MEMORANDOM
TO Paul Abbott
FROM Alex Smith Jr
Phone 954 733-4211
Fax 954-485 9688
Website
wwwjamesacummings com
SUBJECT Village of Key 1 d'ayne Civic Center
Amendment No 12 — Installation of Dewatenng Recharge System for the Village
Community Center
DATE November 24, 2003
Transmitted are five (5) copies of GMP Amendment No 12 for Installation of Dewatenng
Recharge System for the Village Community Center executed by James A Cummings, Inc
Please forward these documents to the Village Clerk with instructions for signature by the
Village Manager & Attorney as this amendment has been approved by the Village Council
Please return Two (2) copies to the James A Cummings, Inc Jobsite Office Thank you for your
attention in this matter
If there are any questions and/or concerns regarding this matter please do not hesitate in
contacting this office at (305) 361-9227 for discussion
cc FILE
AMENDMENT TO AGREEMENT
BETWEEN OWNER AND CONSTRUCTION MANAGER
PROJECT NO
PROJECT NAME
AND LOCATION
AMENDMENT NUMBER
VKB-98069000
Village Community Center (Recreation Center)
Village Fire Station, Police Station, and
Administrative Office of the Village of
Key Biscayne, Flonda (the "Project")
#12 (Installation of Dewatenng Recharge System for the
Village Community Center )
THIS AMENDMENT made this 3rd Day of September in the year Two Thousand and Three
By and between the Village of Key Biscayne, Flonda, a Flonda municipality, (the "Owner") and
James A Cummings, Inc
a Flonda Corporation
3575 Northwest 53rd Street
Ft Lauderdale, FL 33309
Phone (954) 733-4211, Fax (954) 485-9688, Federal Tax I D Number 59-2098732,
(the "Construction Manager")
WHEREAS, the Owner (as a direct signatory and through its former agent, the Department of
Management Services of the State of Flonda (the "DMS")) has previously entered into the
Agreement between the Owner and Construction Manager, and
WHEREAS, the Agreement has previously been revised by Amendment Nos 1, 2, 3, 4, 5, 6, 7,
8, 9, 10 and 11,
WHEREAS, it is now necessary to revise the Agreement to Install the Dewatenng Recharge
System for the Village Community Center
NOW, THEREFORE, in recognition of the good and valuable consideration provided by the
covenants hereof between the parties, the Owner and the Construction Manager hereby covenant
and agree to amend the Agreement to include work for the Owner directed changes for the
Village Community Center and to identify its funding source, to identify the drawings,
specifications and other documents upon which the GMP is based, and to otherwise revise the
Agreement, as follows
(1) Guaranteed Maximum Price — the Guaranteed Maximum Price (GMP) for construction
of Project VKB-98069000, Village Community Center, Village Fire Station, Village
Police Station, and Administrative Office of the Village, as defined in Article 7 1 of said
Agreement shall be
$21,418,894 59 (which includes the $81,728 00 GMP for the Installation of the
Dewatenng Recharge System as listed below in item 2 a for the Village Community
Center Building )
(2) Drawings and Other Supporting Documents — in addition to the drawings,
specifications and other supporting documents identified in previous amendments (No 1,
2, 3, 4, 5, 6, 7, 8, 9, 10 and 11) to the Agreement, the Guaranteed Maximum Pnce (GMP)
for construction of the Project, is based upon the following drawings and other supporting
documents
a Proposal #R -13C to the Village of Key Biscayne from James A Cummings, Inc ,
dated August 22, 2003, and as directed by the Village of Key Biscayne in accordance
with Field Change Order No 3, dated August 21, 2003 and Langan Engineenng
