIQNEN FOAL NIPE(SENT/f1VE • '-'/ii -a( QATE e /0/ CATE TIME AND M ATERIAL INVOICE S -N2 71167 M DATE Lz C VST011Ek NAME —� isEmn Fil ly A i 5111E fT ADGNESS fife_ c1c 't. Jb / S OS* 0-01/ c uSI NMEtt PP]. _,1e K19 tUwE L ,t _ cy /a_Cc _t r — WGRK Ai tHc IdLA1 KI M • RCO • �1riSEAi1(iI oho -3K CQ►opt17r Ar j� irF/1/i Mr DESCRIPTION OF WORK. APP_OIlai vt A#P LAIP rfei/c ielzyirs 111--1eAttrrtIt, t 1.Arl Iciaili 74. Cam'if _ - __1Pn U /0 /&_i cjt �___ _ __.__ I L __G C H' [ / E*f f ay/ 1f a w EGINA RtOUVR 0 • A W F4A1L EALS SVPE4vtSO9 LJ iUPEMAN / / f.f�) EtECIPMWIA oVEFR4E HMOS MA11ME RIVE O01EgTIYE 101 A1S S•• pes EVe 1 4 tip F 0141•04 Eac-R, AN -1-- TQTAt foot t/1apR cn ro 0 0 0 oz�aoaI3 (1.) 0 U1 oci rr 0 Sep 10 01 03 27p Fisk Electric 305 884 2192 P 9 It 09 10 0.► U 5b TEL 305 2.33 6052 BOBBs BRO%\ JFstc Eret..mc CC 9-ECQ0013 -e ci5s Ese: c 2or1yeny 0 25 NW 1161r, Way Sum 4 F,. k3C5 884 53 1 ► ax (3Q5) 884 2191 (C.uS TCYEN %iAYE DATE .c' 3EyO1l ATTN TOr �,,,�cre ,., 4 ..5.1,1 ..,i STREET AESS y Grt,. s KI'E'V° *Vim COMPLETE !-- - — ♦rs Q MO 2'4 j e . c r JCB rwvE ''I Ills' C. ns C. tv? C (,�►-� 4`---' GUSTOWER Pie I ArorotAtfillOStiZATIO44 :iC31 1111 Additional Work Authorization Forrn (mot Nye) items be completed at the above re ferenced jobsite per the work desci tptLon listed below it is also agreed that this Wlttonal work is to be performed based upon a Tune & Matenal pasts ant requesting the following additional w ork 7// 1"p 7 -C7/ 1 S ork Descr;ption (prow de a brief dcscripttion at the dewed work w be rcecuteci) MO>() 1 G D•tAiLif i a c~� /' - ent-L 7v Avg col -n f") Knix- iv -A., 09 /o/v/ k> 7.> 44e-rw ) (rem-) Area \% here Work 15 to be Performed (provide room lOC2taOn) Div ig \ ork Requested by -;r-,4..4c��.✓,'f Date ($ib,•rana c' Approved b; a £?ate 1—i (frr CHANGE NOTICE CCN# 10 Date Nov 02 2001 Job name Key Biscayne Civic Center Job number 601061 Page number 1 of 1 Client address JAMES A CUMMINS Attn FRANK SEDMAK 3575 NW 53RD ST FT LAUDERDALE FL USA 33309 Work Description We reserve the right to correct this quote for errors and omissions This quote covers direct costs only and we reserve the right to claim for impact and consequential costs This price is good for acceptance within 10 days from the date of receipt We request a time extension of 2 days We will supply and install all materials labor and equipment as per your instructions on CCN #10 Matenal Description Qty Price U Hrs U Mat $ Tot Hrs 3/4' PVC 250 46 47 C 0 00 C 116 18 0 00 3/4 PVC T A 15 78 33 C 0 00 C 11 75 0 00 3/4 PVC COUPLING 28 41 03 C 0 00 C 11 49 0 00 3/4 PVC 90 ELBOW 10 144 00 C 0 00 C 14 40 0 00 2GANG FLOOR BOXES 3 175 00 E 0 00 E 525 00 0 00 2GANG FLOOR BOX TRIM 3 75 00 E 0 00 E 225 00 0 00 QT- PVC GLUE 1 8 00 E 0 00 E 8 00 0 00 DUCT TAPE 1 5 00 E 0 00 E 5 00 0 00 Materials $916 82 0 00 Summary General Materials Matenal Tax Material Total Markup Final Amount (© 6 500 %) (© 15 000 %) ')'? ,Z)L c Total ($) 916 82 59 59 976 41 146 46 $1,122 87 Name Date Signature Change Order # I hereby accept this quotation and authorize the contractor to complete the above described work cf FISK electric CC 9-E3CCO 3 F sk Electnc Company 1C25 N W 116tH bray Suite14 M aril FL 331-8 Tel (305) 88-1 5,511 Fax (3C5) 88,-« 2 92 DATE Mc)N-r-1 DAY 1 YEAR 09 1 (i' 1 1 CuS`CMER NAME PT- \.1Q-7,-)A.-e.S ` L t)/ 1 11 �J 7 SEND811L ATTN TO !`�''4 r S-Rt— A RESS ,— \ fir 14,ttr 7' C+/iJ CITY J STAT_LZIP (`A/ ` ..� i C% , `�` i J�� rlv" WORK COMPLETE YES Cj NO ~ JC9 M j ` ! JOB NAMt y k- ? �s �Z n- 4:::: c. i ✓1 c �„� � `-X----- CUSTOMER P10 0 WORK ALTHORLZA'FON R ACO 0 Additional Work Authorization Form I, am requesting the following additional work (Pnnt Name) items be completed at the above referenced jobsite per the work description listed below It is also agreed that this additional work is to be performed based upon a Time & Material basis 7/W-7 A--,07 -0/ ork Description (provide a brief description of the desired ork to be executed) A- ?wit.. J ors -,C)) � k -e -m p%- .5 A-5 72�. i l0 i 614-s C /c6 ' f - )o L A -Y (Cir—V&727/ tN4:e; h), if 412 ALTe .-'/, 71> p c -7-,e`) Area \% here Work is to be Performed (provide room location) 17 co%) L t nix L 0 f n5 L...) r , Work Requested by ,ri-G.�,.� .�-- ` Date (Signature) 1- 7- Approlied by Date LL F'1SK. electric CC 97E000013 Fisk Electric Company 10125 N W 116th Way Suitel4 Miami FL 33178 Tel (305) 884 5311 • Fax (305) 884 2192 QUANTITY MATERIALS DESCRIPTION UNIT PRICE PER A MOUNT C ..., L �01 3/I,",) 1 /.5 )/y"Aii' c , CC zY 3/yy i; k t <4, , /0 /rr,i1- 20 J A Al LL /- Li 1 %�/ c-- 1--✓i r r.. ,..-- 1 lc Z Z. ___Pg. c,/ 7%/..›G- I , THE UNDERSIG NED AGREES THAT THE WO RK DESCRIBED ABO VE WAS AUTHORIZED BY HIM OR HIS AGENT AND TH E MATERIAL LABOR AND OTHER ITEMS ARE ALL ACCEPTED IT IS UNDERSTO OD THAT FULL PAYMENT WILL BE MADE WITHIN 30 DAYS AFTER INVOICE IS RENDERED BILLINGS DUE A FTER 30 DAYS WILL BEA R INTEREST AT CURRENT LEGAL RATE CUSTOMER LEGAL REPRESENTATIVE SK ELECTRIr.J AL REPRESENTATIYi� DATE 7/ el / o/ DATE TIME A ND MATERIAL INVOICE S -N2 71167 DATE M ONTH DAY YE AR Core eV CUSTO MER NA ME J A C vo►/JV/JN i s STREET ADDRESS C_Anikei %17 11C �i i) rr JOB A / JOB NAME CUSTO MER P/ 0 $ SEND BILL ATTN TO CITY /STAT EILIE W ORK C OMPL EYE /Ic y d't s G c y/! li Cry U W ORK AUTHORIZATI ON M I RC O M YLS U C-Lnc,' NO DESCRIPTION OF WORK /.17 7`2, 74;44--- i-,1117(7111 /0/1 Ir en U 12,,7I c _ he -741- 01 /1 G, it./7 f -r CC zIf LABOR REGULAR HOURS REGULAR RATE REGULAR T OTALS SUPERVISOR /.,f f L FOREM AN / (j ELECTRICIAN OVERTIME HOURS OVERTIME RATE OVERTIME TOTALS SUPERVISO R _ li1 FOREMAN ELECTRICIAN y /Z\ TOTAL FOR LABO R $ SUMMARY MATERIAL COST % SALES TAX LAB OR COST INSURANCE & TAX T OOL & E QUIP RENTAL PER MIT FEES SERVICE TRUCK BASE COST ADD % OVERHEAD NET COST % PR OFIT T OTAL PLEASE PAY u 1 4niJr1a %_ I -3, 0rSCR !PT I ON A»p l7Lo1 L C4 L.DT1 1)f� gf� Cou1tG1L GP9yid4J j/b G %t j�4f1�y C Ln Mal JP V S ummary of RAG 1/-11 Q UA NTITY I 1, ..t. 1111111 1 1 1 1 SUD TOTAL 11 1 TOTAL I1 1 1 1 1 1 AT .4ATE RIAL TOT AL TAKE OFF IXTI NDIED AT CKD CKC LAQOP II TOTAL Arrno\.e o .ur CO►1 TR AC ''pTAL TOTAL [Hi 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 i I I 1 1 1 i1111,11 1111111 1 1 1 1 1 I 1 Bill II Illilii' l i 1 1 1 i 1—T-1 1 1 1111-11,1 I Ili II 1 I 1 1 1 1 glyldn'I 1 Ili 1 1 1 1 I it 1 1 1 1 1 1 1 �I I I 1 i I lI James A Cummings, Inc 3575 Northwest 53rd Street Fort Lauderdale FL 33309 Ita1rnrrsin9s General Contractors \./-'---/ June 7, 2003 Village of Key Biscayne Department of Building, Zoning and Planning 88 West McIntyre Street Key Biscayne, FL 33149 