HomeMy Public PortalAbout10-0370 Peebles & BarberCity o bee Island • Community Develd )ent Dept. ����
Inspection Report mum
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 --L%
INTERNATIONAL
Phone 912.786.4573 ext. 114 • Fax 912.786.9539 CODECOUNCIE
MEMBER
f
Permit No /0 -< < - t) Date Requested
-7 uested - / -3
i�
Owner's Name Date Needed , - if
�
Gen. Contractor -,..i . a_40. Subcontractor
Contact Information --7700-1.1)_f." % f
Project Address
Scope of Work 16"Z _Y_ P"e-i-ci
Inspector Date of Inspectio
Inspection
Pass ®` ail fl Fee
Inspection Pass ❑ Fail ❑ Fee
Inspection Pass ❑ Fail ❑ Fee
Inspection Pass ❑ Fail ❑ Fee
Permit No.
City of lee Island • Community Develop ,.tnt Dept.
Inspection Report
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
Phone 912.786.4573 ext. 114 • Fax 912.786.9539
1.0 - 0370
Its
maim
INTERNATIONAL
CODE COUNCIL
MEMBER
Date Requested
Owner's Name - „Jr) r c)P r Date Needed 1 /
• (nO'i 5-0r-kCe)
Gen. Contractor 4 ? ''4-r- r 04: o °I 5 Subcontractor
Contact Information Cr-762-‘,/, 5 ocvrock._ qcko, 09g9
Project Address -1 Z; k 'P lovf C 4 ,(r)-
Scope of Work reOr E(k-, oci. 4(4 on
Inspector /7 I q Date of Inspection i ) Nit \ )
j')
n I ,
Inspection ,.2;'t e c 1.- 4- :ra i Pass 0 Fail 0 Fee e .1 (--)
1 i 1/4-1
-:—.(1 ‘ 1 /t.
i: r I
, /12
Inspection Pass El Fail Fee
Inspection Pass El Fail El Fee
Inspection Pass Fail 0 Fee
City o,! ;bee Island • Community Devel( 'lent Dept.
Inspection Report
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
Phone 912.786.4573 ext. 114 • Fax 912.786.9539
Inmik
INTERNATIONAL
CODE COUNCIL
MEMBER
Permit No. I C) -•O370 Date Requested ' ! i
Owner's Name - f-:76E.,._.. Date Needed
i
Gen. Contractor C r r . k.. Subcontractor
Contact Information / (1i qqL -7- ( f/1
i
Project Address - 1,A)47 C,1
Scope of Work s`r_
Inspector Date of Inspection
Inspection
Pass
•
it U Fee
Inspection Pass ❑ Fail ❑ Fee
Inspection Pass Fail ❑ Fee
Inspection Pass ❑ Fail ❑ Fee
CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 07 -16 -2010 PERMIT #: 100370
WORK DESCRIPTION DECK ADDITION
WORK LOCATION 4 SHIPWATCH CR
OWNER NAME T. & S. PEEBLES & BARBE
ADDRESS PO BOX 682
CITY, ST, ZIP TYBEE ISLAND GA 31328 -0682
PHONE NUMBER
CONTRACTOR NAME RENAISSANCE RESTORATIONS LLC
ADDRESS PO BOX 8604
CITY STATE ZIP SAVANNAH GA 31412
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 117.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $9,000.00
TOTAL BALANCE DUE: $ 117.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
r
P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
Owner
S''i-U( Bi g g.
4 A4/fi Ciree r
91z °Zzo °APO -57
Architect
or Engineer
Building
Contractor
/k7011,9*/c4
g-3° ileA/� LAS
/) 0, 4ox /C!J
St.1M', / 64 1)4'i 2-
9/ - 1Z0-j .
-0310
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
Location: V S� 7, V,4�z// Cf -C L 6
NAME
ADDRESS
PIN #
TELEPHONE
(Check all that apply)
❑ Repair ❑ Residential
Renovation ❑ Single Family
Minor Addition ❑ Duplex
❑bstantial Addition ❑ Multi- Family
t✓' Other Ak-h/ DC Cad ❑ Commercial
Details of Project: ('/5 72"/e /V&A/
❑ Footprint Changes
❑ Discovery
❑ Demolition
/tic oF 141W.
.SEA /41/ ilww .04 ZS.9t1t -
Estimated Cost of Construction: $ fit''
Construction Type
(1) Wood Frame
(2) Wood & Masonry
(3) Brick Veneer ,
Proposed use: (DEek
Remarks: 5w1247-2,61
(Enter appropriate number)
(4) Masonry (6) Other (please specify)
(5) Steel & Masonry
ceir'S'74r i7 pi/' Ate-aka lfl /9-° /L,V
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
# Units # Bedrooms # Bathrooms
Lot Area Living space (total sq. ft.)