Report dated August 22, 2003, which are attached hereto as Exhibit "A 1 "
b The revised Project Budget, which is attached hereto as Exhibit "B "
(3)
Changes in Agreement — various changes are required to the exhibits and articles of the
Agreement to reflect the amendments descnbed herein It is agreed that the articles and
exhibits of the Agreement shall be deemed to be amended, to provide the following
a Installation of the Dewatenng Recharge System for the Village Community Center
Building in the amount of $81,728 00, and establishment of the GMP for the Project
of $21,418,894 59
(4) Effect On Agreement - except as provided above, the articles and exhibits of the
Agreement which are not affected by the amendments provided for herein shall remain in
full force and effect
IN WITNESS WHEREOF, the parties have executed this Amendment the day and year first
written above
JAMES A CUMMINGS, INC
Attest
By 1 �/lr,.�.�� ct1 �G •t
Corporate Secretary
Witnessed
By
L./5 -et 64.177 cch' / o
By
(pnnt name)
illage Clerk
By
tth tA
Gilliam R Derrell Corporate President
James A Cummings, Inc
VILLAGE OF KEY BISCAYNE
Approved as to form and le al sufficiency
By
Vil age Attorne
103001\agreements\amendment t. agreem nt between owner and construction manager
(Corporate Seal)
EXHIBIT B
OWNER S CONSTRUCTION BUDGET
ITEM DESCRIPTION CONSTRUCTION BUDGET
CONSTRUCTION MANAGER S PRECONSTRUCTION PHASE FEE $113 190 00
SUBTOTAL OWNER S TOTAL PRECONSTRUCTION PHASE FEE $113 190 00
VILLAGE FIRE RESCUE DEPARTMENT & ADMINISTRATION AND POLICE FACILITY
CONSTRUCTION MANAGER S CONSTRUCTION PHASE FEE $527 392 00
CONSTRUCTION MANAGER S OVERHEAD & PROFIT $457 223 00
CONSTRUCTION BUDGET BALANCE $9 862 250 00
AMENDMENT NO 09 - OWNER REQUESTED CHANGES $232 893 00
SUBTOTAL CONSTRUCTION COSTS $1 1 079 758 00
ANTICIPATED OWNER SALES TAX SAVINGS ($159 266 00)
SUBTOTAL $10 920 492 00
OWNER S CONTINGENCY $256 924 00
OWNER S GMP BUDGET FIRE RESCUE & ADMINISTRATION/POLICE $11 177 416 00
OWNER S CONSTRUCTION BUDGET FIRE RESCUE & ADMINISTRATION/POLICE
WITH PRECONSTRUCTION FEE $1L290,606 00
VILLAGE CIVIC CENTER SITE & SITE INFRASTRUCTURE WORK ELECTRICAL DUCT BANK AND WATER MAIN
CONSTRUCTION MANAGER S CONSTRUCTION PHASE FEE $119 226 00
CONSTRUCTION MANAGER S OVERHEAD & PROFIT $34 521 00
CONSTRUCTION BUDGET BALANCE $647 913 00
OWNER S CONSTRUCTION BUDGET VILLAGE CIVIC CENTER SITE & SITE
INFRASTRUCTURE WORK ELECTRICAL DUCT BANK AND WATER MAIN $801,660 00
VILLAGE CIVIC CENTER SITE & SITE INFRASTRUCTURE WORK PHASES 1, 2, 3 & 5 (INCLUDING STATE
SCHOOL "FF SANITARY SEWER FORCE MAIN)
CONSTRUCTION MANAGER S CONSTRUCTION PHASE FEE $62 630 00
CONSTRUCTION MANAGER S OVERHEAD & PROFIT $67 483 00
CONSTRUCTION BUDGET BALANCE $1 459 011 00
OWNER S CONSTRUCTION BUDGET VILLAGE CIVIC CENTER SITE & SITE
INFRASTRUCTURE WORK $1,589,124 00
VILLAGE COMMUNITY CENTER (RECREATION CENTER)
CONSTRUCTION MANAGER S CONSTRUCTION PHASE FEE $564 455 00
CONSTRUCTION MANAGER S OVERHEAD & PROFIT $428 698 00
CONSTRUCTION BUDGET BAI ANCE $9 003 553 00
OWNER S CONSTRUCTION BUDGET VILLAGE COMMUNITY CENTER
(RECREATION CENTER) $9,996,706 00
EXHIBIT B (cont d )
OWNER S CONSTRUCTION BUDGET
OWNER CHANGE ORDERS
OWNER CHANGE ORDER NO 1 ($1 140 899 62)
OWNER CHANGE ORDER NO 2 ($l 118 301 79)
SUBTOTAL OWNER S CHANGE ORDERS ($2,259,201 41)
OWNER S TOTAL CONSTRUCTION BUDGET (ALL PHASES) $21 418 894 59
/4\
e__,XJAtilrir "A C"
ummin9s
General Contractor,
\/--'-- /
August 22 2003
SKYLINE MANAGEMENT GROUP INC
88 West McIntyre Street
Key Biscayne, FL 33149
ATTN Mr Paul Abbott, Project Director
RE KEY BISCAYNE CIVIC CENTER — COMMUNITY CENTER