Phone 954 733-4211 Fax 954 485 9688 Website wwwjamesacummings com TRANSMI'I"I'ED VIA HAND DELIVERY ATTN Mr Jud Kurlancheek RE KEY BISCAYNE CIVIC CENTER REQUEST FOR CHANGE ORDER R -13F FIRE RESCUE STATION AHU RELOCATION Dear Mr Kurlancheek, In accordance with your request, we hereby submit this request for change order for the Work associated with Relocating AHU's at the Village of Key Biscayne Fire Rescue Station This material was installed under provisions provided for in the Construction Contingency, item 13-F However, it is our understanding that it is your desire to issue a change order and replenish the Construction Contingency for this material An additive Change Order in the amount of $22,413 00 is therefore required If there are any questions and/or concerns regarding this matter please do not hesitate in contacting this office at (305) 361-9227 for discussion Sincerely, JAMES A UMMINGS, INC Abider Smith Jr Project Manager Cc Rick Derrer, JAC Rob Maphis, JAC FILE James A Cummings, Inc 3575 Northwest 53rd Street Fort. Lauderdafe FL 33309 rninds Z.7! Cortrcc crs epartment. of Management Sen ices State of Florida -Facilities Deti elopment Attn Mr Rafael Martinez Sr , Project Director 4508 Oak Fair Bly d Suite 4 200 Tampa Fl 33610 RE Key Biscayne Civic Center State Project # VKB 9806900 JAC Project # 99-1-38 Dear Mr Martinez, No\ LmbLr 9 2001 �-Icre 954 733-4211 54 465 9688 \./Vecs to ::'^-'eSccurrr- -' s or'i We are herewith submitting Revision # CC -13 F To relocate CU 6&7to the South side of the building, add 3 fire dampers, add an exhaust vent to room 106 Add a roof jack for room 244/245 Extend EF3 duct to the South building Relocate AHU 1,2,3&4 to attic storage room Extend ducts and fresh air intakes Extend ducts from EF 4A & 4B to West side of roof Please see the attached back up and summary for the work in the amount of $22,413 00 This credit will be applied against the Construction Contingency We respectfully reserve our rights to request additional time should it become apparent this work w ill delay the completion of project Sincerely, Frank Sedmak Project Manager Cc William R Derrer Rob Maphis Jud Kurlancheek OBM Miami James A Cummings RCC #13 F Summary Key Biscayne Civic Center Fire/Civic Building nc' Cale 1 u i Cost Code Descriptson Relo uT6 7 south of Material Labor Subcontract building add 3 fire dampers and exhaust vent to room 106 Add roof oack for room 244/245 Extend EF 3 duct to south of budding Relocate AHU 1,2,3,4 to attic storage room Extend ducts from EF 4A & B to west side of roof Coitec Engineering, Inc James A Cummings, Inc $21,779 00 $316 00 SUBTOTALS SALES TAXES ac 6 5% P,T,&I TAXED SUBTOTALS MATERIAL TOTAL LABOR TOTAL SUBCONTRACT SUBTOTAL OF COSTS 15% Markup on M&L Insurance SUBTOTAL TOTAL 1 $520 00 $21,779 00 $22,299 00 $78 00 $36 00 $22,413 00 $22,413 00 $316 00 $21,779 00 520 00 21,779 00 Coltec Engineering, Inc. 12169 S'YA 13'st Akenue Miami FL 33186 Tel (305) 256-0046 Fax (305 256-0044 Septembei 25 2001 James A Cummings 3575 NE 53rd Street Ft Lauderdale Florida 33309 kttn Frank Sedmak, Project Manager RE Fire Rescue Department Village Of Key Biscayne CO #1, Plans reN ision Dear Frank Please find attached our cost breakdown for the mechanical plans revision No 1 as follows M-1 Relocate CU -6 & 7 South of building (core 2 holes) M-2 Add (3) fire dampers to ducts passing through slab Add brick vent for bathroom exhaust Rm 106 M-3 Add Roof jack for Rm 244/245 Extend EF-3 duct to South of building M-4 Relocate AHU-1 2, 3 & 4 in Storage Room - Extend ducts for AHU-1 2 3 & 4 - Extend fresh air intakes Extend ducts from EF-4A & B to West side of roof CO #1 add $18,938 52 tS OH & P 11,849 85 l .73 o '',� 43 Total CO #1 $44704180 80 2- % 77 '7 00 Please issue a change order as soon as possible if you want the changes to be implemented Please note that our shop drawings were corrected to include the changes Call me if you have an questions BOMB ;� ;E 2 7 20011 L L --- - JAM.1�5 A t,UM?iNuS INC CORPORATE L!) Project Fire Rescue Village Of Key Biscayne Ge neral Contract or J A Cummings Subc ontractor Coltec Engineering, Inc CO #01 plans revision Item Des criptio n N 1 Direct cost 2 Sheet M 1 Change Description Plans revisi on Date 09/24/01 U nit Mat Material Extended Labor Labor Extended count Unit Material Cost count Unit Labor Cost Subcontract c ost Total Cost 3 Change EF 8 to in line fan 4 Relocate CU 6 & 7 2 (2) cores for lines 5 Lot Unit 2 6 Sheet M 2 7 24 x24 fire dampers & accessories 8 30 x 24 fire damper & accessories 9 Add brick vent Rm 106 10 NC NC $200 00 Each Each Each 2 $ 8000 $ 16000 200 $5300 $ 10600 1 $ 10000 $ 10000 200 $5300 $ 10600 1 $ 50 00 $ 50 00 1 00 $53 00 $ 53 00 11 Sheet M 3 12 Add Roof vent Rm 244/245 13 Extend EF 3 exhaust duct South 14 Add 24 of 14 duct & fittings 15 Each Lbs $0 00 $0 00 $0 00 196 16 Sheet M-4 17 Relocate AHU 1 2 3 & 4 to storage Rm 18 AHU 1 & 2 add 86 of 28 x16 duct R. fittings Lbs _ 1 65 $ 1 895 85 1149 00 $1 95 $ 19 InsulInsulationv 2 240 55 $0 00 Sq Ft 820 $ 0 65 $ 533 00 820 00 $1 37 $ 1 123 40 20 AHU 3 &4 add 94 of 16 x14 duct 8 Fitting; 30 00 Lbs 858 $ 1 65 S 1 415 70 858 00 21 Insulation 31 95 $ 1 673 10 $0 00 Sq Ft 470 $ 0 65 $ 305 50 470 00 n F/A AHU 2 add 20 of 14 duct & fit � S1 95 $ 916 50 $0 00 Lbs 144 $ 1 50 $ 216 00 144 00 $1 75 $ 252 00 23 F/A AHU 4 add 14 of 10 duct & fit SO 00 Lbs 62 $ 1 50 $ 93 00 62 00 24 EF 4A & 4B add 60 of 20 x 20 duct & fit Lbs 672 _ Si 75 $ 108 50 SO 00 1149 25 00 $ 25 00 1 00 $53 00 $ 53 00 1 50 $ 294 00 396 00 $1 75 r1( $400 0 ) $ )bti 0 I $2116 00 $10100 $0 00 693 00 $0 00 25 26 Field cost 1 65 $ 1 108 80 672 00 $1 95 $ 1 310 40 $ ti 00 $ )Ht 0 ) $1 1300 I $1 f t 10 $ + (INti fit $1 '(n $ 1t 0 ()0 7 )01 0 $0 00 $)41 i ii 27 Field coordinatio n su pe rinte ndent 28 Field coordination foreman 29 30 Administrative C ost 31 Gen eral conditions administrative cost Subtotal 10 00 / $18 940 33 $ 1 894 03 32 Revise CAD plans Update as built 0 00 $50 00 $ Lot 1 $ 500 00 $ 500 00 33 Panting E Mad Distribution of Drawings 00 $ 250 00 2 00 $50 00 $ Lot 1 $ 250 342 00 $50 00 $ 35 Totals $8 840 88 ma n hrs 0 $ $ 8 00 $55 00 $ 440 00 $0 00 man hrs 0 - 8 00 $53 00 $ 424 00 $0 00 $14t)oil l•1 1( I $000 $1HI1I)i __ 100 00 $0 00 Si,() 11 I 100 00 $0 00 $3 U flO $9 699 45 $000 $18940 33 r(Le7 Q!J Lg-Y1/L. c/ JG GLjji?<�iL Summary of TAKE OFF CYD n DESCRIPTI ON IIQ UANTITYC. C1 p. _614 - tai (-AL Ainiff 1914 I I I I II g6149 GM C V 4-‘7 s p ,ro Jr 1 H, 1 j c • PI -D11 1 fr[AC QAN 1011Aj uoili i Aolri !'JG /4 'DA fr onM ell 2 b j c-7 1'0 Jikv O f d Q1 t pi/,r Arco 1 4J)U (,Li) Y Ank I sr>A‘L fioOM 11of 7e o T'1/2lD I I _ft 11174,101.1 L_Y 7n11I plivfl . 