HomeMy Public PortalAbout12-0272 Hannavas 7.:,2 v'E I
6
CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 05-10-2012 PERMIT#: 120272
WORK DESCRIPTION REPAIR ROT ON WINDOW
WORK LOCATION 1105 C BAY STREET
OWNER NAME L.P.HANNAVAS
ADDRESS 500 W 6TH ST STE 401
CITY,ST,ZIP AUSTIN TX 78701-2844
PHONE NUMBER
CONTRACTOR NAME RON JACOBS
ADDRESS PO BOX 1150
CITY STATE ZIP RICHMOND HILL GA 313241150
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 50.00
PROPERTY IDENTIFICATION#
PROJECT VALUATION $500.00
TOTAL BALANCE DUE: $ 50.00
It is understood that if this permit is granted the builder will at all times comply with the zoning,subdivision,flood control,building,fire,soil
and sedimentation,wetlands,marshlands protection and shore protection ordinances and codes whether local,state or federal,including all
environmental laws and regulations when applicable,subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent: /�/% „ �
P.0.Box 2749-403 Butler Avenue,Tybee Island,Georgia 31328
(912)786-4573-FAX(912)786-9539
www.cityoftybee.org
40 ``,, City of Tybee Island • Planning & Zoning Dept. F1®�!`�'
Inspection Report �utidalk 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 €�r��rioNai
��� Phone 912.472.5032 • Fax 912.786.9539 CODE OUNCE
MEMBER
Permit No. /7 p Z.' 2.Z. Date Requested >i i' 1
Owner's Name /1/4J,J1 -L% ) Date Needed
Gen. Contractor I---L) Subcontractor
Contact Information
Project Address I I Lv, 1-4. ,°-1 .
Scope of Work 7e.J4' ()J 1---),--)7')/),
Inspector Date of Inspection : 1\.
Inspection L 44-) \ r ( °- Pass ® n Fee
}
Inspection Pass ❑ Fail ❑ Fee
Inspection Pass El Fail 0 Fee
Inspection Pass 0 Fail ❑ Fee
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
447
Location: i 16 (, PIN# )(7
NAME ADDRESS TELEPHONE
Owner sc3
Architect
or Engineer t--)O�
Building
Contractor LAgS Z1/4)1 .& (SD 4r2•T 7.3Tc
(Check all that apply)
Repair Residential ❑ Footprint Changes
Renovation 11 Single Family ❑ Discovery
❑ Minor Addition ❑ Duplex ❑ Demolition
❑ Substantial Addition ❑ Multi-Family
❑ Other ❑ Commercial
Details of Project: ( .,2 ‘r( V- th 1,v,,-Z)yJ
Estimated Cost of Construction: $ jt ''j
Construction Type (Enter approp ..to number)
(1) Wood Frame (4) Masonry (6) Other(please specify)
(2) Wood &Masonry \ (5) Steel & .sonry
(3) Brick Veneer
Proposed use:
Remarks:
ATTACH A COPY OF THE CE' I D ELEVATION SURVEY OF LOT and complete the
following information based on e cons ction drawings and site plan:
#Units #Bedroo Is #Bathrooms
Lot Area Living space,(total sq. ft.)
#Off-street parking s •ces
Trees located & lis d on site plan
Access:
Driveway (ft.) With culvert? -- With swale?
Setbacks: Fr nt Rear Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade o the building to the extreme high point of the building, exclusive of chimneys, heating
units, entilation ducts, air conditioning units, elevators, and similar appurtances.
LEAD-BASED PAINT
Adapted from http://www.epa.gov/lead/pubs/renovation.htm.Please use that site to access the following information.
