Loading...
HomeMy Public PortalAboutAmendment No 21AMENDMENT TO AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER PROJECT NO PROJECT NAME AND LOCATION VKB-98069000 Village Community Center (Recreation Center) Village Fire Station, Police Station, and Administrative Office of the Village of Key Biscayne, Florida (The "Project") AMENDMENT NUMBER #21 (Revisions to State School "FF" Force Main at the Village Civic Center) THIS AMENDMENT made this 28th Day of July in the year Two Thousand and Five By and between the Village of Key Biscayne, Florida, a Florida municipality, (the "Owner") James A Cummings, Inc A Florida Corporation 3575 Northwest 53rd Street Ft Lauderdale, FL 33309 Phone (954) 733-4211, Fax (954)485-9688, Federal Tax I D Number 59-2098732, (the "Construction Manager") WHEREAS, the Owner (as a direct signatory and through its former agent, the Department of Management Services of the State of Florida (the "DMS") has previously entered into the Agreement between the Owner and Construction Manager and WHEREAS the Agreement has previously been revised by Amendment Nos 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, and 20, WHEREAS, it is now necessary to revise the Agreement to include Work Associated with the Crandon Streetscape Master Plan for the Village Fire Station, Police Station and Administration and Community Center Buildings and Civic Center Project NOW, THEREFORE, in recognition of the good and valuable consideration provided by the covenants hereof between the parties, the Owner and the Construction manager hereby covenant and agree to amend Agreement to include, Work associated with the Crandon Streetscape Master Plan scope changes and added Value Work, and to identify its funding source, to identify the drawings, specifications and other documents upon which the GMP is based, to otherwise revise the Agreement as follows (1) Guaranteed Maximum Price - the Guaranteed maximum Price (GMP) for construction of Project VKB-98069000, Village Community Center Village FIRE station, Village Police Station, and Administrative Office of the Village, as defined in Article 7 1 of said Agreement shall be $22,228,166 00 (which includes the $8,594 00 GMP for the Work Associated with the Crandon Streetscape Master Plan scope changes and added Value Work As listed below in items 2 a through 2 b for the Village Civic Center ) (2) Drawings and Other Supporting Documents — in addition to the drawings, specifications and other supporting documents in previous amendments (No 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, and 20) to the Agreement, the Guaranteed Maximum Price (GMP) for construction of the Project, is based upon the following drawings and other supporting documents a Proposal No R -30I to the Village of Key Biscayne from James A Cummings, Inc , dated February 16, 2005, in the amount of $6,770 00 for Work related with the unforeseen conditions during the installation of the Force Main and Police Officer Traffic Control and Proposal Approval by the Village of Key Biscayne, which are attached hereto as Exhibit 'A 1 " b Proposal No R -54I to the Village of Key Biscayne from James A Cummings, Inc , dated July 6, 2005 in the amount of $1,824 00 to furnish a maintenance bond and the Work associated with the unforeseen conditions at station 0+05 for the completion of the State School "FF" Force Main, which are attached hereto as Exhibit 'A 2 c The revised Project Budget which is attached hereto as Exhibit "B' (3) Changes in Agreement — various