11,5A y h t Yi Tn 711is l✓hrf Jly& 1?r 7ite n og17 n ►iATI RIAL TOTAL txTI Noto CKD I LABOR I1 I' c) T ft A kT. I TOTAL - —c�1�L 11 T OTAL 1 1 1 1 1 1 1 Ii-�� I i f I I I 1 I i I I I ii111f1 , ---' _ II ii l LI , 11 1 1 1 _! j ! I___,I I 11 1 1 1 1 1 1 1 t-_ 1I II 1 I I I i t I 1 1 1 1 III I �f —j ( i!j^� 11 I III I. fl f l l l I' I� Iii ITT' Ili 11 i I itliil it Hi I 1 1 I I If II tit I plc I1�1 t' Iii i,�. 1 1 1 1 1 1 I I I► I 1 i i I I 1(► I I► ill ill;li li j it 11ii11i 1 I1iii1 1 ( I I I I I 1 1 I, ( I I I I . 1 I I1 mil ll t. ItIIIl 1 1 Ii MC 11 01 L�losul 1 i. I I I li l i ii 11� I'� u' 4� .�2 1 11 III ��� I it ,�� I! I I i� I1 1 li II �(i111i-�_ 1 h I I i l I —IF M i 1 I 1' VIII_I�l 1111T I 1 .,_.1 ►► I I I I I_ II !! 1 71-1777--- ti II 111111 III I Illllii 11.1717—_,11 11 111 I clililli 111111 ii lint i illllii !IIlilil 1 1 1 Cl ^Ii I -_- 1 I i 11 mg 1 h I i j li I I I 771- -in 1 i ! 1 1 1 I1 1 1 1 11 1111111 I, 11 1 1 11111 ! 1I1-IT11111 it I i Ililiilf l 7"77-7-11 It it IIIIIit If I�11Ii 1 II II 1 III I l i--I 1 11 I l i i 1 1 l I I 1 1 1 1 1 1 (1 III 1 1 I I 11 1 I 1 1 71 771771, 1`"j —`, i 1 11 IIII (1. —. 1_ Ii 1_1____j_ 0,,jl� 1- II , 1 III t 1 1 1 1 1 1I It (IIII 1 I I —j 1!lim it 11 1 11 ,1 1 1 1 1, James A Cummings Inc 3575 Ncrthwest 53rd Street Fort Lauderdale FL 33309 -r frCC .,r Department of Min igement Services State of Flonda-Facilities Deivelopment Attn Mr Rafael Martinez Sr Project Dire. for Park Trammel Building 1313 North Tampa Street Suite 106 Tampa F1 33602 RE Key Biscayne Civic Center State Project # VKB 9806900 JAC Project # 99-1-38 r7 X54 733 42 'vl irch 14 2002 Dear Mr Martinez, We are herewith submitting Revision # OC-20F Add a 10 high raised wood platform in the Council Chambers Please see the attached back up and summary for the work in the amount of $ 6,530 00 This cost will be applied against the Owners Contingency We respectfully reserve our rights to request additional time should it become apparent this work will delay the completion of project Sincerely, J -,...41,4..A Frank Sedmak Project Manager CC A illiam R Derrer Rob Maphis Jud Kurlhncheek OBM Gus Escobar "1 JCS e —esect.. - nirgs con "r -06-0I III 4Y 6.141 Vt +30c4 -4>U99 T-'3? P 01/01 F -M6 4 ID Tc Bill Hilton From Gus L3cobzr Rc «$ Fire Sf nun Date 9/5 '01 The vill2ge has tequr'ted that aproposal be submitted tot ch ng ng the elevated dar,- area Lrz chc Council Cambers Rrn. 122 Etorll concrete slab to rood platform_ This change would lower all ele% aced concrete slabs to the 5'-3 ' Boor elevation (including ramps) All elevated ;tress including ramps and step% u ould be tabncated with fire retardant ixood. This would he achieved by use 2"x10" wood floor waists �u�, 16" o c -tnd -101040Rgair 3 1' plywood flooring ill ramps and sreps would hat e similar cons--mmrnon Floor Aim her Zvou]d remain the Barrie (carpet) Please provide a cost estimate for the afuremention d revrstons The village is prepared to inalcr a quick decr.-tvn to prevent delays to the project OBM %fiarni. In Archtitectttre Resort Drsk n & Deter Tara tin Interior Design Mao:- R.-wd Sufis �!0 C'sru Gal les elcr.da 33) 34 el 30541- 111 'zee 104' 443 1 %fro, at S.a cum F o5 rua4ccmzxaruc Annan Scram Brune.. Ca' man [slued, err Sr >an* T4JLtO.a afros ,a Cummins, Inc 3 2 - J1r^atf Kay Bas.:ayne Co/ c Cer, er Fire Station Eat, 3 14 C, Cost Code Description Material Labor Subcontract Add a 10 high raised wood platform in the Council Chamber B&B Interior Systems $6,101 00 James A Cummings, Inc $261 00 • SUBTOTALS SALES TAXES@ 65% P,T,&I TAXED SUBTOTALS MATERIAL TOTAL LABOR TOTAL SUBCONTRACT SUBTOTAL OF COSTS TOTAL $429 00 $6,101 00 $6,530 00 $6,530 00 $261 00 $6,10100 429 00 6,101 00 w" _RIOR SYST: IS INC ....MINISINIMMILLAIMINNIVIIIMENIMells..payg 4,00,, 3625 NEST BROWARD BLVD FORT LAUDERDALE FLORIDA 33312 (954? 5810713 FAX 5810738 Cost Proposal Dare 17.E rch 14, 2002 Front Scott 1 ul.il To James A Cummings, Inc 3575 Northwest 53rd Street Fort Lauderdale, Flonrls 33309 Attu Frank Sedmak Job Name Fire Rescue Budding Contract # B & B Job/4 010541 Proposal # 00S Regarding "ood Framed Floor m the Chamber Room The total price for this resision is Material $ 2,285 Labor 5 3,020 Profit S 796 Total 5 6,101 Please note the following qualiflcations Installation of a wood framed floor to include 2 x 10 p t members, laid down on the concrete deck without a sapor barrier 3/4" CDX plywood on top Please call nnith any comments METAL FRAMING DRYWALL ACOUSTICAL CEILINGS EXTERIOR FINISH SYSTEMS La . C. J tt /1B __ 13 (4) rdc '/L//1 c -i34 ' iL LUI[IIfl111yS, Lnc. Sum ma ry of ICoG 1 ,OF of Cnl►Tl cr, )91)1--777j i/ i .0.1 .`L. I,/1 � Q i I I I lit -P'i " /u 7 f�� t' J/c,�� tin/ a . �I 1 I it I Ouw►1TITY AT G uAT[ ni AL TOTAL TAKE OFF C> tXTINO[ O AT II LAEC1r TOTAL crC 1 1 1 Imo 1 1 1 1 1 1 1 1+ I I 1 1 Hi Sri i71 --7-7- I I 1 1 1 1 1 1 la) i 1v1 1 1 1 111 I III III 1 1 1 1111Lii 1 11 it 1777-1 I 1 11 I I I I II I 1, i l II II 1 I F 111iI1j 1i ,1�1-1I.. I 1 i Ii I I I 1 1 1 1 i�-i l iii ' 1 ___ Ii I I' I I I, - j- _ I_i i I U IIII►!I ! 1111!11 : i l 1lllllill►_II�ilij 1 1 .L I___, 1111 I It ---1-7' III 1 T171777-7-11-7-7717----I �__1___ I I I_I r E I 1 I I I'_I" ��� I l i 1_-_� 1 I III I1 I I I I I� 1 ;1-I i" IIII I I I I; j, 1 1 I I I —41-71-71 I i 1111 -- Iilii III i_III� 1 II I I I 1 I I I 7-77 7-4 _ii 1 I I l I l i I j l l I~ 4 1 1 1 1-77-7-1I- 1 1-7i 7 11 11!!_'1 �ii� ll Ili !_ 11 I 1 1� j� I ~ 1 1I ,I1 II j II III Iii IIIl 1 ►1�►►I►. 1 l i IIII I I �� 1 1 1 1 1 1 1 11 i_j 1 f i 1 i li l l 1 �_!__ Iii! 1 1— --1 �, 1 1 ildill L______1 III 1[1 I1 1111Irii' -1�1- jiit I I I I IIII III I I I, 1 1 1 1 1 1, ,- SUP To -AL I I I i i ! 11 I► III I I ► 1 I I 11.14111 —pi I I I I 1 TO AL 1 1 1 1 1 I 1 II I I► 1111 ( I,, f 1 1 1 ' ,_,-1 I 1 1 1 1 1 1 1— 1 I 1 1 1 1 f 1- 1 A. i TA TOTA I I I I I 1 �' i 1 ...... .......- a...4 "f"."-- ... .....1 . ..1, ..........1 11 1 I I 1 I -17-11 .11 I^, ` 1, 1 1 1 1 I I I I I�~i l, I I� 1 �----. i l l l 1 1 (1 I I T I1 I I I— -- -' !_!!