REQUEST FOR CHANGE ORDER PROPOSAL R -13C
INSTALLATION OF DEWATERING RECHARGE SYSTEM
Dear Mr Abbott,
To accomplish work noted in Field Change Order No 03 dated August 21, 2003 for the installation of the
Dewatering Recharge System for the Community Center, an additive change order in the amount of
$81,728 00 is required Please see attached summary form and subcontractor quotations for a
recapitulation of this amount
The work of this change order request is limited to the Installation of a Dewatering Recharge Well Point
& Trench System, as delineated in the Langan Engineering Report dated August 19, 2003 and the
revisions indicated below
James A Cummings Inc
3575 Northwest 53rd Street
Fort Lauderdale FL 33309
Phone 954 733-4211
Fax 954-485 9688
Website
rvww,amesacummings com
TRANSMITTED VIA FAX (305) 573-2620
• Recharge Well Points installed on the North, South and East Perimeter @ 42 centers to EL - 6
• Recharge Well Points installed on the West Perimeter @ 30" centers to EL - 6
• Recharge Trench installed on the East & a portion of the South Perimeter
As you are aware this change is affecting our ability to complete work at the Community Center,
specifically the Excavation for the Mat Foundation James A Cummings, Inc is proceeding with the
Work to mitigate any schedule impacts resulting from this change
James A Cummings, Inc reserves its right to request a time extension along with compensation as
outlined in the Agreement between the Owner and Construction Manager The extent of the time
required is not discernable at this time, once the impact has been determined, we will advise you
accordingly
If there are any questions and/or concerns regarding this matter please do not hesitate in contacting this
office at (305) 361-9227 for discussion
Sincerely, Reviewed & Approved
JAMES A CUMMINGS, INC SKYLINE MANAGEMENT GROUP, INC
/
Cc
der Smith Jr
ect Manager
Rick Derrer JAC
Paul T Abbott
illage of Key Biscayne Project Director
Rob Maphis, JAC
Fnc Squilla JAC FILE
James A Cummings Inc
Proposal Summary Form
Village of Key Biscayne
R -13C
Community Center Dewatenng Recharge System
IE
ummin s
SECTION
+
DESCRIPTION OF WORK
1
LABOR _
MATERIAL
SUBCONTRACT
02
STONE CIRCLE UNDERGROUND INC
Furnish & Install 240LF of French Dram for
Dewatenng Recharge System at the Community
Center
-1-
03
FORMWORKS INC
$11 050
Griffin Dewatenng - Furnish & Install Dewatenng
Recharge System as indicated on Langan
Engineenng Report dated August 21 2003
$66 384
SUBTOTAL
LABOR BURDEN
SALES TAX
SUBTOTAL
TOTAL
OVERHEAD (4 5%)
SUBTOTAL
PROFIT (Included in Overhead above)
SUBTOTAL
BOND
TOTAL
$01 $01 $77 434,
$0 00
$0
$0
$0
$77 434
$77 434
$3 485
$80 9191
N/A
1
$80 9191
$809
1
$81 7281
08/22/2003 JAMES A CUMMINGS INC
btN tlY b UN U-Ht,Lt, 954 JJ 0685,
AUG 19 03 '1 1 GAM, PAGE 2/2
STONE -CIRCLE
UNDERGROUND, INC
CHANGE ORDER REQUEST FOR
KEY BISCAYNE RECREATION CENTER
AUGUST 19, 2003
i
water • sewer • drainage
construction
Description This change order is to provide a 8" perforated HDPE pipe with 4' wide x 2'
deep exfilltration trench Trench will contain 3/4" wash rock with filter fabnc above ground
water elevation for jobsite dewatering operation Connection to this pipe to be performed
by others No mobilization fee will be required if work is performed while onsite performing
contract work
Description uanti Unit Extended
Equipment Mobilization (If Required) 1 LS $850 00 $850 00
8' PHDPE French Drain 240 LF $42 50 $10.200 00
Total = $11 050 00
Total For This Change Order = $11,050 00
keybtsreccntr5
383U S W 30th Avenue
Hollywood, Florida 33312
(954) 331 5020
Fax (954) 331 0685
License #91 1257
FORM WORKS, INC.
