Loading...
HomeMy Public PortalAboutSEVENTH ST_4A.pdfDATE ISSUED: 07 -17 -2013 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT R &R CHIMNEY CAP 4A SEVENTH ST ANTHONY T. RYAN 4A 7TH ST # HC -32 TYBEE ISLAND GA 31328 ACE ROOFING 5256 HWY 80 E ELLABELL GA 31308 P $ 0.00 PIN #4- 0005 -09 -009 $ 350.00 PERMIT #: 130452 TOTAL BALANCE DUE: $ 0.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org /32rea4- 2013 -07 -17 07:24 ACE ROOFING Property Address; 9127283945 » 912 786 9539 Si. P 1/1 City of Tybee Island, Georgia 912 -472 -5030 ' Fax 912 -786 -9539 APPLICATION FOR BUILDING PERMIT PIN: - oao5 -09 -' [..Single Family ❑ Duplex ❑ Multi - Family units �] " Commercial unit(s) Cheek 011 that apply ❑ Discovery/Tearout ❑ Footprint Changes ❑ additional square feet heated /cooled ❑ Demolition or Relocation ❑ Other A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A l. commercial protect may require Site Plan Approval Details of Project: e -W�) VC. (3-14j' Estimated Cost of Construction: $ 36—_C. • 03 (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon the scope of the work, two sets of construction drawings and /or a site plan may be required. Year Built: Listed on National Historic Register or located within a National Historic District? Y / N • Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you may be eligible to take advantage of various fax Incentive programs while presenting the heritage of Tybee island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation Qlaring construction: On- e rest • •m fact'ties will be provided through . Construction debris will be disposed y ` � by means of i l �t, •4vt LC: I understand that I must comply with zoning. flood amaze ,n - h. rot lion an .iA ::(! •i.'E :( -- FEMA re ula ions an =I • . , ., (• ;1 n regulations. 1 realize that 1 must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaired by this pq nitted construction. Date: —7/ 7113 Signature: Printed Name of Applicant: Note: A permit normally takes 7 to 10 days to process. Processing time for q historic structure MY be longer. Approvals: / Signet -1 Date Planning & Zoning Manager iddliarin.12-)(; I f 7 ' f Building Official Water /Sewer Storm /Drainage City Manager FEES Permit Inspections Cap. Cost Rec. Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL Name Making Address j t� >, . Home: Cell: Telephone Owner �� -- � j` Architect or Engineer Office: Cell; _. Contractor 16\ e ‘c).3 " U e: Lf ? 'f . (-r Lu.,446 1rt iCt - 3 13 I') Office: CeII: - -q5a l [..Single Family ❑ Duplex ❑ Multi - Family units �] " Commercial unit(s) Cheek 011 that apply ❑ Discovery/Tearout ❑ Footprint Changes ❑ additional square feet heated /cooled ❑ Demolition or Relocation ❑ Other A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A l. commercial protect may require Site Plan Approval Details of Project: e -W�) VC. (3-14j' Estimated Cost of Construction: $ 36—_C. • 03 (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon the scope of the work, two sets of construction drawings and /or a site plan may be required. Year Built: Listed on National Historic Register or located within a National Historic District? Y / N • Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you may be eligible to take advantage of various fax Incentive programs while presenting the heritage of Tybee island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation Qlaring construction: On- e rest • •m fact'ties will be provided through . Construction debris will be disposed y ` � by means of i l �t, •4vt LC: I understand that I must comply with zoning. flood amaze ,n - h. rot lion an .iA ::(! •i.'E :( -- FEMA re ula ions an =I • . , ., (• ;1 n regulations. 1 realize that 1 must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaired by this pq nitted construction. Date: —7/ 7113 Signature: Printed Name of Applicant: Note: A permit normally takes 7 to 10 days to process. Processing time for q historic structure MY be longer. Approvals: / Signet -1 Date Planning & Zoning Manager iddliarin.12-)(; I f 7 ' f Building Official Water /Sewer Storm /Drainage City Manager FEES Permit Inspections Cap. Cost Rec. Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL 2013 -07 -17 07:22 ACE ROOFING 9127283945 » 912 786 9539 P 1/1 LEAD -BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and chili -care facilities with a copy of EPA's lead hazard information pamphlet R= novate R'rht: . n L:a. Hazard inform: ,•n c•. its Child Care Provid. = • chools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363 -7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. * * * * * * * * * * * * * * * * * * * ** Asbestos /Environmental Notification to Georgia EPD for Projects Involving Demolition. Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. in most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are In the most basic and common BMPs; Co — Construction Exit and Sdl — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http: / /www.gaswcc arg /flocs /fie;ld__manual 4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5 " -3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or od posts, post spacing, l y • - A. gnat or receipt of -7/ -2 3 sbestos, and BMP notices Date Pnn are Chatham County Board of Ass' ,ors: 2013 Property Record Card 4 -000` 99 -009 Page 1 of 2 2013 Chatham County Board of Assessors 4- 0005 -09 -009 Property Record Card 4 S 7TH ST TYBEE ISLAND APPRAISER jlmarine LAST INSP 06/06/2007 APPR ZONE 000008 LOT A SEGALL'S OCEAN VILLAS PH 2 WARD 2 RYAN ANTHONY T 4 7TH ST TYBEE ISLAND GA 31328 -8742 CAMA ASMT 213,200 213,200 LAND 1 288,200 288,200 BLDG 1 OBXF 0 501,400 501,400 Cost - MS SALES BOOK / INS VI QU RSN PRICE PAGE 01 Dec 1991 GRANTOR: GRANTEE: 1 U UO 177,000 COMMENTS: �;�y -ti___ O [Click for larger picture] -SACKS Chatham County Tax Commissioner Property Tax Statemm CODES PROPERTY 0006 RESIDENTIAL USE UTA NBHD 0004 Tybee Island 020213.00 T213 TYBEE BTL BEACH EXEMPTIONS L1 L9 S1 L8 HISTORY LAND IMPR TOTAL 2012 213,200 183,800 397,000 Cama 2011 213,200 174,600 387,800 Cama 2010 450,400 183,800 634,200 Cama 2009 450,500 189,000 639,500 Over 2008 617,000 165,500 782,500 Over 2007 617,000 165,500 782,500 Over 2006 782,500 A/C 2005 226,500 234,500 461,000 Over 2004 226,500 234,500 461,000 Over 2003 461,000 A/C 2002 280,000 280,000 Over 2001 280,000 280,000 Over 2000 280,000 A/C 1999 76,500 140,500 217,000 Cama 1998 76,500 137,500 214,000 Cama 1997 76,500 129,000 205,500 Cama 1996 27,730 126,350 154,080 Cama 1995 27,730 181,120 208,850 Cama 1994 27,730 162,650 190,380 Cama 1993 27,730 114,630 142,360 Over 1992 27,730 114,630 142,360 Over LAND ID# USE DESC FRONT DEPTH UNITS / TYPE PRICE ZONING LCTN TOPO OTHER ADJ1 ADJ2 ADJ3 ADJ4 MKT VALUE 109412 SINGLE FAMILY RES 0 0 5,330.00 -SF 40.00 R2 213200 http: //boa. chathamcounty. org /DesktopModules/ ChathamCounty /BoardofAssessors /Propert... 7/17/2013 Chatham County Board of Ar ssors: 2013 Property Record Card 4 -0('" ' -09 -009 Page 2 of 2 2013 Chatham County Board of Assessors Property Record Card BUILDING SECTION 85093 -1 -2013 4- 0005 -09 -009 4 S 7TH ST TYBEE ISLAND CONSTRUCTION TYPE RCN AYB EYB DEP TYPE PHYS ECON FUNC OBSV / % TOTAL DEP % RCNLD U.FACTOR MKT VAL Residential 231,678 1991 MS 22.00 0.00 0.00 0.00 22.00 180,709 1.10 288,200 30' MOW 11011 11.., living Area iw 7' 23' x• ▪ 911 ruh R94 u earw Ih▪ imo Area 96 20' El 711 I3e111.1s Game 10U Bev Ii. up Are, 1140 Seth Parch with Roof 200 9' f, .711 mGems Rase Living A 150 [Click for larger picture] SECTION TYPE 1 - Main AREA 2306 TYPE 1 - Single- family Residence FRAME 1 - Stud Frame STYLE 5 -1 1/2 Story Finished QUALITY 4.00 CONDITION 3.00 # UNITS 0 # OF BEDS / BATHS 2 / 2.10 COMPONENTS R1 108 Frame, Siding, Wood R2 208 Composition Shingle R3 352 Heat Pump R4 402 Automatic Floor Cover Allowance R6 601 Plumbing Fixtures ( #) R6 602 Plumbing Rough -ins ( #) R6 622 Raised Subfloor (% or SF) R6 642 Single 2 -Story Fireplace ( #) R7 711 Built -in Garage (SF) R7 711 Built -in Garage (SF) R11 904 Slab Porch (SF) with Roof R11 904 Slab Porch (SF) with Roof R11 904 Slab Porch (SF) with Roof R11 904 Slab Porch (SF) with Roof R11 904 Slab Porch (SF) with Roof R11 904 Slab Porch (SF) with Roof Units 10.00 1.00 1.00 380.00 90.00 96.00 64.00 64.00 280.00 280.00 150.00 QUAL 100.00 100.00 100.00 100.00 http: //boa. chathamcounty. org /DesktopModules/ ChathamCounty /BoardofAssessors /Propert... 7/17/2013