Mathews Consulting, Inc
HEW
0,1 And F.I.YMP R1.1 I:nrneva
September 18, 2003
Mr. William Thrasher
TOWN OF GULF STREAM
100 Sea Road
Gulf Stream, FL 33483-7427
Dear Mr. Thrasher.
(561) 478-7964
Town of Gulf Stream
Mathews Consulting, Inc. (MC) is pleased to submit herewith the scope of services and fee proposal for
providing Engineering Services for the lift station electrical improvements. The project consists of
providing electrical connections to the sanitary lift station located at the corner of the Town Hall parking
lot in order to serve the lift station from the Town's emergency generator.
SCOPE OF SERVICES
Task I —Design
MC, through our electrical subconsultant C&W Engineering, shall provide the following services during
design of the project:
• Coordination of the project between Town, MC and C&W Engineering.
♦ On-site meetings to evaluate existing conditions.
• Engineering calculations to determine wire and circuit breaker sizing.
♦ Prepare engineering drawings, including electrical site plan and power one -line diagrams.
Provide specifications on the drawings as required for permitting and construction.
♦ Prepare cost estimate of improvements at the 100°/a design stage.
Task 2 — Bidding Assistance
it is assumed that the Town will solicit quotes from licensed electrical contractors to perform the
construction work. MC, through.aur electrical subconsultant C&W Engineering, will assist the Town in
obtaining quotes from the connectors and negotiating final price of the project. MC shall provide the
Town with contract documents for which to secure the contractor's services. The contract documents will
not include detailed specifications (these shall be included on the drawings).
Task 3 — Construction Services
MC, through our electrical subconsultant, will provide the following services during construction:
• Coordination with the contractor.
• Shop drawing review and approval.
Marhewe Canrutting, 1"C. • 1475 Cenrnpark BautewarL Shite 250 • Wev Palm Beach, FL 33401 •561478-7961 • Far 561478.7964
p.I
Sep 1B 03 09:53a Mathews Consulting, Inc. (5G1) 478-7984
MATHEWS --- _
Q CONSULTING '"c.
♦ Field inspections, including substantial and final completion inspections.
♦ Final certification of completion.
CointiensatiUR
The compensation for services provided shall be billed on an hourly basis plus reimbursable expenses for
each subtask of work, up to the following not -to -exceed cost.
Engineering Services
Task 1
Task 2
Task 3
TOTAL PROJECT COST
Estimated Fees
$2,930.00
$ 220.00
$1,240.00
$4,390.00 (Lump Sum)
Assumptions
Work described herein is based on the assumptions listed below. If conditions differ from those assumed
in a manner that will affect the Scope of Work and schedule, MC shall advise Town in writing of the
magnitude of the required adjustments. Change in completion schedule or compensation to MC shall be
negotiated with the Town.
1. Town shall furnish MC available record drawings of the lift station.
2 Town personnel shall assist in field verification of affected Town facilities.
3. The contractor will be required for securing all necessary permits for construction of the project.
We are looking forward to working with the Town on this project.
Sincerely,
MATHEWS CONSULTING, INC.
M -
Rene L. Mathews, Y.E.
President
c: File No. 1058
TOWN OF GULF STREAM
Approved by:
UkA�'--
illiam Thrasher
Town Manager
p.2
Sep 18 03 09:53a Mathews Consulting, Inc. (5611 478-7964 p.3
9�17-2Q03 6:08PI4 FROI-1 C AND R' ENGINEERING 561 662 5333
P 2
00/I7/03
FROM: D. WALKER, C&W GULF STREAM LS GEN FEED DOO 123
MPROJECT TOW OF GULF S?REAM GENERATOR FEEDER TO EXISTINU LIFT STATION
ASE DESIGN AND CONSTRLCTION PHASE SERVICES 1
TO: RENE MATHEWS, P.E.
..... i
DGW CD DRFT SEC
COORDINATION —
MATHEWS CONSULTING I 0
OWNER--�-i-� .._
VENDORS i
MEETINGS
INITIAL MEETING ONSITE 2'—
REVIEWMEETINGS WITH THE OWNER ---"-- 3 - I
I
j ENGINEERING CALCULATIONS 1 -- -
ELECTRICAL SITE PLAN
EXISTING GENERATOR AND POWER DIST. EQ. - ----"
EXISTING LIFT STATION
NEW CONDUIT AND WIRE
NOTES ON ON THE DRAWINGS --'- "'
jPOWER ONELINE DIAGRAM
! 4 4
' EXISTING POWER EQUIPMENT.---
1 NEW BRANCH BREAKER TO FEED THE LIFT STATION
- !
�— I
NEW MANUAL TRANSFER SWITCH
STEP DOWN TRANSFORMER AND CIRCUIT BREAKER
... .._.
COST ESTIMATE
I
i BID SUPPORT
2 _.... _.....
! MAN HOUR TOTALS
MAN HOUR RATES
ENGINEER
j AUTO CAD DRAFTING
5125 5110 —
SECRETARY
I__.....
LABOR COST SUBTOTALS
SS60I $601
LABOR COST TOTAL
1EXPENSES
_
..$100
i
TOTAL ......
NOTES
I NEED BACKGROUND FILES FROM MC
2 DOES NOT INCLUDE PREBID MEETING.I SUGGEST WE INVITE 4 OR 5 ELECTRICAL AND SEND THEM THE BID DOCS.
3 PROPOSAL BASED ON LUMP SUM
Sep 18 03 09:53a
9-J 7-2W3 4: OSPM
09117/03
Mathews Consulting, Inc. (561) 478-7964 p.4
FRaj C AND w ENGINEERING 561 662 5333 P 3
j roo11DINAT1ox
i
MATHEWS CONSULTING
I CONTRACTOR
SHOP DRAWING REVIEW AND APPROVAL
PUNCH LIST INSPECTION
FINAL INSPECTION_._.._
'N1.4N HOUR TOTALS
MAN HOUR RATE
ENGINEER
AUTO CAD DRAFTING
SEORETARY ... -
LABORCOSTSUBTOTALS
LABOR COSTTOTAL
SES
EXP-' _, .....
NOTES
I PROPOSAL BASED ON LUMP SUM
FROM: D. WALKER. C✓PW GULF 5[REAM LS GEN FEF.D.DOO 123
_.. DGW - CD DRF( SGC
I•
aT----•o a
5125 5110
570
�� j ,., 5058801 SO •-- SGO
j SIOOI
SI,041