Loading...
HomeMy Public PortalAbout07.27.2016 Park Commission Special Meeting Comprehensive Plan Page 1 of 1 July 27, 2016 Parks, Trails, and Open Space Park Commission Meeting MEMORANDUM TO: Park Commission FROM: Dusty Finke, City Planner DATE: July 25, 2016 MEETING: July 27, 2016 Park Commission SUBJ: Comprehensive Plan – Trails Plan Background The Park Commission reviewed the DRAFT Parks, Trails, and Open Space Plan at the July 20 meeting. The Commission planned a special meeting to specifically discuss the Trail plan. Attached is a map displaying only the existing trails. The Commission had requested this information in order to help prioritize future trail construction. The Commission also requested financial information to better inform decisions. Financial Information The City currently has a balance of approximately $1.6 million following construction of the Arrowhead Drive trail. Based on the City’s current Park Dedication fee and the projected growth of 950 households, staff estimates that the City would collect approximately $7.47 million. This would result in approximately $9 million of expected park revenues, unless the City adjusts its fees. The Park Commission discussed three future parks to support future development areas. Staff estimates that the cost to develop these parks would be between $4.6 - $6.9 million. The attached table summarizes the costs. Although the City usually obtains land through the park dedication process, doing so reduces the park fees paid by the development. As such, staff assumed full park fees and full land cost in order to equate the two. The current trail plan is very substantial, including over 40 miles of trails. A mile of paved trail costs approximately $330,000 to construct. If the City desires to construct these trails outside of the right-of-way, trail easements would also need to be obtained. A 20-foot wide easement for a mile would equate to approximately $250,000, resulting in a total cost of approximately $580,000 per mile of paved, off-road trail in the developing area. The construction costs of a turf trail are substantially less (approximately $37,000 per mile). The primary cost would be in easement acquisition. Attachments 1. Existing Trail Map 2. Existing Trail Map with Land Uses 3. Financial Information Medina Golf & Country Club YMCA - Camp Ihduhapi Spring Hill Golf Club Baker Park Reserve Baker Park Reserve Wolsfeld Woods (SNA) City Hall Gregor Farm Walter G. Anderson Maple Plain Park and Pool OSI Loram Target Polaris Water TowerCity of Loretto Medina Orono Corcoran Plymouth Independence Maple Plain Independence HAMEL PIONEER HOMESTEAD PARKVIEW WILLOW COUNTY ROAD 19 MEDINA NAVAJO HIGHWAY 55 TOWNLINE TAMARACK CHESTNUT COUNTY ROAD 24 ARROWHEAD HUNTER BROCKTON HOLY NAME HACKAMORE HOLLYBUSH MORNINGSIDE HUNTER COUNTY ROAD 19 TAMARACK MEDINAMEDINAWILLOW COUNTY ROAD 24 Loretto Greenfield Maple Grove TOMAHAWK CHIPPEWA CHIPPEWA COUNTY ROAD 101 COUNTY ROAD 116 MOHAWK ARROWHEAD CHEYENNE COUNTY ROAD 11 CLYDESDALE CLYDESDALE EVERGREEN HIGHWAY 55 COUNTY ROAD 19 HAMEL WILLOW PIONEER WILLOW HAMEL HIGHWAY 55 Map Date: July 25, 2016 Scale: 1:30,000[0 0.5 10.25 Mile Park and Trail PlanExisting Trails Residential Density 1 Dot = 1 Potential