_1 7 1 1 1 1 1/ 1 1-'1...,.1 1 , i I i l i i T 1, , I !HI y Ir_ --11 I 11 Ei 1111 -- -- _-r 1 1 1 1 1 11-1-77-1-771 I _ _ I I I-1 I; 1111 (111 11 1 1 1 1 1 i~, 1 1 1 .. a�.aver is��4acx�rr r . i O`' CHANGE ORDER PROPOSAL TO Frark Sedmak Project Manager CHANGE ORDER NO g James A Curr'irgs Inc DATE 9 _0/C f 35-5 N iV 53 Street PROJECT Village of Kay V scar e For' Lauderdale FL 333C9 We hereby proposed to make the following changes at Administration & Police Building due to attached Memorandum 1 Change from concrete slab on grade 6 1 elevation to Wood platform at 6 1 elevation over concrete slab at 5 3 elevation a Remove existing grade at 6 1 elevation by hands b Preparation and pour concrete slab on grade at 5 3 elevation c Supply and Installation of materials for Wood platform ramps and stairs at 6 1 elevation TOTAL ADDITION THIS CHANGE ORDER PROPOSAL $ 12 921 05 Note Upon approval this Change Order Proposal becomes part of and in conformance with the existing contract WE AGREE to modify the original contract by the following CHANGE ORDER amount Authonzed Signature Armando L Alonso President Areda Construction Inc ADD $ 12 921 05 ACCEPTED the above paces and specifications of this Change Order are satisfactory and are hereby accepted All work to be performed under same terms and conditions as specified in original contract unless otherwise stipuled Client Authorization Date Frank Sedmak Project Manager James A Cummings Inc (Please sign and return ore ccoy fcr cur records CHANGE ORDER PROPOSAL TO 7.a --ti Sedn ak P :led Varay`tier CttANGE ORDER NO Janes A.. Curnmint3s irc DATE 3575 NW 53 Street PROJECT ccrt Lauderdale F. 3330 1; 1riilage ct Kay We hereby proposed to make the fonowtng oranges at Fire Rescue Departure-nt due to proposed concrete platform council of chamber, Elev +6 1 ' (See attached sketch) 1 Orli & dowels wit epoxy ##5 rebar 24" o/c [q] 53 2 One courses of 8 regular & baby "o" Nooks NI 15C 3 Pounng all cells of blocks [If] 100 4 Preparation and installation of looking rrraterrals for concrete stairs (2) concrete rangy (2) and 10" concrete slab with 2 layers of wore mesh & 1#5can not. at edge [NMI 550 5 Place & fkush 10' concrete slab (sgtt) 550 (Notes All metal framing already installed should be removed before start our job and by others ) TOTAL ADDITION THIS CHANGE ORDER PROPOSAL S 9 932.46 Note Upon apprera! this Change Order proposal becomes part of and in conformance with the =stag condsct WE AGREE to modify the original contract by the following CHANGE ORDER amount- Atitnonzed signature rnando L Alonso President Areda Construction. Inc. ADD $ 9,982.48 ACCEPTED the above pnces and spearcattons of this Charge Order are satrstactcry and are hereby accepted All work to be performed under sarne terms and onditions as specified in original contract unless otherwise sapuIed Client Autfwor'zation Cate Frank Sedmak Project Manager James A Cumrnirgs Inc . e ;1r ard roar^ f'e '^.pv Mir our-eccrds) urn min c1s Gyre CI , (1 CC Cr, Department of Management Services State of Florida -Facilities Development Attn Mr Ratael Martinez Sr Project Director Park Trammel Building 1313 North Tampa Street Suite 106 Tampa, Fl 33602 RE Key Biscayne Civic Center State Project # VKB 9806900 JAC Project # 99-1-38 James A Cummings, Inc 3575 Northwest 53rd Street Fart, _3Lderda{e FL 33309 e. 954 9 4 733-4211 v54 —35 9683 June 8 2002 Dear Mr Martinez, We are herewith submitting Revision # OC-22F Change a full height wall to a knee wall in the council chamber room 122 change the light soffit in rooms 101 and 121 per architect field directive Please see the attached back up and summary for the work in the amount of $ 916 00 This cost will be applied against the Owners Contingency We respectfully reserve our rights to request additional time should it become apparent this work will delay the completion of project Sincerely, Frank Sedmak Project Manager Cc William R Derrer Rob Maphis Jud Kurlancheek OBM Gus Escobar 1 e. Zs e ��u(T�f"'IrCJS con lib.* INTERIOR SYSTEMS INC #CKC056641 3625 WEST BROWARD BLVD FORT L4UDERDALE FLORIDA 333,2 r95-0 531 0713 FAX 581 0788 January 21 2002 James A Cummings 3575 NW 53rd Street Fort Lauderdale FL 33009 RCO #1 RE Key Biscayne Fire Station 1 AWA Dated 1 09 02 Mechanic 10 hours @ $34 00 $340 00 Helper 10 hours @ $28 00 280 00 Laborer 2 hours @ $22 00 44 00 Material 38 00 Total $702 00 $702 00 2 AWA Dated 1 09 02 Mechanic 5 hours @ $34 00 $170 00 Laborer 2 hours @ $22 00 44 00 Total $214 00 $214 00 Total due this RCO $916 00 Thank you for your business, B&B Interior Systems Inc METAL FRAMING DRY WALL ACOUSTICAL CEILINGS c XTER/OR FINISH SYSTEMS (954) 581 0743 Fax (954) 581-0788 DATE Interior Systems Inc CK C056641 3625 W BROWARD BLVD FORT LAUDERDALE FLORIDA 33312 SHEET NO OF CUSTOMER ORDER NO WORK AUTHORIZATION # / PROJECT l i Qfit c v L PC /9 WORK PERFORMED BY_J c g /N I JOB NO Of 05C4/ FOR ✓ /'9 e__: C C u MM / wr 6 S /N c fA0 /cc I AUTHORIZED BY J.4, TITLE e, t9 N ire DESCRIPTION OF WORK C Ai A, , 6-i2 Fv LL li r.5 ,-( T jam✓ A t j o k/i e e 1,,,i/ LC i/v At-vrl 1 2 1. GE/UN 4 L. CH/9rnBt,& F6Ke A-A'C -# Tc,A( — Re T��/in, LABOR I MATERIAL NAME La — age; 1 TRADE 1111MMEMI MIIIIIMI ACTUAL HOURS WORKED QUANTITY STRAIGHT PREMIUM TIME , TIME DESCRIPTION : ro` .: QUIPMENT & TOOLS DESCRIPTION TIME DESCRIPTION TIME M IEMARKS ONTRACTOR ARCHITECT r OWNER SUBCONTRACTOR Y BY BY LUNG BILLING DORESS ADDRESS ADDRESS JOB COMPLETED D YES ❑ NO TOTE COMPLETE A SEPARATE DAILY WORK ORDER DR (1) EACH J08 (2) EACH DAY 10 NOT ATTEMPT TO COMBINE JOBS OR DAYS) WORK AUTHORIZATION NOT SIGNED BECAUSE ❑ UNABLE TO CONTACT REPRESENTATIVE ❑ AUTHORIZED BY PHONE ❑ FORM ISSUED FOR RECORD PURPOSES ONLY AUTHORI7ATIfN IN DISPIITE (954) 581-0713 Fax (954) 581 0788 DATE I - Cf 03. Interior Systems Inc PROJECT Ft4E Q e S C tJ e WORK PERFORMED BY gc 48 / iV / DESCRIPTION OF WORK CK C056641 3625 W BROWARD BLVD FORT LAUDERDALE FLORIDA 33312 SHEET NO OF CUSTOMER ORDER NO WORK AUTHORIZATION # e F PA RT ili Fri i JOB NO *--O ! L= 5 4 / FOR ,s%} ,•, cJ fi rth ail I'to C ,, /tic p/ZG 1 14c r -- TITLE //'9ivC-AX- C C1 & r fi so ,cc,r,---- ikti go 01,1 i - r Loge f- , k Ai; goof -$-1 IQ 1 RPC Pr, L.) -P,)A ARc H t 1- ec l.)tic if 42 4 S S"„ AUTHORIZED BY J1 si LABOR MATERIAL NAME TRADE ACTUAL HOURS WORKED QUANTITY STRAIGHT TIME PREMIUM TIME DESCRIPTION f -I ' r9 v r L YP C ► b c c -4 I D '/ I./)(1 Via, 4 N9 /-e a o 4.4.9 6/ - L&0Y0 c,v,cci 1dw N<t(26 (6 —1✓ e .S To f& P 0 44t LABoteK / , r QUIPMENT & TOOLS DESCRIPTION TIME DESCRIPTION TIME tEMARKS ONTRACTOR ARCHITECT OWNER SUBCONTRACTOR Y BY BY LLING BILLING DDRESS ADDRESS ADDRESS JOB COMPLETED ❑ YES ❑ NO 7.1_.,_, TOTE COMPLETE A SEPARATE DAILY WORK ORDER DR (1) EACH JOB (2) EACH DAY 0 NOT ATTEMPT TO COMBINE JOBS OR DAYS) WORK AUTHORIZATION NOT SIGNED BECAUSE ❑ UNABLE TO CONTACT REPRESENTATIVE ❑ AUTHORIZED BY PHONE ❑ FORM ISSUED FOR RECORD PURPOSES ONLY At1THf1RI7ATICIN IN nICPItTF 1 James A Cummings Inc 3575 Nor*rwebt 53rd Street L&.cerdaie FL 33309 ummung3 ...mow Ccr roc ` = -YJ J3OQd1 Lom Department of Management Services State of Florida -Facilities DeNielopment Attn Mr Ratael Martinez Sr