Loading...
HomeMy Public PortalAboutWater System Improvements Contract Thomas and Hutton THOMAS & HUTTON 50 PARK OF COMMERCE WAY SAVANNAH, GA 31405 POST OFFICE BOX 2721 I SAVANNAH, GA 31402-2727 912.234.5300 WWW.THOMASANDHUTTON.COM June 10, 2013 Ms. Diane Schleicher City of Tybee Island 403 Butler Avenue Tybee Island, GA 31328 Re: Water System Improvements City of Tybee Island, GA Letter Agreement for Services Dear Ms.Schleicher: Thank you for requesting our engineering services for the water system improvements projects. In general, the projects consists of the installation of 850 linear feet of 8-inch water main on Highway 80 from the curve to Jones Avenue, 8,500 linear feet of 8-inch water main on Jones Avenue from Highway 80 to Chatham Avenue, and 1,680 linear feet of 6-inch water main on Lewis Avenue from Highway 80, connections to existing distribution mains, service • connections, hydrants, valves and other appurtenances. Our services will consist of the survey phase, design phase, permitting phase, bid phase, monitoring during the Construction Phase and Closeout Phase, as set forth in the General Provisions, supplemental exhibits, attached hereto, and such Additional Services as you may request during the course of the Project. We understand that you will furnish us with full information as to your requirements, including any special or extraordinary considerations for the Project and will make pertinent existing data available to us. Payment for our services will be as described in the attached General Provisions. You will be billed monthly for our services rendered and for Reimbursable Expenses. We propose that payment for our services will be as follows: Fee or Time& Phase Fee Structure Expense Budget Survey & Preliminary Engineering: Lump Sum $ 14,000.00 Design: Lump Sum $ 12,000.00 Permit: Lump Sum $ 3,000.00 Bid: Lump Sum $ 3,500.00 Construction: Lump Sum $ 10,000.00 Post-Construction: Lump Sum $ 2,500.00 Additional Services: Time & Expense wner's Initials �Consultant's Initials CHARLESTON, SC I MYRTLE BEACH, SC I WILMINGTON, NC I BRUNSWICK, GA Ms. Diane Schleicher City of Tybee Island Letter Agreement for Services June 10, 2013 Page 2 The above fee arrangements are based on prompt payment of our invoices and the orderly and continuous progress of the Project through construction. It is necessary that you advise us in writing at an early date if you have budgetary limitations for the overall Project Cost or Construction Cost. We will endeavor to work within those limitations. At appropriate times during the Design Phase, we can submit to you our opinions as to the probable construction cost of the Project. We do not guarantee that our opinions will not differ materially from bids or negotiated prices. This proposal between the City of Tybee Island ("Owner") and Thomas & Hutton Engineering Co. ("Consultant" or "Thomas & Hutton"), consisting of the Scope of Services, General Provisions, Consulting Services on a Time & Expense Basis Rate Sheet, and this letter with authorized signatures, represents the entire understanding between you and us with respect to the Project. This agreement may only be modified in writing if signed by both of us. If the arrangements set forth in these documents are acceptable to you,please sign and initial the enclosed documents in the spaces provided below and return to us. This proposal will be open for acceptance until August 30, 2013, unless changed by us in writing. We appreciate the opportunity to prepare this proposal and look forward to working with you on the project. The parties agree and acknowledge that any of the parties hereto may execute this agreement by electronic signature, and the other party may rely upon such electronic signature as an original record of signature. Very truly yours, THOMAS & HUTTON ENGI NG CCU. By 1 / amen J. ollins, P.E. ice Presioent/Regional Director By A. Christopher Stovall, P.E., LEED AP BD+C Project Manager JJC, ACS/kbw Enclosures: Scope of Services General Provisions Consulting Services Rate Sheet C0X/ner's Initials _ Consultant's Initials Ms. Diane Schleicher City of Tybee Island Letter Agreement for Services June 10, 2013 Page 3 ACCEPTED: , 2013 By TITLE J51t-v 6,17,77 71 ,&). Owner's Initials 1fConsultant's Initials LETTER AGREEMENT FOR SERVICES BETWEEN THOMAS& HUTTON ENGINEERING CO.(CONSULTANT)AND CITY OF TYBEE ISLAND(OWNER) WATER SYSTEM IMPROVEMENTS SCOPE OF SERVICES JUNE 10,2013 SCOPE OF SERVICES In general, the projects consists of the installation of 850 linear feet of 8-inch water main on Highway 80 from the curve to Jones Avenue, 8,500 linear feet of 8-inch water main on Jones Avenue from Highway 80 to Chatham Avenue, and 1,680 linear feet of 6-inch water main on Lewis Avenue from Highway 80, connections to existing distribution mains, service connections, hydrants, valves and other appurtenances. 1. SCOPE OF SERVICES Prior to beginning design services, Consultant shall hold a kick-off meeting with the City to discuss the scope of improvements, operational considerations, project schedule, administrative procedures, respective responsibilities, lines of communication, City contacts and expectations, progress reporting, data collection, construction methods to be utilized, potential/existing easements and rights-of-way, permitting issues, flow diversion phasing, master plan adjustments (if any), and other projects matters as appropriate. A written work plan will be prepared by Engineer subsequent to this meeting. Work plan will include scope, budget, schedule (including significant review points with the City), contact information, deliverables, sub-contractors, standards and procedures, and the project team, including an organization chart. A. Survey Phase Engineer shall review as-built information, utility mapping, and previous studies to compile base maps and verify preliminary plan of improvement. The City shall make drawings, studies and other documents related to the existing water system available for reproduction and use by the Engineer. We shall review collected data to verify the proposed service areas and flow projections for the existing and proposed developments served by the proposed project, as well as proposed improvement plan. Based upon concept plan approved by the Owner, Consultant will perform the following Survey Phase tasks: 1. Topographic Survey Surveyor shall prepare a topographic survey of the site for use in planning and engineering design. Surveyor shall obtain vertical and horizontal data in a roughly 30-foot wide grid along the water main routes, from centerline of road to edge of right of way on the side selected by Owner for installation of the water main. Surveyor shall field locate known visible utilities and drainage within the project limits. If underground utility locates are needed, a separate proposal can be prepared based on the needs of the Client. No other survey tasks (easements, etc.) are included at this time. _ Owner's Initials �� Consultant's Initials LETTER AGREEMENT FOR SERVICES BETWEEN THOMAS&HUTTON ENGINEERING CO.(CONSULTANT)AND CITY OF TYBEE ISLAND(OWNER) WATER SYSTEM IMPROVEMENTS SCOPE OF SERVICES JUNE 10,2013 B. Design Phase 1. Engineering Design After completion of Survey Phase and Owner approval of the Preliminary Subdivision Plat, the Consultant shall prepare site development plans. These plans shall be submitted to the Owner for review. The site development plans will include: • Water Distribution - pipe route and size, valve location, hydrant location, and building connection, including preparation of design calculations. • Erosion Control-for roadway, drainage, water, and sewer systems • Construction Details-water distribution and erosion control. • Quantity Takeoff and Opinion of Probable Construction Cost for water systems. • Technical specifications for water systems. • Design calculations-water distribution. • Coordinate with Geotechnical Consultant - The Owner will retain a geotechnical consultant to perform subsurface investigations for the project. The Consultant will coordinate with the geotechnical consultant regarding needs of the project and preliminary design information for the project. 2. Project Team Meetings Consultant shall attend project status meetings. Services will be provided based on a kick-off, 30%, 65%, and 90% design review meeting schedule. If the Owner requires additional meetings, these can be added and the Owner will authorize additional funds. C. Permit Phase 1. Permits Consultant shall assist Owner with the preparation of submittal packages for the development approval. The payment of fees associated with the application process is the responsibility of the Owner. Consultant shall submit final plans and specifications to the applicable local, state, and federal agencies for review. Agency submittals anticipated for this project include: • Georgia EPD - water line construction & NPDES construction permit (see below) • City of Tybee Island • US Soil Conservation Service - erosion control report of technical review • Georgia Department of Transportation- parallel encroachment along 1 Hwy 80 Owner's Initials 2 Consultant's Initials LETTER AGREEMENT FOR SERVICES BETWEEN THOMAS& HUTTON ENGINEERING CO.(CONSULTANT)AND CITY OF TYBEE ISLAND(OWNER) WATER SYSTEM IMPROVEMENTS SCOPE OF SERVICES JUNE 10,2013 Submittal fees are not included in our fee schedule and shall be provided by the Owner at the time of submittal. Consultant will assist Owner in obtaining construction permits for the project. This phase includes revising plans and specifications according to agency comments and if requested, meeting with the agencies on behalf of the Owner. 2. Erosion Control Permit Consultant will assist the Owner in compliance with the requirements of the permit to Discharge Storm Water Associated with Construction Activity. This assistance may include,when requested by the Owner: • Submit Notice of Intent (NOI) to the State on behalf of the Owner (as a Primary Permittee). This will include a certification that the Erosion, Sedimentation, and Pollution Control Plan (ES&PCP) has been prepared in accordance with the General Permit. • Develop a Comprehensive Monitoring Plan (CMP). The ES&PCP will indicate monitoring locations and may be used in the CMP. • Provide an initial observation of the measures installed under the ES&PC within one (1) week after construction activities commence. Additional observations will be conducted as other measures required by the Plan are installed. • Prepare and submit, as warranted, amendments to the ES&PCP. The Consultant's services do not include: • Qualified personnel to monitor maintenance of ES&PC measures. • Continuous monitoring of maintenance of ES&PC measures • Monitoring of NTU's at outfalls or receiving streams • Submittal of monthly reports to EPD • Submittal of Notice of Termination (NOT) and certification D. Construction Phase Consultant will provide the following services for the Construction Phase: 1. Bid Process Consultant shall assist Owner during the Bid Phase. The service shall be provided on a Time & Expense basis. Typical services provided during this phase include preparation of contract documents, assembling bid packages, attending or conducting pre-bid meetings, responding to contractor questions, and preparation of the Consultant's recommendation letter for award of bid. Personnel time will be detailed on monthly invoices. 2. Construction Services During the course of construction, the Consultant will provide the following f I services: VIiIVN Owner's Initials 3 -4W)-Consultant's Initials LETTER AGREEMENT FOR SERVICES BETWEEN THOMAS&HUTTON ENGINEERING CO.(CONSULTANT)AND CITY OF TYBEE ISLAND(OWNER) WATER SYSTEM IMPROVEMENTS SCOPE OF SERVICES JUNE 10,2013 • Review material data, shop drawings, and construction schedules provided by the Contractor. • Provide construction observation and monitoring to ascertain that the work is in substantial conformance with the contract documents and with the design intent. Construction Observation based on twice/month schedule based on a 6-month construction schedule. • Attend final field inspections by regulating agencies for the project. • Review record drawings provided by Contractor. • Request project acceptance by applicable agencies. • Prepare water record drawings. Construction observation and monitoring does not include exhaustive or continuous on-site inspections to check the quality or quantity of the Contractor's work. However, it does include visits to the project site at intervals appropriate to the various stages of construction to review general compliance with approved plans and specifications. Such visits and observations shall not require Consultant to assume responsibilities for the means and methods of construction, nor for safety measures or conditions on the job site. Both parties understand that the Contractor has notification requirements at specific intervals of the construction process. The Consultant provides construction services for the work designed by the Consultant. Other construction work that may occur on site is the responsibility of other design professionals or the Owner and expressly not the responsibility of the Consultant. 3. Record Drawing Preparation Consultant shall prepare record drawings based on information supplied by the Contractor. The Contractor will provide a survey regarding the constructed facilities. The survey provided by Contractor shall be certified by a registered surveyor licensed in the state in which the work is performed, if required by the governing agency. The scope does not include field work on the part of the Consultant. The information will be compiled in an AutoCAD format by the Contractor and submitted to the Consultant. The Consultant will review this information to ensure that the information submitted meets the intended design. The Consultant shall not verify or certify that the information submitted by the Contractor or Contractor Representative is correct. The Consultant will submit this information to the City for review. • The scope does not include the location or depth of any power, telephone, cable television, or natural gas lines. • The record drawing will be compiled from field information collected during the survey phase, water and sewer lateral locations as determined in the pad elevation survey, contractor's notes, and observations made by Consultant. The data will be presented in a format for the reviewing City's review. If_. vner's Initials 4 Consultant's Initials LETTER AGREEMENT FOR SERVICES BETWEEN THOMAS& HUTTON ENGINEERING CO.(CONSULTANT)AND CITY OF TYBEE ISLAND(OWNER) WATER SYSTEM IMPROVEMENTS SCOPE OF SERVICES .TUNE 10,2013 • Additional information required by the reviewing agency beyond what is reasonable and customary for record drawings, shall be billed as additional services. Examples are as follows: -- Geodetic coordinates for structures, fittings, or pipes - Profiles for sanitary sewer, water, or storm drainage - Roadway profiles - Testing locations for roadway on the plan view E. Exclusions Items not included in the scope of services are as follows: • Archaeological survey and report • Wetland delineation, surveys, or permits • Geotechnical investigation or report • Phase One or Phase Two Environmental Assessments • Endangered species survey and report • Off-site work unless specifically covered in the scope of services • Approvals or permits other than those related to the scope of work covered by this contract • Act as an expert witness for legal activities • Telephones, cable television, gas, and power distribution systems These items can be coordinated or provided, if requested by the Owner in writing. 2. PERIODS OF SERVICE A. Survey& Preliminary Engineering Phase After the Owner approves the final master plan, Consultant will commence work within seven (7) calendar days after receipt and complete work described in this phase within thirty (30) calendar days. B. Design Phase After the Survey Phase required for design is complete, Consultant will commence work within seven (7) calendar days and complete work described in this phase within thirty (45) calendar days. C. Permit Phase After receipt of a written notice to proceed from the Owner, Consultant will commence work within seven (7) calendar days after receipt and complete work described in this phase within fifteen (30) calendar days. wner's Initials 5 Consultant's Initials LETTER AGREEMENT FOR SERVICES BETWEEN THOMAS&HUTTON ENGINEERING CO.(CONSULTANT)AND CITY OF TYBEE ISLAND(OWNER) WATER SYSTEM IMPROVEMENTS SCOPE OF SERVICES JUNE 10,2013 D. Construction Phase After receipt of a written notice to proceed from the Owner, Consultant will commence work based on a six-month construction schedule. Owner's Initials 6 Consultant's Initials sieiliui s,luelinsuo3 sieiliui s,JauMO— -- Q) cT A W - - t 40 49 3 , N -+ --40 I 1.1 N Ch p 3 d �D '� y 0 cr f p CO a n g �ill> y 7 < IjI p O O p O $ S p O pp p pI p 8 p p C f0° 4 3 N 1 ,, 0 a y y Q0 •• ,. m > m ° >y J m m m 1 s co°z -a o 1 Cr TO W _ ca p 7 0 cp tO 0 0 -' n C) c) n � -• -o- -0-v ' ' D- -u c m x c w 7- °°+,c3 cD^ o m C O O � N o o O•o _5..Q.o o o Si; •< 4l N coo 0 -. -�]ar L: p CO i y m• m cg° m 3' 3' Q "»` CD. o= on m v CO i m --L 3 on> aQ g- M- 5- - .`-�•�� zi .d =m.2d=CD7m M 6 `° m o•v`Di o m Er 3 g = 3. ?. m a, n m N T. N N cc =i0. = ta.=c0 = d (- co = .• CD ai 01 �ii w- n' Q. — _?_ < t� m m c� co co : _ to J CO c) y (p cD C' _ _ ? _ rte- �3. v —— —__— 'O ? = J p » it co 0- — = Wj = = _ — —c « G< a, c j A a y< O co — _ — G N m O coi r To' cp S • 7, o N.< 3 co c2. 0 c -o ccn N - -O Co •�» N O co M 0. f) 0 0 F o ' 3 0 co Z N S O t0 7 CA I 3 c ,z w �/• tn c o.¢1 Oa g 2 co rg a s 2ma�c o535 o�o5 2g N -�D CO ° 3 2 c 7 7 < m < n m 6i m�c ° co (?) U11111111HSUII '�3 c �� -0 o °� y p_ m.p [ [ LII ! O)Ccn� comca u, G N c a' c ° c w,, c y O m w m a=i n=i r-_N W .t m pa m w v m 3 — � —<< .2. �' ° 0 o w 0 0 C Q o m =_y a vli rn co to y0 H C N v • -4 Fo' o • m y O -I o O D O -o -» 47 - - - - M 7• f7 ? v 3 I N 0 0 y • O p� a, U1 .,a) o-^ a g J I gym( SAr1i d r r fir, t d ,0., 0 fic OO1 Cl N 7. 0 di a Cl n y no ^' y X — CD c 0••- c co co 0 ccb -O co O 7 0 C c%1 N O ° m m ° y a 0 9. •• a H m ° m D D a a a n�i ° n N cc m Z j N y J C. ° — - — = c < = — R. < y m N O co N s° = 0.o 0 -•1 �- 7 CD 3 a I n?o -0 co 0 a)Z 0 y co to - co o O n 3 O7 -. ` I �.Q1 c0/1 Q d 0 7 N 7 N M M CA G—) G) L2 0 G� 0 0 0 G) p) I F.N O 3 — v < a 3 - a a U) D C C M Cl) s. C) m < m N cip� _ CO 3 y m C N to j n=i a=i N o = _ _ o c - O G. c)• rt W 7 - c3 25, Z m w Co w N CD Cr Z Pi a �co C -• a Q� M X 5- . N I C co o� 0 a C Cps = a Sr 0 (� 0 Al -11 -n -n -n _n 7 • + 4U co O N CO 0 D• o pt 3 f0 m tx 2E i6 o a m B I o y- •� — CO J •- co -8 CD co v S iJ O O t 6 $ iB n £6 f6 2 ca. n aa, CO n c c O c0 3 = = 7 = = 3 3 = a1 O so fD . z co 0 v 6 fii Es c a 3: 3. so 0 0• n < m 7. m w m m m W m '� �^ o m o 3 3 w °� m _ C Co • I — = E < < Q O T P _ _.O (D cil > y I cn � a Q s I � o ° 7 Z. 0 _ a s m 0 co m g n n C7 co co(7 D r.'C x • o. 7 13 y SD - _ = 0. o F m a O N VI IA • CO 0 3 CO co �' N O — 3• c c cc c d co n cT =_ 0 0 5 d Q 0 O 11. a•< GENERAL PROVISIONS TO LETTER AGREEMENT FOR SERVICES BETWEEN THOMAS&HUTTON ENGINEERING CO.(CONSULTANT)AND CITY OF TYBEE ISLAND(OWNER) WWTF-REUSE PUMP STATION APRIL 22,2013 PAYMENT FOR SERVICES CONSULTANT'S RESPONSIBILITIES For services rendered,Owner shall pay Consultant as outlined in the The professional services performed under this Agreement, os Letter Agreement for Services. defined in the scope, shall be consistent with sound engineering practices and shall incorporate federal,state,and local regulations Payment for services on the basis of'Time&Expense"shall be paid and standards that are applicable at the time the Consultant in accordance with the schedule of charges attached hereto. rendered his services. Project related costs for printing, reproductions, materials, and Consultant will strive to perform services under this Agreement in o travel will be billed as reimbursable expenses. manner consistent with that level of care and skill ordinarily exercised by members of the profession currently practicing in the Projects will be billed monthly or at the completion of the work, area under similar conditions. No other representation,expressed whichever comes sooner, with payment due upon receipt. or implied,and no warranty or guarantee is included or intended in Payment shall be considered overdue after forty-five(45)days from the Agreement,or in any report,opinion,document,or otherwise. date of invoice, with interest charged at a monthly rate of 1.5 percent(18 percent annual rote). MISCELLANEOUS Consultant reserves the right to suspend work hereunder or any other A. Opinions of Probable Costs work to be performed by Consultant for Owner or any of its affiiates under a separate agreement or agreements with Consultant in the Since the Consultant has no control over the cost of labor. event of delinquent payment by Owner to Consultant hereunder or in materials,or equipment,or over the Contractors methods of the event of delinquent payment by Owner or its affiliates to determining prices, or over competitive bidding or market Consultant under a separate agreement or agreements. For all conditions. his opinions of probable construction costs purposes hereof.affiliate shall mean(i)in the case of an individual,any provided for herein ore to be made on the basis of his relative of any person listed among the following, (ii) any officer, experience and qualifications. These opinions represent his director.trustee.partner.manager,employee or holder of 5 percent or best judgment as a design professional familiar with the more of any class of the voting securities of or equity interest in the construction industry. Owner;(m)any corporation,partnership,knifed liability company,trust or other entity controlling,controlled by or under common control with However,the Consultant cannot and does not guarantee that the Owner; or (iv) any officer, director, trustee, partner, manager, proposals, bids, or the construction cost will not vary from employee or holder of 5 percent or more of the outstanding voting opinions of probable construction costs prepared by him. securities of any corporation. partnership, limited liability company, trust or other entity controlling.controlled by,or under common control B. CADD Files with the Owner. Information supplied to the Consultant for use on the project OWNERSHIP OF INSTRUMENTS 9F SERVICE will be in AutoCAD 2008 format or later version. Translation of files or entering data into a compatible format is beyond the All reports,drawings,specifications,computer files.field data,notes scope of the contract. CADD files generated by the and other documents and instruments prepared by Consultant as Consultant will be in accordance with the Consultant's CADD instruments of service shoo remain the property of the Consultant. specifications. The Consultant shall retain all common law, statutory, and other reserved rights.including,without limitation,the copyrights thereto. C. Umits of Liability The Consultant shall retain these records for a period of two (2) years following their completion during which period paper copies Services to be performed by the Consultant under this will be made available to the Project Owner at reasonable times. Agreement ore intended solely for the benefit of the Owner. Nothing contained herein shall confer any rights upon or OWNER'S RESPONSIBILITIES create any duties on the part of the Consultant toward any person or persons not a party to this Agreement including,but A. Access not limited to.any contractor,subcontractor,supplier, or the agents,officers,employees,insurers,or sureties of any of them. Owner shall make provisions for the Consultant to enter upon public and privote lands os required to perform such work as ner agrees to limit the Consultant's a mployees{e surveys and inspections in development of the Project. liability wner and to all constru Contractors and Subcontractors o project to the Consultant's B. Owner's Representative negligent acts, errors, or ' stns, such that the total aggregate liability of the Consulton a named shall not The Owner shall designate in writing one person to act as exceed the Consultant's total fee for service ed on tha Owners Representative with respect to the work to be protect cribed In this contract,whichever is gr performed under this Agreement. This Representative shall II cap may be increased by mutual consent of bo have complete authority to transmit instructions, receive droadies.anri In exchange for additional compensation. information, interpret, and define Owners policy and decisions.with respect to the product materials,equipment, D. Acts of Others elements, and systems pertinent to the work covered by this Agreement. The Consultant shall ngt be responsible for the means. methods, techniques, sequences, or procedures of C. Fees construction selected by Contractor(s) or the safety precautions and programs incident to the work of The Owner is responsible for payment of fees associated with Contractor(s). Consultant shall not be responsible for the the project. Such fees include permit review and application failure of Contractor(s) to perform the work in accordance fees, impact fees, and capacity fees. The Consultant will with the Contract Documents. notify the Owner regarding the amount of fees and timing of payment. The Consultant shall not be responsible for the acts or omissions of any Contractor,or sub-contractor,or any of the Contractor(s)', or sub-contractors' agents, or employees or j. any other persons (except Consultant's own employees and U Owner's Initials 1 of ima Consultant's Initials GENERAL PROVISIONS TO LETTER AGREEMENT FOR SERVICES BETWEEN THOMAS&HUTTON ENGINEERING CO.(CONSULTANT)AND CITY OF TYBEE ISLAND(OWNER) W WTF-REUSE PUMP STATION APRIL 22,2013 -..rte agents) at the site or otherwise performing any of the J. Additional Services of Consultant Contractor(s)'work. However,nothing contained herein shall be construed to release Consultant from liability for failure to If authorized by Owner in writing, Consultant shall furnish or perform properly the duties undertaken by Consultant in the obtain from others. Additional Services of the following types Contract Documents. that are not considered normal or customary Basic Services. The Consultant shall not be responsible for the acts,omissions, 1. Revising previously accepted studies, reports. design means, methods, or specifications of other design documents.or Contract Documents when such revisions professionals involved in the project. Unless specifically stated are due to causes beyond Consultant's control. otherwise,the Consultant's work and responsibility under this Contract terminates at the building pod or within five(5)feet of 2. Furnish the services of special consultant for other than the building,whichever Is greater,for any proposed building the civil or structural engineering defined in the scope of shown on the plans. The Owner/Architect/Contractor is services. Special services Include services such as responsible for compliance with codes, regulations, mechanical or electrical engineering, geotechnical manufacturer specifications, and construction methods exploration, underwater investigation,laboratory testing, related to the building structure. In no circumstance is the and inspections of samples,materials,and equipment. Consultant responsible for any portion of the building, especially as it relates to moisture or mold. 3. Preparing to serve or serving as a consultant or witness • for Owner in any litigation,public hearing,or other legal ... . €1) or administrative proceeding involving the project. •••lion, and notwithstanding any other provisions ;•t 4. Defending the issuance of any permit or certificate for Agree -- the Client agrees, to the fullest exten --rmitled the project. Services for the defense against third party by law, to in•-•• ify and hold hornless th= onsultant, it# actions opposing or appealing the issuance of ony officers.directors.e • • ees and subc•• fonts(collectivelyf permit or certificate for the Project will commence with Consultant) against all do •--s. •lities or costs. includiin receipt of notification of the action. reasonable attorneys'fees••. :- -• - costs,arising out of at in any way connecte. ' this Project o - •=rtormance by 5. Services after completion of the Construction Phase, ony of the parti- ••ove-named of the serve - nder thi$ such as inspections during any equipment, material, or Agreement - cepting only those damages,liabilities - •st construction guarantee period and reporting observed t"f attrib '-•e to the negligent acts,errors or omissions,or will discrepancies under guarantees called for in any - -• '•- I contract for the project. - . _•• 6. If requested by Owner and agreed to in writing, a •wrier Resident Project Representative will be furnished and will act as directed by Consultant in order to assist in The Owne •II indemnify and hold the Con •nt hormle• observing performance of the work of Contractor(s). from and agains -• and all judgme . osses, damage, Through more extensive on-site observations of the work and expenses (induct; - .ttorney =-s and defense cost-1 in progress by the Resident Project Representative, arising from or related to clot•..-. third parties to challeng- Consultant shall endeavor to provide further protection the issuance of permi •r certi - : for the Project b for the Owner against defects and deficiencies in the agencies with juris• on in the premises. :- -nse costs s •I work of Contractor(s). However, the furnishing of such include the t'.- and expenses of the Consulta •ersonnel representation will not make Consultant responsible for to ossi ' the defense of the issuance of the pe or construction means, methods, techniques, sequences. procedures,or for safety precautions or programs.or for Contractor(s), failure to perform their work in G. Termination accordance with the Contract Documents. Ether party may terminate this Agreement by seven(7)days K. Amendment written notice in the event of substantial failure to perform in accordance with the terms hereof by the one party through This Agreement for Services can be amended by addenda if no fault of the other party. The Consultant shall be paid for agreed to in writing and signed by both parties. services performed to the dote of termination, including reimbursements then due. H. Abandoned or Suspended Work 1 If any work performed by the Consultant is abandoned or suspended in whole or in part by the Owner, other than for default by the Consultant, the Consultant shall be paid for services performed prior to receipt of a written notice from the Owner of such abandonment or suspension in an amount equal to work performed as of the date of abandonment or suspension. I. Signage Owner agrees to allow Consultant to place a sign on the job site during construction. The sign will indicate that the Consultant performed site design. Consultant is responsible for the sign installation and removal. Ui/A9Owner's Initials 2of2 Consultant's Initials ___ $