Information for Property Owners of Rental Housing, Child-Occupied Facilities -----
Property owners who renovate, repair, or prepare surfaces for painting in pre-1978 rental housing or space
rented by child-care facilities must, before beginning work, provide tenants with a copy of EPA's lead hazard
information pamphlet Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, IF YOU'RE NOT
and Schools. Owners of these rental properties must document compliance with this requirement. EPA's sample _LEAD SVECFRTFIED
pre-renovation disclosure form may be used for this purpose. -DISTURBING
After April 22, 2010, property owners who perform these projects in pre-1978 rental housing or space rented JUST SIX
by child-care facilities must be certified and follow the lead-safe work practices required by EPA's Renovation, SQUARE FEET
Repair and Remodeling rule. To become certified, property owners must submit an application for firm
:COULDC TOSTTYeODU
certification and fee payment to EPA. The Agency has up to 90 days after receiving a complete request for 'BIG TIME
certification to approve or disapprove the application. . Y,.---
Property owners who perform renovation, repairs, and painting jobs in rental property should also: +
• Take training to learn how to perform lead-safe work practices.
• Learn the lead laws that apply regarding certification and lead-safe work practices beginning in April 2010.
• Keep records to demonstrate that you and your workers have been trained in lead-safe work practices and that you followed lead-
safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeepinq checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements that took effect April 2010.
• Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right.
• Read about how to use lead-safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting.
Information for Homeowners Working at Home
If you are a homeowner performing renovation, repair, or painting work in your own home, EPA's RRP rule does not cover your project.
However, you have the ultimate responsibility for the safety of your family or children in your care. If you are living in a pre-1978 home
and planning to do painting or repairs, please read a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child
Care Providers, and Schools lead hazard information pamphlet. You may also want to call the National Lead Information Center at 1-800-
424-LEAD (5323) and ask for more information on how to work safely in a home with lead-based paint.
Information for Tenants and Families of Children under Age 6 in Child Care Facilities and Schools
As a tenant or a parent or guardian of children in a child care facility or school, you should know your rights when a renovation job is
performed in your home, or in the child care facility or school that your child attends.
• Before starting a renovation in residential buildings built before 1978, the contractor or property owner is required to have tenants
sign a pre-renovation disclosure form, which indicates that the tenant received the Renovate Right lead hazard information
pamphlet.
• Beginning in December 2008, the contractor must also make renovation information available to the parents or guardians of
children under age six that attend child care facilities and schools, and to provide to owners and administrators of pre-1978 child
care facilities and schools to be renovated a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child
Care Providers, and Schools lead hazard information pamphlet.
Information for Contractors
As a contractor, you play an important role in helping to prevent lead exposure. Ordinary renovation and maintenance activities can create
dust that contains lead. By following the lead-safe work practices, you can prevent lead hazards. Contractors who perform renovation,
repairs, and painting jobs in pre-1978 housing and child-occupied facilities must, before beginning work, provide owners, tenants, and
child-care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families,
Child Care Providers, and Schools. Contractors must document compliance with this requirement. EPA's pre-renovation disclosure form may
be used for this purpose. Understand that after April 22, 2010, federal law will require you to be certified and to use lead-safe work
practices. To become certified, renovation contractors must submit an application and fee payment to EPA. See: Application for firm
certification. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application.
Contractors who perform renovation, repairs, and painting jobs should also:
• Take training to learn how to perform lead-safe work practices.
• Find a training provider that has been accredited by EPA to provide training for renovators under EPA's Renovation, Repair,
and Painting (RRP) Program. Please note that if you previously completed an eligible renovation training course you may
take the 4-hour refresher course instead of the 8-hour initial course from an accredited training provider to become a
certified renovator. Click here for a list of eligible courses.
• Provide a copy of your EPA or state lead training certificate to your client.
• Tell your client what lead-safe methods you will use to perform the job.
• Learn the lead laws that apply to you regarding certification and lead-safe work practices beginning in April 2010.
• Ask your client to share the results of any previously conducted lead tests.
• Provide your client with references from at least three recent jobs involving homes built before 1978.
• Keep records to demonstrate that you and your workers have been trained in lead-safe work practices and that you followed lead-
safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeepinq checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements.
• Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right.
Read abo _low to use lead-safe work practices in EPA's Steps to Lea Safe Renovation, Repair and Painting.
Signature Date
Printed Name
DOM OF
NATURAL
FIZZOMES
1
GEORGIA
Permit Acknowledgement of
Asbestos/Environmental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
project.
( '
, S/1417
Undersigned ` Date
Printed Name
Office Use Only:
Project Address:
Permit Number: