Loading...
HomeMy Public PortalAboutRIVER OAK LN_3.pdfCITY OF TYBEE ISLAND BUILDING PERMIT DATE ISSUED: 07 -2 -2013 PERMIT #: 130418 WORK DESCRIPTION WORK LOCATION CLEARING 3 RIVER OAK LN OWNER NAME HARBOUR POINTE PROPERTIES ADDRESS 9100 WHITE BLUFF CITY, ST, ZIP SAVANNAH GA 31406 PHONE NUMBER CONTRACTOR NAME COASTAL CONSTRUCTIVE INNOVT'NS ADDRESS PO BOX 13824 CITY STATE ZIP SAVANNAH GA 31416 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 557.50 PROPERTY IDENTIFICATION # PIN #4- 0019 -04 -027 PROJECT VALUATION $ 200.00 TOTAL BALANCE DUE: $ 557.50 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org CITY OF TYBEE ISLAND 403 Butler Ave PO Box 2749 Tybee Island, GA 31328 -2749 Ph (912) 786 -4573 FAX (912) 786 -5832 Vendor # : 01- 002055 Issued to: DAVIS ENGINEERING, INC P 0 BOX 1663 TYBEE ISLAND, GA 31328 F.O.B. Point - Tybee Island, GA UNE UNITS DESCRIPTION PL ZCHASE ORDER PO Number: 14-23327 This number must appear on all related correspondence, shipping papers and invoices. Date: 0 7/ 0 8/ 2 013 Requisition #: 14 - 2 3 3 2 7 Ship to: CITY HALL 403 BUTLER AVENUE TYBEE ISLAND, GA 31328 Terms - Net 30 days PRICE AMOUNT 1 0.00 Engineering - River Oak Davis Engineering, Inc. 07/01/2013 for $315.00. 100 - 7220 -52 -1203 invoice #21400101 dated Engineering services for River Oaks Land Disturbing on Lots J & L Purchase Order void after 90 days. 0.00 315.00 Special Instructions: I agree to provide the items /services listed on this purchase order and accept the Purchase Order Terms and Conditions that accompany this form. Supplier Acknowledgement Date TOTAL 315.00 Authorized by For the City of Tybee Island Date DAVIS ENGINEERING, INC. PO Box 1663 Tybee Island, Georgia 31328 Tel. (912) 695 -7262 dkdbus @gmail.comt July 1, 2013 Diane Otto City of Tybee Island P.O. Box 2749 Tybee Island, GA 31328 Invoice # 21400101 Phone (912) 786 -4573 Fax: (912) 786 -9539 RE: River Oaks Land Disturbing on Lots J &L 06 -21 -13 06 -23 -13 06 -24 -13 06 -26 -13 06 -27 -13 06 -28 -13 06 -28 -13 07 -01 13 n.c. 0.25 hours 0.50 1.00 0.50 0.75 0.25 0.25 3.50 hours Consulted with Diane Otto on E &S violations Consulted with Diane Otto on E &S violations Consulted with Diane Otto on E &S violations Consulted with Diane Otto on E &S violations and applicable laws Site visit and status review Met with Contractor and adjacent lot owner Revieewed "red line" Final review prior to concurring on E &S violation status © $90 = $315.00 Total Due This Invoice La.;,„„,) 03-in '7 -2 -I3 -o4/7 ' i s't. s ° /3 446 tis'7.so ?D (LC-0733 ,27 City OT 1 wee .slang. Cis=( ,::.-- 912- 472 -5033 or 912 - 472 -5031 Fax 912- 786 -9539 APPLICATION FOR BUILDING PERMIT Property Address: . III e. a4-L /r i 4 PIN: 0a/f.-424-Z7 ' Name Mailing Address Telephone " Owner i IC/lifei— ;�/b/h sy' ,o,ia., / / U C&: .9/7-.7 7161 Architect or Engineer %ZG- Office: Cell: Contractor j / .I/ 4 vi:;z -: Cell: Pt' Single Family L j uupiex ❑ Multi- Family units ❑ * Commercial unit(s) Check all that apply O DiscoverylTearout lJ r-ootprint unanges ❑ additional square feet heated /cooled ❑ Demolition or Relocation LI uiznei * A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contraftor with the appropriate State of Georgia professional license. A commercial project rnayy require Site Plan Approval. Details of Project: Zero �'e- ..UN,OP2 ,29 ds ,- �j Aj %,j Estimated Cost of Construction: $ 20.03 , C1 e.e,ri/ (materials + labor + profit/overhead) Sl - 9 If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon the scope of the work, two sets of construction drawings and /or a site plan may be required. Year Built: 4/l%- Listed on National Historic Register or located within a National Historic District? Y / N • Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation Durino construction: On -site restroom facilities will be provided through /f/ /4- . Construction debris will be disposed by by means of . 