# Off - street parking spaces
Trees located & listed on site plan
Access:
Driveway (ft.) With culvert? With swale?
Setbacks: Front 2 ,0 ' Rear (�° Sides (L) (0' (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through
On -site waste and debris containers will be provided by /ft/W17( WAGE=
Construction debris will be disposed by by means of
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: 7, /O. / C) Signature of Applicant:
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification
Approved rezoning/variance?
Street address and number: New
Is it in compliance with City map?
If not, has street name and /or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
NFIP Flood Zone
Existing
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals:
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Storm /Drainage
Inspections
City Manager
Signature
Date
FEES 90
Permit
Inspections Z%
Water Tap
Sewer Stub
Aid to Const.
TOTAL j j /
LEAD -BASED PAINT
Adapted from http: / /www.epa.gov /lead /pubs /renovation.htm. Please use that site to access the following information.
Information for Property Owners of Rental Housing, Child- Occupied Facilities
Property owners who renovate, repair, or prepare surfaces for painting in pre -1978 rental housing or space rented
by child -care facilities must, before beginning work, provide tenants with a copy of EPA's lead hazard information -
pamphlet Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, and Schools.
Owners of these rental properties must document compliance with this requirement. EPA's sample pre- renovation
disclosure form may be used for this purpose.
After April 22, 2010, property owners who perform these projects in pre -1978 rental housing or space rented by
child -care facilities must be certified and follow the lead -safe work practices required by EPA's Renovation, Repair
and Remodeling rule. To become certified, property owners must submit an application for firm certification and fee
payment to EPA. The Agency has up to 90 days after receiving a complete request for certification to approve or
disapprove the application.
Property owners who perform renovation, repairs, and painting jobs in rental property should also:
• Take training to learn how to perform lead -safe work practices. L__
• Learn the lead laws that apply regarding certification and lead -safe work practices beginning in April 2010.
• Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements that took effect April 2010.
• Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right.
• Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting.
Information for Homeowners Working at Home
If you are a homeowner performing renovation, repair, or painting work in your own home, EPA's RRP rule does not cover your project.
However, you have the ultimate responsibility for the safety of your family or children in your care. If you are living in a pre -1978 home and
planning to do painting or repairs, please read a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child Care
Providers, and Schools lead hazard information pamphlet. You may also want to call the National Lead Information Center at 1- 800 -424-
LEAD (5323) and ask for more information on how to work safely in a home with lead -based paint.
Information for Tenants and Families of Children under Age 6 in Child Care Facilities and Schools
As a tenant or a parent or guardian of children in a child care facility or school, you should know your rights when a renovation job is
performed in your home, or in the child care facility or school that your child attends.
• Before starting a renovation in residential buildings built before 1978, the contractor or property owner is required to have tenants
sign a pre- renovation disclosure form, which indicates that the tenant received the Renovate Right lead hazard information
pamphlet.
• Beginning in December 2008, the contractor must also make renovation information available to the parents or guardians of
children under age six that attend child care facilities and schools, and to provide to owners and administrators of pre -1978 child
care facilities and schools to be renovated a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child
Care Providers, and Schools lead hazard information pamphlet.
Information for Contractors
As a contractor, you play an important role in helping to prevent lead exposure. Ordinary renovation and maintenance activities can create
dust that contains lead. By following the lead -safe work practices, you can prevent lead hazards. Contractors who perform renovation,
repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and child-
care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families, Child
Care Providers, and Schools. Contractors must document compliance with this requirement. EPA's pre- renovation disclosure form may be
used for this purpose. Understand that after April 22, 2010, federal law will require you to be certified and to use lead -safe work practices.
To become certified, renovation contractors must submit an application and fee payment to EPA. See: Application for firm certification. The
Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application.
Contractors who perform renovation, repairs, and painting jobs should also:
• Take training to learn how to perform lead -safe work practices.
• Find a training provider that has been accredited by EPA to provide training for renovators under EPA's Renovation,
Repair, and Painting (RRP) Program. Please note that if you previously completed an eligible renovation training course
you may take the 4 -hour refresher course instead of the 8 -hour initial course from an accredited training provider to
become a certified renovator. Click here for a list of eligible courses.
• Provide a copy of your EPA or state lead training certificate to your client.
• Tell your client what lead -safe methods you will use to perform the job.
• Learn the lead laws that apply to you regarding certification and lead -safe work practices beginning in April 2010.
