HomeMy Public PortalAboutSEVENTH ST_4A.pdfDATE ISSUED: 07 -17 -2013
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
R &R CHIMNEY CAP
4A SEVENTH ST
ANTHONY T. RYAN
4A 7TH ST # HC -32
TYBEE ISLAND GA 31328
ACE ROOFING
5256 HWY 80 E
ELLABELL GA 31308
P
$ 0.00
PIN #4- 0005 -09 -009
$ 350.00
PERMIT #: 130452
TOTAL BALANCE DUE: $ 0.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
/32rea4-
2013 -07 -17 07:24 ACE ROOFING
Property Address;
9127283945 » 912 786 9539
Si.
P 1/1
City of Tybee Island, Georgia
912 -472 -5030 ' Fax 912 -786 -9539
APPLICATION FOR BUILDING PERMIT
PIN:
- oao5 -09 -'
[..Single Family
❑ Duplex
❑ Multi - Family units
�] " Commercial unit(s)
Cheek 011 that apply
❑ Discovery/Tearout
❑ Footprint Changes
❑ additional square
feet heated /cooled
❑ Demolition or Relocation
❑ Other
A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State of Georgia professional license.
A l.
commercial protect may require Site Plan Approval
Details of Project: e -W�) VC. (3-14j'
Estimated Cost of Construction: $ 36—_C.
• 03 (materials + labor + profit/overhead)
If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and /or a site plan may be required.
Year Built: Listed on National Historic Register or located within a National Historic District? Y / N
• Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
may be eligible to take advantage of various fax Incentive programs while presenting the heritage of Tybee island.
• Also see the Tybee Island Land Development Code Article 14: Historic Preservation
Qlaring construction:
On- e rest • •m fact'ties will be provided through . Construction debris will be disposed
y ` � by means of i l �t, •4vt LC: I understand that I must comply with zoning. flood
amaze ,n - h. rot lion an .iA ::(! •i.'E :( -- FEMA re ula ions an =I
• . , ., (•
;1
n
regulations. 1 realize that 1 must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions
that may be necessary to restore drainage impaired by this pq nitted construction.
Date: —7/ 7113 Signature:
Printed Name of Applicant:
Note: A permit normally takes 7 to 10 days to process. Processing time for q
historic structure MY be longer.
Approvals: / Signet -1 Date
Planning & Zoning Manager iddliarin.12-)(; I f 7 ' f
Building Official
Water /Sewer
Storm /Drainage
City Manager
FEES
Permit
Inspections
Cap. Cost Rec.
Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
TOTAL
Name
Making Address
j t� >, .
Home:
Cell:
Telephone
Owner
��
--
�
j`
Architect or
Engineer
Office:
Cell;
_.
Contractor
16\
e
‘c).3 " U e: Lf ? 'f .
(-r Lu.,446 1rt iCt - 3 13 I')
Office:
CeII:
- -q5a l
[..Single Family
❑ Duplex
❑ Multi - Family units
�] " Commercial unit(s)
Cheek 011 that apply
❑ Discovery/Tearout
❑ Footprint Changes
❑ additional square
feet heated /cooled
❑ Demolition or Relocation
❑ Other
A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State of Georgia professional license.
A l.
commercial protect may require Site Plan Approval
Details of Project: e -W�) VC. (3-14j'
Estimated Cost of Construction: $ 36—_C.
• 03 (materials + labor + profit/overhead)
If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and /or a site plan may be required.
Year Built: Listed on National Historic Register or located within a National Historic District? Y / N
• Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
may be eligible to take advantage of various fax Incentive programs while presenting the heritage of Tybee island.
• Also see the Tybee Island Land Development Code Article 14: Historic Preservation
Qlaring construction:
On- e rest • •m fact'ties will be provided through . Construction debris will be disposed
y ` � by means of i l �t, •4vt LC: I understand that I must comply with zoning. flood
amaze ,n - h. rot lion an .iA ::(! •i.'E :( -- FEMA re ula ions an =I
• . , ., (•
;1
n
regulations. 1 realize that 1 must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions
that may be necessary to restore drainage impaired by this pq nitted construction.
Date: —7/ 7113 Signature:
Printed Name of Applicant:
Note: A permit normally takes 7 to 10 days to process. Processing time for q
historic structure MY be longer.
Approvals: / Signet -1 Date
Planning & Zoning Manager iddliarin.12-)(; I f 7 ' f
Building Official
Water /Sewer
Storm /Drainage
City Manager
FEES
Permit
Inspections
Cap. Cost Rec.
Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
TOTAL
2013 -07 -17 07:22 ACE ROOFING
9127283945 » 912 786 9539
P 1/1
LEAD -BASED PAINT RRP RULES
Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform
renovation, repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning
work, provide owners, tenants, and chili -care facilities with a copy of EPA's lead hazard information pamphlet
R= novate R'rht: . n L:a. Hazard inform: ,•n c•. its Child Care Provid. = • chools.
Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you
to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based
Paint and Asbestos Program (404) 363 -7026.
Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator
When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior
room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size.
* * * * * * * * * * * * * * * * * * * **
Asbestos /Environmental Notification to Georgia EPD for
Projects Involving Demolition. Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission
to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a
structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation
Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia
Environmental Protection Division administers the rules. in most cases, the rules require both the owner and
the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by
an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before
renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the
building. Further guidance for regulatory compliance and contact telephone numbers are provided by the
brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such
as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have
EPD regulations that could affect the project.
BMPs
While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility.