Project Director Park Trammel Building 1313 North Tampa Street Suite 106 Tampa, Fl 33602 RE Key Biscayne Civic Center State Project # VKB 9806900 JAC Project # 99-1-38 Dear Mr Martinez We are herewith submitting Revision # OC-27F Aprils 2002 Add lookouts for architectural appearance at single trusses over the apparatus bay so these will appear as 4 member truss tails to match double trusses This is in accordance with OBM direction Please see the attached back up and summary for the work in the amount of $ 4,560 00 This cost will be applied against the Owners Contingency We respectfully reserve our rights to request additional time should it become apparent this work will delay the completion of project Sincerely, Frank Sedmak Project Manager Cc William R Derrer Rob Maphis Jud Kurlancheek OBM Gus Escobar 1 1 -RCM-JEW V iM(! VC +31Ett 3 r_7 3 J4 J4 F- 102 OBM Miami, Inc 2600 Douglas Road, Suite 510 — Coral Gables Flor da 33'34 T_! X30; 443-'781 i • Fat l30c') 445-O) • F nu I )b:tii.i h`,rr FL: � 1. )\' D1 \\‘1" -‘ t Dk11} 113102 RE%ISION' # 1 DING I ll PROJECT 1,70 FIRE STATIOA DRAWINGS RE% ISED CO\f11E'TS Detail for double truss out -looker scabs L-.wVtoyLE TfZstJ55 oom exiweiz (serra) aeks fz'e2 -rF-056 HAS.K.Vp ----\ i 4 -a v, L. ' _..643 1T1S.1 t - R iF t. 1 lui ') 4 L 5 P CZ tPi 54.4i 1 aIA -rwv riz.k. -roc' CIA c tz c> s 4. or4C-- cxrr- w '�r-.. Cs4-p48 WILL Nita -Orr -- C i-' rt c—i 12.Qt11 rz..M0=r4-Ts "T IMO BE- rZ 6? O.JfLae J:=' tZev t w t- a.1Urc-'s w --- Lam_ =_(-E J_ _I_ Stinle uraI floorStricins. Inc. PHONE (954) 484 9663 FAX (954) 484-4421 FAMES A CIJMMTNGS, INC 3575 NW 53rd Street Fort Lauderdale FL 33309 ATTENTION Mi Frank Sedrnak I PHONE -'gin Bred ST „c � 2t NOW Roc( & r c� L - e -S 2703 N W 55th Court FORT LAUDERDALE FLORIDA 33309-2542 JL r e 13, 2u02 DATE PROPOSAL -CONTRACT KEY BISCAY.TE CIVIC CENTER 7 RE Key Biscayne, FL (954) 733-4211 Fax (954) 485-9688 Page 1. et 1 CHANGE ORDER #03 To supply and install additional Timber Tails at Apparatus Bay for architectural appearance ADD TO THE CONTRACT TFfE SLIM OF 3.e Cartificatton'CBC 038865 s contract does not become a b►nding contract untlt counterstgnec by an officer Structural Roof 8yatema, inc Ater its acceptance by the purchaser STRUCTURAL ROOF SYSTEMS INC 5 contract expires unless accepted within days from quoted date The 1 didonal terms and conditions on the reverse Side of the page aro Included in and By a part of the contract = ever y . • u on, reasurer .TAMES A CLTMMINGS, INC FOR STRUCTURAL ROOF SYSTEMS INC USE ONLY Name of Buye Aop lived e , REV 11/'01 Auto zed s g.%$ ure t1e Core PLEASE SIGN & RETURN BOTH COPIES c urmminas General Contractors June 7 2003 Village of Key Biscayne Department of Buildmg, Zoning and Planning 88 West McIntyre Street Key Biscayne, FL 33149 James A Cummings, Inc 3575 Northwest 53rd Street Fort Lauderdale FL 33309 Phone 954 733-4211 Fax 954 485 9688 Website www jamesacummings com TRANSMITTED VIA HAND DELIVERY ATTN Mr Jud Kurlancheek RE KEY BISCAYNE CIVIC CENTER REQUEST FOR CHANGE ORDER R -30F FIRE RESCUE STATION APPLIANCE ALLOWANCE Dear Mr Kurlancheek, In accordance with your request, we hereby submit this request for change order for the Work associated with providing Appliances at the Village of Key Biscayne Fire Rescue Station This matenaI was purchased by James A Cummings, Inc pursuant to Owner Contingency Authorization No 3, item 30-F However, it is our understanding that it is your desire to issue a change order and replenish the Construction Contingency for this material An additive Change Order in the amount of $5,500 00 is therefore required If there are any questions and/or concerns regarding this matter please do not hesitate in contacting this office at (305) 361-9227 for discussion Sincerely, JAMES : CUMMINGS, INC der Smith Jr ect Manager Cc Rick Derrer, JAC Rob Maphis, JAC FILE James A Cummings Inc 2575 Nor,,h\,vest 53rd Street + acderdale FL 33309 � 2 1 5 Department of tNtanagemtnt SL.r\ icts State of Florida -Facilities Development Attn Mr Rafael Martinc.L Sr Project Dtrcctor Park Trammel Builder` 1 313 worth Tampa Strett Suite 100 Tampa F133602 RE Ker Biscayne Civic Center State Project # VKB 9806900 JAC Project # 99-1-38 Dear Mr Martinez Jure 10 2002 We are herewith submitting Revision # OC-30F Increase the kitchen appliance allowance from $ 5 000 00 to $10 500 00 to purchase appliances selected by OBM and VKB Fire Rescue Please see the attached back up and summary for the work in the amount of $ 5 500 00 This cost will be applied against the Owners Contingency We respectfully reserve our rights to request additional time should it become apparent this work will delay the completion of project Sincerely, Frank Sedmak Project Manager Cc William R Derrer Rob Maphis Jud Kurlancheek OBM Gus Escobar S 3 VKB Fire Stat on Cost Code Description Material Labor TSuccontract 1 1 I Purchase and install appliances selected by OBM and VKB 6 CU FT Ref Uline / 75 RSS 18 CU FT Ref Frigidaire 4 ft - $866 00 $460 00 Ilr . W. 4 r 3 23 CU FT Ref Frigidaire 1 2 1 24 Dishwasher Fngtdaire 50 L8 Ice makers 15 ivibk1o2L Gas range Vulcan 481 L $2,847 00 $245 00 $1,880 00 $2,780 00 I Y Set Up $71000— Delivery $122 00 INIIIMI llll 1 Mr 1 4 VII $9,078 00 SUBTOTALS SALES TAXES @ 6 5% P,T,&I TAXED SUBTOTALS MATERIAL TOTAL LABOR TOTAL SUBCONTRACT SUBTOTAL OF COSTS TOTAL $9,078 00 $832 00 590 00 9,668 00 832 00 $9,668 00 $832 00 $10,500 00 $10,500 00 PROPOSAL RFT, FST r-• PROJECT (Name and addrts) OWNER (Name and address) 3 FIRE ST ATIO\ PROPOSAL REQL EST NO DATE OF ISSL ANCE ( )2 VKB CONTRACT FOR CONTRACT DATED TO CONTRACTOR CL'MMINGS ARCHITECT PROJECT NO 98080 (Name and address) ARCHITECT OBM MIAMI INC (Name and address) Ili Please submit an itemized proposal for changes in the Contract Sum and Contract Time for proposed modifications to the Contract Documents descnbed herein Submit proposal within days or notify the Architect in writing of the date on which you anticipate submitting your proposal THIS IS NOT A CHANGE ORDER A CONSTRUCTION CHANGE DIRECTIVE OR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED IN THE PROPOSED MODIFICATIONS Description (Insert a written description of the Work) Appliance selections to be coordinated with the cabinet supplier / manufacturer Attachments Cut sheets RECEIVED \Ai Y 0 9 2002 .,,MES A. CUMMiNGS, INC .OBS1TE Note 1 The ice makers shall remain as previously specified 2 The garbage compactor has been deleted and a cabinet will be required in it's place / REQL ESJ,TD BY c 1 J (Signal ire) (Printed ar"rne and tide) R A-rn st c P 5 Y is )4 i) ' (n S 3tt P po I R g e P pt I R q est F r -n 5 .fo.. n fcfl{e"N q $T UF, N 440. •J r ar PH (305i 324-08'3 • FAX (3C5) 545-0471 To Company, Facsimile Number; From Facsimile Cover Sheet Date /ae c, Nz,2c L Total Number of Pages Including Cover Sheet, Message, tA)) V � c141t ea 1( ;t1} f7A “ 6 G20 VULCAN N,LaT COVPAkii P 0 BOX 6 6, LOUIS ILLS_ —1 502 r, �� +r KY 4Q2n1, TEL 1-a0Q- 114-2428 1 8 1 i al SERI v�u sr la y 3 9 a all _ 3 N 1 s z3 3-- PI cas tco r a car r, N r~ ad yr3 a ,. a? 3 :-..