changes are required to the exhibits and articles of the Agreement to reflect the amendments described herein It is agreed that the articles and exhibits of the agreement shall be deemed to be amended, to provide the following a Establishment of the GMP for Work Associated with the Revisions to State School `FF" Force Main in the amount of $8,594 00, and establishment of the GMP for the Project of $22,228,166 00 (4) Effect on Agreement — except as provided above, the articles and exhibits of the Agreement which are not affected by the amendments provided for herein shall remain in full force and effect IN WITNESS WHEREOF, the parties have executed this Amendment the day and year first written above JAMES A CUMMINGS, INC Attest By c /ra 4- By Corporate Secretary, Pamela Kalis William R Derrer, President James A Cummings, Inc Witne- -d By By Attest By VAC GC-4— ,dL j4/eE 1/c (print name) e Clerk Approved as to form an By i age me (Corporate Seal) VILLAGE OF KEY BISCAYNE` D PZORIV legal sufficiency 1 IS� �.� OP 4,r iT7Y an .: er 103001\agreements\amendment to agreement between owner and construction manager EXHIBIT B Amendment Number 21 OWNER S CONSTRUCTION BUDGET ITEM DESCRIPTION CONSTRUCTION BUDGET CONSTRUCTION MANAGERS PRECONSTRUCTION PHASE FEE $113 190 00 SUBTOTAL OWNER S TOTAL PRECONSTRUCTION PHASE FEE $113 190 00 FIRE RESCUE DEPARTMENT & ADMINISTRATION AND POLICE FACILITY CONSTRUCTION MANAGERS CONSTRUCTION PHASE FEE $527 392 00 CONSTRUCTION MANAGERS OVERHEAD & PROFIT $457 223 00 CONSTRUCTION BUDGET BALANCE $10 277 461 00 SUBTOTAL CONSTRUCTION COSTS $11,262,076 00 ANTICIPATED OWNER SALES TAX SAVINGS ($159 266 00) SUBTOTAL $11,102,810 00 OWNER S CONTINGENCY $256 924 00 OWNERS GMP BUDGET FIRE RESCUE & ADMINISTRATION/POLICE $11,359,734 00 OWNERS CONSTRUCTION BUDGET FIRE RESCUE & ADMINISTRATION/POLICE WITH PRECONSTRUCTION FEE $11,472,924 00 VILLAGE CIVIC CENTER SITE & SITE INFRASTRUCTURE WORK ELECTRICAL DUCT BANK AND WATER MAIN CONSTRUCTION MANAGERS CONSTRUCTION PHASE FEE $119 226 00 CONSTRUCTION MANAGERS OVERHEAD & PROFIT $34 521 00 CONSTRUCTION BUDGET BALANCE $647 913 00 OWNERS CONSTRUCTION BUDGET VILLAGE CIVIC CENTER SITE & SITE INFRASTRUCTURE WORK ELECTRICAL DUCT BANK AND WATER MAIN $801,660 00 VILLAGE CIVIC CENTER SITE & SITE INFRASTRUCTURE WORK PHASES 1, 2, 3, 4, 5, 6 & THE CRANDON N STREETSCAPE MASTER PLAN (INCLUDING school FF SANITARY FORCE MAIN) CONSTRUCTION MANAGERS CONSTRUCTION PHASE FEE $80 382 00 CONSTRUCTION MANAGERS OVERHEAD & PROFIT $98 288 00 CONSTRUCTION BUDGET BALANCE $2 237 526 00 AMENDMENT NUMBER 20 CRANDON STREETSCAPE (SCOPE CHANGES & ADDED VALUE) $251 661 00 AMENDMENT NUMBER 21 REVISIONS TO STATE SCHOOL FF FORCE MAIN $8 594 00 OWNERS CONSTRUCTION BUDGET VILLAGE CIVIC CENTER SITE & SITE INFRASTRUCTURE WORK $2,676,451 00 VILLAGE COMMUNITY CENTER (RECREATION CENTER) CONSTRUCTION MANAGER S CONSTRUCTION PHASE FEE $771 920 00 CONSTRUCTION MANAGER S OVERHEAD & PROFIT $434 328 00 AMENDMENT NO 18 — EMERGENCY POWER & POOL EQUIPMENT MODIFICATIONS $126 398 00 AMENDMENT NO 18 — ARTS IN PUBLIC PLACES ALLOWANCE ($135 000 00) CONSTRUCTION BUDGET BALANCE $9 597 214 00 EXHIBIT B OWNER S CONSTRUCTION BUDGET OWNER S CONSTRUCTIONN BUDGET - VILLAGE COMMUNIY CENTER OWNER CHANGE ORDERS OWNER CHANGE ORDER NO 1 OWNER CHANGE ORDER NO 2 OWNER CHANGE ORDER NO 3 OWNER CHANGE ORDER NO 4 OWNER CHANGE ORDER NO 5 TOTAL OWNER CHANGE ORDERS OWNER S TOTAL CONSTRUCTION BUDGET (ALL PHASES) AMENDMENT NO 07 - VILLAGE HALL GENERATOR BUILDING (NOT INCLUDED IN GMP) OWNER S TOTAL CONTRACT BUDGET $10,794,860 00 ($1 140 899 62) ($1 118 301 79) $34 363 00 ($1 195 184 00) ($97 707 00) ($3 517 729 41) $22 228 166 00 $72 760 00 $22 300 926 00 ( A `) urrirnings General Contractors February 16 200-, 1 l SKA LINE MANAGEMEN f GROUP INIC 88 West McIntyre Street Kev Biscayne FL 33149 1 -TRANSMITTED James A Cummings Inv 3575 Nortnwest 53rd Stree Fort Lauderdale FL 33309 Phone 954 733-4211 Fax 954 485 9686 Website wwwjamesacummings corn (305) 573-2620 ATTN Mr Paul T A. ; • Project Director RE KEY BI ' • YNE CIVIC CENTFR — S 17 j REQU T FOR �:�a• •+_ R PROPOSAL R -30I STATE SCHOOL "FF" FORCE MAIN- UNFORSEEN CONDITIONS & POLICE TRAFFIC CONTROL AT CRANDON BOULEVARD Dear Mr Abbott James A Cummings Inc is submitting Proposal #R -30I in the amount of $6,770 00 This proposal incorporates the Work associated with Unforeseen Conditions and Police Officer Traffic Control required while completing the installation of the State School ` FF' Force Main Please see attached summary form and subcontractor quotations for a recapitulation of this Work The request for this change order is limited to the costs associated with labor, materials & equipment necessary due to Unforeseen Conditions Encountered Dunng Installation of the Force Main as well as Providing an Off -Duty Police Officer to Control Traffic at the Intersection of Crandon Boulevard and West McIntyre Street while Installing Force Main Across this Intersection As required by Bisca e Police Department, an ofd duty officer must be stationed at the intersection d is taking place in this intersection This change may be charged a rated into the Agreement Between the Owner and the Construction Please provide direction on funding for this Work If there are any questions d 'di/Ur concern. regarding this matter please do not hesitate 'n c miact1 'this of Le at (305) 361-9227 tor discussion Sincerely JAME CLMMI GS INC JorgrA Fuentes Project Enginter Reviewed & Approved SK N &NAGEI NT GROUP, INC b /0"2 ott /SMG Project Director Cc Roberto La`gt SPILL IS CA.VDEL A. DM EM via fax (305) 447-3558 Armando Nunez 1, KBP1\ D t 'a tax (305) 36..-77). 7 Eric Squilla J'�C FILE 10 James A Cummings Inc Proposal Summary Form Village of Key Biscayne R-301 STATE SCHOOL FF FORCE MAIN UNFORSEEN CONDITIONS 444: urn m l ncjs 11 WI SECTION 1 DESCRIPTION OF WORK 02 STONE -CIRCLE UNDERGROUND INC Unforseen Conditions- Underground Utility Conflicts at I Crandon Boulevard Police Officer at Intersection- VKB Requirement SUBTOTAL LABOR BURDEN SALES TAX SUBTOTAL LABOR M EP a_ L B NC FACT 54118 $2 296 $o $0 $6 414 $0 $0 $0 $0 $6 414 TOTAL $6 414 OVERT LEAD (4 5%) - - $289 SUBTOTAL 7731 PROFIT (Included in Overhead above) SUBTOTAL BOND TOTAL N/A $6 703 $67 $6 770 02/16/2005 JAMES A CUMMINGS INC STONE CI R CL E LI \DERGROLII\D, I `C CHANGE ORDER REQUEST FOR STATE SCHOOL "FF FORCE MAIN JANUARY 3, 2005 r k ) sa er • scv.er • (La laze c0rsncto'' Description This Change Order rs a result of the unforeseen conditions encountered on 12116 and 12/29 while completing our contract obligations On 12/16 an existing 8" water main was discovered at the same elevation and ditch line as the proposed 8" force main Under MDWS investigation and direction the proposed face main wss redirected to the north 5' parallel to the existing main Four hours of equipment and labor performance was lost due to this unforeseen condition On 12/29 an additional existing 12' force main was discovered 14' parreliel to the existing 12" force main that was tapped for our final connection This existing force main was at the same elevation as our proposed main Four hours of equipment and labor including matenal was required to pass the proposed force main under this conflict pnor to our completion Listed below is a cost breakdown for the additional matenal equipment and labor exhausted due to these unforeseen conditions Materials 8" M J 22-1/2 Elbow 8* DIP Mega -Lug Kit Eguiriment Track Excavator Wheel Loader Compactor Crew Truck w/ Tools Ths Work Order continues on rage 2 Quantity 2 EA 4 EA Ti me 8 hrs 8 I, rs 8 nrs Q J Unit $11900 $40 50 Sub -total = +7% Saps Tax Material Total = Unit 588 00 $59 00 $17 00 $30 00 Eq�'crnent Total = Extended $238 00 $16 00 $400 00 $28 00 $428 00 Extended $704 00 5472 00 $136 00 $240.00 $1,552 CO 38 10 S w 10th Avcl}uc For Lauderdale Fonda 33-12 (954) 331-5020 Fax (954)33t MR-) Ltccnse 444 1 1 35, Page 2 - State School FF Force Main Change Order Labor w/ Burden Supenntendent Foreman Backhoe Operator Loader Operator Pipelayer keybrsreccntr-ff1 Quantity Tame Unit Extended 1 4 hrs $65 CC $260 00 1 8 hrs $47 OC $376 00 1 8 hrs $25 00 S200 00 1 8 hrs $23 00 $184 00 3 8 hrs $22 00 $528 00 Labor Total = 31 548 00 Sub -total for Above = $3 528 00 +10% Overhead = $352 80 +5%Profit = $1?gttrl 34 057 20 + 1 5% Bond = $60 86 Grand Total for thrs Change Order = S4,118 00 STO\E- CIRCLE C \UFRGR(IC NU IBC CHANGE ORDER REQUEST FOR STATE SCHOOL "FF' FORCE MAIN JANUARY 7, 2005 • •c 1 • JI 1 1'_L Description This Change Order is a result of the traffic and pedestrian control requirements the Village of Key Fist ayne Police Department had during our installation of the proposed force main crossing at Crandon Blvd and West Mclntrye Avenue An off -duty police officer with vehicle was utilized during working hours while crossing this intersection Listed below is a cost breakdown for this sevice fee Materials Administrative Fee Police Vehicle Fee Police Officer kevbisreccntl-ff2 Grand Total tor tens Change Order = RECE:1 Jy Quantity 8 Shifts 8 Shifts 66 Hrs Unit Extended $15 00 $120 00 $15 00 $120 00 $29 00 $1,914 00 Sub -total = $2 154 00 +5% Overhead/Profit = $107 70 $2 261 70 + 1 5% Bond = $33 93 $2,296 00 ,t) `\ A Liu 1 F1t,1ILI l i 12 (`l,-:) , 1 -3I)2I) 1 t. (0.1-4) „ 1 0(‘).1 1 n -- I 12-) Dat.. Apr , Add L, \ iJ1agt of Nei Biscayne Police Depai tment 1", //IL Lill, )11 1(); Off -Dcf tl Eric21() P'.1 s 2/i 4 -.Li‘ 4- �;_-Tl L itior ST�4\ c - C t 2CLE UKCE R612bOND Phone (vs 33 ► - 502 o 33o 6 1A.c 30/WE LittiDGRIAla.x 0$ 331 — OG $5 Applicar t NA, 1shes to engage the sen ice of off -duty personnel of the Village of Key Biscayne Police Department for Public Sa err Sen iLes that are in addition to those provided generally to the public There is a $15 00 sernicP fee for each shift officers are required to work type of er� ice to be perto-med r c20.66\rau< ()Pteav1sioN Location or sen lee to be performed CiZANDCYQ SIAM IQEsr Inc. NreeE **************-*************************************************************************** Number 8 classtfitation of personnel required Superr'sor (s) Officer (,) 1 **********************************************,.