4951 SW 34 Place
Ft Lauderdale, Fl 33314
Date 8/21/03
Attention Alex Smith
Addressed To
James A Cummings
3575 NW 53 St
Ft Lauderdale, Ft 33309
Phone (954)587 0530 Fax (954)58' 75/ i
RCO # 5
Ticket # s
Jobs!te
Key Biscayne Rec Center
We hereby request an increase in our Contract for the Amount of $66,384 for the following 734‘j tics (1)-\)
Ground Water recharge system per JA CUmmings /Langan 8/18/03
Item
Qty Unit Rate Sub Total Tax Ins Fringe Fnnge Total
13% 24% Rate Amount
Griffin Dewatering
4 MONTHS SYSTEM
Sincerely
Steve Binford
1 00 EA 635 890 00 $35 89
90 00 DAYS $235 40 $21 18
$57 076
$35 890
$21 186
Total $57 076
Sub Total $57 076
10% Overhead $5 708
Sub Total $62 784
5% Profit $3 139
Sub Total $65 923
0 70% Bond $461
Total $66 384
R E ' ' '_ D
Ai lC
Jar --1_ , 14
Key b SL3yl a .: — -titer
\uallst 21 2003
Pi_ 1
FROM GRIFFIN CELH-EF i ',G SOF
FH -< No 954 173 �y Aug 21 2003 11 15AM °2
FORMWORKS INC
4951 S W 34'14 PLACE
FT LAUDERDALE FLORIDA 33314
ATTENTION STEVE B LNFORD
SUBJECT GROUNDWATER RECHARGE SYSTEM QUOTE
Dear Mr Binford,
VGRIFFIN
Griffin Dewatenng South Florida L C
1321 NW 13th Ave
Pompano Beach Ronda 33069
Phone (954) 969 8854
Fax (954) 969 9113
8-21-03
Per my conversation with Alex Smith of Tames A Cummings, Inc of yesterday P M we
have been requested to provide a revised price for the recharge system with changes as
follows
East side- recharge points installed @ 42 centers
North and South sides- recharge points @ 4-2' centers,
West side- recharge points ® 30" centers
Based on these changes we amend our price for services to $35,890 tax included
The daily cost for system usage is reduced to *$235 40 per day tax included
*Daily usage/rental charge to commence upon completion of installation of this system
Tune frames for procurement, preparation and installation to remain the same as noted in
our letter of 8-19-03
We hope that this is the information you require Please contact us should you have
questions or comments
Very Truly Yours
4 ,, ,, ,1/ '
David Handy al
Langan
)
Mr Pa,l Accc
SKy(ire Maragc-'e-, c..c
4040 NE 2nd Ave
Suite 305
Miami For Ca 33137
RE Recharge System
Village of Key Biscayne Recreation Center
Key Biscayne Florida
Dear Paul
i y AugL�
C:6€908
1
tc
C rifer
� r
rf
l
CcAeer 3frIG
Pt ,sac r .�
kr<iic a J w9'
C
1 rl ar 3 l-tt an
Cerake J Z9rnt eYa
^a,8 A A abet
G-agary _ P ,.
Micvel C
Sam B 'shah M C S t
.icel B L rdes o
John J McDoy „Jr Ph O P
?plan R Poe oel p -
Jescon E Romano P L�
Learard C Savirc
Steven Leland P
OMNJ Leary PE
Based on our previous groundwater model studies a recharge system is required around the site The recctaucharge system
in conjunction with the sheetpiles will minimize the impact of groundwater drawdown around the site The recharge system
will consist of closely spread we'Ipo►n's around the perimeter of the excavation In addition an Exfiltraton/French drain
will be placed along the southeastern portion of the site The approximate layout of the system IS shown on the attached
figure wh ch was prepared by James A Cummings based on our meeting yesterday
The wellpoints w II be placed on 2 1/3 ft spacings and the tip will be at el 6 In areas where there are vehicular access
points the weltpotnts will be omitted and the recharge header pipe will be buned to avoid damage
The recharge trench will be 4 ft wde and about 4 to 5 ft deep (slightly penetrating below the water table) A geotextile
filter fabric will enclose the trench and crushed stone w11i be placed in the trench A perforated pipe capable of high
discharge flow will be placed within the crushed stone to carry the discharge waters through the trench The geotexttle
fabric will cover the top of the stone and fill will be placed above the trerch at least where it underlies tt'e access points
on the south and east sides The trench could be left open at the top along the eastem side A sketch of the trench cross-
section is attached
An addrttonal 10 groundwater monrtormng wellpc►nts should be mstal'ed at locations dispersed throughout the site during
the recharge system tns'allatlon ir order to better document and venfy the groundwater levels around the see during
dewater ng
Should you have any questions please call us at (305) 362 1166
JMIRAA cs
Attach men's
Ce Ernes`o Ce cas \ Skji ne Marageme^t G
Alex Smith \ James A CLmn~ rigs
T Cata9k6C60J\60669tralRecnarge System icc
Very truly yours
LANGAN ENGINEERING AND
VIRoON TAL SERVICES INC
John Magnav�, E
stant Pj ject Manager
ogek A A c
Asscctate
7940 V Al LA 2D i v E Si 1 N A A ,_a1(E F rn t 3 a-11 7 )99 (3Cc) 902 1 b5
ill/0030 PARK P4
NEW TOR N 1 1 W
V C Alf A 0 EJTOPTY PA N A W
30
rvr 1 9
Fri
F.,ti 1,305 3t2 521_
L
1
0
71
Y
r4
J
Im
m
Lz
a
1
r 1 % f _ `
1 j
T
Cast7WfllG1..