Unit Legend Regional Corridors Type Three River Trail Corridor Trail Surface Type Paved Shoulder Turf Sidewalk Medina Golf & Country Club YMCA - Camp Ihduhapi Spring Hill Golf Club Baker Park Reserve Baker Park Reserve Wolsfeld Woods (SNA) City Hall Gregor Farm Walter G. Anderson Maple Plain Park and Pool OSI Loram Target Polaris Water TowerCity of Loretto Medina Orono Corcoran Plymouth Independence Maple Plain Independence HAMEL PIONEER HOMESTEAD PARKVIEW WILLOW COUNTY ROAD 19 MEDINA NAVAJO HIGHWAY 55 TOWNLINE TAMARACK CHESTNUT COUNTY ROAD 24 ARROWHEAD HUNTER BROCKTON HOLY NAME HACKAMORE HOLLYBUSH MORNINGSIDE HUNTER COUNTY ROAD 19 TAMARACK MEDINAMEDINAWILLOW COUNTY ROAD 24 Loretto Greenfield Maple Grove TOMAHAWK CHIPPEWA CHIPPEWA COUNTY ROAD 101 COUNTY ROAD 116 MOHAWK ARROWHEAD CHEYENNE COUNTY ROAD 11 CLYDESDALE CLYDESDALE EVERGREEN HIGHWAY 55 COUNTY ROAD 19 HAMEL WILLOW PIONEER WILLOW HAMEL HIGHWAY 55 Map Date: July 25, 2016 Scale: 1:30,000[0 0.5 10.25 Mile Park and Trail PlanExisting Trails Residential Density 1 Dot = 1 Potential Unit Legend Regional Corridors Type Three River Trail Corridor MEDINA_Parcels_Nov2015 Future Land Use Rural Residential Agricultural Future Development Area Low Density Residential (2-3 u/a) Medium Density Residential (5-7 u/a) High Density Residential (12-15 u/a) Mixed Residential (3.5-5 u/a; 1 u/a HDR) Uptown Hamel Commercial Business Rural Commercial Institutional Private Recreation Park, Recreation, Open Space Closed Landfill Right-of-ways Trail Surface Type Paved Shoulder Turf Sidewalk Park Dedication Units New Households 825 6000.00 $4,950,000.00 Commercial 350 7200.00 $2,520,000.00 Future Fees $7,470,000.00 Current Balance $1,600,000.00 Total Park Dedication Fees $9,070,000.00 Trails Priority Length  (miles) Cost/Foot (low) Cost/Foot (high) Total Cost (Low) Total Cost (High) Paved Trails 21 55 100 $6,098,400.00 $11,088,000.00 Turf Trails 11 5 10 $290,400.00 $580,800.00 Shoulder Trails 9 40 70 $1,962,048.00 $3,433,584.00 Easement Acquistion 32 25 82 $4,224,000.00 $13,854,720.00 $12,574,848.00 $28,957,104.00 Parks New Parks: Units # Cost/Unit (Low) Cost/Unit (High) Total Cost (Low) Total Cost (High) Land (active) Acre 20 130,000 180,000 $2,600,000.00 $3,600,000.00 Land (passive) Acre 20 40,000 60,000 $800,000.00 $1,200,000.00 Preparation (grading, stormwater, landscaping) Acre 20 15,000 30,000 $300,000.00 $600,000.00 Playground Equip Set 3 100,000 170,000 $300,000.00 $510,000.00 Walking Paths Linear Foot 3,600 50 70 $180,000.00 $252,000.00 Baseball Fields Field 1 20,000 60,000 $20,000.00 $60,000.00 Basketball Court Court 3 20,000 30,000 $60,000.00 $90,000.00 Tennis Court (2 courts with fence)2 Courts 2 70,000 100,000 $140,000.00 $200,000.00 Water Fountain Fountain 3 4,000 5,000 $12,000.00 $15,000.00 Picnic Shelters (4 tables)Shelter 6 20,000 35,000 $120,000.00 $210,000.00 Soccer Fields (grading, drainage, nets)Field 2 25,000 35,000 $50,000.00 $70,000.00 Irrigation for fields Field 3 10,000 20,000 $30,000.00 $60,000.00 Sand Volleyball Court Each 2 5,000 6,000 $10,000.00 $12,000.00 Small Restroom Building Each 0 100,000 125,000 $0.00 $0.00 Bleachers (3 rows x 25')Each 1 4,000 6,000 $4,000.00 $6,000.00 $4,626,000.00 $6,885,000.00 Dedication/ Unit