Two areas of deficiencies are In the most basic and common BMPs; Co — Construction Exit and Sdl —
Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment
Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission;
http: / /www.gaswcc arg /flocs /fie;ld__manual 4ed.pdf.
Problems with the Co is not limited to the installation, but to material. The stone will be a representation of
1.5 " -3.5" stone or larger.
Type A sediment barriers have been installed where Type C is required and shown on the permit drawings.
Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall
over) without impacting the second one. The complete assembly and installation must be compliant; steel or
od posts, post spacing, l y • - A.
gnat
or receipt of
-7/ -2 3
sbestos, and BMP notices Date
Pnn
are
Chatham County Board of Ass' ,ors: 2013 Property Record Card 4 -000` 99 -009 Page 1 of 2
2013 Chatham County Board of Assessors 4- 0005 -09 -009
Property Record Card
4 S 7TH ST TYBEE ISLAND
APPRAISER jlmarine
LAST INSP 06/06/2007
APPR ZONE 000008
LOT A SEGALL'S OCEAN VILLAS PH 2 WARD 2
RYAN ANTHONY T
4 7TH ST
TYBEE ISLAND GA 31328 -8742
CAMA ASMT
213,200 213,200 LAND 1
288,200 288,200 BLDG 1
OBXF 0
501,400 501,400 Cost - MS
SALES BOOK / INS VI QU RSN PRICE
PAGE
01 Dec 1991
GRANTOR:
GRANTEE:
1 U UO 177,000
COMMENTS:
�;�y -ti___ O
[Click for larger picture]
-SACKS
Chatham County
Tax Commissioner
Property Tax Statemm
CODES
PROPERTY 0006 RESIDENTIAL
USE
UTA
NBHD
0004 Tybee Island
020213.00 T213 TYBEE BTL
BEACH
EXEMPTIONS L1 L9 S1 L8
HISTORY LAND IMPR TOTAL
2012 213,200 183,800 397,000 Cama
2011 213,200 174,600 387,800 Cama
2010 450,400 183,800 634,200 Cama
2009 450,500 189,000 639,500 Over
2008 617,000 165,500 782,500 Over
2007 617,000 165,500 782,500 Over
2006 782,500 A/C
2005 226,500 234,500 461,000 Over
2004 226,500 234,500 461,000 Over
2003 461,000 A/C
2002 280,000 280,000 Over
2001 280,000 280,000 Over
2000 280,000 A/C
1999 76,500 140,500 217,000 Cama
1998 76,500 137,500 214,000 Cama
1997 76,500 129,000 205,500 Cama
1996 27,730 126,350 154,080 Cama
1995 27,730 181,120 208,850 Cama
1994 27,730 162,650 190,380 Cama
1993 27,730 114,630 142,360 Over
1992 27,730 114,630 142,360 Over
LAND
ID# USE DESC FRONT DEPTH UNITS / TYPE PRICE ZONING LCTN TOPO OTHER ADJ1 ADJ2 ADJ3 ADJ4 MKT VALUE
109412 SINGLE FAMILY RES 0 0 5,330.00 -SF 40.00 R2 213200
http: //boa. chathamcounty. org /DesktopModules/ ChathamCounty /BoardofAssessors /Propert... 7/17/2013
Chatham County Board of Ar ssors: 2013 Property Record Card 4 -0('" ' -09 -009 Page 2 of 2
2013 Chatham County Board of Assessors
Property Record Card
BUILDING SECTION
85093 -1 -2013
4- 0005 -09 -009
4 S 7TH ST TYBEE ISLAND
CONSTRUCTION TYPE RCN AYB EYB DEP TYPE PHYS ECON FUNC OBSV / % TOTAL DEP % RCNLD U.FACTOR MKT VAL
Residential 231,678 1991 MS 22.00 0.00 0.00 0.00 22.00 180,709 1.10 288,200
30'
MOW
11011
11.., living Area
iw
7' 23'
x•
▪ 911
ruh R94
u earw Ih▪ imo Area
96
20'
El 711
I3e111.1s Game
10U
Bev Ii. up Are,
1140
Seth Parch with Roof
200
9' f,
.711
mGems
Rase Living A
150
[Click for larger picture]
SECTION TYPE 1 - Main
AREA 2306
TYPE 1 - Single- family Residence
FRAME 1 - Stud Frame
STYLE 5 -1 1/2 Story Finished
QUALITY 4.00
CONDITION 3.00
# UNITS 0
# OF BEDS / BATHS 2 / 2.10
COMPONENTS
R1 108 Frame, Siding, Wood
R2 208 Composition Shingle
R3 352 Heat Pump
R4 402 Automatic Floor Cover Allowance
R6 601 Plumbing Fixtures ( #)
R6 602 Plumbing Rough -ins ( #)
R6 622 Raised Subfloor (% or SF)
R6 642 Single 2 -Story Fireplace ( #)
R7 711 Built -in Garage (SF)
R7 711 Built -in Garage (SF)
R11 904 Slab Porch (SF) with Roof
R11 904 Slab Porch (SF) with Roof
R11 904 Slab Porch (SF) with Roof
R11 904 Slab Porch (SF) with Roof
R11 904 Slab Porch (SF) with Roof
R11 904 Slab Porch (SF) with Roof
Units
10.00
1.00
1.00
380.00
90.00
96.00
64.00
64.00
280.00
280.00
150.00
QUAL
100.00
100.00
100.00
100.00
http: //boa. chathamcounty. org /DesktopModules/ ChathamCounty /BoardofAssessors /Propert... 7/17/2013