HomeMy Public PortalAboutIdaho Power Energy Efficiency Audit Application no date, unsignedCommercial & Industrial Energy Efficiency
Audit Application
Please check a box below to determine audit level requested*
❑ Scoping Audit (Identify energy saving opportunities)
nDetailed Audit (Analysis of specific project)
Customer Information * indicates a required field
��DAHO
PO
An IDACDRP company
Idaho Power Use Onl
Rec'd:
Submitted
for Pmt:
C. Rep:
Amt
Paid:
App#:
Rate:
kWh/yr:
$/yr:
Customer Name*
City of McCall
Enter Number*
°Account Number or °Meter Number ( Provide one) 87208048
Project/Facility Name*
Ledacv Park Pump Station
Building Type
Other:
Project Site Address*
1136 E. Lake Street - Legacy Park WLS #5
City*
McCall
State*
ID
Zip*
83638
Customer Mailing Address (If different)
216 East Park Street
City
McCall
State
ID
Zip
83638
Contact Name*
Nathan Stewart
Title*
Public Works Director
Phone*
(208) 634-8943
E-mail*
nstewart@mccall.id.us
Project Information*
Description of Study: (Identify areas or systems to be analyzed.)
Legacy Park Pump Station VFD Upgrades
Evaluate projected energy savings through the addition of variable frequency drives at Legacy Park Pump
Station. The pump station uses 3 constant speed 75 hp pumps to convey water to the Water Treatment Plant. A
16" diameter sleeve valve at the plant currently throttles pressure and flow to meet city water demand. One year
of actual pumping data will be evaluated in 10 bins to estimate current and future (with VFDs) energy usage at
the pump station.
Customer Agreement
I, the undersigned, declare that I am a duly authorized representative of the owner of the building described above. I further acknowledge that I have
read and agree to comply with the Commercial and Industrial Energy Efficiency Program Terms and Conditions set forth at http://www.idahopower.com/
EnergyEfficiency/Business/termsConditions.cfm, and the Program requirements set forth at http://www.idahopower.com/pdfs/EnemEfficiency/business/
PoliciesProcedures.pdf. I certify that the information provided in this application is true and accurate and that Idaho Power may verify such information
at Its sole discretion. By typing In the signatue box below you are electronically signing this application.
Customer Name (please print)
Customer Signature
Date
Submit to: customprojects@idahopower.com
Idaho Power Approvals
Technical Administrator:
Review Date:
Peer Review:
Review Date:
Leader Approval
Approval Date:
CRR 191 (5/15/2017)
Clear Form
IPC