•00 c4.rra ^eac5 1 w " -ar-e ac< 1 N CU' p4.1 our crLr^: rsys u ca Oc.r^a s T 000 376../h s a,dard oven ri;, . s,,res 23 l: Tnermcsta' 3C4us s'ro^, 50 to 500 F c. ale two rac►< pos,rrcrs r wide open storage :aOinet on tre rgrt 1 3 res gas cornectrcn and gas resaura rear,►atcr >w a ^a year irr^rtea pares and ►aoor Iva ants OP 'ONS J ep up Curners dear ts>urrtiers et ivatec 4 24 36 Cr 48 wide pafrsned roe, gr CC e p a e art rns r in 15 CCO BTurrtr ourier per 2 grrccle worn Cnolca c man Lal ortnerrnostatic controls ono control per thane A 24 hot top in place c f two oper Durners 2" I C00 Sru/hr rnpu' 000 BTU/hr Snorkel Convecticn overt in place of start c C oven rnterrar measures 26) w x 79) a A 13,, n 7 e-nostat a4justs from 175 to '-00 F Tnraa _von racrss • c rive rac►c positions 1/ M P 121}/0"0/t otower,rotor wct-r 7 COr.7 arts p, c.g 3va 9q Droner or cneesemerter z 23 rrgn srarr:ass scam tide Ise ri p,4 -c o, Sraiddrd ck rise and r,an sne►f (No chc ge 1 t o` six casters two lock ng (Nc ava taote w,tn e►evatoo c )Ile or cieesemCter coic year ex*eicleo 'cmlteC pars and labor war a^ty ACC ESSQRIES E Ira oven racKtst - s smut at' va ve 'r NPT - ixrC a gas rose w,r" cu ck c7 arrac arid: s t d =o^s.,,t price occ< to a rat iao d a 2e 9 NSF SPECIFICATIONS t8 w,Ce gas restau a -t arge Vutcai ra^ Mocal No 4871_ rainless soeat fror1 sizes nacK riser n 5r she and 6 Cjustabte legs Fiad cart of pare, wi r eversrzect easy gn -rods Ecgnt 25 OCO $r.JPtir cast top cur^re s w, ^ tit 01 larder t1eacts Ina is tor ea.:— Dur^6 12 x 12 cos 3rates w trt as a rn taw s '"op g a d Dur'tar heads ^Isrea wct'1 rattle D,ac►k pc calalr Fr l w otr p„ ( out cr.rmo ays under nurners 35 CGC 3TJf'r stardarC oval measures '`/` w x 22 c x 14'/ h T"e rrosta aCjus s from 750 to 0°F One oven rack and two rack pcsl,rors 72 w;Ce open age cao net on tre ,grt S/ ear gas correc or aid gas assure regulator Total 'rot. 243 uvC BT,, *,r er or d,^1ers ors 43 w ,c 3: ▪ x 59 r c-1 6 ao`jus acre 36'/4 work rg ^ a,gr't A cosign co-, as 13= c star ECIFY TYPE of GAS wtiEy ORDER tiG ECIFY ALTITUCE WHEN ABOVE 2 CCO `���' 8-2, QUOTE & O)1LEF FAX I-8400-4 0602 4 t Nx2? x Cie over 48 ; L SERIES C ' - A _ 3 .3 j =7 2 iris -a ge S s.;.0 a„ ri ^ a 5 gas ...,r^a., is max.muri pa-fcrTa-,ca cr w^a a s..ppiy pipe e^g ny ara grea or rt"ar 2 rr tcrg we reccrn—erct a s.tcpty r^e a 1♦textb{e S ..add ^'CJs ne ' so tor tra c al gas i^pLr agt.f, smelts ct ►4a �arga 2 'lc: .cps a^C ,r1:1w e p'a 33 as^r0 ca :as a^ac :! 3c cva, c;,^ vac c cve- :or 3 S 43 3t^;as rvr.."" :or 03a Ove(7s T7t.S► /Are/ 3r2-7 '.)ti.'T7d, S t^ .."'d A pas id 4 An adequate vent.la..0 1 system is requ ear ,cr comma : a cooking equ►bmart In(onra►Ion may :e obta nad by w rt Inc; to tra ti at.cna1 F re ctect cr Associa fci Ba^aeymarcr Pa X Cc.rrcy MA 02299 Wren wri rg refer to r•rzPA Mc 98 .a7rotr C imITS ON.? 13 t2S 61113 L.__ swift tt. 3vtrl city Ty :Dad t;ra %MILL MIOTh C►cT inaNl) n ISO 1173 vIPOILi 214.92 1.9 SOS 6.911 JAILS re air 1$. its cs33) 2 440 151) (13) 3/. 0111 OAS Ct+recrra, Gt� z% oft COs 7) R 7Sv )t no 13)1) r- ;2 CS727 t3ti, — —i c762)Q 1 I RS. ow (SN) S 72 tan Z Soo 77S) g 0 0 M M c Si) 300 lit C QS) h n d 9� Asscc a cn • ^,ee Rea C �e7 sa:: r L 3'._ 3t3s N '^ay as oz a -mac 15 3 W son avc COrc„sr� 2 6 d -ca ^'a a, - e. 3 "_ r "Cat.. 'Cr ^;.r re ..59 es 000 C1211) 17Sa 4 aimCON CONNECTION rePti) l) 0 O•o 0•.O C76?)��1 ♦III) Crlr1 ..._.. -! 1 s 00 iii,' -_E- shpt•! \s .^3 =tea .aa3C f^— ^a A-' a -an Gas Ail ;Icon v A 22209 c ^ _C • rs _ la..�r• t2 300 (s0%, T zSa c a+ 2 000 CS))) F1..Et C.?Ju rs >41-Y , , P, .x 1 CN4 S♦ NOTE In Una with is policy o ccr.i^ua ly I "prow its p cd..0 s V..lc ) Hart Cor^pary eservas tre n;l i to c^a^qa rra ara:s a^d sp*cifcat,ors w ^o.,ce FVuv PT -02i VULCAN HART COMPANY, P 0 BCX 696, LOU 3VJLLE, KY 402201, TEL 1-8C.3-8 2028 502-T7S-2791 QUOTE & OR Di R FAX 1-800-444-06a2 , tO(.E O RESTAURA IT IQ1JIPM1NT CC ^^ 1 J .. r. _ m ;-;" --(0 - SiS cs_„j 414 ; _ t5 LLEtt} ACCEPTED 8 l A.JRe'N, 3 F R C 1 80C 237 637 Refri tcra Air CCtIc7i =tiers J Cssi,wrashers Herne Car -fort Wine Refngerators } Baer Coders 1 Freezers Small Appliances 12 Vat Coolers ) 4ea Makers 1 Ovens 1 Cnnitrta ) TraSh CovnpactOas ^ _} E - a 1' On` e -s le- �rn it 6 0 Cid Ft Stainless Stet t AJ' Refrrglirator The Surr mrr FF-3.5S-'3 rs nc only practical, afforaataie anti highly tearurec beautiful a5 welt The Sumr ►t FF-8SSTt3 is ideal for households restaurat restaurants kitchens, waite stations deli s, cafeterias and convenience also perfect fcr many haspit its, food service and institiotional user where durability and value of stain ass steel is important, and where an affordab' refrigerator with commercia approval is necessary Tre FF-SSSTiS can be under counters (including rr iny new ADA compliant ca .inters) or .ased fre Features and Specificatic is • A)1 Refngeraror • Stainless Steel Side Top id Door • Stainless Steel Towel Bar land e • Self -Closing Hinge • Use Freestanding or Built • hinged Right: Orly • Full Automatic Defrost • Large Adjustable Sneaves • Extra Shelves Available (� • Adjustable Thermostat • No Internal Fans • One Piece Searniess Inter • u L Approved • ETL Sanitary Apzi•ova(1 (CC • 110 Volts/ 60 Hertz • Shipping We git 97 bs • Warranty 90 days pans Dirnansicns Height Width Depth a r ,11 n each shelf holds trays up to 19 1/2 x 1.5 1/2) Standard) t..iner NSF -71 lc tabor, 1 year parts, 5 yt,ars an t"1e compre Sh pT v' & C ti it 1r ^rrr3tiOf1 \a^ch cnr,L3rrpat...ta p iii t. 1,4 V C AvatIabtIity LSD? ly snip ^es., �.fayrs FF8SS'-3 Compare A: $ . .1 39 00 Cur Saies Price $39 00 AggIcZEC4 • WO% parts ara taoor • Replaces product if ir erarac • No Ceducit:te o max mum • Fully tnsure4 8. transferable „earn rnorc ab a c • Protect yaw. lnve Trent • Nc limit to the number cl repat-s • ever 52 DCC sertilce cer cars • Nac,onw,de tnsurarce col ipany EE tended Se -v ce Prams 1 Year Bronze Plan 2 Yea Silver Plan 4 Year Golai Plan _- Rits1 $29 00 L egy $59 00 y"a I $99 00 •G • • !Maw Swiariess ProgramCsaar 70 GFTTtPG AROUND .dgatc tI Rena I View Shwpirt mart i tIffit Acaut Us C y$JRC19G L V 32 CorTIPaCC NEED hi LP' -ar+rct UT 1 Pa Snippin ; InfgrrrLat.an I Return Terms of use t Privac .pi ar�ce mom At1 Re,er,ea Alt appl a 1Ca +"" are arc r aQ_ "'a tt Of Peir re.