Loading...
HomeMy Public PortalAboutLift Station Elec. Improvements Agmt 2003Sep 18 03 09:53a MA � r�r Mathews Consulting, Inc HEW 0,1 And F.I.YMP R1.1 I:nrneva September 18, 2003 Mr. William Thrasher TOWN OF GULF STREAM 100 Sea Road Gulf Stream, FL 33483-7427 Dear Mr. Thrasher. (561) 478-7964 Town of Gulf Stream Mathews Consulting, Inc. (MC) is pleased to submit herewith the scope of services and fee proposal for providing Engineering Services for the lift station electrical improvements. The project consists of providing electrical connections to the sanitary lift station located at the corner of the Town Hall parking lot in order to serve the lift station from the Town's emergency generator. SCOPE OF SERVICES Task I —Design MC, through our electrical subconsultant C&W Engineering, shall provide the following services during design of the project: • Coordination of the project between Town, MC and C&W Engineering. ♦ On-site meetings to evaluate existing conditions. • Engineering calculations to determine wire and circuit breaker sizing. ♦ Prepare engineering drawings, including electrical site plan and power one -line diagrams. Provide specifications on the drawings as required for permitting and construction. ♦ Prepare cost estimate of improvements at the 100°/a design stage. Task 2 — Bidding Assistance it is assumed that the Town will solicit quotes from licensed electrical contractors to perform the construction work. MC, through.aur electrical subconsultant C&W Engineering, will assist the Town in obtaining quotes from the connectors and negotiating final price of the project. MC shall provide the Town with contract documents for which to secure the contractor's services. The contract documents will not include detailed specifications (these shall be included on the drawings). Task 3 — Construction Services MC, through our electrical subconsultant, will provide the following services during construction: • Coordination with the contractor. • Shop drawing review and approval. Marhewe Canrutting, 1"C. • 1475 Cenrnpark BautewarL Shite 250 • Wev Palm Beach, FL 33401 •561478-7961 • Far 561478.7964 p.I Sep 1B 03 09:53a Mathews Consulting, Inc. (5G1) 478-7984 MATHEWS --- _ Q CONSULTING '"c. ♦ Field inspections, including substantial and final completion inspections. ♦ Final certification of completion. CointiensatiUR The compensation for services provided shall be billed on an hourly basis plus reimbursable expenses for each subtask of work, up to the following not -to -exceed cost. Engineering Services Task 1 Task 2 Task 3 TOTAL PROJECT COST Estimated Fees $2,930.00 $ 220.00 $1,240.00 $4,390.00 (Lump Sum) Assumptions Work described herein is based on the assumptions listed below. If conditions differ from those assumed in a manner that will affect the Scope of Work and schedule, MC shall advise Town in writing of the magnitude of the required adjustments. Change in completion schedule or compensation to MC shall be negotiated with the Town. 1. Town shall furnish MC available record drawings of the lift station. 2 Town personnel shall assist in field verification of affected Town facilities. 3. The contractor will be required for securing all necessary permits for construction of the project. We are looking forward to working with the Town on this project. Sincerely, MATHEWS CONSULTING, INC. M - Rene L. Mathews, Y.E. President c: File No. 1058 TOWN OF GULF STREAM Approved by: UkA�'-- illiam Thrasher Town Manager p.2 Sep 18 03 09:53a Mathews Consulting, Inc. (5611 478-7964 p.3 9�17-2Q03 6:08PI4 FROI-1 C AND R' ENGINEERING 561 662 5333 P 2 00/I7/03 FROM: D. WALKER, C&W GULF STREAM LS GEN FEED DOO 123 MPROJECT TOW OF GULF S?REAM GENERATOR FEEDER TO EXISTINU LIFT STATION ASE DESIGN AND CONSTRLCTION PHASE SERVICES 1 TO: RENE MATHEWS, P.E. ..... i DGW CD DRFT SEC COORDINATION — MATHEWS CONSULTING I 0 OWNER--�-i-� .._ VENDORS i MEETINGS INITIAL MEETING ONSITE 2'— REVIEWMEETINGS WITH THE OWNER ---"-- 3 - I I j ENGINEERING CALCULATIONS 1 -- - ELECTRICAL SITE PLAN EXISTING GENERATOR AND POWER DIST. EQ. - ----" EXISTING LIFT STATION NEW CONDUIT AND WIRE NOTES ON ON THE DRAWINGS --'- "' jPOWER ONELINE DIAGRAM ! 4 4 ' EXISTING POWER EQUIPMENT.--- 1 NEW BRANCH BREAKER TO FEED THE LIFT STATION - ! �— I NEW MANUAL TRANSFER SWITCH STEP DOWN TRANSFORMER AND CIRCUIT BREAKER ... .._. COST ESTIMATE I i BID SUPPORT 2 _.... _..... ! MAN HOUR TOTALS MAN HOUR RATES ENGINEER j AUTO CAD DRAFTING 5125 5110 — SECRETARY I__..... LABOR COST SUBTOTALS SS60I $601 LABOR COST TOTAL 1EXPENSES _ ..$100 i TOTAL ...... NOTES I NEED BACKGROUND FILES FROM MC 2 DOES NOT INCLUDE PREBID MEETING.I SUGGEST WE INVITE 4 OR 5 ELECTRICAL AND SEND THEM THE BID DOCS. 3 PROPOSAL BASED ON LUMP SUM Sep 18 03 09:53a 9-J 7-2W3 4: OSPM 09117/03 Mathews Consulting, Inc. (561) 478-7964 p.4 FRaj C AND w ENGINEERING 561 662 5333 P 3 j roo11DINAT1ox i MATHEWS CONSULTING I CONTRACTOR SHOP DRAWING REVIEW AND APPROVAL PUNCH LIST INSPECTION FINAL INSPECTION_._.._ 'N1.4N HOUR TOTALS MAN HOUR RATE ENGINEER AUTO CAD DRAFTING SEORETARY ... - LABORCOSTSUBTOTALS LABOR COSTTOTAL SES EXP-' _, ..... NOTES I PROPOSAL BASED ON LUMP SUM FROM: D. WALKER. C✓PW GULF 5[REAM LS GEN FEF.D.DOO 123 _.. DGW - CD DRF( SGC I• aT----•o a 5125 5110 570 �� j ,., 5058801 SO •-- SGO j SIOOI SI,041