ad .5-7 37P*'a
wA-S NEo ,mac
/ Tb ?
per►_ tea, 7E l/#1.
#4 4/#9Mm'
zez4,71,11
1- Fr
12.`1
EL -a 7Z( 77' E
Frli i;44c
I 14/
rid' cave(
-7;o-7 Z,9 . fed
Wive 1414
Atctti?Ade' 7tie y ,.s.tfe 4' 'f2 y we-G1//Ak,I 40F"
3 s' it si c'• s J '377, roc' EL ele, -r/'MJ 77, et 6
.lea~ Ar4 e' T11
- mf' I)' 4se- 4e .Ec Cho
DA "E
A'E
P901 NC ‘Q 9p6.
a,En / or _Z______.
i= Langan
QRDE�
VLs a et Key s1scsys. Coasauity Cuter
!ri'RA
Jam, A. �Iac.
DIRECTIVE NO _ - -
DATE • cep/ Zi /p; _
VIM PROM= NO —11X341061000
CONTRACT DATE GNP - Oct 17, 20G2
CONTRACT FOR General Coastraction
Yon Oro kereby dfr.cted to sec or porahr lrIewkeg damp is the eas,ttraee
024:5...ie
toe / aL.. N ca Ss 2 c.r r4. -ors. au ties is
- euma ►- tAm. ---n r I3 cT(A✓ Mx - / 1z -t N Cm 2,43.4.- G)4
S •ST M ,a.•s. 't0 % rt..." 1,4 "'rl4At' W.4 MC. Foil
1.„‘..1 .44,1"-....) to try Ilirznla rlc, tab -wk. -C:6 tZerm-tet2.3..*1.-7csrC) it$
_ __ ___
"Tfike .1 4. c.,. s_s --C ►-r;,p -as.---z. `_ per_.
ANTICl'ATvD ADJUSTMENTS
1. this pcopossd bass of sdju•as.vt to tbs Ousn:eised Marina Price is
o Lump p Se$s (nurse) ay off ' cao
a Veit Tres of
a AI prervided ha S s spb 10 1.3 of Agmen,ttnt b t„oon Owner and Commotion }Anew
_. Tho'Cottstrart r ano m reposed (to bcoiletcrsomill The Droposad act aatricrt of (to be deteez,ais.dl days)
Wyatt aimed by pa Owner aad Contractor, thh daft bearer
efittettve mountArns as s YIELD C*ANGE O*DU1 ad the
Costractor shad proceed with lye cbup dascribcd above
bf 8
0
89 Watt MoIA'rro Strom
rom
Kcy Biscayne, Flanda 33149
DATER
Swam b7 *fie Cdr Iadikar the
Caictar r with repased
sclitalesseit la Cabot SAM art Catur.e
Thew sat faith fa thi. Pidd Clump Ohre
Jams A. Cam,k
cOImacroa
3575NW 53"&net
P t Laude dale, Flom de 33309
taftrEs
12 �nr .
tray
t Langan
Engineering and Environmental Services Inc
22 August 2003
6066908
VIA FAX AND MAIL
Mr Paul Abbott
Skyline Management Group
4040 NE 2nd Ave
Suite 305
Miami Florida 33137
RE Additional Discussion of Recharge System
Village of Key Biscayne Recreation Center
Key Biscayne, Florida
Dear Paul
Bernard F Langer P
Geage E Dernck P
George!' Kelley P
Michas A_ Sorrier= Jr P E
Dawd T Gocicel P E
Nic olev De Rose PG
Cabot M Hudson P E
Andrew J Gam. PE
George E. Looerme P E
Gerard M Coca. P E
Colleen Costello PG
Rudolph P Fnm P E
Ronald A Fuerat C LA
Cnaona M Gonzalez P t.