›,:er%ve '7)a nufdCrwter tarp I/store yahoo conucompa,. acclia^ce SUM ctku,la 1 t ml Refrtgera crs } T�s. %L > �.4 a ` FR 13B4A "wr. _ .I 3 • 4% S., • 12st • 2rxrC f .c.[5 • }c3 ra,-S Remartr9?Or • 2 S4Iarc ire sr•atvea • 2 WrIi e c spers • 3 `ucec at r raci s T w to ga on toraGe • Frig Eta rs artCte & barge • Sit c -Yar xnser • W"Ite is Qoar • Wrtlte Ce irawer Cobra • 13,ocue 1. • Wt1+ce c"W Total metoht 1w/ i has Cove) 38-11a Cabinet Depth 2 3i8" Caolnet Hsignt E 18 C2Dinet WIaW 2 a18 Depth Including 30r 31 5/8 Extant Dimtsnel ns ri g5-318' 1 W 29-518 x 0 3 518 Totai D♦ptn two/ 9 dogmas Open) 59-713 Total Doom (w/ h notes) 33 51 a" http "www friz ci ~ Rf 133-, -k a 3'V��.�=R�f^�:.-3 cis a c+err 4 r Di ?ens'orr C Mode s r- 6531 31 5/1 Fran 1 rani 29 5r'8 Top View 59 7'B rt t.i H- C b.nct Width Wd.hu'3{. or a&'a.de C birc, Dcptb TUt.tI Death w i.ic : cz Turat Depth ( 9t;' oacn, two IBS _95'3 13 _3 3<3" y 7i8" %! nunurn b tsnc_ vcn adjst.ziar via!! 04m. 5 c ) rlr c —1 Pu -- rcrno4.t1 W r wl. -erno d. 10 JO Door openung rogiatrci fur rel.:oval of crispers al r ck rcmoticd t 35' Mtnt.vum op rung acighr os 314 Muzumum a ,erung width 30 00 Shappcne Wct, r (I.bs) Est 'Qb td oRaof httornrrtran - L nit does NOT a rcpt cuAom p.uicls • Elcc.cical Re lucr. tneruN 11 a V eau This nforrnstlur 5 pub o c �� v Cho I Qoa�s Pl:at,c c - CO L nscailan )I z t scaon.) MAC %..VZ1c wrltt yO,... vDI PLHS 4YZA O 26 cubic feet wlrlgtvaio► Section St4w.ir S eel cow & la Ole* 8ac4.Gr.rel d. A .ent PtrteSG, C. 2 " .,p -rock, r air it F cer Gtiar ie Sig' Clean To..acn Orspense► w Cn.sr+eedr.:..txar'Aoabe a ..srra ILt Sao', t Cnncrc+ Pranci JD Froe, C.,t,t v a L ShOe out & xed Sp 115. tc Gra+4 S ,c" ' ] rr0 ,,ssat.it (WVOrl L .t.o0 4. car aoau c.fcar 1e r, uoOr i Frrs n Lo,C"^ .iesa.. comer 2C •«r Frew 1.O.1 fir Ora or3 e4 Con 2t.cen et 4 ry nt ri Doc-i• w a.nec Precsi n—O"rp"rT r.3 t?a Q0r Fierier Steetlort Clrlr fce Cre2rr7 Srv+ ri.xe i404 rie., ec w a Grass Free. _ )rwY c ? aR 3 l Req.. at fr our 3d eca Ent S..rr D,e+enJbrd CO:Vn0se3 4 -Ha PLHS237ZA B 21.6 cubic feet u. .cK RN t»n 3 „f14")" (/ r CCf/l�f )'e‘ /1 r v 1 S ) �� PRS� $115 22 6 c Dic feet Ref? g► 3or $Semen 5 14 y S eel 000. L 3.ack rt41L' es Slack Canrfr t Z r... erti PPTe .,rcc T. •3p ontl s, ter wr Racer CniN,e c QNr o�Ch :rap51.4er r#4:ra-Nr.YC4044/eva er 5 out 31 MOO Sp IiSd}4•"a771 Sneves 2 AJ ri& C -Non t 2 Tl.4,/. tr wr Fia4v2 Door 3 v L 1G a .a 7 C J J1 new r r cl fl 1.4s htectc tsvp e► z( e Fr a'7 r 010" 11,11( a Ian Fri or p'-rultased . flvw STAR, Freeze ettson S,r) 2r+! reei.1wieners 144e Ir 2 a eg ..tacr tt x.�, Oii.arr r GIG' A Sr 04r,ea anc C3a a is3 TWA.31 3 4 0 4•Pco4d g_oo FRS 6N5A.S B 26 ci feai r"r 3'ti e e ept 2 JC• r c'`.e.rr '^F—" r Dim.% MOr,s f•-(1// " 7 CI s 4 1 0/cf tyy (VI c°5ia. cJitl SCJO F R t G I )AIR E 0 - r) 68 1)4 313/4 Front v e ti 1 1 325/8 Top Vrnw f f 4s `s e 5 O''' ff Tura` He g^ t ' J�iag� -uYCr .Dirrers ono C b .n K Jct. & ha:4le e C bTr c T Di w I .^..tr 41.e 4 1 -r fecal Cepcn 9Q' opz-t 3 Mirton..•n d ttei e 1 am ut,a..cnc wail it.,age suL i tamper matt) Z. w / ck re rno v.;1 u 1-) Door opening -egturei for removal of .nspr-a wl r Gk removed 1 �' Minimum Ot jtng heiohr 68 S/8" Muumu•n ol.caing w1dch ►3 00 Shtppcng Watgl r (Lbs 1 Esr _8z Jtdditional Infc rrtatlon • Unit doe) NOT 4* ceps k.uawnt pL.ne • EAectncal Requirements L' aV 64t -ti 1 1 T`tc irttoru racn > >(..b.2 ncuce P ease refe co ci, .hac game! V., t11 yh.,r unf i CO a^�-' a.,3^ LLB ▪ L.. CI> Nt.'1 T -1 J-1. . =,. - Dishwashefs > 3..f'-fr a 24 rcti r F►.at. Imp Pwurvi, z, +..1 , r•:. .,1 -d ,. _ •ter i F*41a.►ss .1. .,... , - •-.11- • , fZ o': [ kW.= v4:4F6fr • 5-4_2..eJ roc coon Od Agie Syarn • 8 ?asy in Tc►rcnpaC 3 • A veCa ret A' W'Q 3r4ia T • Demu„ +a .tverr.rgirs 51F2.0111 • F.,r' LAN m C..p Srte" • -iwreet, wasn • NSF C+ ciea 53/14.9 f rise opaor► • Prem.. ippmr Racx au) M.wm.m ..ar.a Re. • Sea Co Arts; =Ju r • Sraw+e Siam "opa A• spfcser • same& sum wtm 134.cat AccnruS • u 6 . P1..• Soa4 3c1►apa • va rdP4 t1 $ p1a•rs) Cep,► SCal grwr 24/71d14 OCS 19 33.3/4 w 23-7/r a.24- 14a tf(Oi PA2 i c��✓U �6 �Zzf) -(Z00 131c..14.) 5 Wia/Y Z. ;_-_ ,' - —;.1 '---2 .)a+= `,3 ;ZA, _sp cf_:..o =D31' w 1z -'s 4 13 02 , L .1 }*---16' From true to of warcr 1nic1 ,•a1 c �x / r4 3 —� From re o /•✓k! ar .0 Frans View (nor to wale) F'vm floor to wailer miss: rrsi c A44142011. Qa; (1ac vu bk Xough-sn Dssne/mons (nor to u..ule) 0 0 34 min Eicctr►c, i1 was. r ..r.! -o Mei tt}wt & ccinf 1 J shaded cu i II 7 r / I r 1 /// I I I /111/ I hr r // 6 / k le tr 11 ring rD(( �. Jbr a` tc� 3.:.0 tie i- pis m..r� lr at'a ..r C :.a 3m. -1 1w I cur cr�c La! 1, or` C... or :ar'c' ia.c.- 5e pag Ldd,tios�st lydormation 5 220 eV: 60 P.. th or 20 s. ap ruled tear 4.a! �uppiy 15 required Corner . tsta' lariob 11tlo w 2" Minar Ian be'wees 4.oraer nd d shwa,her openaig Do NOT insca! dt,k .s,ttcr on i-acrpe cj floor • Wstct rcquitctticnts Cie not water line ties the dishwasher must,ru ;de between 2C.-120 psi water pressure Into,nines water tern )eraturc to the dishwasher sh u d be at least 20QF for best results Use 3 8 OD cupper tubing or hugh presser std !u h-ceaTperscure raced plastic. tti.bists with a ntatatum'matt d>racnter of I/. Dtbhwastrer al= valve has 3 8 NPT internal pipe thread Drain requirementa the dra.n host s looped up die nght side ofrk. dishwasher insc se proper arauubc D . cwt reMtaYr ko►•c frunr ssaachMOIL accept diatom nil See page 2 for seta 1 This n.,onri ,.1r, let o h ar� r o roc ? cac lee z o let s t y r at, r r-� c, r c wt h uni I di came Paget 1 4 .� "" -1 11 r N ti Z•>t ruu-ar r i.. tc5 t 1- /0 Cur dje AAA., ,4 241 s / " (typical) L -- r i `1. — r/► " (Yrf caO Overall Height 3' Calactg ZS rf/ r 6" Conbule 73 is" Door Paired Front Sear Bela for Orcru!! 1 iglu 01,1 1 td4ittICr?a Sr1far77a't or? N C..13h ha I r ..cor r-4 ar b: ~vc� mx d o in.3 4cc.i 2a nc -ItLk r Ch-+^ 4 rci7,...r.'J -opt 1, a 1 Ill.» -d,.s o 1 , 5. - t .0C T3 pre xcti,. tea^ f.,rr .,r^ ( r 3CR 3 ' ]^..� C�> >"".._C �. _� Oil .,7 "WC. -1.2s :1w ..cc aa, c » 10pi L. -r,-% Kit numbers for 3" coisolek 1 431 0301 (wau2 true 154)10303 (almond .rcln) 1.:4310303 (bL. l .r ra 143.0304 (bisque tar ) Kit numbers fur 6" console) 154362701 (vrhite .r.m ,4362702 (ulrrscn' at, r) 154362703 (biscL. true 154362704 (biigi.c cnrrr? Recital -es Kit This r nab o ,..tstragz w hour Slat -e PI CO t to 1 1t.L11 to CrLi6C' lP tha Fc iar4 dot, &('Companv ....Y.-..,10... , .� .a......