1 understand that t must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. 1 realize that 1 must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaired by this permitted construction. Date: Signature: PrfnttJd Name of Applicant: Note: A permit normally takes 7 to 10 days to process. Processing time for a historic structure may be longer. Approvals: Planning & Zoning Manager Building Official Water /Sewer Storm /Drainage City Manager W o r rl o v-r Q ?� ✓y�,� X2fkg 2So Signatu Date . bi 7- 2 -i 3 FEES 75- Permit Inspections Cap. Cost Rec. Water Tap I O Sewer Stub 1, . Eng. Fees Aid to Const. c{Do e . 15 .7.50 TOTAL g 557-) LEAD -BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363 -7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. * * * * * * * * * * * * * * * * * * * ** Asbestos /Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. * * * * * * * * * * * * * * * * * * * ** BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http://www.gaswcc.orgidocsifield_manual_4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5 " -3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or wood • osts, post spacing, Type C or A. Signature f.r receipt of Lead Paint, Asbestos, and BMP notices Printed Name Date %3 SET SILT L115 OF IASTUR APPEND et k 0 OT SET t211.1 FEINICE LIMITS OF DISTURBANCE 1)0 *IV SET SILT PENCE Limas OF PISTU SET SILT FMGE. Lirirrs OF DI ' 1- A 0 NAL PE LOT E L EGEND: calf Conc. Monument Found 1pf Iron Pipe F d If Imp Rod Found pp P r Pole op 0 d Power tine EleK Asphalt Pawing Contour rive of Drainage L HO OWNER OR HOME BUILDER SHALL BE RESPONSIBLE FOR PROVIOINO TEMPORARY SEDIMENT IN TO CONTAIN SEDIMENT LADEN RUNOFF AT THE RATE OFfil CUBIC YARDS PER ACRE DISTURBED. HOME OWNER DR HOME BUILDER StiALL RESPONSIBLE FOR PROVIDING POSITIVE DRAINAGE TO THE ESS ENE 3. SOIL SERIES FOR ENTIRE sin is cHIPL COMPLEX 4. PAricei iD:4-04)1644-04? ZOtiklING: R2 LOT: N AO T k 4(ER OAK LANE CHATHAM COUNTY, OA 5. ALL DRIVEWA T IJNOER ROOF SHALL BE POROUS PAVEMENT. PROOCT „ EXISTING: THE EXISTING SITE IS APPROXI ACRES IN SIZE AND SIST OF OPEN G WITH TREES. PROPOSED: THE PROPOSED DEVELCIPMENT WILL CONSIST OE CONS TING A SINGLE FAMILY IIOME ON THE LOT, A PROPOSED SWALE WILT. BE CONSTRUCTED TO COLLECT STORM WATER RUNUP THE SWALE BEEN SIZED TO •HA 1' E THE C4FFERENCE BETWEEN THE PREVEV PUU AND POST DEVELOPED 25 YEAR RUNOFF. OWNER CONTACT t1i»1 4: MICHAEL THOMAS LOT (le RIVER OAK LANE eeiSILAND. CI4ATHAM COUNTY, GA EROSION CONTROL IA ALL TIMES. IF FULL Ilt1 DUES WILL UE INI.INTAINED AT ENTAT ION OF THE APPROVED PLAN DOES NOT PR CIVIOE FOR EFFECTIVE EROS/ON CONTROL. AD DITIONNL EROSION AND SEDIMENT CON TROL MEASURES SHALL BE IMPLEMEN1 I) TO CQNIROI Oft j T THE SEDIMENT SOUIRGE STATEMENTS; CAPE OF %DIME, NT FROM THE SITE SNALi. BE PR EVEN THE INSTAL.LATION OF EROSION AND SEDIMENT CONTROL I SORES AND PRACTIGES PRIOR TO, OR C()NG Yt4r WITH LAND DISTURBINK1 AC TIVITIES, 2. ANY DISTU GREATER T AREA LEFT EXPOSED FOR A PERIOD 4 DAYS SHALL BE STABILIZED WITH vvrni MULCH OR TEMPORARY SE.EDING