Loading...
HomeMy Public PortalAbout10-0371 SidesurfDATE ISSUED: 07 -16 -2010 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT ADD AWNING TO BUILDING 22 TYBRISA ST C /SIDESURF INC DBA MONTGOMERY RALPH PARKS TYBEE ISLAND GA 31328 912 - 308 -1726 C /SIDESURF INC DBA MONTGOMERY RALPH PARKS TYBEE ISLAND GA 31328 U $ 124.00 $2,100.00 PERMIT #: 100371 TOTAL BALANCE DUE: $ 124.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org ae3 CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT \O -o31( Location: t / NAME ADDRESS PIN # TELEPHONE x�wner //1V7 P �C3 /6/4 c- ", /t-'r3 9/ -WS-a; Architect or Engineer , / Building Contractor (Check all that apply) Repair Renovation ❑ Minor Addition Substantial Addition Other II ❑ Residential ❑ Single Family ❑ Duplex ❑ Multi- Family ❑ Commercial n Footprint Changes ❑ Discovery n Demolition Details of Project: / 4 I 5 / ///L! p p 67/. /%/v' Estimated Cost of Construction: $ p4 / 400 Construction Type (1) Wood Frame (2) Wood & Masonry (3) Brick Veneer Proposed use: Remarks: (Enter appropriate number) (4) Masonry (6) Other (please specify) (5) Steel & Masonry 4itie4 feltf � 446r ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following information based on the construction drawings and site plan: # Units Lot Area # Off - street parking spaces Trees located & listed on site plan Access: Driveway (ft.) Setbacks: Front # Bedrooms Living space (total sq. ft.) rooms ith culvert? With swale? Rear Sides (L) (R) # Sto Height Vertical distance measured from the average adjacent ade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through //L) War- On-site waste and debris containers will be provided by (1:194,50),-- e/iz7i Construction debris will be disposed by by means of / I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drain_ age impaired by this permitted con structipn. Date: b /?'1//0 Signature of Applicant: Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification Approved rezoning /variance? Street address and number: New Is it in compliance with City map? If not, has street name and /or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) NFIP Flood Zone Existing Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Zoning Administrator Code Enforcement Officer Water /Sewer Storm /Drainage Inspections City Manager Signature Date FEES /09 15 Permit Inspections Water Tap Sewer Stub Aid to Const. TOTAL 07/12/2010 14:41 9122327884 COASTALCANVAS PAGE 02/02 AWNING NING RAIL. FABRIC HEADROD RAFTER 4" X 2.4" TAPCON SCREW FASTENER HEADROD DETAIL NOT TO SCALE SHM N0. 1 of 1 SCALE NOT I) KAU. A W W AWN01 P0UI ALL POINTS CAFE 221 1STNA 7Y1117,x ISLAND, GA 3132$ 01011 HC,UM+n r MVAN iAu I PRQNP, SI1li, l'1.,AN TSOMI TRIC fRAMTVT13T ARC 102/07/2010 10205 COASTAL CANVAS PIMPS Co„ INC. Ct l4a0.4 246" [20' -6 "] REVIEW FOR Every effort has code violations reviewer shall b to v'olate, can any applicable c review and permi as a warranty Of Reviewed By w , no oversio t by the construed as authority el, alter or set aside des or ordina,ces.The should not be construed rantee. Date i k•ifa "An Approved Set of Plans Must Remain on Job Site at All