*********************************,t********* There is a four (4) hour minimum on all off -duty employment Cancellations must be made 24 hrs in advance *******************k********************************************************************** Period of e 'ip1 , mLnt Beginning Date 1Z/h0/04 Ending Date ? Number of hours Beginning Time 7' 040A in Ending Time 4 ao em Payment of ser%lce is due at time of application Payment must be made by check or money order payable to the \ illage of Kev Biscayne' Officers may not accept cash payments The % ILI LGE OF KEA BISCkY" E POLICE DEPARTMIEST is "SOT obligated to provide off -duty Police st r iLL Off dun Polhci sLrN ills K all not be approtied to anN, person, firm, or organization v hose officers members business or operations are of a questionable nature or for an eN.ent that will discredit_ -- the empl4) t 11 Pollee Department or the. \ illage It is unJt. r) ' 'a it n )t kith ird n_ the faLt that the applicant %sill pas the 1 illage of his, Biseasne for services rcn.i r d ind adrnint.tr n: fits Polies personnel remain emploNets of thi \ illac.2t of Keti Biscatin 1' 11 , t) p irtrntnt Tht applicant is restricted to the general assignment of dutiLs to be perform 1 9 i no iuthoritl o1Lr Polttt personnel 1 1, S' 2n 11 n i _ikit/C4- (alt Rif list " Village of Key Biscayne Police Department --ir )pl1catzon for Off-Dutti Ernploi anent A.,i-1r r.L'F Police \ e^i L. t LL. 4 Official L se Onl` Seri ice Fees tS ' ' 1 s Sing (s) X S-15 00 (per S1uft) ! X ; Police Lieutenant ' Police Sergeant ' Police Office Community Sen. i-e Officer* 1 i `-131500 (per shift) = L, r ek ' Police Vetuc1e(s) = Personnel Costs ' .s /;0 c. " s /LcoO 3 Hours (S)X { Ili" t33 00 (per hour) = $ Hours (s)i 1 . 'S'31 00 (per hour) = Hours (s)X ( 529 00 (per hour) _ $ Hours (s)X 520 00 (per hour) = $ TOTAL DUE s_ *Community SerNtLc Officers are permitted to work Off Duty Details requiring traffic control, and only when accompanied by a Sworn Police Otc-LLr . Remarks i I. Appros ed, Dtsapproti ed Appro t(-1 1 i -),t.d Appro'tdi I) , 1 1 ->�t.1 r 1 �� Off Duty Coordinator 42 - / c c 1 Date Deputz Chief of Police Operations alt., I)ireLtor of Public Sa1Lt\ Dat. Cumming Generd Contractors A Company ., ulv 6 200) James A Cummings Inc y General Contractors t r 2 South Florida Office 3575 Northwest 33rd Street Fort Lauderdale FL 3330Q Phone (954) 733 4211 Fax (954) 485 9688 Central Florida Office 11-0 Celebration Blvd Suite 105 Celebration FL 34747 Phone (321) 939 0583 Fax (321) 939 1998 SKYLINE MANAGEMENT GROUP NC 88 West McIntyre Street Key Biscayne, FL 33149 TRANSMITTED VIA FAX (305) 573-2620 T *4 Mr Paul T Abbott Prnie.* r, rFc ter r REQUEST FOR CHANGE ORDER PROPOSAL RA4I STATE SCHOOL "FF" FORCE MAIN — MAINTENANCE BOND & CONFLICT Dear Mr Abbott James A Cummings, Inc is submitting Proposal #R -54I in the amount of $1 824 00 This proposal incorporates a request to furnish a maintenance bond and the Work associated with the unforeseen conditions at s*,t 3n 0+05 for the completion of the State Scnool FF Force Main Please see a LalLhed summary form and subcontractor quotations for a recapitulatio of this Work The request for this change order is limited to the costs associated with the labor materials & equipment necessary due to the unforeseen conditions encountered during the tnstallatton of the Force Main as well as the request to provide a Maintenance Bond for the closeout of this Work Said Work may be charged against the Owner Contingency or incorporated into the Agreement between the Owner and the Construction Ma lager eta Future Amendment Please provide d recti' n furding for this Work 'f there are an) questions and/or concerns regarding this rr a*ter please do noL hes tate in contacting this office at (.505, 361-9227 for discussion Sincerely, ,I AMES A Ci MMINGS, INC j((, Enc Squilla Vice President of Operations B/SMG Project Dir, tor ReN, iewed : Approved SK LIME IANAGEMENT GROUP, INC