��.... w.� . Facsimile Cover Sheet To. Bail Hilton & Frank Sedmak Company Cummrngs Phone 305-361-9227 Fax 305-361-5647 From: Franz Tarafa Company Edward Don & Co Beeper 305-658-3345 Fax 305-868-7032 Date 01-24-02 Pages including this g cover page To Bill Hilton & Frank Semak Attached is the quote containing Range Compactor Ice Maker Dishwaher, & Regfrfclerator/ Freezer As for the Hood -Work I will be bringing the representatives at approximately 11 00 Tuesday morning As of now there hasn t been a 2002 price increases and the lead times remain 3-4 weeks Thank you very much for the opportunity Regards Franz Tarafa Edward Don & Co Edward Don 8T Company c ,. 26,2002 Protect GE Appliances and Sub Zero QUOTE i crom To Franz P Tarafa / Edward Don 2200 SW 45 St Ft Lauderdale FL 33312 (800) 777-4366 Fax (305; 868-7032 ^tt Qty Descnption Page 1 of 2 FT 00943 130083 - Frank Sedmak & Bill Hilton Key Biscayne Police & Fire Dept Sell Each Sell Total 1 RANGE GE Model No ZDP48L4GWSS GE Monogram 48 Professional Range with 4 Burners Gncl and Gnddle Propane 5 702 00 5 702 00 1 COMPACTOR GE Model No ZCG3500DSS GE Monogram 12 Stainless Steel Built -In Compactor 5000 -lb Maximum Compacting Force Automatic Anti -Jamming Feature Slide Out Compactor Drawer 531 30 531 30 2 ICE MAKER GE Model No ZCIS15CSS GE Monogram Stainless Steel High Production Large Capacity Automatic tcemaker 968 00 1 936 00 1 DISHWASHER 802 80 802 80 GE Model No ZBD45000SS GE Monogram American-Cesign Stainless Steel Dishwasher with PermaTLf Irtercor CleanSersor Technology 3 REFRJGERATORJFREEZER Subzero Mode' No 650/S SubZero Stainless Steel Regngerator/Freezer l -f 84 W 36 D 24 Franz P Tarafa / Edward Don 571200 17 136 00 .4. 25 2002 GE App ,ai ces and Su., Za c> 'aye 2 cs 2 FT 0D143 am Qty Description Sell Each Sell Total Total 26 108 10 Grard Tonal 28 f08 10 The prices in this quote are valid for 30 days from the da e of this quote and are subject to manufacturer price increases We reserve the right to correct any material errors cortaned herein Franz P Tarafa f Edward Don Apc a -c=5 Vendors F)Ortlia Bwirier Appliances itti ARD 1' Apolfance Appliances Abot Mills 1 Bells TV Depot Appliances Appliances Equtpmettt Surtmt* k odel FFSSSTB Stainless Steel } Carh' De rY Susan Narc,r Csca 954 927-9206 800 654 772 305-688 1000 305 593 2322 No Uline 175RSS No I Sanyo 4 9 cu ft Les( e 305 883-3377 No 2G 75RSS 1 �v: �w,W� r. --. V .v....7 I A r v rrI11iJ 1 LVV Frigidaire FRT 8B4A 1� Stainless Steel $020 $460 18 cu ft f$675 FRT21147ASB Alt Model 21 Cu ft/$725 Fngidaire FRS23H5ASB $1,238 Stainless Steel $949 1 $1,129 FRS23MSASB I Alt Model no Dishwasher Frigidaire 24 S431 FDB658RA Stainless Steel $245 $365 GLDB958AS6 Alt Model no Ice Maker GE ZDIS15CSS No Stainless Steel Ulfne/2060PSSRH $940 No Uluie/2DIS15C5S Alt Mode! $1,755 No $1 025 Sotto tot $4,954 $2 754 $4 524 Delivery 3110 $60 $50 installation & Set up xxxxxxxxxxxxx $365 xxxxxxxxxxxxxx Trx s $296 $20.5 $317 Final Total 1 $5 360 S3,37S ( $4 891 07 Jun 02 Aquiles (Cell) 305 986 8392 Slie, c`13 L a) Iu'T/tScr., 3(101 0- /LI 4 MAIMINNIII trikgi`icv ',Om ( ( a i + Am AZ -4 >C . - Pu+Ch: 2q$ 4s a 2N1 &x 3c5) s- f:S e:›0141----&-fr ... 35-? ao Y 4 3 3 V 7 D.4 aews APPLJ r'F� z - s r AA 2C j • r`:.r+ DWI% , -)ANTI T v t TN,- l.,'e si ,it, I3.s► a equipment does 1'O7 inclvde Phousitint Eioctrtcii Cispentering or ►V5'',1_.LA t c nC' s -0<x... e" ctit.sra moYt be noted s tiara 01 daltrrry 'mt. d '*s Jnd 1 v•d JM4J 4t 1 t „At `recr twh,c4 i.a Compeadd of end tnciudeea the attreistc an en( a h n r 7 = artd the elnlre AgfewWert/ f iftyrow/ION the prrem. —Lite to (ha applvi i1'fe Ari tci}ar is re sit..- aY 1hx s^�!+( ,•-td t"Ic cc lP. 1 pond to ItoJ► 3&_.3---V yc\ 3? 2 1�Y Jt rr� r gr.:452--2 JOB a_ Q isecte o c C E t _fit4P-5 BE:L APPLIANCES 81 Urc is irl, RILE James A Cummings, Inc 3575 Northwest 53rd Street Fort Lauderdale FL 33309 I I urrrmil nas General Contractors June 7, 2003 Village of Key Biscayne Department of Building, Zomng and Planning 88 West McIntyre Street Key Biscayne, FL 33149 Phone 954 733-4211 Fax 954 485 9688 Website wwwjamesacummings com TRANSMITTED VIA HAND DELIVERY ATTN Mr Jud Kurlancheek RE KEY BISCAYNE CIVIC CENTER REQUEST FOR CHANGE ORDER R -31F FIRE RESCUE STATION KITCHEN HOOD Dear Mr Kurlancheek, In accordance with your request, we hereby submit this request for change order for the Work associated with kitchen hood at the Village of Key Biscayne Fire Rescue Station This matenal was purchased by James A Cummings, Inc pursuant to Owner Contingency Authonzation No 3, item 31-F However, it is our understanding that it is your desire to issue a change order and replenish the Owner's Contingency for this material An additive Change Order in the amount of $19,435 00 is therefore required If there are any questions and/or concerns regarding this matter please do not hesitate in contacting this office at (305) 361-9227 for discussion Sincerely, JAMES MINGS, INC er Smith Jr ct Manager Cc Rick Derrer, JAC Rob Maphis, JAC FILE PA L.urTimings Inc ]=775 • ----oyes,. 53rd Stree r _ creole FL 333C9 .. 1 �. Ya • �rsii f'r J -e . _. � ! i Department ot Management Seri Ices State ot Flonda-f aulltles De'etopment Attn Mr Ratael Martinez Sr Project Director Park Trammel B{L11du' T 1313 North Tampa Street Suite 106 Tampa, F133602 RE Key Biscayne Civic Center State Project # VKB 9806900 JAC Project # 99-1-38 \.t h 2002 Dear Mr Martinez We are herewith submitting Revision # OC-31 F To provide a commercial kitchen hood with a fire suppression system in the Fire Station Please see the attached back up and summary for the work in the amount of $ 19,435 00 This cost will be applied against the Owners Contingency We respectfully reserve our nghts to request additional time should it become apparent this work will delay the completion of project Sincerely, Frank Sedmak Project Manager Cc William R Derrer Rob Maphis Jud Kurlancheek OBM Gus Escobar '{mot JLat C l.rd! e Fire Station Cost Code Description Add a commercial kitchen hood Material Labor Subccnt-act with fire suppression • Captive Aire System S 14 636 (40 Fisk Electric $4 110 00 James A Cummings $20 00 j $230 00 ( $290 00 r SUBTOTALS SALES TAXES @ 6 5% P,T,&I TAXED SUBTOTALS MATERIAL TOTAL LABOR TOTAL SUBCONTRACT SUBTOTAL OF COSTS TOTAL 20 00 1 00 21 00 $21 00 $378 00 $19,036 00 $19,435 00 $19 435 00 $230 00 $19,036 00 378 00 19,036 00 ��Y T c l a m 4 r C a m n u o g s , d d r e A t t n . 1 3 0 1 A n a V K B F , r S t a t i o n t p r o p o s e d o f x h t i n e l o o a w c t g s c i a e g a m t 2 1 a c c o e t t a n c e n t h t h e C s p t r v e - A w e &