Times" All construction The International Edition and State Amendments must comply with Build ng Code a� anrgia Building OVERALL FRONT VIEW 18f ' 16 1816' 1816" NM= �.7.,. _.mot., .ate__ ai :VI IP : i :WIC — 6" FONT 4" HEIGHT BLACK FONT 6" HEIGHT CENTERED ON VALANCE PEACOCK BLUE COF 2" BOTH END PANELS VANGUARD 2990 WHITE VANGUARD 2904 TURQUOISE VANGUARD 2990 WHITE VALANCE VANGUARD 2990 WHITE VANGUARD 2906 BEACON YELLOW ALL POINTS' CAFE FABRIC VALANCE FRONT VIEW FABRIC END VIEW "An Approved Set of Plans Must ISOMETRIC FABRIC VIEW Remain on Job Site at All Times" NOT TO SCALE 2" VALANCE VANGUARD 2990 WHITE FONT 4" HEIGHT ATOMIC RED BRF — 6" KFAST BOTH END PANELS VANGUARD 2990 WHITE 60" [5' -0 "] FONT 4" HEIGHT BLACK Z- CLIPS @ 2' -6" O.C. SCREW FASTENER OVERALL SIDE VIEW AWNING RAIL FABRIC HEADROD RAFTER HEADROD DETAIL NOT TO SCALE NOTE: CANVAS COVER IS REMOVABLE AND IS TO BE REMOVED BY CUSTOMER BEFORE 74 MPII (OR HIGHER) WIND EVENT. THE FRAME AND ANCHORING METHOD IS DESIGNED TO WITHSTAND 130 MPH WINDLOADS. REVIEWED BY gt g FRONT, SIDE, PLAN ISOMETRIC F U 0 (-> Cr) U d IZ. Cr) Z Q U —J 1- U A NEW AWNING FOR ALL POINTS CAFE TYBEE ISLAND, GA 31328 z z HATHAM COUN SCALE 3/8' = r -o" REVISION 1 DATE 07 /01/2010 REASON DESIGN SHEET NO. i of 2 0 246" 61 Z" [20' -6 "] [5' -1 1/21 T Y W Y 61z" T Y W T I12" [5'- Y W T Y Y W T :_- - - — v ! — • — Ni - • FRONT VIEW 246" [20' -6 "] PLAN VIEW Z -CLIPS @ 2' -6" O.C. SCREW FASTENER AWNING RAIL FABRIC HEADROD RAFTER HEADROD DETAIL NOT TO SCALE AR NOTE: CANVAS COVER IS REMOVABLE AND IS TO BE REMOVED BY CUSTOMER BEFORE 74 MPH (OR HIGHER) WIND EVENT. THE FRAME AND ANCHORING METHOD IS DESIGNED TO WITHSTAND 130 MPH WINDLOADS. AR AR II ISOMETRIC FRAME VIEW REVIEWED BY FRONT, SIDE, PLAN ISOMETRIC FRAME VIEW a N O O N r• oa C.5 O U I- C-) 0 N Z v J Q N U A NEW AWNING FOR ALL POINTS CAFE TYBEE ISLAND, GA 31328 SAVANNAH, GA. CHATHAM COUNTY SCALE 3/8" =1' -o" PART c 1 of 1 QUANTITY 1 EACH REVISION DATE 1 07 /01 /2010 REASON DESIGN DROP 21" BRACE SMP 4B PRO.I 60" PRO.I SMP 4B WIDTH 246' 11 /R SMP 4B AR VAL 8" F/B SMP 4B VAI. PAT STRAIGHT RAP. /BOW SMP 4B DE'T'AIL OF FRAFII. TRUSS AND VAI. ATTACHMENT VAI. SIZE MAY VARY .REF TO WORE ORDER SHEET NO. 2 of 2 T Y 61 " W T Y 61z" W T Y I12" [5'- W T Y W 61Z" T [5' -I1/2' [5' -1 I'2 "] 1/2 "] 1 [5'- I1 /2 "] PLAN VIEW Z -CLIPS @ 2' -6" O.C. SCREW FASTENER AWNING RAIL FABRIC HEADROD RAFTER HEADROD DETAIL NOT TO SCALE AR NOTE: CANVAS COVER IS REMOVABLE AND IS TO BE REMOVED BY CUSTOMER BEFORE 74 MPH (OR HIGHER) WIND EVENT. THE FRAME AND ANCHORING METHOD IS DESIGNED TO WITHSTAND 130 MPH WINDLOADS. AR AR II ISOMETRIC FRAME VIEW REVIEWED BY FRONT, SIDE, PLAN ISOMETRIC FRAME VIEW a N O O N r• oa C.5 O U I- C-) 0 N Z v J Q N U A NEW AWNING FOR ALL POINTS CAFE TYBEE ISLAND, GA 31328 SAVANNAH, GA. CHATHAM COUNTY SCALE 3/8" =1' -o" PART c 1 of 1 QUANTITY 1 EACH REVISION DATE 1 07 /01 /2010 REASON DESIGN DROP 21" BRACE SMP 4B PRO.I 60" PRO.I SMP 4B WIDTH 246' 11 /R SMP 4B AR VAL 8" F/B SMP 4B VAI. PAT STRAIGHT RAP. /BOW SMP 4B DE'T'AIL OF FRAFII. TRUSS AND VAI. ATTACHMENT VAI. SIZE MAY VARY .REF TO WORE ORDER SHEET NO. 2 of 2