• Ask your client to share the results of any previously conducted lead tests.
• Provide your client with references from at least three recent jobs involving homes built before 1978.
• Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements.
• Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right.
• Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting.
IF YOU'RE NOT
_LEAD SAFE CERTIFIED,
:DISTURBING
-JUST SIX
SQUARE FEET
',COULD COST YOU
'BIG TIME.
X10. /0
Signature / fi ' Date
rd7/eiy 15
Printed Nam e
Permit Acknowledgement of
Asbestos /Environmental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
project.
Undersigne�
Printed Name
1,/c'. 10
Date
Office Use Only:
Project Address:
Permit Number:
CITY OF TYBEE ISLAND
June 30, 2010
The following deficiencies have reached an unacceptable level on the projects in the City of Tybee Island. While the
deficiencies are not necessarily the fault of the Owner or his agent, they are their responsibilities. The two areas of
deficiencies are in the two most basic and common BMPs on local projects. They are:
Co — Construction Exit
Sdl — Sediment Barrier
Correct installation information can be found not only in the "Green Book" but in the Field Manual for Erosion and
Sediment Control in Georgia, Fourth Edition 2002, 4310 Lexington Road, P.O. Box 8024, Athens, GA 30603, telephone
706.542.3065, www.gaswcc.org, Georgia Soil and Water Conservation Commission; http: / /www.gaswcc.org /docs/
field_manual_4ed.pdf.
Problems with the Co is not limited to the installation, but to the material. Specifically, the job site personnel are telling
me the stone delivered is the 1.5 " -3.5" stone they requested. I have experienced on my own projects suppliers not
adhering to the specs they are given with the orders. While I regret this situation, I will no longer be accepting any
deviation from the State requirements. The stone will be a representation of 1.5 " -3.5" stone or larger. Gradations that are
obviously smaller will no longer be tolerated. The smaller stone allows for a smoother surface with smaller voids, thereby
reducing the function of the construction exit.
Similarly, I am finding Type A sediment barriers installed where Type C is required and shown on the permit drawings. I
have attempted to work with the Owners through increased inspections, additional backup BMPs, etc. This has evidently
become common knowledge based on the installations I am finding. Where two rows are called for they will be installed
with a separation that allows for the first one to fail (fall over) without impacting the second one, The complete assembly
and installation must be compliant; steel or wood posts, post spacing, Type C or A.
There has been no discharge into state waters due to previous occasional deficiencies. However, the increased frequency
has created unnecessary exposure to:
1) Sediment discharge into nearby waters of the State,
2) Increased maintenance efforts by the DPW on downstream lines.
3) Due to #2, higher cost to island taxpayers.
I will be adhering strictly to the manual on all BMPs and not just these two.
Downer Davis
City of Tybee Island Consulting Engineer
Signa ure o Owner/ tractor
P.O. Box 2749 — 403 Butler Avenue, Tybee Island, Georgia 31328 -2749
(912) 786 -4573 — FAX (912) 786 -5737
www.cityoftybee.org
LOT 16
5/8" RBS
LOT 10
N 66 °28'06 "E 54.84'
5/8" RBF
POND
SHIPWATCH CIRCLE
35' _ CCESS,
1 2" RBF
Cr)
CV
15.3'
CO
CV
co
rri
LOT 18
16.2'
�uu�uun�:
30' : SL
c
cNz
10' NON ACCESS ES
2" RBF
S 66 °32'37 "W 65.00'
BAY STREET 75' R/W
PLAT OF LOT 17, SHIPWATCH DUNES,
BAY WARD, TYBEE ISLAND, CHATHAM
COUNTY, GEORGIA
STREET ADDRESS: 4 SHIPWATCH CIRCLE
FOR: SHIRLEY BARBER
REFERENCE: 5MB 13 —S 26
J. WHITLEY REYNOLDS
LAND SURVEYOR
636 STEPHENSON AVENUE
SUITE C
SAVANNAH, GEORGIA 31405
TELEPHONE: 912- 352 -0464
FAX: 912- 352 -7787
EQUIPMENT:
TOPCON AP —L1A
ERROR OF CLOSURE:
LINEAR: 1/-
G: —" /ANGLE
BALANCED BY: —
PLAT: 1/198,000
0 30
f t I
SCALE: 1" = 30'
DATE: JUNE 30, 2010 SURVEY
DATE: JULY 1, 2010 PLAT
FILE NO. 10-53
��
l i . * f . . . . .
M " ;
" ; k e g
. . . . . , _
I M a w s
: t 1 1 1 f i g l i l l
r m w
` "