bbt tt Cc Roberto Lagt ',PILL Is < \\D[I \ DMA! pia tax ( 0-)) 447 >>D8 Armando Nune7 KRP`\ D is tax (30)) 365-77.)" FII E (R -54I) James A Cummings Inc Proposal Summary Form Village of Key Biscayne R-541 State School FF Bond & Conflict i (ummirs I I 1 y SECTION DESCRIPTION OF WORK LABCIR 1/IA TER',iL. --.,8t -`I-7--- -C' i 1 01 Stone Circle Provide maintence bond for WASA Document was excluded from the original proposal 02 Stone Circle Utility conflict at station 0+05 Unforeseen condition not shown on the Contract Documents i r -- I F SUBTOTAL LABOR BURDEN SALES TAX SUBTOTAL TOTAL OVERHEAD (4 5%) SUBTOTAL PROFIT (Included in Overhead above) SUBTOTAL BOND TOTAL 07/06/2005 JAMES A CUMMINGS INC 1 $289 $1 439 $ot $01 $1 7281 $0 $0 $0 $0 $1 728 $1 728 $78 NA 1 $1 806 1, $13 $ 824 • STONE -CIRCLE L 1,DERGROLND, ICE CHANGE ORDER REQUEST FOR KEY BISCAYNE CIVIC CENTER May 18, 2005 water • sewer • dramage construction escrn • tion Per our letter of August 25 2003 our tnrtial contract for $279 000 00 for the above referenced lob included 1 5% pQrforrrar'cc ht -.2r The ....r i. o F E u►o nut ,'iclude a oond cost but these proposals became approved change orders to the original contract Listed below is a breakdown of change orders that did not include a bond cost han • e Order hange Order #1 hange Order #2 hange Order #4 hange Order (5 hange Order #6 hange Order #7 hange Order #8 hange Order #8 �an;e CO'der #9 Amount Description $ 84 800 00 C►vrc Center Phase 18 $ 11P 000 00 State School "FF" FM $ 7 400 00 Civic Center Phase 3 $ 11 050 00 Recreation Center Devvatenng trench $ 47 100 00 Civic Center Phase 4&6 $ 8 849 00 State School "FF FM MDWASA Revisions $ (11 773 00) Recreation Center Plan Revisions $ 14 875 00 Recreation Center Plan revisions $ 9 775 00_ Recreation Center Well Abandonment $ 288 076 00 _IALOO MD /x 1 5'/o Bond 4 325 $ -4-2— 1NASA maintenar,c�� bord TOTAL FOR THIS CHANGE ORDER $4,325 y cn1r13 r R� 11111Wpg Cor ti ', 1 FIVED t005 9'3 � r1�a n h 1 r- 3830 S W 3Cth Avenue Far Lauderdale Flonda 33312 (954) 331 5020 Fix (954) 331 0685 Lscense * 1 1257 1 STONE -CIRCLE UNDERGROUND, INC CHANGE ORDER REQUEST FOR KEY BISCAYNE RECREATION CENTER K _ AUGUST 21, 2003 k vatcr • sewer • drainage construction ``- f 1 -r/1 it vc "CO, FT— Frvo aescripticni G°ilaligE cr dr is b rc...t s,.' vast*`ruet fTEVicr 0+05 on the State School "FF" civil documents The plan view on sheet C1 1 01 did show we would be crossing the existing drainage on the south side of McIntire Street, but there was no profile view provided showing that both pipes would be in conflict with each other and we would have use (4) 8" D I P elbows to cross under the drainage with 6" of seperation This installation was installed per MDWS specifications Listed is a cost breakdown for these additional fittings with components We will not be charging any ;Lditional labor or equipment for this installation Matenal Description 8" M J C-110 D 145 Elbow 401 -lined 8" M J Standard Gland 8" M J Neoprene Gasket 3/4" H D G Al Thread Rod 3/4" H 0 G Eyebolts 3/4' H D G Washers & Nuts keybisreccntr6 Quantity 4 8 8 16 16 Unit Extended ea $220 00 $880 00 ea $12 50 $100 00 ea 34 50 $36 00 $2 00 360 00 ea $1 25 $20 00 ea $0 50 $8 00 Subtotal = $1,104 00 +7% Sales Tax = 377 28 Material Total = $1 181 28 Summary Matenal Total = 31 181 28 +10% Overhead = $118 13 +10%Profit = 511813 +1 5% Bond = 321-26 Total for this Change Order = $1,438 80 t 3830 S w 30th Avenue Hollywood Florida 33312 (954) 331 5020 Faz (954) 331 0685 License #91-1257