HomeMy Public PortalAbout11-0129 MartinDATE ISSUED: 03 -9 -2011
WORK DESCRIPTION
CITY OF TYBEE ISLAND
BUILDING PERMIT
REPAIR RESIDENTIAL DOCK
WORK LOCATION 151 LEWIS AVE
OWNER NAME FRANCES MARTIN
ADDRESS 151 LEWIS AVE # HC -32
CITY, ST, ZIP TYBEE ISLAND GA 31328 -9791
PHONE NUMBER
CONTRACTOR NAME POP AND SON CABINETRY
ADDRESS PO BOX 311
CITY STATE ZIP TYBEE ISLAND GA 31328
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 109.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $2,800.00
PERMIT #: 110129
TOTAL BALANCE DUE: $ 109.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
I ( -01-2 9
Location:
• 5 • f1 nets
NAME
A "
ADDRESS
PIN #
TELEPHONE
Owner
F!'4-N t1,¢ ,1I-/A
/3'/ ,.t-'vv'ys 4 vi: Arc iE
786*-, 7 /
Architect
or Engineer
Building
Contractor
Pe, A' Scw-
,_
/se, 4 r_; v -i 4''r =tic{
i/8 y- G 5 7 7
(Check all that apply)
N. Repair
n Renovation
[l Minor Addition
❑ Substantial Addition
❑ Other
Details of Project:
11' AP
❑ Residential
❑ Single Family
❑ Duplex
❑ Multi- Family
❑ Commercial
❑ Footprint Changes
n Discovery
E Demolition
Sc •�
5fiv, le.,<s- . e c�
Estimated Cost of Construction: $
Construction Type
(1) Wood Frame
(2) Wood & Masonry
(3) Brick Veneer
Proposed use:
Remarks:
(i)
./1
„go giz
(Enter appropriate number)
(4) Masonry
(5) Steel & Masonry
:a1Q Ooc,
No ecal Fr-Q- -
o o v��
Q ±
`'.�.rQr
(6) Other (please specify)
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
# Units
Lot Area
# Off - street parking spaces
Trees located & listed on site plan
Access:
Driveway (ft.)
Setbacks: Front
# Bedrooms
Living space (total sq. ft.)
With culvert?
Rear
# Bathrooms
With swale?
Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through C9 wi
On -site waste and debris containers will be provided by e) W/7
Construction debris will be disposed by yfr -j9ez2-- by means of j k
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drai _e impaired by this
permitted construction.
Date: 3 7'/// Signature of Applicant: /'
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification
Approved rezoning/variance?
Street address and number: New
Is it in compliance with City map?
If not, has street name and /or number been reported to MPC?
NFIP Flood Zone
Existing
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals:
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Storm /Drainage
Inspections
City Manager
Signature
FEES
Permit
Inspections
Water Tap
Sewer Stub
Aid to Const.
TOTAL
Dianne Otto
From: Deb Barreiro [Deb.Barreiro @dnr.state.ga.us]
Sent: Tuesday, March 01, 2011 8:41 PM
To: Dianne Otto
Subject: martin, 151 lewis avenue, tybee
i was out on site with mr. george on monday.
the proposed work on the existing dock is within the structure's footprint and is considered maintenance.
thanks for having him contact me.
Deb Barreiro
Coastal Permit Coordinator
Georgia Department of Natural Resources
1 Conservation Way, Suite 300
Brunswick, Georgia 31520 -8687
FAX 912.262.3143
1
(2 -13 ci per-44'1.A-
717-4- lokc lw b rL rn n der ‘4 JS
PV- ''+ was c oywr Co leAeci plus s
m,fl o r- add, 4-:Qoai pe,4&in:,(
D4-4„