Wrlbam G Lothian F E
Steven Wand PE
Ge aid J Zar^brella C E
Roger A Archabal P E
Gregory L Biesladecda P E.
Michael E Coveau P E
Michael M Gold• ein
Soma landic.MCSE
Joel 8 Landes P E
John J McElroy Jr PhD P E
R S Murafi MS
Alan R Poepral P E
Joseph E Romano P L S
Leonard U Savtno P E
CON4ULTANI
Denrns J Leary PE
This letter is written to amend some of our suggestions discussed in our letter dated 19 August 2003 for installing the
dewatenng recharge system With the assistance of James A Cummings (the General Contractor) we have scrutinized
the cost effectiveness of installing closely spaced wellpoints and material costs for the recharge trench cross-section while
maintaining the technical feasibility of the system The recharge system plan configuration should remain the same as
shown in the plan attached to the previous 19 August 2003 letter
However based on our discussions with the General Contractor and after evaluating the recharge system preliminary cost
estimates the wellpoint spacing could be spread from 30 inches to the original 42 inches on the north east and south
sides of the excavation The wellpoint spacing should be kept at 30 inches on the west side of the site The wellpoint tip
elevations will be at el -6
The supplemental recharge trench in the southeastern area should have at least 12 inches of washed filter rock above the
top of an 8 inch diameter perforated pipe The on -site relatively clean sand removed from the excavation can be used as
trench backfill matenal overlying the filter fabric wrapped washed rock The overlying material should be free of
deleterious matenal and placed in compacted lifts where required As previously stated the depth of the trench should be
4 to 5 ft and should penetrate into the clean underlying sands Based on the Geotechnical Investigation done by others
our own field observations of the mass excavation bottom and the pilot test discharge pit excavation we anticipate this
range of depth to be below the organic soils and silty sand stratum of low permeability and into the underlying sand which
has a higher permeability
We understand these refinements to the recharge system discussed above will reduce recharge system costs These
refinements should have negligible impact on the desired effect of the recharge system
Should you have any questions please call us at (305) 362-1166
1
JM\RAA cs
Attachments
cc Ernesto Cercas 1 Skyline Management Group
Alex Smith \ James A Cummings
T \Data9\60669\6066908Wdddional Recharge System Comments doc
R
Very truly yours
LANGAN ENGINEERING AND
ENViRONM NT - INC
PE
ect Manager
A. rctiabal P
Associate
... 1. left earn
7900 MIAMI LAKCS DRIVE WE"T SUITE 102 • MIAMI LAKCS FLURICA 33016 5897 • (3C5) J62 1166
ELYM000 PANIC NJ NEW YORK NY NEW MAVEN CT Pn1LADELPNIA P. DOYLESTOWN PA ■IAYt FL
FAx (305) 362 5212
Pug 18 03 CS OSF
key Biscayne Civic Certa-
536 1 5647
P 2
r
i
i
fro .5
•
fol
1-N 11
r
f3-2
2i:
Fr
-ir
11L17, -__L
..fi yvr97 i t/6 5')'s '`? Cae.�,�
,r4vpfjer 47R10 ,FJi-
c s7 .s19�4-
C" wAy A�
WIHSA /E ,iCk-
/ v6 2 /44-A
/:›tocA'QATED ,/P‘
4 F tAl i FAN
��
r
ente
lJ
WIZ sine 11
ova-t_r•
121" fri,14
was ' rTACIC
rill' Gave(
4 /4 AINV
FAA°, eto 77 '1 y
e,Ccti rdF , *W Ti'P "L srT
Xor 5c
.5kETC, Y ve.sZ'A 8/z / 1i- 70. i2 /4 of e4j I4
476 SFr
�ECf f.4 ...e77?s C,Rdi 5 S OAJ
Vitt 46.6 ac Irzr/,414-AyIE RE< C6ansummummom
-
9Y
DATE A//7/
GKD DATE
p"cu np f 041-'/ 08
SHEET OF
Langan
Engineering and Environmental Services the